HomeMy WebLinkAboutBLD2003-00793 alp
BUILDING PERMIT APPLIIION MLA03-00667
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT#: BLD03-00793 Received Date: 12/19/2003
SITE ADDRESS: MT CONSTANCE WAY
PORT LUDLOW, 98365
OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 34
PARCEL NUMBER: 978800034 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License PORTLAL994L8 Expires 5/2/2004
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOP NEW SFR W/ATTACHED GARAGE & DECK(S)
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 201,054.00 MAIN: 2,782
CODE EDITION: 1997 ADD'L: HEAT TYPE: HTP
OCCUPANCY: R_3 HEAT BASE: HEAT TYPE: PRO
OCCUPANCY: UNHEATED: #OF STORIES:
CONST TYPE: 5N OTHER: SHORELINE:
CONST TYPE: GARAGE: 555
DECK: 270 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 3 Prop: 3 Seismic Streams
Total: 3 Total: 3 Flood Way Floodplain
Routing Date: ,q/
�3 i
„ F&W Landslide
S "` Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: AAPT5tlabvED
State Building Code $4.50 KAS 12/19/03 60540
Potable Water Application $51.00 KAS 12/19/03 60540
Permit $1,564.95 KAS 12/19/03 60540 JAN 2 3 2004
Total: $1,620.45 Jefferson County Planning
& Building Department
• 12/16/2003 10;23 FAX 3604372. PORT LUDLOW ASSOCIATES JC PERMIT CENTER VI 004
Jefferson County Department of Commlfty Development
.,,._"� 621 Sheridan Street,Part Tm wnsend WA 58868(360]370-4450
perm 0 U A .. . °
.Y d•- ., 0CQ Oo
cTT=3 q
1 q72$OODSq
F'raject Description; #Dc K t.7fGn or-3_Wl
Building Type: Project Type: Y� mare Types
? Single Family x New x WO44'
x Garage Anached/Detached w Addition Steel
Modular c= Alteration/Remo del Concrete
Cox imerciul Repair Masonry
. Multi-family/4 of Units ... Demolition Other_
Indusrrial 1
Other:
Bathrooms: Bedrooms; 'type of Sewage Disposal; Type of Heats
Choose one:
• Existing: O Existing: d - xSewer Community System Electricity Oil
Proposed: 3 Proposed: 3 Individual System _ Woodstove Propnssa
Total: 3 Total: If not sewer,fill out the following: )(Heat Pump
Conventional Alternative Other ne F tei7(acii
Pennit# SEP
a..
Wafer Supply;
"P' vn a well Two Party Well X 'ublic:Name of water s syyttem: Ql/S r
Square Footage: 4' Ott , D r I ." ILli risiY. .,a' 1. �f4^'c. ',
m uu;iiuiouuin '
cllnrri�:wrum6n forte f ,1n mu:•, '1I1 YpR1y a 11 i aw,uw '�J'� r
,,,Ifc,,glip ,
I,�'�' I4�:�iJ�BIJ:{I ?Toro-7 / 9 1ul�7ii1'e"'oh'(i 'r:' wiiz,);Inuamodri� m rti',`, r; n,i.,�Main I�lbor ! [1 ����/ 2r �6linln,7r.° li''�n'rlarniiu, o°�an ""hhr,i ,',,c;'. ,iI { kqq� ':4%,,, gyr�lyy �I'nocaouua ;'{r� 1p��r 'GvSililn i� C ���';;' '..n n,„1, ,yWa l° d it 4 9P*nilo�1„.,,,,uDNl' y ,, !,,,,,onu „ '„/_� 6, n'.wc,,.,,...-P
'aLr �nl� I y� {,��{,'�,;„Z:l'. A &}tJLr 6f DYf[0 1 fD 0 ,,igRl�1�,' r
_____
2ND Floor `i e �p 1 r Ndn�i nun°ao11 a f r 'rrn�{yi'a r .4 a,nc,ro zo;:l';i
���buaawan ou,nronr�}���D°p���� ��^��..�.,� ..�. � -, Ci F'S:Sn�{:h't, ,•e,nu°,'�,�''�.
