HomeMy WebLinkAboutBLD2003-00663 Ilk
nAL03-il UILDING PERMIT APPLICAgAN MR Review Typ583
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD03-00663 Received Date: 10/21/2003
SITE ADDRESS: \'2) TIMBER HEIGHTS DR
OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360) 437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: TIMBERTON VILLAGE PHASE III Block: Lot: 69
PARCEL NUMBER: 998500069 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License PORTLAL994L8 Expires 5/2/2004
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOI NEW SFR W/ATTACHED GARAGE AND DECK(S)
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,585
VALUATION 167,861.00 ADD'L: 725 HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE: PRO
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5-1 HR GARAGE: 615 SHORELINE:
CONST TYPE: DECK: 109 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 3 Prop: 3 Seismic Streams
Total: 3 Total: 3 Flood Way Floodplain
Routing Date: I Landslide
291//Q3 F&W
Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: /� ®�/¢
Permit $1,374.55 KAS 10/21/03 60198 /`� r �,J I
State Building Code $4.50 KAS 10/21/03 60198 DEC 1 a 2003
Potable Water Application $51.00 KAS 10/21/03 60198
Total: $1,430.05 Jefferson County Plannis
&Building Department
C cUlAD, 'Jm o L--K
-tnnor- (10 Se.e .t
--41 -- . PF4
- _So: _ i. ',f?.,.c711,21•51.____rai...kri, - --- - _
-
.. a - 11T ' 4---)-4 -e,-; SITE PLAN
NOV - 3- 2003
i , -
-1 sg-P •I .
1 1 v 12 - ___., _ 1 . :4 - RSON *4,1. / . ''._Z.__,.";'-'1 ', 1-CO-1 .•_
---a- rtze *
14;e'
PITA- --------41 . ‘
ip*-4 N A-N,..A_ . 1 1
••
-' ' 111111M.Pi IIK 7z 3j0 OS ip7
z .s
ft,e4,2,1
-\\ p, 604,
, - ir"`
vo,
,
•-1.
ATP
- 00 -
1":2. i .,,c7'. _ , 1 4i ,t,ii,„
ril" 1 cpr .f.-) . s. s ____ALL6A-44 --- ,
\ , .
' ils I
-to
.,;...„. ,
. 4
, ,. c....,
1 0 '
A - 4 12...
N
N -/..
4: -----1-24iteti . /-_-;v- -
/ , .„,„ \' '''_____ ,_\, \_',.1.,:i___:.,F,_::_„.„._
-,
/ I
1 /
F-)9171 2 -1 .---14L.-4 4-21-rt,, Ft ..4 Nil 21:364kit, ilt . 2/ 51-1.
1,471- 4 V1 --r1 t"15 ,77-0'N.-- \111-L444-W-4, -?1•7" ,' 142ajo
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD03-00663 Received Date 10/21/2003
SITE ADDRESS: 132 TIMBER HEIGHTS DR Issue Date 12/10/2003
PORT LUDLOW, 98365
APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: TIMBERTON VILLAGE PHASE III Block: Lot: 69
PARCEL NUMBER: 998500069 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License: PORTLAL994L8 Expires: 05/02/2004
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE AND DECK(S)
REQUIRED INSPECTIONS:
[ ] SETBACKS: OK /L /03
[ ] UFFER: , K /z//7 a3 j
[ ] Footing: 'K /2//7/3
[ ] Foundation:a� /.30 ege#
[ ] Underground Plumbing:
[ ] Underground Insulation:
[ ] Shear Wall : 1PK 3//7/o4/
[ ] Framing: 0,4)/C601,6o-nS /1/0
f 1 Plumbing: OK 4/17G1`(971
[ ] Propane Tank/ Lines /,lire,.� ;°i�INE Z/Au; D,e 47 �o
[ ] Insulation: O oselif.16nS /15/O't
1 1 Sheetroc ZSY _
[ ] Septic S em Final Approval:
r 1/ Zoning Final Approval:
[ Final/Occupancy Approval: „.shin 7,//z r,
HEALTH D'EPAR MENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY-SEE REVERSE
• I
SPECIAL CONDITIONS FOR CASE t BLD03-00663
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on November 3, 2003 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Great Blue Heron; LSHA 1.
2.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type,
geologic material, and groundwater that may combine to create problems with slope
stability, erosion, and water quality during and after construction or during natural events
such as earthquakes or severe rainstorms.
3.) The applicant is proposing to create or add 2892 square feet of impervious surface and
6602 square feet of land disturbing activities.
