Summary Letter
Geotechnicai Engineering Services
Timberton Wage III—Jefferson County
Jefferson County,Washington
Job No.OlyPnop.22
This letter summarizes our observations, data review and conclusions for earthwork activities
associated with the Timberton Village Phase III residence development. GeoResources and
ADaPT Engineering, Inc.visited the site on an intermittent basis during earthwork activities,
discussed earthwork activities with Seton Construction personnel and Mr. Ray Welch of Olympic
Property Management and reviewed the General Testing Field Reports(construction monitoring
records, July 25 through September 25,2000). In-place density tests were not performed on the fill
material because of the percentage of plus 3/4-inch material(as prescribed in ASTM).
Based on our site observations during the project earthwork activities, review of the field
documentation provided by General Testing and our discussions with site personnel,it is our
opinion that the fill material placed in the roadways, utility trench bac kfil and lot areas was placed in
general accordance with the GeoEngineer's 1997 geotechnical report for the site and the project
plans and specifications. Localized field changes in grading were made during the advance of the
project. We were included in the proposed changes and provided input regarding the earthwork
activities related to these changes. The subsequent earthwork activities were completed in
accordance with our recommendations.
Based on our site observations,data review and discussions with site personnel, it is our
opinion that the project was completed in accordance with the geotechnical standards of practice in
the Puget Sound area and in general accordance with the project plans and specifications.
Changes in grades and earthwork activities were done to benefit the final project and the
subsequent owners and in accordance with our geotechnical recommendations.
♦ ♦ ♦ —
PE RMIT # BLB • OCT 2 1 2003 _.
0 3 -
KtrPcnN COUNT' 1,1!fm
Dec-07-01 08:41A
. ..•
P .02•.
ORM-Timberton Ill
• April 25,2001
We hope this satisfies your current needs. If you have questions or need additional
information, please contact us.
Respectfully submitted,
GeoResources ADaPT Engineering, Inc.
/iad P. ;.e41(0/ Kurt Groesch, PE
Princi." Principal
'1?0
ak"
t1/43,
lir
v.,
18.45g- A.•.4,41 -
vb'" 44i3P
1:Y.Prei,' C• 7/et
• ,
•
Dod0:01yProp.22SL
Attachments
Two Copies Submitted
etrital I 4f DLO
0 3 - 6 s
JEFFERSON uuii ot,;0
- 1,1
111
OCT 2 1 2003
; •-•; •-•,A,kr,Ni ElEvELOPMENT