I I ,„„,, rl: r a, u1inrdr^nr C 1,.
[e u Y �,r,I`,�Y�!Y,i'�E.'�oi..a �'��Jo�aJ lea �Jr �V� '��em n n^innwe la�u,o n �
3�Floor n� ��, I ,.,�:W,, arm ;E� j�iq.. ,' .1 �� ..111A�Imraeee.. w: - ,:.r,,,� c �I'rn 1,l'I�;�
Dqc o I IYo`1n,JJnU u'dpo°I°rep. jj +M':+unnar`ppr•1�Jtltl ", '1
nit ,+'j 11'r.1,nn . 1 iirinJ:,.l'""J4','18' pi�"7.4,,i:r�k�'
Htd Basement � "1.,, t:1'i d 1^ i, y
I +I J; :',..1T,,,,{i'111;i;,;1Fr1? s'';. -yll,� "f-' rh-'' .
Urhtcl Basement � J yet !(G��
Garage/Carport 555 /3 o /-/ 35 '1 ti , ,„" ,k'' — .
Decks 270 6 J 63. /"' ' . `I`'+I ! f , `� r. 1� 00
Commercial f l ,r[4,'.,-I 'r11°1"':':,1'W�.".a4"1fI 15i,1,,' 1
(a/ .� 1,1Da rl�ouai e i I',„Y,Pp�F,,2;i:l'41 i., i NC'yo1''2'ly,' .. :1'r ' < / Q
� /, n��Jlii Ji�ic�rtJo�n.�JoY11"';s,�
hldustztal .� • _ V v. & ,.I" Y ,i1v !Irv.:; �g, I , ,.'„,,.
'rot;,r"' l'i:er: .en. i'''.- 'I. /
Oilier ���yVW, � ' ,4.. . /, i (�.
Total Vahiaeton: lE yl C EI'! i li' "::,ai'i�°t°1•' 1o::i�n.;,;�,1. :'. ..
1,1' �1 I ir; i&u,� ' 'rl 61, ,
uunuar L �� IMH.°.� cr rtjl 33j �, �^��,.W:11,,I �/� �T, .�. '
uu'u,°wJ:F,'1 8 p , V,y dd�a,,, rJoSu..246 Kulji��F .ur"r j� 1..�;i�„'ylli.k'��:fie 1 wcd,DJa1c'111 QQ I,�'1„I;i ai:1iw� ,
'' P Y d'�ADyDncunn4 11'i n,1.11a.;ilk l�n,S Jo ionic l I I
Or a,, ,q 1' IrjP,,J d'i,,,o��j' fr;06:Erlunrocrr �l„, i'nlN. �:
�j �/ �n r61,1
I pr n.oa:u eiao:m I r'LiDaena'a�,yr{ k "'r""i�niudijimw. �,w1 D •�'71�,.:�„'� '
Estimated Cosr. 7 7 ii „o° pg wi r D _ 4 f .L`i F1 e Yn: r
P, PA 1"SS, ,J±.4ini io°D- rnroi,rno y
Q I8J8•ICV't l"II F"J�FIIo:EftamnD I�unRfir4° n'unoGnoiiarl�1 pj�°�umSa noa,r ,C:;3r� ';1;f. .
Dnn'pp� A�I,Drvou� na•ykp � YI''"i�,ngo D �j p Ilu,t:un°'nu i � f N'•k.,"ill�y c,��, `a' ,•f.
1 " E 1 .i Ain,1P.;S:Pi�Di ee S'i3iD7oiiiiMnoc lrxf 1J;;II;Pk RICH:S +�lil,t' 1r Jr9'a4i�Nt;.,l i .`'''' ''
If within 200' of the Shoreline,
Distanee to Bank or Ordinary Nigh Water Mark - ft.Bank eight _ ft.
