HomeMy WebLinkAboutBLD2003-00730 41110B
UILDING PERMIT APPLION MLA03-00626
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD03-00730 Received Date: 11/20/2003
SITE ADDRESS: DRIFTWOOD CT
PORT LUDLOW, 98365
OWNER: PORT LUDLOW ASSOCIATES LLC PHONE:
70 BREAKER LN
PORT LUDLOW WA 983659766
SUBDIVISION: LUDLOW POINT VILLAGE DIV 4 Block: Lot: 1
PARCEL NUMBER: 969800001 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License PORTLAL994L8 Expires 5/2/2004
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NEW SFR W/ATTACHED GARAGE & DECK(S)
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,818
VALUATION 183,811.00 ADD'L: 719 HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE: PRO
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 497 SHORELINE:
CONST TYPE: DECK: 275 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 3 Prop: 2 Seismic Streams
Total: 3 Total: 2 Flood Way Floodplain
Routing Date: j > F&W Landslide
C �jol, Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $1,464.15 KAS 11/20/03 60385 APPROVED
State Building Code $4.50 KAS 11/20/03 60385
Potable Water Application $51.00 KAS 11/20/03 60385 DEC 1 7 2003
Total: $1,519.65 Jefferson County Planning
& Building Department
/(1 4'
10/6).1t i 4 ell/(6
S(a/
-----..........I.IIMIMIIIIIMIMMIMIMIMIIIIIIN
w/2005 17:29 FAX 3604372522 PORT LUDLOW ASSOCIATES -› JC PERMIT CENTER Q002
, ...___.
II . . .
BUD...DING PERMIT •
Jefferson County Department of Comm!inity.Development
621 Sheridan S tre...,et, Port Townsend, WA 98368
(360)379--4450 FAX (360)379-4451
' °ERMIT IP SW03-00730 Received Date 11/20/2003
:3ITE ADDRESS:
_ ,. 11 DRIFTWOOD CT
issue Date 12/17/2003
PORT LUDLOW, 98385
APPLICANT: PORT LUDLOW ASSOCIATE'S LLC
PHONE:
‘ .
70 BREAKER LN
PORT LUDLOW WA 933059766
SUBDIVISION: ---- LUDLOW POINT VILLAGE DV ,':
Block: Lol: 1
PARCEL NUMBER: 96.9k3f)0001--- Section: '17 =:-.,.."1-ov.rn :!'iii): 28 /N . Range: 01
__,,.
- --
C'•ONTRACTOR: PC..)R LUDLOW ASSOCIATES LLC
PHONE: I380437-2101
70 BREAKER'LN
1 PORT LUDLOW WA 98365
Contractor's License: PORTLAL,994L8 Expires: 05/02/2004
________________________________7____________
LOAN/LENDER/
3(7,..NNID, HOE DER:
/
___________________
• ______________________.
PROJECT DESCRIPTION: NEW SFR VVIATTACHED GARAGE&DECK(S)
[ ] SETBACK :
,--
[ ] UFFER:
[ ] Founda n: e),C4447 d',7
[j Underpround PtumbingL -
-------------
f .1
Underground Insulation:
I ] Shear Wall: d k s s 441 4 ---------------------÷---------------------_____ -------
-.--_______ _
/
[ ] Framing Ili
44
,7 1 Plumb in i
i 1 - Propa2.8 Tank LLi
[ ] Insulation. , A 11 v... • '
r 1 Streeti-oc
[ 1 Septic Syt Final Approval:
t 1 Zoning Final Approval:_
I ] Final/Occupancy Approv .
0— -
' I HEALTH DE' A MENT AP ROVAL REQUIRED PRIOR TO FINAL INSPECTION .
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
. Office-Hours 9:00 a.m. -4:30 p.m.
. ,
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY-SEE REVERSE
I e
SPECIAL CONDITIONS FOR CASE t BLD03-00730
1.) The application was reviewed by the Jefferson County Department of Community
Development for the presence of Environmentally Sensitive Areas (ESAs). The
Department conducted a review and has concluded that the property DOES NOT contain
Environmentally Sensitive Areas. However, future proposals will be subject to a new ESA
review and conditions may be added if new ESAs are found on the property.
