Loading...
HomeMy WebLinkAboutBLD2003-00795 ',BUILDING PERMIT APPLID SON MLA03-00668 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD03-00795 Received Date: 12/19/2003 SITE ADDRESS: `'►)\ MT CONSTANCE WAY PORT LUDLOW, 98365 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: 360 437-8242 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 5 PARCEL NUMBER: 978800005 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2004 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI NEW SFR W/ATTACHED GARAGE & DECK(S) TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,289 VALUATION 170,168.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 540 SETBACK: DECK: 340 BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 2 Prop: 2 Seismic Streams Total: 2 Total: 2 Flood Way Floodplain Routing Date: 1"- F&W Landslide Ja/a3/d3 y2.. Shoreline Aquifer 3 '" Forest: Commercial Rural Type Amount Paid Bv: Date: Receipt: Approved/Date Permit $1,391.35 KAS 12/19/03 60541 APPROVED State Building Code $4.50 KAS 12/19/03 60541 Potable Water Application $51.00 KAS 12/19/03 60541 JAN 2 3 2004 Total: $1,446.85 Jefferson County Planning & Building Department air a 12/1 /2003 10:22 PAX 30043726 PORT LUDLOW ASSOCIATES JC PERMIT CENTER l,�002 ,w. 4.. Jefferson County I part meet at Community Dovelnpmern 521 Sheridan Street,Port Townsend WA 0R305[Sail]378-446I ., . .1:kilhi 1 porm [lotThp, Ap, ,cat oon o Project Description: 64-Dc1C n OT Building Type: Project Type: Frame Type: X Single ramify X New ?( Wood Xc Garage Attached/Detached Addition Steel Modular Alteration/Remodel Concrete Cortutertial Repair Masonry Multi-fiutiap/#oftl iiti Demolition Other Industrial Oh ex Ate. .---•—._--._, Bathroom/at ]B m ccirootr " Type of Sewage Disposal: Type of Meant Choose one: Existing: O - Existing: _c___, Ac Sewer Community System ElccriiCity Oil Proposed: 2- Proposed; Z Individual System 'Woodel'otre Propane Total: .._ Total.: P If not sewer,fill out the following: X Heat Pump Conventional Alternative Other rd n, 1 7.4]4pCc, Pexm.it## SEP —+�.. Water Supply --" "- ' Private well Two Pares Well ?<Public:Name of water syscum: C)4) �Square Foot -- ��yL������ : '1 �y age' a6dn"agpi x r w,. ..7l 4:kl,�alz,„21: ire la 7.:.,r,,7'7.7-tic, u t 1. I m.e.. 'n:u ie.r, wraar i�.•'tin:i��' � +� y� 9Z 1166 .,. �I 1�; 'iii:roeu.a�.]L e!:Swi`id�,ltmr R r !�; Main Floor a��L F� �y 9 yas� lll ,i v moaukea^'1r I'll2:iti"nvru 11 inns I� . i:'I'13�iDorna'avx an ro;.a�'a p i•'r2ND i 1oox .f �,w� 'g„'1"�i3r Q:„q�6",��'�i 3�1 F�yft'par GSi�o�oa ,. 1�.; I? ,1,„,,l�rwrl it ae ,Malin.„', t. R el" r j`!'GG�i E%IDe�'r''-'.t . ,. f,,,t,.,,L SH P,.. ,,„; •I:v`„'�;.,. , a ��a i�i o ,r .,klwyr'a` uoa�ail�gtluY•ot 3rd Floor r'�' !Rfl.'�[����.�'.,,, d �'�„I� n ra,4rt:'1 i1 _ y r ur r"'"ISI�riSiI,E:iviijlbt wtupnene d r '`1 rrJ:'inteno ,LI,r.l..',' I:r i:,6r^r_ ,^ �. . 7� �7 .� • dC n owns nationco .vr 4� 9 Pat':'u'41�4i�;,'ouv bin'e, e Hcd Basement as r .r,.,,lia alp„ LIIk "., ut'�,::,LJ u,m;.V,-",,tl,��1,,',J ' .� • Unhtd Basement - I �: a o 11`"r' � �ira• �.� /J ✓J L. n d 0 Garage/Carport 5410 �� `Q3 C_'W F }1" 4' I 'k' to d' gal. . Deck 3`{c • v 1 n t,"''''i•, ` " P1,• : ,.J l/r, ()• `_ Cla1 L it t rw t aP s R,„ ,t.rp 1,';' r o i� t� C Co'txtfllCl `� 6 -• f - l�', L. $ f / r i < �it 'i:�i"Arr;:':no'Ili},�',.,' �f� �'� v'J �,'�rYi 'I'''Ir�u�. P�, t;,;11'!id; ":'J' _�_ Trldustrial l i'fii'.,d,rviu Pocono {Ij 1 1 z �1 1 O i 6, ��i m Ho3rnj'°c„SIiE"i'� 1�'l z' f' i,: I'• A 1 Q�� a t°', "lR:I,i{I'%91,111 11 I''f"`: COOther „'' $'.. y+ ',4. ,�°�,pp r I ,• CO 0 sL 1 F r 'i� u � 7c r ^', rv "fo ;.',To al Valuation; • ,; i' � ° :l L o6, Ir.,; : ''i ,..le ,,o onlPl ldI s r �.a,,si • moiw cC,P I 'l` Pp�1naCc .JntrnlontYi �F,}i 4 n:'r �� f' lr,k litY�� Or n •Rvt