By caving the Jrpp option form,the applicant/o''noi lit lt MA EH chat the information provldad herein is mitt sad correct ro T C best of emir knotticase. Any material l;nlnrhood nr a.rp
omission of a material faze made by the applicaor/wmer with respite so chi::application packet Intl moult in tills po:mnit being out and vend,
1 r°urthcr agree to sate,indemnity find hold harmlal<a Jefferson CoueLy against all llabilitie:,judgmenrp,court co.gc,aeasorntblc Atterney's,bee rind expenses'WhIeh may in any way accrue:
aping Jefferson County a8 a result of OE in con9e9uance of the granting of this peeoi c,
I runner agree to provldeaccess andsigl,C ofentry rainier:eon County and it'xemployeaa,represcnontivoa or'agurts for the porposo of epp1 cadonreviaa+sad any xxgeslred lateriroprecdons-
Ace9wA and right of entry to the appilicnt's property of i<utitture shall be roquestcd and el]aU occur druing lnular bue3ttess hour.
Signature: Fate. - .
OVER,
(i:IIOMF,\I)LNCNTR\INFOBLDG`FORMS\BLDpermit ar oplic on 11-8-01
tie 92d aoa OD Ada' T5bb6LE09E ZZ :bT EOOZ/9T/ZT
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD03-00793 Received Date 12/19/2003
SITE ADDRESS: 140 MT CONSTANCE WAY Issue Date 01/23/2004
PORT LUDLOW, 98365
APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 34
PARCEL NUMBER: 978800034 Section: 21 Township: 2''8 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License: PORTLAL994L8 Expires: 05/02/2004
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE & DECK(S)
REQUIRED INSPECTION
[ ] `SETBACKS: O 7/OV
[ ] UFFER: )J( 2-7f7/1,I /
[ ] Footing: E W rtti Z�or1S Z//2/W
[ ] Foundation: 61e Jfe 4bo. c yip4e
[ ] Underground Plumbing:
[ ] Underground sulation:
[ ] Shear Wall :L i l f 7/j f
[ ] Framing: j� � �rJd' (�t/ S,i /#
[ 1 Plumbing: e4 5A/6y,
[ ] Propane Tank/ ine : NftittioZ G'�as�.�wes s S/z-##
[ ] Insulation: ,e _5"/7
1 Sheetrock —S7 6,4 :v _
[ ] Septic Sytem Final Approval:
1 Zoning Final Approval:
[ ] Final/Occupancy Approval: e or G D 8 zr5 GV
HEALTH DEPARTMENT APP OVAL RE UIRE PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY -SEE REVERSE
i
SPECIAL CONDITIONS FOR CASE A BLD03-00793
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on January 14, 2003 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Osprey.
2.) The applicant is proposing to create or add 3274 square feet of impervious surface and
5749 square feet of land disturbing activities.
3.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
4.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by
the Department of Community Development. Once the subject permit has been issued
the applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
5.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
6.) The site plan as submitted with the single family residence application on December 19,
2003 has been reviewed for consistency under the UDC, and has been approved by
Jefferson County Department of Community Development. Any modifications, changes,
and/or additions to the stamped, approved site plan dated January 23, 2004 shall be
resubmitted for review and approval by Jefferson County Department of Community
Development.
7.) This approval is for a single family residence with attached garage and decks only. Any
future permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
8.) The lot has been designated as MPR-SF 4:1 under the Jefferson County Comprehensive
Land Use Map effectvie August 28, 1998.
9.) The lot was created through the Olympic Terrace Division I Subdivision on March 11,
2003 under AFN 466745.
10.) The lot is subject to Port Ludlow water and sewer.
11.) An address of 140 Mt. Constance Way, Port Ludlow has been assigned to the lot. Mt.
Constance Way is a county local access road (517009).
12.) Per email dated January 20, 2004 from Jeff Davis, WDFW, the proposal will not have a
significant impact on the osprey.
13.) A road approach permit (RAP03-0278)will be issued with the building permit.
14.) A minimum of two (2)on-site parking spaces shall be provided for the single family
residence.
15.) Per MPR Code Section 3.107, Accessory Dwelling Units (ADU's) shall not be allowed in
the MPR-SF zone.
16.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
17.) The building height is not to exceed 35 feet.