2.) The applicant is proposing to create or add 2,815 square feet of impervious surface and
5,715 square feet of land disturbing activities.
3.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by
the Department of Community Development. Once the subject permit has been issued
the applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
4.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
5.) The site plan as submitted with the single family building
20, 2003 has been reviewed for consistency under the UDC, and has been approved
permit application on November
Jefferson County Department of Community Development. Any modifications, changes,
and/or additions to the stamped, approved by
resubmitted for review and a site plan dated December 1, 2003 shall be
Development. approval by Jefferson County Department of Community
6.) This approval is for a single family residence with attached garage and decks only. Any
future permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
7.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
8.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC)Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
9.) Maximum lot coverage is not to exceed 45%.
Lot coverage is
impervious surface which includes roof tops, driveways, concrete,fned etc. as amount of
10.) The building height is not to exceed 35 feet.
11.) Minimum setback from Driftwood Court and Camber Drive rights-of-ways shall be 20 feet.
Minimum rear(west)setback shall be 5 feet.
12.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
13.) The lot has been designated as MPR SF4:1 under the Jefferson County Comprehensive
Land Use Map effective August 28, 1998.
14.) The lot was created through the Ludlow Point Village Division 4 subdivision on February
22, 1994 under AFN 368980. permit.
15.) A road approach permit (RAP03-0255)will be issued with the building
16.) Per MPR Code Section 3.107, Accessory dwelling units (ADU's)shall not be allowed in
the MPR-SF zone.
17.) The lot is subject to Port Ludlow sewer and water.
at
18.) An address of 11 Driftwood':;ourt has been
county local access road (C515309). Camber Court, aocounthe y local ot. faccess road twood Court is a
(C514409) runs parallel with the southern property boundary.
I:\F_BLD_Permit_Buildng.rpt
10/29/19
7. : c•-)ctI 1 14c1 v-i. i,E-1-4
I 0
- / f, ---
\ (
7 ,
' Ast(27°$,IG2-7d \
1.1! /
111
-_ :- / I ------- -- -__ _
.,—<----
I ic.E. ,041,i.I i
, i C_
• 2 I ,,c 5 7
- _311
- -NOV -I
• 2 0 2003 s 3LP,1,
1 ,
. ' f
01 •
_ * . I
I__.. . Aii mov, I , - 24
, .p, : ; , •,-:‘ -_. .i% --
• --- APPRO E I -,-* -12-•,- , . __ I
SITE P AN-.
. w.
; at
, pp
DEC - 1 20-0i- i
1 1 I A
--, k I ..i J
"U"• t • ••
SZILITR2E:t'i il iiit ,D3k ... 2 .) . A--_
tam-
.1,10,00 (9 it„ -3
- 4.. ii I
F)
ICItrirr. 14. w.
141-,-.4.1 - . , ,411111111.11111r F =, 9/51p 1
04c „-rioNt -p-1\11
- . . • i-z r.3-21.•P _ —1.4Ls ft, 1244.1-L. PP$M11411 l 'Fi-d ,"1
'Lir \h(-._,..1.... ,bic:6.1s; t...• el, - Leif' I
APPROVED 111 •
STORM WATER PLAN
1 µ`E
! of
Y i
7—ti DEC - 1 2003
F.
i ,\ NOV 2 0 2003
IEFFE N LINTY JEFFERSON COUNTY j
DEPT OF i 01 VELOPME STORMWATER MANAGEMENT
Sicl�llr ( *� Ej,P�RCEL EROSION AND SEDIMENT CONTROL PLAN
RO'ION AND SEDIMENT CONTROL WORKSHEET
Property Owner: Port Ludlow Associates Telephone: 437-2101
Address: 70 Breaker Lane, Port Ludlow, WA 98365
Assessor's Parcel Number: 962 9-SOO -oo/
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description: New Single Family Residence W/ attached garage.