r� ' ��� uyunlyitul TUI. ; onal'orve. T,T.n 1;�,' •�r °,P"'1 ail o fi, Nlilr' 't diva4 om.uu'1,-!I2i I w 9:s�.Y rE1;,i,r; 'I ' ' Estimated Cost ?K.J ; i1F t i, ¢ S," t omn"l no ,rn L•r „n;:i r,1 "rog, an ,T1.3:. f S ii1N31'S' ,kjid !w °', If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Pleight ft. fiy signing the application Even,the appl eaur/wner aaears chat the inromuuibn psavided herein is titre arid comoet ao the bees of then knowledge. Any material falsehood or any omission of a dtuttiaal fen made by the Appl Iuaukt/owner with respect to taro application packet may omit ill clue permit bell*null and void. 1 further Agee to save,indemnify and bold harmless f efferson County Blraintt a liabilities,judgrranca,court costs,rearoluable,lttOmey a leek rod espenses which may i4lily way stair against Jefferson County as rt result of or in consequence of the pianeing of this perrnia, 1furtheragreetoprovideacce4:gsadtightofentrytoJeffersonCountyAndit'semployee;represe.dntivasoragentsforthepurposeofappIi ttiounruiewandallyrevisedraceriaepections" Arras t end right of entry co tht tipp91einte property as etrueruta shall be requested and ehel occur during regnllar business hours. Signature: Date: OVER I1:1ION \P NCNTR\INFOTIWG\FORMS\BID perrnitApplication 11-B-01 ZO E d 110G 00 dd3f Z5bb6L999E ZZ :bI E130Z/9I/ZI BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00795 Received Date 12/19/2003 SITE ADDRESS: 131 MT CONSTANCE WAY Issue Date 01/23/2004 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: 360 437-8242 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 5 PARCEL NUMBER: 978800005 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE & DECK(S) REQUIRED INSPECTIONS: Y[ ] SETBACKS: e:X /Ali% 47.4 UFFER: O4 1A27/071 G Footing: OK v2:Q gi Foundation: O4 y�y Q4' �' Underground Plumbing: Underground Insulation: ,,k Shear Wall : [yr 4E42 dk 3/2 0 Framing ece.me'rie.3 y� } Plumbing g'/l6v Propane Tank/ Lines: 'AS D,e 4-41 fl Insulation: Ø ,%p'f'(rl Sheetrock: G'k j4'oiid't e71 [ ] Septic Sytem Final Approval: 1 Zoning Final Approval: aN Final/Occupancy Approval: (71< cr C/b 77 o'/ HEALTH DEPARTMENT APPROVAL EQUI D PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE • • SPECIAL CONDITIONS FOR CASE # BLD03-00795 1.) The application was reviewed by the Jefferson County Department of Community Development staff on January 15, 2004 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: osprey. 2.) The applicant is proposing to create or add 3319 square feet of impervious surface and 5759 square feet of land disturbing activities. 3.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 5.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i). 6.) The site plan as submitted with the single family residence application on December 19, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated January 23, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 7.) This approval is for a single family residence with attached garage and decks only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) The lot hs been designated as MPR-SF 4:1 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 9.) The lot was created through the Olympic Terrace Division I Subdivision on March 11, 2003 under AFN 466745. 10.) The lot is subject to Port Ludlow water and sewer. 11.) An address of 131 Mt Constance Wat, Port Ludlow has been assigned to the lot. Mt. Constance Way is a county local access road (C517009). 12.) Per email dated January 20, 2004 from Jeff Davis, WDFW, the proposal will not have a significant impact on the osprey. 13.) A road approach permit (RAP03-00279)will be issued with the building permit. 14.