Laserfiche WebLink
0 0 <br />RESOLUTION N0. <br />COUNTY ROPE PROJECT NO. 798 <br />BEFORE THE BOARD OF JEFFERSON CO UMI G0101ISSIONERS, STATE OF WASHINGTON. <br />In the matter of Chimacum - ) Resolution to grade, drain and surface <br />Beaver Valley county road ) 1.705 miles of county road no. 123 <br />(Road No. 12) ) Chimauum - Beaver Valley Road <br />IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COMSSIONERS that it is their <br />intention to improve 1.705 miles of the Chimacum - Beaver Valley (County <br />Road No. 12) by grading, draining and surfacing. <br />BE 17 FURTHER RESOLVED THAT for the foregoing proper county road purpose <br />there is hereby appropriated sums in the following detail: <br />Loc. Engr. <br />Right of Way <br />Items of work: <br />Day Labor <br />Contract <br />Constr. Engr. <br />Total <br />Gas Tax Funds <br />2Q„46ti.00 <br />$ 20..6k.00 <br />•• <br />0-124a6 .00 <br />her Total <br />0 000 00 <br />$ 0 000 00 <br />The county road purpose herein described is HEREBY DECLARED to be a public <br />necessity and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED TO <br />report and proceed thereon as by law provided. <br />BE IT FURTHER RESOLVED that this purpose be performed by Contract <br />in accordance with the Standard Road and Bridge Specifications of the <br />State of Washington as adopted by this Board. <br />ADOPTED this 72�-k day of <br />SEAL <br />ATTEST; <br />County Au or and Ex- <br />officio Clerk of the Boar <br />!;Y. <br />Deputy Auditor <br />