Loading...
HomeMy WebLinkAboutBLD2004-00116 6 MLA04-00094 BUILDING PERMIT APPLICA�"ON Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00116 Received Date: 2/24/2004 SITE ADDRESS: 1 r FALCON LN PORT LUDLOW, 98365 OWNER: JACQUELINE L SEELEY PHONE: (360) 765-3883 PO BOX 532 QUILCENE WA 98376-0532 SUBDIVISION: PORT LUDLOW NO. 4 Block: Lot: PARCEL NUMBER: 990500044 Section: 8 Township: 28 N Range: 01 E CONTRACTOR: CENTRAL SOUND CONSTRUCTION INC PHONE: (360) 297-3153 PO BOX 7303 KINGSTON WA 98346 Contractor's License CENTRSC071 L8 Expires 2/25/2005 REPRESENTATIVE: CENTRAL SOUND CONSTRUC- PHONE: (360) 297-3153 PO BOX 7303 KINGSTON WA 98346 PROJECT DESCRIPTION NEW SFR W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,579 VALUATION 106,047.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 126 SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: F&W Landslide o? a7 a z Shoreline Aquifer „,( Forest: Commercial Rural Type Amount Paid By: Date: Receipt: ,t, , t ,, F.. Permit $1,032.95 KAS 02/24/04 62582 , .. s„- Plan Check $671.42 KAS 02/24/04 62582 State Building Code $4.50 KAS 02/24/04 62582 MAR 3 1 2004 Potable Water Application $52.00 KAS 02/24/04 62582 Jefferson County Planning Total: $1,760.87 & Building Department CCULCIAn'N r � Aso co Jefferson ComitOert t nt I vanity DoVe nt 6 621 Sheridan Street,Port .i "aOf fen:68[3601370-445a r� <<� 1 0 IF 004, ,,_-_,;-----.., r Ap ^ x Building Family .�' New � Wood Project Type: Frame Type:,_`_ ,J•'.'- `j.. � g Single ❑ Garage Attached/Detached ❑ Addition ❑ Steel ' 1 ❑ Modular ❑ Alteration/Remodel ❑ Concrete ❑ Commercial ❑ Repair ❑ Masonry ❑ Multi-fam ly/#of Units ❑ Demolition ❑ Other: ❑ Industrial ❑ Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: Existing: X Sewer ❑ Community System ❑ Electricity ❑ Oil Proposed: Proposed: ? ❑ Individual System Total: Y ❑ Woodstove ❑ Propane Total: If not sewer,fill out the following: „ ,Heat Pump ❑ Conventional ❑ Alternative ❑ Other Permit# SEP Water Supply: ❑ Private well ❑ Two Party Well❑ Public:Name of water system: Square Footage: Office Use For Office Use Only Main Floor / 5 11 I 0 3,611, Consistency Review _- 2ND Floor Base fee IC 3Q g, 3rd Floor Plan Check fee Cc7I. ' Htd Basement State Surcharge fee .`1 -5° Unhtd Basement Subtotal I jj c" 8 / Garage/Carport C:........__________,.. of Water Review fee85 atit Decks A 911 Rdit / Approach fee � Commercial 1 TOTAL 1q85, �� Industrial Receipt# 3 `-.5 Other Cash/Check# I is Initials a Date a 0 Estimated Cost: / 0 G. •`�/If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be reque ed and sh occur during regular business hours. 0: Signaturf •y�� //I Date: Z 1/7 /0 V OVER ► G:\PermitCenter\FORMS\BLDG FORMS\BLDPermit Application.doc 01/08/2004 e . BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00116 Received Date 02/24/2004 SITE ADDRESS: 41 FALCON LN Issue Date 03/31/2004 PORT LUDLOW, 98365 APPLICANT: JACQUELINE L SEELEY PHONE: (360) 765-3883 PO BOX 532 QUILCENE WA 98376-0532 SUBDIVISION: PORT LUDLOW NO. 4 Block: Lot: 44 PARCEL NUMBER: 990500044 Section: 8 Township: 28 N Range: 01 E CONTRACTOR: CENTRAL SOUND CONSTRUCTION INC PHONE: (360) 297-3153 PO BOX 7303 KINGSTON WA 98346 Contractor's License: CENTRSC071 L8 Expires: 02/25/2005 PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE REQUIRED INSPECTIONS: [ ] SETBACKS: 44' S//;7 [ ] UFFER: /(bhp,)._.. [ ] Footing:; 4 '��,� [ ] Foundation: d �} brans 5/3/ [ ] Underground Plumbing: [ ] Underground Insulation: [ ] Shear Wall : AL' l�z. af! [ ] Framing: ('rf',,) '',1, , / .%3jix f f 1 Plumbing: ff [ ] Propane Tank/ Lines' /1�'r"� i4 /_;,};- ;2 2-5'jjA' [ ] Insulation: a<l�e/G� , / /dh 9 /3/d4/ i,,e 5 :dL ®3/1 1 Sheetrock: 0l< 07/411 [ ] Septic Sytem Final Approval: f 1 Road Approach Final Approval: [ ] Zoning Final Approval: 1 Final/Occupancy Approval: .(ter- C O j o� ,i/ HEALTH DEPARTMENT AND PUBLIC WORK APPR A REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY-SEE REVERSE litSPECIAL CONDITIONS FOR C A BLD04-00116 • 1.) The application was reviewed by the Jefferson County Department of Community Development staff on March 9, 2004 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Osprey. 2.) The applicant is proposing to create or add 3012 square feet of impervious surface and 4732 square feet of land disturbing activities. 3.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) A Medium Project Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 5.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 6.) The site plan as submitted with the single family residence building permit application on February 24, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated March 9, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 7.) This approval is for a single family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 9.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk(or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 10.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) Minimum setback from Falcon Lane right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 13.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 14.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 15.) Per MPR Code Section 3.10711, ccessory dwelling units (ADU's) shall not Allowed in the MPR-SF zone. 16.) The parcel has been designated as MPR SF 4:1 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 17.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 18.) The lot was created through the Port Ludlow No. 4 Subdivision on March 26, 1979 under AFN 256622. 19.) An address of 41 Falcon Lane, Port Ludlow has been assigned to the lot. Falcon Lane is a county local access road (C513309). 20.) Per email dated March 2, 2004 from Jeff Davis, WDFW wildlife biologist, osprey are no longer a priority species. 21.) The lot is served by Port Ludlow water and sewer. 22.) A road approach permit(RAP04-0036)will be issued with the building permit. I:\F_BLD_Permit_Buildng.rpt 10/29/1999