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 15.) The building height is not to exceed 35 feet. 16.) Minimum setback from Mt. Constance Way right-of-way shall be 20 feet. Minimum side and rear setbacks shall be 5 feet. 17.) A minimum of two (2)on-site parking spaces shall be provided for the single family residence. 18.) Per MPR Code Section 3.107, Accessory Dwelling Units (ADU's) shall not be allowed in the MPR-SF zone. I:\F_BLD_Permit_Buildng.rpt 10/29/19 . V, APIROVED si E PLAN 4i, 2 3 2004 i.,, 1 i 'EtFlq. EtP ,I' DEPT.OF C, Hilt, %Lis., ,er,iiii„ , SIGNATURE:1 tamil'A tritamimiksiehth_ .4 \ 'In IP*. er Vs \ 1 -: Requi : • A II. qk T6 w, te,m, af.Aposl i ,,, / 4,31 NIN 1 . . TS ' • : . ;7•° 14(..... i2vt,,A2A-i44.-- Pin 1111101 _-- \• pj .4, kioris..1-1 ' I ------ L.= profi-ii 4:81N -- .. . , ., A --EM'IMI-t• 11 grf . 111 Iv(Lo..,1-C,1-i- s- _ ----ir __:.a._ez_„.,,,,,,11 ,,,,„ Al --- I -- - --- 721-4'* -- - 41',t 2 ::14711.16Lo rrE.* 7441 T*, Hi ize, --r LT * 6 c2()-(1-4etric, --rsig,r-A6,-.-7, 1 pms: [411,102, 0 APPROVED N STORMW ATER P LA DEC 19 2003 JAN 2 3 2°°4 JEFFERSON COUNTY STORMWATER MANAGEMENT JEFFERS c.UNTSM: P CEL EROSION AND SEDIMENT CONTROL FLAN TY r EVELOP OS ON AND SEDIMENT CONTROL WORKSHEET DEPT.OF CO ill j�,� , ,• SIGNATUR Prope , O er: Port Ludlow Associates Telephone: 437-2101 Address: 70 Breaker Lane, Port Ludlow, WA 98365 Assessor's Parcel Number: 97e— Soo -Doc-- Building Permit or Septic Permit Application Number(if applicable):_ Brief Project Description: New Single Family Residence W/ attached garage. Site Location: ? /Yl¢ - Person Responsible for BMP Installation and Maintenance: Jeff Evange r Address: Same as above Telephone:Same as above 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets,if more space is required. [] Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [] Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas,landslide or erosion hazard area,etc.). SPESC Instructions—Short Form Revised July 17,2002 3 i EROSION AND SEDIMENT CONTROL WORKSHEET [] Phase clearing so that only areas that are actively being worked are uncovered. [] Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. [)Q Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [] Place gravel base on roads,driveways,and parking areas after clearing and subgrade preparation. [ Protect adjacent properties and water bodies from sediment deposition: [] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies.(See attached illustrations from Stonnwater Management Manual.) [ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaveso the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) [X Regularly inspect and maintain all BMPs especially after storms events. [] Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Site is very flat with sandy soils . So I believe the above measures will be sufficient, SPESC Instructions—Short Form Revised July 17,2002 4 DEC 1 9 2003 EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized(seeded,landscaped,apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line • 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.). All imnPrvinus surfaces will he run to roof drains and catch basins as designed into the plat requirements. DEC 1 9 2003 SPESC Instructions—Short Form Revised July 17,2002 5 EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices.Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to landscape and all roof drains/ catch basins are in. Landscaping will be installed as early as possible on the exterior of the building when all exterior concrete work is completed,( . The Best age e -Practices proposed above will be implemented to control erosion, sediment, and stormwaatt I n tify the Jefferson County for inspections as required. Signature of er/Agent Date DEC 19 r003 SPESC Instructions—Short Form Revised July 17,2002 6