Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2004-00062
BUILDING PERMIT APPLICION MLA04-00058 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00062 Received Date: 2/3/2004 SITE ADDRESS: 62 N DUQUESNE AVE PORT TOWNSEND, 98368 OWNER: JAIME KOZELISKY PHONE: (360)385-3215 1112 S JACOB MILLER RD PORT TOWNSEND WA 98368 SUBDIVISION: IRONDALE Block: 126 Lot: 35-37 PARCEL NUMBER: 962112614 Section: 34 Township: 30 N Range: 01 W CONTRACTOR: JAIME KOZELISKY PHONE: (360)385-3215 1112 S JACOB MILLER RD PORT TOWNSEND WA 98368 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NEW GARAGE ATTACHED TO EXISTING MFH TYPE OF WORK GAR SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 11,314.00 ADD'L: HEAT TYPE: CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: 480 SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: Prop: Seismic Streams Total: Total: Flood Way Floodplain • Routing Date: F&W Landslide o�oL/ �y Shoreline Aquifer 7, Forest: Commercial Rural Type Amount Paid By: Date: Receipt: A r,Qq�pCdOty E D Permit $209.25 KAS 02/03/04 62602 �--++��----++ Plan Check $136.01 KAS 02/03/04 62602 MAR - 3 2004 State Building Code $4.50 KAS 02/03/04 62602 Total: $349.76 Jefferson County Planning & Building Department „oil?) BUILDING PERMIT • Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00062 Received Date 02/3/2004 SITE ADDRESS: 62 N DUQUESNE AVE Issue Date 03/3/2004 PORT TOWNSEND, 98368 APPLICANT: JAIME KOZELISKY PHONE: (360)385-3215 1112 S JACOB MILLER RD PORT TOWNSEND WA 98368 SUBDIVISION: IRONDALE Block: 126 Lot: 35-37 PARCEL NUMBER: 962112614 Section: 34 Township: 30 N Range: 01 W CONTRACTOR: JAIME KOZELISKY PHONE: (360)385-3215 1112 S JACOB MILLER RD PORT TOWNSEND WA 98368 PROJECT DESCRIPTION: NEW GARAGE ATTACHED TO EXISTING MANUFACTURED HOME REQUIRED INSPEC IONS: X ';ETBACKS: 1)4 OFFER: ,i Footing tit copio 5(0y Founda iron: [ ] Underground Plumbing: [ ] Underground Insulation: [ ] Shear Wall : X Framing: [ 1 Plumbing: [ ] Propane Tank/ Lines: [ ] Insulation: [ 1 Sheetrock: _ [ ] Septic Sytem Final Approval: �//4 Road Approach Final Approval: !}lP03 - to, [ ] Zoning Final Approval: /A , ,X( Final/Occupancy Approval: C-19e:cc/HEALTH DEPARTME �/ ANDB WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PORMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE SPECIAL CONDITIONS FOR CAE # BLD04-00062 • 1.) The application was reviewed by the Jefferson County Department of Community Development staff on 2/11/04 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Aquifer Recharge Area (SARPA). 2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. • 5.) The applicant is proposing to create or add 480-square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to the Small Parcel Plan Stormwater Provisions. 6.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 7.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i). 8.) The site plan as submitted with the building application on 2/03/04 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 2/11/04 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 9.) This approval is for a new garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 10.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) North Duquesne is classified as a local access road and requires a minimum 20-foot front yard setback. The setback shall be measured from the edge of the right-of-way to the proposed development. The side and rear setbacks shall be a minimum 5-feet from the lot lines to the proposed development. 13.) A Declaration of Restrictive Covenant was recorded to combine Lots 35-39 in Irondale. The document was recorded under Auditor's File No. 469440. 14.) The subject property is near an airport where a variety of airport dependent uses occur that are not compatible with development. Potential discomforts of inconveniences may include, but are not limited to: noise, aircraft take-offs and landings. I:\F_BLD_Permit_Buildng.rpt 10/29/19 gsoN • m• Jefferson MA Department of City Dev t r °6 521 Si Street,Pat Towel WA 88308130013104450 s- a`0. prm5t Ppic@fl©.,,,, Project Description: • Building Type: Project Type: Frame Type: O Single Family l New mood Ed"--Garage Attached/Detached 0 Addition 0 Steel O Modular 0 Alteration/Remodel 0 Concrete • ❑ Commercial 0 Repair ❑ Masonry ❑ Multi-family/#of Units 0 Demolition 0 Other. ❑ Industrial O Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing. Existing. 0 Sewer 0 Comm ' S to 0 Electricity it Proposed: Proposed: 0 Individual System 0 Woodstov 0 ropane Total: Total: If not sewer,fill out owing: 0 Heat Pump 0 Conventional 0 Alternative 0 Other Permit# SEP Water Supply: O Private well 0 Two Party Well 0 Public:Name of water system: Square Footage: For Office Use Only tie, Main Floor Consistency Review - 2ND Floor Base fee Z09, Z.S. 3rd Floor Plan Check fee-65% 1 3 10 - 0 Htd Basement r State Surcharge fee Li 5' Unhtd Basement Subtotal 3 9, . -I 40 Garage/Carport T O 3' Co -0 Pot Water Review fee Decks 911/Rd Approach fee g161: ". ► 'u3-/Lik Commercial y TOTAL J j 9, , 7 !p Industrial Receipt# (0 e boa Other Cash/Check# R( )7 Total Valuation: Initials /I/ Or y O,p Date Z�3�a I Estimated Cost: /cCX) If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property 9Lstructure shall be requested and shall occur during regular business hours. Signature: , Date: Z — Z — o L( OVER f H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01 ; p t Z - t..1.1 , i • g) i rt riTil Z o g:1:4 ... Li 111 C. :?,-. ea„s 1 (1 ccs' "b8 I Le, (OP', lor+4 ;• 4 Lti CC(t, ' NIlif ••• el Aibih..". CtIU3 113 ‘t gi '..... -- Z •311"2, r #1.0110. r„.fic -c- ---- o z -016'% L , ‘ ;I, k,i-i• ... . NJ •$13 I Z NI 11... '& ICI C. (1 Z i' -<, ..., 7 - cm2 1 dik t(-P-1 ii biz-zri,10-1 ., t • c.., CV = 1=1 _ ••••1 Ct) 9..... Q .. ''-"."*.- CZ) 1.•..... — 4:C• C:St C:3 ' ? il.o.... . , f y ..... , c=. 2 I. ,...... • \ vi \ \ \ I , 1 f 2. vf) , 1 \ .... w \ „....i. ey „-------', \ tp t,.i A .., . t , ‘ ,... ..,, \..... c\:\ \ 0 I .4, ,j, \ c"..., c„,...., \ . r- , , ----- 3; \ ...., 4, A 0 , 4, i2s1 ., . \ .„------ cs_a 9, , . 11/4 \-\\ et, 1 \ \ \ .., ---- \ \ , • , .\\,..-- - • ‘,,,, ,...... l l • I \ ‘ ..'' \ ••••''''' ..• ''••s, \ ) I • '• \ k, , \ ', , . ' (Z4) 4 \. CI 0 ' \ '----a- • 7 \ '' i J + Ir.". \ j \\\: er,, v i'r N t ,I (,)Y \ . .. .. . _ : ...... \ , _ ..- ,. -\ ..-_-.. ...y. ,- ----.._ • , .>. Iii