18.) Minimum setback from Mt. Constance Way right-of-way shall be 20 feet. Minimum side
and rear setbacks shall be 5 feet.
I:\F_BLD_Permit_Buildng.rpt 10/29/19
t,,tr, 4,t, ._ L ._
7%
7 •••\
--C 1. .1--M----tril t., 1-1 ( V,--- .1t TT, r .
i
1
I
-1,-elLA 1
iktCrir4Z ../- F/F).16 .. i
___ ,
1 ,
am= - . - . ! P - - ----
P(; 4/.1e,.r
r r ::
..
C,Ot)tg .fTtphi, FT -- ---- ; !
, .
f
' , ,irow, ,,A.,
, .
'
. 'I#- '' i i15-.--):i .-
r• i imi-4 2 501 _-- ,...
C..i
"o,-P
it'
,
i 1 9
,...„..
. .
APPROVED u4
cz
SITE PLAN
JAN 2 3 2004 Stormwate : ;1,S)
/1
Requi : 1 Air i.i A
DEPT.OF17F,E, 7 ccriop IENT i 1-- . _t /
SIGNATURE. T \"
.., ,z.
.. Rei2it4-11l 47 -F.- .frPJ4 14 . 11, 120.2- 1/
,;cT * 4-• . 0 1.1/ret lc,. ---F,...-pr,64.-F.,-, I . plric.,,, tz../ keiO3
a � � ` '��D DEC 1 9 2003
A-- STORM Y"ATER PLAN
r
J A N 2 3 2004 JEFFERSON COUNTY
STORMWATER MANAGEMENT
S MALL PARCEL EROSION AND SEDIMENT CONTROL PLAN
JEFFERSO1 OUN Y ROSION AND SEDIMENT CONTROL WORKSHEET
DEPT.OF CO, D•V OP(piE
SIGNATUR / J\
rope • ' Fort Ludlow Associates Telephone: 437-2101
Address: 70 Breaker Lane, Port Ludlow, WA 98365
Assessor's Parcel Number: '70-Soo-b3Y
Building Permit or Septic Permit Application Number(if applicable):_
Brief Project Description: New Single Family Residence W/ attached garage,
Site Location: 772 F 6 f ,7 cc 2✓a
Person Responsible for BMP Installation and Maintenance: Jeff Evan_g e r
Address: Same as above
Telephone:Same aS above
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads. Please check the measures you plan to implement and show their approximate location on
the site plan. You may also propose measures other than those listed. Attach additional sheets,if
more space is required.
[J Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[J Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas,landslide or erosion hazard area,etc.).
SPESC Instructions—Short Form
Revised July 17,2002
3
EROSION AND SEDIMENT CONTROL WORKSHEET
[] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1
and September 30. Stabilization means that disturbed areas will have well-established
plant cover or be landscaped to minimize erosion.
[)4 Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads,driveways,and parking areas after clearing and subgrade
preparation.
[ Protect adjacent properties and water bodies from sediment deposition:
[1 Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies.(See attached illustrations from Stormwater Management Manual.)
[] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
[X Regularly inspect and maintain all BMPs especially after storms events.
[] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy soils. So I believe the above
measures will be sufficient.
SPESC Instructions—Short Form
Revised July 17,2002 0_( C r ,
4
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabili7Pd(seeded,landscaped,apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural
type vegetation and lawn to property line
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.).
All impprvi nlls rfares will he run to roof drains and
catch basins as designed into the plat requirements,
DEC 19 2003
SPESC Instructions—Short Form
Revised July 17,2002
5
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices.Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and silt
fence will be installed. Silt fence will be left in
place until we are ready to landscape and all roof drains/
catch basins are in. Landscaping will be installed as •
early as possible on the exterior of the building when
all exterior concrete work is completed(.
The Best Man ent Practices proposed above will be implemented to control erosion, sediment, and
stormwat I will notify the Jefferson County for inspections as req ' ed. //
Si e Owner/Agent Date / G
DEC 19 2003
SPESC Instructions—Short Form
Revised July 17,2002
6