4.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by
the Department of Community Development. Once the subject permit has been issued
the applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
5.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
6.) The site plan as submitted with the single family residene with attached garage and decks
building permit application on October 21, 2003 has been reviewed for consistency under
the UDC, and has been approved by Jefferson County Department of Community
Development. Any modifications, changes, and/or additions to the stamped, approved
site plan dated November 3, 2003 shall be resubmitted for review and approval by
Jefferson County Department of Community Development.
7.) This approval is for a single family residene with attached garage and decks only. Any
future permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
8.) The parcel was created through the Timberton Village Phase III Subdivision on August 29,
2001 under AFN 447260.
9.) The parcel is designated as MPR SF4:1 under the 1998 Comprehensive Land Use Map
effective August 28, 1998.
10.) The lot has direct access off of Timber Heights Drive which is a county local access road
(C516909). An address of 132 has been assigned to the parcel.
11.) A road approach permit(RAP03-0243)will be issued with the building permit.
12.) No conflict per WDFW.
13.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
14.) The building height is not to exceed 35 feet.
15.) Minimum setback from Timber Heights Drive right-of-way shall be 20 feet. Minimum east
setback shall be 16 feet. Minimum south (rear) and west setbacks shall be 5 feet.
16.) A Geotechnical Report dated January 15, 1997 was prepared for subdivision of Timberton
Village Phase Ill. A summary letter dated April 25, 2001 prepared by GeoResources was
submitted inconjunction with this application. The report stated that the development of
the plat pertaining to roads, earthwork activities and fill were completed in accordance with
the geotechnical report standards of practice and with project plans and specifications. A
geotechnical report was not required for this proposal.
17.) The proposal shall be constructed in conformance with the"Notice to Purchasers" as
identified on the face of the recorded subdivision.
I:\F_BLD_Permit_Bu ild ng.rpt 10/29/1999
APPROVED.
STORMWATER PLAN
NOV — 32003
JEFFERSON COUNTY
STORMWATER MANAGEMENT JEFFERSON OUT,
SMALL PARCEL EROSION AND SEDIMENT CON ROP,EfTL o� of v: OP T
EROSION AND SEDIMENT CONTROL WORK�T
Property owner: Port Ludlow Associates Telephone: 437-2101
Address: 70 Breaker Lane, Port Ludlow, WA 98365
Assessor's Parcel Number: 978 5-co -o(o g
Building Permit or Septic Permit Application Number(if applicable): tJ'A
Brief Project Description: New Single Family Residence W/ attached garage,
Site Location: T rnbe. N-e<'ShtS d";ve- L4.dr04., 9 E- 3Cpc
Person Responsible for BMP Installation and Maintenance: Jeff Eva n g e r
Address: Same as ahnve
Telephone:Same as above
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads. Please check the measures you plan to implement and show their approximate location on
the site plan. You may also propose measures other than those listed. Attach additional sheets,if
more space is required.
[) Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stomiwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[] Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas,landslide or erosion hazard area,etc.). _
PERM11
SPESC Instructions—Short Form i
Revised July 17,200222�Q3
pt
0 3 - 36
R ON COUNTY DCD '� }=rY
JEHE S �__:.
t
F
EROSION AND SEDIMENT CONTROL WORKSHEET
[] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1
and September 30. Stabilization means that disturbed areas will have well-established
plant cover or be landscaped to minimize erosion.
[ Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ J Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads,driveways,and parking areas after clearing and subgrade
preparation.
[ Protect adjacent properties and water bodies from sediment deposition:
[] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies.(See attached illustrations from Stormwater Management Manual.)
[ 1 Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
[X Regularly inspect and maintain all BMPs especially after storms events.
[) Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy soils . So I believe the above
measures will be sufficient,
PERMIT # Utu 1 � E
SPESC Instructions—Short Form O 3 ,.
'
Revised July 17,2002 ? L`�:3 _.r
rrrr
. SON COUNTY UCH
k
r" •
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized(seeded, landscaped,apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural
type vegetation and lawn to property line
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.).
t
All impervious surfaces will he run to roof drains and
catch basins as designed into the plat requirements.
PERMIT # - T ,„,
0 3 - 6 ,, IG
SPESC Instructions—Short Form T003 I
Revised July 17,2002 JEFFERSON COUNTY DCD
5
a
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices.Describe proposed maintenance of BMPs.
After excavation the soil riles will be covered and silt
fence will be installed, Silt fence will be left in
place until we are ready to landscape and all roof drains/
catch basins are in , Landscaping will be installed as
early as possible on the exterior of the building when
all exterior concrete work is completed,(
The Best . :_:dent Practices proposed above will be implemented to control erosion, sediment, and
storm • Liji1L.
oftify the Jefferson County for inspections as/re quired.
