HomeMy WebLinkAboutBLD2003-00796 4110
•
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD03-00796 Received Date 12/19/2003
SITE ADDRESS: 120 MT CONSTANCE WAY Issue Date 01/23/2004
PORT LUDLOW, 98365
APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 35
PARCEL NUMBER: 978800035 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License: PORTLAL994L8 Expires: 05/02/2004
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE & DECK(S)
REQUIRED INSPECTIONS:
(.4 SETBACKS:
j)ci UFFER:
g Footing:
Pi Foundation:
krUnderground Plumbing:
NrUnderground Insulation:
er Shear Wall :
MFraming:
t] Plumbing:
Propane Tank/ Lines:
Insulation:
Sheetrock:
[ ] Septic Sytem Final Approval: .'elNeI'-
Zoning Final Approval:
Final/Occupancy Approval: Scuu_e_ilie ct
HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY -SEE REVERSE
•
•
SPECIAL CONDITIONS FOR CASE # BLD03-00796
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on December 28, 2003 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Osprey.
2.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
3.) The applicant is proposing to create or add 3309 square feet of impervious surface and
5559 square feet of land disturbing activities.
4.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by
the Department of Community Development. Once the subject permit has been issued
the applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
5.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
6.) The site plan as submitted with the single family residence application on December 19.
2003 has been reviewed for consistency under the UDC, and has been approved by
Jefferson County Department of Community Development. Any modifications, changes,
and/or additions to the stamped, approved site plan dated January 21, 2004 shall be
resubmitted for review and approval by Jefferson County Department of Community
Development.
7.) This approval is for a single family residence with attached garage&deck(s)only. Any
future permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
8.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
9.) The building height is not to exceed 35 feet.
10.) Minimum setback from Mt. Constance Way right-of-way shall be 20 feet.. Minimum side
and rear setbacks shall be 5 feet.
11.) The lot has been designated as MPR-SF 4:1 under the Jefferson County Comprehensive
Land Use Map effective August 28, 1998.
12.) A minimum of two (2)on-site parking spaces shall be provided for the single family
residence.
13.) The lot was created through the Olympic Terrace Division 1 Subdivision on March 11,
2003 under AFN 466745.
14.) The lot is subject of Port Ludlow water and sewer.
15.) An address of 120 Mt. Constance Way, Port Luldow has been assigned to the lot. Mt.
Constance Way is a county local access road (C517009).
16.) Per email dated January 14, 2004 from Jeff Davis, WDFW, the proposal will not have a
significant impact on the osprey.
17.) A road approach permit(RAP03-00280)will be issued with the building permit.
18.) Per MPR Code Section 3.107, Accessory Dwelling Units (ADU's)shall not be allowed in
the MPR-SF zone.
I:\F_BLD_Permit_Buildng.rpt 10/29/19
UILDING PERMIT APPLICAfON MRAOW00666
Type:
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD03-00796 • Received Date: 12/19/2003
SITE ADDRESS: MT CONSTANCE WAY
PORT LUDLOW, 98365
OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 35
PARCEL NUMBER: 978800035 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License PORTLAL994L8 Expires 5/2/2004
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOI` NEW SFR W/ATTACHED GARAGE & DECK(S)
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 2,289
VALUATION 170,168.00 ADD'L: HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE: PRO
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY:
OTHER:
CONST TYPE: 5N GARAGE: 540 SHORELINE:
CONST TYPE: DECK: 340 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: PUD PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 2 Prop: 2 Seismic Streams
Total: 2 Total: 2 Flood Way Floodplain
Routing Date: F&W Landslide
1 a o�'4103 iti_ Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: Ir••u
Permit $1,391.35 KAS 12/19/03 60539D
State Building Code $4.50 KAS 12/19/03 60539 JAN 2 3 2004
Potable Water Application $51.00 KAS 12/19/03 60539
Total: $1,446.85 Jefferson County plerltifjP/611/ ninn
& Building Qepart ent
f5et!ci()
12/1872003 10:23 FAX 36043720 PORT LUDLOW' ASSOCIATES* JC PERMIT CENTER I1003 .
