Loading...
HomeMy WebLinkAboutBLD2004-00042 • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00042 Received Date 01/23/2004 SITE ADDRESS: 141 MT CONSTANCE WAY Issue Date 02/11/2004 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 6 PARCEL NUMBER: 978800006 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE & DECK(S) REQUIRED INSPECTIONS: [ ] .3ETBACK: : [ ] UFFER: G /4 ' [ ] Footing: [ ] Foundation: tu/co.44--z-45/0/ [ ] Underground Plumbing: [ ] Underground Insulation: [ ] Shear Wall : I-7yr bu rr IdAte n,‹S,z4Aii [ Framing: 176)e,] 9 G O/J Tt2'cY'.ty �✓ c aue�ct��h�_'a j. 1 1 Plumbing: 15K 419/o41 j (oJ [ ] Propane Tank/ Lines: /m- 6 • s 4/9/0 [ ] Insulation: Ok w/eena/IZ/pn 4L+ i4'/' 1 1 Sheetrock: OK it/khan 4/2rit1 _ [ ] Septic Sytem Final Approval: 1 Zoning Final Approval: Af [ ] Final/Occupancy Approval: 4 ,r-- G� D / // O5 HEALTH DEPARTMENT APPROVAL REQ IRE IOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE 11) BUILDING PERMIT APPLIC�ION MLA04-00040 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00042 Received Date: 1/23/2004 SITE ADDRESS: 1 41 MT CONSTANCE WAY PORT LUDLOW, 98365 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360) 437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 6 PARCEL NUMBER: 978800006 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2004 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP NEW SFR W/ATTACHED GARAGE & DECK(S) TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,562 VALUATION 191,878.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 775 SHORELINE: CONST TYPE: DECK: 270 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 2 Prop: 2 Seismic Streams Total: 2 Total: 2 Flood Way Floodplain Routing Date: F&W Landslide a`7 D11 Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: A P PR eeVE Permit $1,508.95 KAS 01/23/04 62433 State Building Code $4.50 KAS 01/23/04 62433 FEB 1 1 2004 Potable Water Application $52.00 KAS 01/23/04 62433 Jefferson County Planning Total: $1,565.45 & Building Department 1� c5c64 01/22/2004 10: 46 3603794451 JEFF CO DCD PAGE 01/0 «. &t,t,x iv."1.c rnn oou4d roc YUKi LUDI.UW ASSVCIAT -. „IC PERMIT CEN R [2 002 ant D E _ I 1 tro;,,;r gli ti, ;111ty Qeuekipmen f-g...07, ... - r � _ N prI I . LT,.ont��ppi�t n.:II.41,141A10 C350)376.4451 ► l. 0 t . p r e r• rno • 0 i 1 ! reilitric -do"r) !. '; L�" PT_QF COMMUNITY DEVELOPMENT 61. plan or- 3 Project Dosed.tion: _ q fi g- ��-Ups Building Type; Piojevt Type; Frame Type: )(Single l*tx,ily 0 U _t°O j KNew 7S Woad ' -Gatage Attached/Detsiehed Addition Steel Modular 3-0 I-/o /o Altmtion/l emodel Concrete Commercial 0 Repair Ivlasonry Multi-family/#of Units Dcunolirion Irtdyaet:la] 7 9 Other: Other: n.. , .tom — ,...� . Bathrooms: Bedrooms: Ty re o/Sewage Disposal:_r Type cif FEct: Choose ones Existing: 0 Existing, C) Sewer Community Sysreeil Electricity Oil Proposed: Z. Pybposed: Individual System Total: ' oCal: —2"-- -if not sewer,fill out the following: ar Pump Fro�ianc Conventional Alternative 0t}aar:pteaFewe Permit# SEI' Water Supply Private well Two Pat Well Public Narise of water;s stem: t... . _ --- Square Fo o ages /- ) n ^�T� :` o iaisfidgiiigi'd;:tiiai ; Main Floor _ /� A'Ot 1; 3 Co .I y i u' ''i i ri'''f i,Nn'?!!.. ..:1: , '.' '!I.! • 14 Q , ' 1I01t+r;�1I7A��II__���iI��ls("V�1�11l'I�-� 'I :,�i�� ,r �d, 2Np):oox �iliI it' till Fi9+i i i'L.l •n 1111' ;11,:.',;11,L l il,l �6 3rd Floor +-. 