Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
New files
Zoom files
01_Staff Report
02_2025-0910_Prior Conditions Status and Analysis Matrix FINAL
03_Referenced Documents
04_2025-0820_Setback Code Interpretation 17-65-040
05A_1995-2011 Road Standards
05B_Road Standards
06_Permit Application - signed_2023-1030
07_Supplemental Permit Application - Land Division_2023-1120
08_Supplemental Application - Certificate of Water Supply_Revised_2024-0325
09_Permit Application - Stormwater Management_2023-1120
10A_Stormwater Calc Worksheet 2
10B_Stormwater Calculation Worksheet_2023-1030
11_Subdivision Application Cover Letter_2023-1120
12A_SEPA Checklist_2024-0320
12B_Modular Construction Impact on EIS_2024-0325
13_List of Other Permits Required_2024-0325
14_Certificate of Water Right (American Campground Well 1972)_2023-1120
15_Partial Relinquishment WR#G2-20465C
16_Water Right G2-21134C
17_Water Right G2-23623C
18_Water Right Permit G2-27964P
19_Water Right G2-27964_Amended
20_Superseding Water Right Permit - G2-30436 (2007)_2023-1120
21_Superseding Water Right Permit - S2-30437 (2007)_2023-1120
22_Wastewater System Plan
23_DOE Sewer System Plan Approval Letter
24_Water System Plan_2025-0627
25_Water System Tech Memo
26_Drainage Report_2024-0620
27_CSWPPP_2023-0630
28_Wildlife Management Plan Rev 4_2025-0618
29_Wetland Verification Report_2024-1018
30_Wetland C Buffer Averaging Memo
31A_Geotech Response Letter_2024-1015
31B_Geotech Engineer Of Record Letter_2023-0407
31C_2008-2013 Geotech Report
31D_DRAFT Limited Geotech - Infiltration Feasibility Evaluation
31E_Retaining Wall Geotech Letter
31F_Coastal Bluff Setback and Buffer Clarification
32A_Roadway Width Memo_2024-1002
32B_Roadway Width Response 2025-0829
33_Plat Drawings Rev 2025-0828
34_Prelim Civil Plans_06.20.25 SIGNED
35_Site Lighting Plan _2024-0314
36_Lanscape Plan_2024-0325
37_Project Narrative_Revised 2024-0325
38_DRAFT Declaration of Covenants, Conditions and Restrictions_2024-0325
39_DRAFT Design Review Guidelines_2024-0325
40_Phasing Response_2024-0325
41_Vegetation Management Plan Narrative_2024-0325
42_Cultural Resources Management Plan - Preliminary Plat Response_2024-0325
43_Fire System Flow Rate Response_2024-0325
44_Conservation Easement Rec No 664860
45_Tunicate Monitoring Schedule_2
46_Construction Order Narrative_2023-1120
47_Draft Wetland Conservation Easement
48_Completeness Review Extension
49_2023-1211_PHMPR Notice of Incomplete Application
50_Completeness Resubmittal Extension
51_2024-0416_PHMPR Complete Application
52_NOA
53_NORA
55_Pre-App Comments
56_Revision Cover Letter_2024-0325
57_2024-0703_Technical Review 1
58_Civil Technical Review 1
59_2024-0816_Technical Review 1_Revised with Planning and Civil
60_Response Letter_2025-0131
61_Project Hold for Scope & Fee Negotiation
62_PHMPR Clock Toll Email
63_Resubmittal Cover Letter 2025-0623
64_PPlat Update Memo 2025-0901
65A_2023-0906 Aramburu
65B_2024-0202 Aramburu
65C_2024-0207 Best (HCEC)
65D_2025-0515 Crowell
65E_2024-0518 Iles-Shih
65F_2024-0518 Hendricks
65G_2024-0521 Aramburu
65H_2024-0822 Aramburu
65I_2025-0122 Aramburu
65J_2025-0906 Germaine
65K_2025-0912 Dufresne
65L_2025-0912 Ger
65M_2025-0912 Carson
65N_2025-0914 Cochrane
65O_2025-0915 Black Point Advocates
65P_2025-0915 Schanfield (North Olympic Group of Sierra Club)
65Q_2025-0915 Iles-Shih
65R_2025-0916 Burden
65S_2025-0916 Straight
65T_2025-0916 Stroh-Stern
65U_2025-0916 Leet
65V_2025-0916 Hendricks
65W_2025-0916 Aramburu (The Brinnon Group)
65X_2025-0927 Carson
66A_2024-0508_Scagliotti (JST Extension Request)
66B_2024-0510 Rossi
66C_2024-0520 Rossi (PNPTC)
66D_2024-0521 Powers (PGST)
66E_2024-0521 Scagliotti (JST)
66F_PNPTC Letter 2024-0815
66G_Scagliotti (JST)_2025-0903
66H_2025-0912_Taylor (JST)
66I_PNPTC 2025-1009
67A_2024-0515 WSDOT (Larson)
67B_Mason PUD
67C_DOE - Sewer System Plan
67D_DOE - Water Rights
67E_2025-0110 WSDOT (Larson)
67F_JCSO
67G_Brinnon Fire Department
67H_Brinnon School District
67I_WDFW - Elk Collars
67J_Mason Co PUD Power Supply Letter_2025-0826
68_CORRECTED Response to Aramburu Letter Dated 2024-0202_2024-0416
69_2024-1113_BoCC response to PNPTC Tribes Aug 15 2024 Letter - FINAL
70_JeffCo Response to JST Letter
71_Applicant Response to JST Letter
72_Fire Marshal Emergency Services Response to Public Comments
73_Applicant Response to PNPTC Oct 9 2025 Letter
74_2025-1010_FINAL Addendum to Staff Report
75_Aramburu (The Brinnon Group) PHMPR Comment to HX 20251014
75A_Brinnon Group PHMPR Comment 20251014 Att. A
75B_Brinnon Group PHMPR Comment 20251014 Att. B
76_2025-1015_Staff Presentation
77_2025-1014 Applicant Response to Staff Report
78_Marla Powers_2025-10-14 PGST Pleasant Harbor Prelim Comments
79_Allie Taylor_JeffersonDCD_PleasantHarborMPRSUB2023-00025_FINALLetter_10142025
80_Melissa Chittenden email 101525 11:18am
81_Melissa Chittenden email 101525 12:09pm
82_2025-10-15 PGST Pleasant Harbor Addendum w attachment
83_Miriam Murdoch – email 101525 re MPR Brinnon
84_2025-10-14 PGST Pleasant Harbor Prelim Comments
85_Shellie Yarnell 101525 re: letter from Suzy Ames
86_Patty Schmucker 101525 - comment on PHMPR
87_Nikki Aikman re: FW FPA 2618496 Landowner – Tribal meeting required
88_FW Jan Wold’s public comments for the pleasant harbor MPR hearing 101525
89_Atty Aramburu email 101525 at 4:18pm
90_APPLICANT SUB2023-00025 Applicant Response to Open Record Comments (002)
91_JC FINAL Jefferson County Response to PHMPR Hearing Testimony and Comments
EXHIBIT LOG 102825
EXHIBIT LOG_2025-1010