HomeMy WebLinkAboutBLD2003-00662 Geotechnical Report Dec-07-01 08:41A
P'.O:
, GeoResources
Pb. 253-222-0901 5113 Pacific Hwy. E.,Ste. 1-P
Fs. 253-638-8992 Fife,Washington 98424-2648
April 25,2001
Olympic Property Group
70 Breaker Lane
Port Ludlow,WA 98385
Attention: Mr.Jon Rose and
Mr. Ray Welch
Summary Letter
Geotechriicai Engineering Services
Timberton Village IIi—Jefferson County
Jefferson County,Washington
Job No.OlyProp.22
This letter summarizes our observations, data review and conclusions for earthwork activities
associated with the Timberton Village Phase III residential development. GeoResources and
ADaPT Engineering, Inc.visited the site on an intermittent basis during earthwork activities,
discussed earthwork activities with Seton Construction personnel and Mr. Ray Welch of Olympic
Property Management, and reviewed the General Testing Field Reports(construction monitoring
records,July 25 through September 25,2000). In-place density tests were not performed on the fill
c material because of the percentage of plus 3-inch material(as prescribed in ASTM)_
Based on our site observations during the project earthwork activities,review of the field
documentation provided by General Testing and our discussions with site personnel,it is our
opinion that the fill material placed In the roadways, utility trench baddtll and lot areas was placed in
general accordance with the GeoEngineer's 1997 geotechnical report for the site and the project
plans and specifications. Localized field changes in grading were made during the advance of the
project. We were included in the proposed changes and provided input regarding the earthwork
activities related to these changes. The subsequent earthwork activities were completed in
accordance with our
Based on our site observations,data review and discussions with site personnel,it Is our
opinion that the project was completed in accordance with the geotechnical standards of practice in
the Puget Sound area and in general accordance with the project plans and specifications.
Changes in grades and earthwork activities were done to benefit the final project and the
subsequent owners and in accordance with our geotechnical recommendations.
♦ ♦ ♦
1
6 4` Y ,' ,
)\\-- cT 21 :303 ,,,,,,J, PERM
\ _,' ----------,;-; ,,, \ 0 .5 - °
RSo� cpuNly Q
SEFFE
' Dec-07-01 O8:41A
F) .0:
ORM-Timberlon Ill
April 25, 2001
We hope this satisfies your current needs If you have questions or need additional
, -
I, information, please contact us.
Respectfully submitted,
GeoResources ADaPT Engineering, Inc.
(/44":--r- 4.4) /--,----- c--I
/ $4reCP. 6;;..a '14411- Kurt Groesch, PE
/
Princi.,/ Principal
VI. Gli
til•
,..)fi.. f WASIi4vs.
A4' ? CCI
in -.; • % tr,,,,, ,
, , ....•..„,-...-:,
,--
.. •P
''',-r.ttctr-r• , N. -,-::-:;7:1.:
1:v.P17-ii,,.';C•1•/ey a
•
:,- -1 ,
DodD:OlyProp.22SL
Attachments
Two Copies Submitted
,,....k.A:,... -- .
. ..., . .
fi----:-N---7.7,-7:-7-,-----.-------- --,..--,--7,-,:---,
I
0-)) i'..._',. i' D ;.,'• 1:1 \'''I i:-- H\II,:,:),'1
: : I
L] 1; OCT 2 1 23 ' ' ) 1
Lr_f:'T CIF.'"::'P'ii,;!" ir', ':-':.•? :,,,, ,,, :
iliglitIl # %It
0 3 ° 6
SIIIIIIS" t°11411\1 11°