Jefferson County Department of Community Deveinpinen1
., 621 Sheridan Strew 8 Port Townsend WA 136 ( 60a 3Th-411 t
,
o
,'i I Q Q? rm
� 0im-.3 S---
q188000 3s
PIO ect Des cri ition: cC .--61b t Plan DT—
BuildingType: g Ptofeet'1'ypc Frame ype:
X Single Family X New X Wood
k Garage Attached/Detached 4V Addition Steel
Modular 0 Alt-en-Lion/Remodel Concrete
Comtnerelal Repair Masonry
Multi-Family/##of Links Desrnolitlon Other.
Industrial _
Other
Bathrooms: Bedrooms: Typo of Sewage Disposal: Type of Heat:
Choose and:
Existing: _,,,, _ Exiting: __La.___ ASewer Comrramity System E1u euicity Oil
Proposed: Proposed: ...L,......— Individual System Woodstove Propane
Total: Total —
If not Sewer,fill out the following. k Ileat.Pump
Corlvei Donal Alternative Qthei k e F:ke7Yc r
rcrmit## sEP
Water Supply: ,
Private well Two p. Well • Ptl.hlic:Name of water G eft/tin: r
1._._.uar---'•^^'� •'J tl'-'I w{ W' °lli .'1�.HI I!!�1(}i ,u'°"J.w�. •r]"�'1...,
Square rootage: ---" .._. �,;`. ;NlAll�+ nS, n1 C4 .. .I ti .61'9.I':I":n '''i l '1i I;'n.�y.,�„ e' u�' �i' 4.., •
,.°un:Siem P,I , ,r, ri.c° u,11 it� h.tu , " r
. '1 41111 u g'ni j G'm"11',010:1ci 111,1int, LO I"p<a"n'r" anud„ 1 rV4i ,
9 A Ia I il.Z a' ui o- �u��fir i r uvo- ori'• MnUdJlc.Lp u.i1i
Floor '3.r, ... l''d''' A d H, _ 1 r l fib( w,
�� q Cal�Ufa 5 v� ��,,; I, `����� yf �, IRY�,.I,"",. '.�r . ,.ti',al';��:.,,.;�'�:`',n
T wu O uu[unr I iiuniir I • u• .:.3.',Fj: 'i Hne1v u r�d' Fi Ltc:u o�numc d 4�I fry' "iLi.iif"Ir; ;,,
F �{dl''r,'1'1311,lm't,P,°r E° 9f N fi Jll 9111,111;f P LF:'r'u '4;::: ,!.i"w„ !I,r":111i. A"� '
2 Floor °i ° 1, ' n u.nnn
74'° qq 7@ w" MI n'in�Pr,uo° t , a uoJoum uxp ,rr 'cuvyy' N,•v,.,.,
N r.,r4 3 i ,::. I °k11°i°1ki °u>;'::'F1I 7il {f1 , „1':S.l " I ° ' .
3'd Floor — �,,, I ;rW �" 1
<li i'MJJ4 uioiwuu.u°o $11 'rM. r I . "„: ...
k L W.nIDLligke011 we4Till S.IC ac.r,o•nur^ ,°i1ILr tl 11n, 417 ar
l Itd Basement — • w:}l ,^�;,u'v" ''''.'"•iv 1�,Lgili�ii i 1 N",i,,,,'',A p� I�.p,i,,.,.' ,
uac � i�""� � �J1nd•��..'u i�rtn.,u�•nu.�idYa 1,'�li`� ,t'� 11• O'.