A
Signa :of Owner/Agent / Date
PERMIT # NO
j, , � 17
i;;� I i;1
OCT 21 2003 1'`',/
J
;y
SPESC Instructions—Short Form ^ `'
Revised July 17,2002
6
412003 08:10 FAX 3604372521D , PORT LUDLOW ASSOCIATES ,C PERMIT CENTER l 002
affergon County Devartme t or cemmingty DeseloPmelit
;,Ty ... R ,ti,,, . , 821 Sheridan Street,Port Town.,E nd WA 80868 L860i 078-4460
''':,', ,. ..".4"1 ,441i , ''` tt.o. r Yin
. ,: ), ot (A1,5011 * n o
i-)U 0 CacT o ora
,,,,,t.. .,
` ) N.
O, ,,e ? T;rnber l•Icr3itt5 d "7'ACs9`
Project Description: - f ,5fcct p fe2 S-. Z
Building Type ,',- O -> -
Slagle parniF t Project Type: ?sane Type;
Y in l N� _ :-. ��
$ /; rC New X.Wood
x Garage Attached/De....: J \// Cs Addition Steel
Modular O4 .t�ltcr txon/Ttcmodd
Concrete
•
Commercial Repair Masonry
Multi-family/4 of Unitas Demolition Other:
Indushial
Other _
Bathrooms: Bedtoom>a: Type of Sewage Disposal: 'Type of Heat
Choose one;
Existing • &dating: 0 -4 Sewer Community System Electricity Oil
Proposed i Proposed: 3 Individual.System Woadstove propane
Total: 3 "loot 3 ,—
>f not sewer,On out the following: k Heat Pump
Conwmionttl Altesaative Other fang d•J'teppk4.6C..
Petruit## SEP
Water 5oppir
Private wall Two Marty Well x Pulsar;Name of water system: Duerr
�y I ,y
Square Footage: .J;^i1: ' n"r i '.racy ,, 1„[f_ 11 xlt7'd hy;;,;t%...•l' '
//''�� � E 1•'Vv n 11r1.1 J. I Y t ten"U'IC Y'nN!'n r!'''1 ,,�{t�/ 1 1• •
I V 3 4tO� S N�I'^v.sigirit•inch'i1VanZu:41°"11'6'ihi/JviI i' i a at, ' 1ti.I -
`p "�wy�l�.�yytv�,7]�u¢¢eW,°'�un nu JJI levrwuyy' p+o lu{ tP'. :^•6S .a.
f58S ..1. is o�N9 I b.iC ..,.r MrrdWl.? unsi.0,M q
Main Floor tr �;'�.:'.
stater Y-II aln fh v OS i n i ,
—y (� �^�7Q' j''� �,,���r ..•�' r �[ '�ppq yy11 " , ,n�S�'..w��.C.p �,i;.r'rF IL:., t
2ND Floor 7z-S 11 3'+/1 C 7 r 0° �T 16 e,19,!�r� u Ltl', �� 1 i p 8 '11oun E In'"we ! Xi.,}hi':IlitFe'Ijl/1;,V 1
r ArCfj iwli wl s[ n w u, s i
IINJE il$�5 1 E l riNu 9 S ly,liti1 ^R4.114, re A I .i1•0 d�' / t. 'w ' . .
:ro s'a. ,. y j,8 1 a 3 Ilul 6.1,, ,...., v_J13�'J dal '' y
3rd Floor I f 1 -uin'rc�Wllw"'I'5 rn ui 1A''' I 1,' •":.S 'tn smuu a v' '.r,ml: Ii2° I",'� �r.. .r•r'v-n ,EI••. ('•Y�rtl Basernesst .,,,s44`"'illm •PrOill� g(q y av„,�,,,, .'e.1,:,'1'7,,4"�, % ,b1TMT,,11i', 'I I 1 I'M1 ..i.n'.'v'. .n'", u'fin•tS
Unhtd Basement r ' �j 4a4 tot .' I
v • 0�
Garage/Carprsrt �01 1 1 4 61 5J• • S 5 t rt W.Ate ,tkih.Vag, — �? ,
Y 5'•tr i,n t3o' ' 4 r
l Commercial ,-`S h,!° .', ,i��i 1a 1. n'Y1 1'N t: C ' O5
I [_Sl d��� �y��,• 5"'e::"✓''lia:'�lia I �' � ,'`t �1'. `
iia�iis�in:�J;'�r',bEa�";'.�;ilai�lSE'Si P•IS`'N1 �w 1.w ..'%i i '"'�I Q uen��n 'ilt+aun r .�'a.'t}I R' gtfM �'-'^'" ,�. V inausti �l _ 1`o c �_ °;° r` �n��JeN; r:�n,::,�'. ,.{:;4' `
t I �rc�'.,.r.% I. 3, —7 ci
Other Ili ����1�t�6".InaE*e .��fa:rn'Sv' E•' • .Ti'..