'V ...,, �'1,r4gl'�95iq,'' i, i, itdilli q I-ltd Baserneot _ +,; # i rX r ,tejrr•, ._I ' ' ''9 ,, Unhtd Basement ' 5;ibtoO9• _ � oc . } 561. Garage/Carport 5- I ?, o.(4�, r1 Pot Water Q2ic w;fed _ 85 DCC1 7p 11111 . Co 1./r A4C�fAif@H' 1�Commercial - ;t i i G'�?P ''414 I �', ,Induscrjsl It • ' " - ':...._,?1_7qz.r. r4.,.... Lis &a5/ Other . Total VRIuad c i;^ r 1 Or ii.11,I,4,„l(°•.1.., 'tt"rlr'�,,;, .h.:�, 1'P.`!!,,,,' .., • Estimated�Ast, `/'e� ,,x;;, ",•i..'I'II l ;! 'l i;ile 11,1,: ; N:r, ;-;;.;;;1 1, ,.1 ���rr`1,, I h i"' If within 200'of the Shoreline, Distance to Bank or Ordi;nazy High Watez Mark ,ft.Bank Height _ ft. By Atning the appineatiun form,the applicant,/ew rie naresrx that the in Foreanden provided herein iN true and coiveer to t a hest of their knowledge. Any matedial fakehood or and ondxstun of a maatial Ent muds by the applicant/owner with roapecc to thin npplicndan pnehnt finny tcsah in this permit being null any I-raid. 1 further Nyrsa to save,intictnnify and k,uW humlcss Jcffer nn County in tint ail liabilities,iudg+mante,eoutt costs,ecasonabIe acrorne''yt/sru and expense,which may in Loy t y;lcca,c_ ct 1nwnJc(ft:rton Conniy Is,n o)k or�`. consequence or dies.-nor,/of thU parfait, I further wee t n provide access and ri• .Eon otaion only and Ws omplayens,reprtdemadves or:l ord,.rat dim purit,sc ofu;rltll on Asti ' and any required laterinspuctyunw, ,1ewx.:a.d right of entry to rho appli Fir ty eruct rn fall be reque; and shall occur riming raaular business hours. / Sigfiiature; pate: 2 If:lfO;VfI;\PI.NCN1'R\INVOBT.DG\FORMSVILDpeunitA.pplication 1t.8.01 OV APPROVED SITE PLAN FEB - 42004 JEFFERSON COUNTY STORMWATER MANAGEMENT DEPT.OFFFFE O SMALL PARCEL EROSION AND SEDIMENT CO _ EROSION AND SEDIMENT CONTROL WORT Property Owner: Port Ludlow Associates Telephone: 437-2101 Address: 70 Breaker Lane, Port Ludlow, WA 98365 Assessor's Parcel Number: 9 78R0000 Building Permit or Septic Permit Application Number(if applicable): /— O Brief Project Description: New Single Family Residence W/ attached garage. Site Location: Person Responsible for BMP Installation and Maintenance: Jeff Ev a n g e r Address: Same as above Telephone:Same as above 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets,if more space is required. [] Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spalls,ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [] Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas,landslide or erosion hazard area,etc.). SPESC Instructions—Short Form Revised July 17,2002 JAN 2 7 2004 3 EROSION AND SEDIMENT CONTROL WORKSHEET [] Phase clearing so that only areas that are actively being worked are uncovered. [] Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. [)� Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [] Place gravel base on roads,driveways,and parking areas after clearing and subgrade preparation. Of Protect adjacent properties and water bodies from sediment deposition: [] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies.(See attached illustrations from Stormwater Management Manual.) [ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) [X Regularly inspect and maintain all BMPs especially after storms events. [] Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Site is very flat with sandy soils . So I helieve the above measures will be sufficient. SPESC Instructions—Short Form Revised July 17,2002 JAN 27 2004 4 EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized(seeded,landscaped,apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.). All immarvinus surfaces will he run to roof drains and catch basins as designed into the plat requirements, SPESC Instructions—Short Form Revised July 17,2002 5 J n N EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices.Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be installed, Silt fence will be left in Place until we are ready to landscape and all roof drains/ • catch basins are in. Landscaping will be installed as early as possible on the exterior of the building when all exterior concrete work is completer,( , The Best age e t Practices proposed above will be implemented to control erosion, sediment, and stormwater o 1 the Jefferson County for inspections as re uire . Signature of 0 e Agen Dat SPESC Instructions—Short Form Revised July 17,2002 6 JA . 2 7 , i - i'rr-. .4,, 1-1,t1( i;r114-. r-r,--r` [0,46.-TioN... 11 _ //' \ '‘‘ _If.t , -------M-rt-'w1-'-t--4° Pv-2. .. .- ' Storrpwuter s JtF 4 Required C0UNTV APPROVED 0 •RMWATER PLAN 71;°1t" 014 (-1; 1 P. N -14i JEFFERSON I DEPT.OF CO' ,) DE T.LOPM'NT . -I SIGNATURE: may' !4 iii 1 - Mtnli)i �(' 21 � ..4. / (29i? P f 9 c, i , 1___' ':-- A -1. 14�t; ,-' [ - _ �� _ _ 1 : -) : ! - I I.of #Z-ljlot\b*E . to 'I2o r t... I Fle,PArab 01971 2P1.1N-A4,0 ,I ; ft ; OtiAter); I4. 1d - ; Vitg ' /7 I 1+1 H ' -Li:- R= ' 1.0 , tl ,0 I _, JAN232004 I ' 100i Jr 1 Agt=h-.4-7 --, . --Ft.-‘-,[7 .-riArL., i- c-Tt. ii,. L.rr tv c2L,-1`1-1116; —1-. ..-ppAc,,e,,.. 1 Dtt H,Di)21-,-.T1 , • SPECIAL CONDITIONS FOR CASE # BLD04-00042 1.) The application was reviewed by the Jefferson County Department of Community Development staff on January 28, 2004 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Osprey. 2.) The applicant is proposing to create or add 4406 square feet of impervious surface and 6517 square feet of land disturbing activities. 3.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 5.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i). 6.) The site plan as submitted with the single family residence with attached garage and decks building permit application on January 27, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated February 4, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 7.) This approval is for a single family residence with attached garage and decks only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 9.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC)Section 6. Outdoor storage of thirteen (13)or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 10.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) Minimum setback from Mt. Constance Way right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 13.) An address of 141 Mt. Constance Way, Port Ludlow has been assigned to the lot. Mt. Constance Way is a county local access road (C517009). 14.) The lot was created through the Olympic Terrace Division 1 subdivision on March 11, 2003 under AFN 466745. 15.) A road approach permit(RAP04-0011)will be issued with the building permit. 16.) WDFW stated on January 30, 2004 that the proposal will not have a significant impact on the Osprey. 17.) The parcel has been design ied as MPR SF 4:1 under the Jefferson coy Comprehensive Land Use Map effective August 28, 1998. 18.) The lot is served by Port Ludlow water and sewer. 19.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 20.) Per MPR Code Section 3.17, Accessory dwelling units (ADU's)shall not be allowed in the MPR-SF zone. I:\F_BLD_Permit_Buildng.rpt 10/29/19