Un td Basement . — E Q
Garage/Carport 54/0 /, !� ! e !".,•0 'I i y,. " 7 On t,;g6 — `'',oq
Decks 3/0 ,Q /31 d " ��1�'�' .14,;eke ti.r•Y-.� ' �.,°� / �1. v0
5), 9 'ilillor°`I e:,,'. g p¢i'-'•'" ( e5
Commercial � i IIW:;iI�',1 a,uliF,I:giw�iil�n:�.L'�,I r�,,6�rggg'"I.'=';�_ � Ix' :' ,' /
l ' i 1i'li.rn'�mi"rr'•,ioi iij{yr ��'°l'L,� l l .,I,_'t,
Industrial mo '! 'i r ''o,.Bmauiuui.'' rm i':r�:i'1; !� '��,,`l'..T
IndusCi "b'�,aol"I I'. w',',tiuf"'aiiiYnlP'91ER2,PGhi�,°„'. ,r"'i]'ti{�Gw'
it e ,u'ilr.np:'ek4e s1 ,„I,.�.; 'i '.,Ali,,. NT1
Other 'J�ul� •' ��" lyi � ��l., ��' �'.� , _ /
Total Valuation) �r '89o"u' ., Vi,''pri1.14}ISiS.'.!1:v. .. c
of I,iu r o-ivuLu r� iSlavaddv...t.e i 1 vim un•''. ,.
Or � J �rPS'4�i al`r1, I,,G�L�'y ryry qq ','iI; 4q 2,0t1 'f' "• ,
S' c W i 'l Y t,��fl�h��,y-RuS4YN9N!''lj F.Y4�N°'�lii�711�'4"TPf.�^� !��Ir .�� : � .
cn omopliSr° 1 nouiuon ',i'�,:•„ . uK, 1
'g". y ,,.1:adaR°d"cHfi.IN'ge! 6 1 iitHi;9Hil lliF, it�'i JIY"4iiVi;iC`o, , F'/4;n�.`y,"? ;n .
y.-� //� 7 2 gpp}}FF,, :P:'nyg ,,ckna°i c al on.mn w u w,i 1) i'�unu,n'�ae_trcoenn . �, ^{low..w••,nr ,
;US'dtelated Cost: /4NO/ z 3� _ BYE "� �il.Y4J p ' t °1 ' �i { ppr v uv I ,,
,i�,iu ,�i Gd t m �".I 1H�C i-f I't, i ,.�ir,P:H' 7l�lillI�r iN.i �:i���:.1:..�,,,il�C��r1:1'n'�li,,i.i,.
i iluo r, ,euaa 1up L ue pr, "i 1 d 0,o N.4.NOJ4° , 1 r I. i;;;ue�°munlll wu:
If within 200' of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft.Bank Height _ ft.
Sy ergiirig the applieatlon font,the appheanC owner aneata(Jtati-0tf fltro9E10r,i p . .is:
Re6cn is true and CM'LOFt m the he>:c n sir L-nowkdge. Any mattes)fah rehn or am
emission of a trattetial fact made by du applicant/owner With reapcet to tide appliaAdoti packet may itoaltlt in this permit being null and roil.
I further agitc to save,Indemnify and hold harmless Jefferson Caunry against all liabJlltios,judgnenrs,coure casts,reic,nablu at omey'c.fee.and expenses which may in any way necrw
apinst Jeffcr'soa County as a result of or in consequence of the granting or Arlo permit. .
I further agr0 to provide adam and tight of cnay tv J eftctaon County and iF s employees,repeaFentatives or agents for the purpose of application reviaW and any required later inapecaon.
Aeeerz and right of entry to the appliemt's property ore trueture shall be requetsied and ab 1l occur during regular business houlrs.
Signature D ate: ,
OVER
1 l:l IOME\pI N CNTR\INPOBLDG\FORMS\BLDpermitAppllcatio0 11-8-0 t
60 39' d QDQ 00 dd31 TSPVELEe9E ZZ :t'1 c09Z/9I/Z1
1 e (tdIt".7 _ 1-111.1?1( 1Z4'"
--tkit, :te-rli -. _=:-----'iZ-V9 ' 14•I'Vil., __ ------1= _A-.-7 -_,_ , __ ,1)690 4- v4 ,.14g1.
p ..... .\ 1
• /.., 1JAN/ , it- 'i\\- \ , --, --.1_ _ --,_ ___ _ 1
C-tatlel•iiiviNt7 ,
.. ... .T.,
- --1-
-f:pift,4-f ,H'8: i
\'-; •.