• 1: '.rl'.rry I`y
Tonal.Valuatioxv /1I01�b ,1,,"11,.. j1..1 .it..0,4 /.,v'Y r., .••'
E 1 r pa} t al'4;.'v. r' .
anNdthro0111P giii h111� 1l�' un.nai.4i.x.iai ' JL4 1
g�{vu r i Iyow amm • nurl aura a as % 'I /� ••
QX i(sAaa n� ggg �Y . 51 1 L�aa.a'41l" tit 1 °'...e •r..6uw .
au � s,7}4+p!Y�y�i �� a 1 i lnMIWItlN111r�U. I•.v,la..�l .��' f• I
�l' Gn ES3PaIW � k �'YY.31/:&„.vv9M:E°44�yIqI��J/'1; 1pp'Y°.4IA18E"�,„ „,e::el: ,,
as rrnWLl MIO n' IW fW Inc.,n.ii.WfnY'Iel ( n5E1.ZAr5S 1 ri 5 3F{
Estimated Cost 'EII'1451� 1.1"IEu�mma.uf r. n1''IItt powrormlul�s.�ni E sY;000:°Fv�r.u•".r•n�"v1C},
•}mE:nrmly add Yn•fortii p' t��N7' �i1Wa:IC•ItRI�fig;! pl' �,�d1Wllli Ji$alhrraanuw inlwn Ip•�iN-.u.Ir.1!
If vwlthin 200' of the Shoreline,
Distance to Barak or Ordinary High Water Mark ft.Bunk Height ft'77711 ng the applioadon roam.The applicant/owner melee dies. e .renae en provided herein ip uua v e to le at crrecs the hod of their knowledge. Any material Fu aterileenoadr or any
omission of a material filet Zulu by the applicant/owner with ravpaer to this application packet inky remit in this permit being null and void'
I further agree ro ave.Indemnify and hold harmless Jefferson County agpinst 9ii ilabilitiellt lodgments,court costs,rea.•wnahltt attnmey's fees and expetsllr s which may in arty way acasut
against Jefferson County as a result of or in consequence at the grandng of this permit.
1 Fo thcr agree to provide WOOF and dghrofentty to Jeffetion County and it's employees,represents.tivir magenta rut the purpose of apotteation review and any requited laterinspecciona.
Aceeas and right of et any to the applicant's property or structure shall be repeated and shall occur door's,regular business hours.
Signature: _ Date:
OVER
. RHOME\PI.NCN'`l'R\INFOBLDG\POI MS\BLDpermihApplication 11-8-01
Z0 3E10d QOQ 0O .9d3f 1917126LE09E 917:80 EgO ibI/ I
. Jefferson Countpartment of Community Development
' 621 Sheridan Street,Port Townsend WA 08368 13601 370-4450
/ \e/rr .\
„..
44 . . ,,,,,,
�� \ Dermoci. A ° °..„ , „.., ,
O
N • -T ;rnt�Q� ltctShtS d� qs--Soo ocoel
Project Description `�• ,vS,,,,c? y,a Scat piq,ct S1.Z
Building Type: �' \)i_ �� / C�\,c>' Project Type: Frame Type:
Single Family �'}�.. � ,/'� ',';' ?c New �CWood
n Garage Attached/Detac kS"c? Addition
C. Steel
Modular c., Alteration/Remodel Concrete
•
Commercial Repair Masonry
Multi-family/#of Units < Other:
Y/ Demolition
Industrial
Other:
Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: O Existing: 0 X Sewer Community System Electricity Oil
Proposed: 3 Proposed: 3 Individual System Woodstove Propane
Total: 3 Total: 3 P
If not sewer,fill out the following: X Heat Pump
Conventional Alternative Other prri pit.e 6i r pk iC- _
Permit# SEP
Water Supply:
Private well Two Party Well X Public:Name of water system: Cp W5.
Square• Footage: For Office Use Only
Main Floor /585 xCostency Review
2ND Floor 7z5 Base fee
3rd Floor ,Plan Check fee 'p1Ctr1 S!a.
Htd Basement State Surcharge fee
Unhtd Basement Subtotal
Garage/Carport (ol'S Pot Water Review fee
Decks /09 Rd Approach
Commercial TOTAL
Industrial ,b iit# ,
Other Cash/Check#
Total Valuation: /ga d'Z)
litrals
Or
.ate
Estimated Cost:
If within 200' of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft. Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide acces . of-ntry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access and right of entry to . c. is.rop- ty or structure shall be requested and shall occur during regular business hours.
Signature: Date: ( 2 d,
OVER ►
El:I TOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01