Site Location: 73 Vr;4 f-Uood Coch-.."-
Person Responsible for BMP Installation and Maintenance: Jeff Evange r
4" i Address: Same as ahnvP
I
Telephone:Same aS above
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads. Please check the measures you plan to implement and show their approximate location on
the site plan. You may also propose measures other than those listed. Attach additional sheets,if
more space is required.
[i Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast,or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[i Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas,landslide or erosion hazard area,etc.).
SPESC Instructions—Short Form
Revised July 17,2002
3
• •
NOV 2 0 2003
EROSION AND SEDIMENT CONTROL WORKSHEET
R _
[] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1
and September 30. Stabilization means that disturbed areas will have well-established
plant cover or be landscaped to minimize erosion.
[)� Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads,driveways,and parking areas after clearing and subgrade
preparation.
[ Protect adjacent properties and water bodies from sediment deposition:
[] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies.(See attached illustrations from Stormwater Management Manual.)
[ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
[X Regularly inspect and maintain all BMPs especially after storms events.
[] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy snits . So I believe the above
measures will be sufficient,
SPESC Instructions—Short Form
Revised July 17,2002
4
•
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized(seeded, landscaped,apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural
type vegetation and lawn to property line
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.).
All impervious surfaces will he run to roof drains and
catch basins as designed into the plat requirements,
SPESC Instructions—Short Form
Revised July 17,2002
5
' . •
4
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices.Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and silt
fence will be installed, Silt fence will be left in
place until we are ready to landscape and all roof drains/
catch basins are in, Landscaping will be installed as
early as possible on the exterior of the building when
all exterior concrete work is completed.
The Best Manage ent Practices proposed above will be implemented to control erosion, sediment, and
stormwate o . y
' the Jefferson County for inspections as required.
i Ili/e''t,4--
////'7 'b',3
Signatur of wner/Agent Date
if I.:, Y f s 'I'
i
NOV 2 0 2003 �y .
SPESC Instructions—Short Form
Revised July 17,2002
6
• Jefferson Co.Department of Community Development
621 Sheridan Street,Port Townsend WA 88368[3601370-4450
• ... , -; bi 44„,,,,,,,,
PerMi App -iCachan ip„.. )
w NOV 2 0 2003 L`I 9109-Fsoo -ov i
Project Description: s-f-CcK p/cf� s
Building Type: Project Type: Frame Type:
X Single Family /New--
,c Wood
Y Garage Attached/Detached Addition Steel
Modular Alteration/Remodel Concrete
Commercial Repair Masonry
Multi-family/#of Units Demolition Other:
Industrial
Other:
Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: 0 Existing: O XSewer Community System Electricity Oil
Proposed: Z. Proposed: 3 Individual System Woodstove Propane
Total: Z- Total: If not sewer,fill out the following: ,Heat Pump
Conventional Alternative Other Propane F‘rc oce
Permit# SEP
Water Supply:
Private well Two Party Well )( Public:Name of water system: t 74'5 t
Square Footage: ffxce Use Only ::
Main Floor I S/Fs > n€y 1 e et<. 4�
2ND Floor r
3td Floor '.; i� ck fee PI9Y1
Htd Basement ;'State Surcharge fee 14 c
Unhtd Basement Subtotal ( Q
Garage/Carport /-/97 Pot Water Review fee (]�
Decks 7 S 911/Rd Approach fee ,
Commercial TOTAL f 7343
Industrial Receipt# ,.�C'"?O.,
Other Cash/Check#
n
Total Valuation: .2491 oaa . latials
Or ' ate
Estimated Cost:
If within 200' of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft.Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or am'
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
Al further agree to provide access an -igh e to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
ccess and right of entry to the p ca t' r perry �truccture shall be requested and shall occur during regular business hours.
Signature: 4/ �+ 1 Date: I I 1 1 d 3
OVER ►
H:HOME\PIN CNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01