-----%------<-
.
rrTI 1 tiv 2,7-•) 11,1 -.1";r- itc I plAQ *21
1
,
\
I ''6 0 " ;.- Prr ••12
1-9-
I rtf2A--46444240 j.- PERMIT # BED
APPROVED
0 3 - 0 7 9 6
SITE PLAN
JEFfER$ON•COUNTY BCD
JAN 2 1 2004
DEC 1 9 2003
1
OFIEF•F:illi 4,11 C°0 t
it ''''t.,, i V - SIGNATURE: ri I Ilri-It Akiii ie-. filo..
-*4 fiat‘i
I
I ir!:rj7t.7N'IT144fL 04rrE** /AN- Pp,•- rit
i/opi t 124 e7L----(Viric, -41.42-(2A-c,,v_.- 1 _aitf_..- 12-ibairY3
APPROVED
STORMWATER PLAN
JAN 2 1 2004
JEFFERSON COUNTY
STORMWATER MANAGEMENT JEFFE SO OU Y
SMALL PARCEL EROSION AND SEDIMENT CONfRQIESIc 1No. E OPM NT
EROSION AND SEDIMENT CONTROL WORYITUR •
Property Owner: Port Ludlow Associates Telephone:_ 437-2101
Address: 70 Breaker Lane, Port Ludlow, WA 98365
Assessor's Parcel Number: 417g&'0 3 S-
Building Permit or Septic Permit Application Number(if applicable):_
Brief Project Description: New Single Family Residence W/ attached garage,
Site Location: ta3/2'I f D726 ne.c
Person Responsible for BMP Installation and Maintenance: Jeff Evange r
Address: Same as above
Telephone:SAMP. as above
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads. Please check the measures you plan to implement and show their approximate location on
the site plan. You may also propose measures other than those listed. Attach additional sheets,if
more space is required.
[1 Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[1 Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas,landslide or erosion hazard area,etc.).
SPESC Instructions—Short Form
Revised July 17,2002 DEC 1 2003
3
EROSION AND SEDIMENT CONTROL WORKSHEET
[] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1
and September 30. Stabilization means that disturbed areas will have well-established
plant cover or be landscaped to minimize erosion.
[)Q Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads,driveways,and parking areas after clearing and subgrade
preparation.
[f Protect adjacent properties and water bodies from sediment deposition:
[] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies.(See attached illustrations from Stormwater Management Manual.)
[] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
- Stormwater Management Manual.)
[X Regularly inspect and maintain all BMPs especially after storms events.
[] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy soils . So I helieve the above.
measures will be sufficient.
SPESC Instructions—Short Form
Revised July 17,2002
4 DEC 1 9 2003
•
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized(seeded,landscaped,apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural
type vegetation and lawn to property line
3. Describe how runoff from impervious surfaces.will be controlled (disperse to vegetated areas to
infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.).
All impPrvinus surfares will he run to roof drains and
catch basins as designed into the plat requirements ,
SPESC Instructions—Short Form
Revised July 17,2002 DEC 1 9 2003 -
5
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices.Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and silt
fence will be installed. Silt fence will be left in
place until we are ready to landscape and all roof drains/
catch basins are in. Landscaping will be installed as
early as possible on the exterior of the building when
all exterior concrete work is completed,( ,
The Best Mana e t Practices proposed above will be implemented to control erosion, sediment, and
stormwate I 1 fotify the Jefferson County for inspections as req ' ed.
/(/' ta' /
Signature of er/Agent IL/e Date
lam+
SPESC Instructions—Short Form
Revised July 17,2002 DEC 1 9 2003
6
Au
\ ^ .
. . �r