Loading...
HomeMy WebLinkAboutBLD2004-00221 • 0 BUILDING PERMIT APPLICION MLA04-00184 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00221 Received Date: 4/2/2004 SITE ADDRESS: 151 GYBE HO RD NORDLAND, 98358 OWNER: DIANNA R WIKLUND PHONE: (253) 939037 GLENN WOODBURY 252 PROTECTION RIDGE RD eA-zt 340 :-'/ 3C9.2- PORT TOWNSEND WA 98368-9680 SUBDIVISION: ROBERT SPERRY SHORT PLAT Block: Lot: 4 PARCEL NUMBER: 921081028 Section: 8 Township: 29 N Range: 01 E CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI NEW SFR W/DECK(S) TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,120 VALUATION 176,267.00 ADD'L: 570 HEAT TYPE: WOD CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: 1,120 #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: SHORELINE: CONST TYPE: DECK: 379 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: 2WELL PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 2 Prop: 1 Seismic Streams Total: 2 Total: 1 Flood Way Floodplain Routing Date: / F&W Landslide [ . , ` `jPP,' , Shoreline Aquifer / is Forest: Commercial Rural Type Amount Paid By: Date: Receipt: A P1319C �t. /E D Permit $1,424.95 KAS 04/02/04 64122 f �/ Plan Check $926.22 KAS 04/02/04 64122 MAY 1 1 2004 State Building Code $4.50 KAS 04/02/04 64122 Potable Water Application $52.00 KAS 04/02/04 64122 Jefferson County Planning & Du' ding Departure Total: $2,407.67 'I 02) S , 4 / BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00221 Recei✓ed Date 04/2/2004 SITE ADDRESS: 151 GYBE HO RD Issue Date 05/11/2004 NORDLAND, 98358 APPLICANT: DIANNA R WIKLUND PHONE: (253) 939-1639 GLENN WOODBURY 252 PROTECTION RIDGE RD PORT TOWNSEND WA 98368-9680 SUBDIVISION: ROBERT SPERRY SHORT PLAT Block: Lot: 4 PARCEL NUMBER: 921081028 Section: 8 Township: 29 N Range: 01 E CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: NEW SFR W/DECK(S) REQUIRED INSPECTIONS: A SETBACKS: [XJ UFFER: [J Footing: [) Foundation: [ ] Stormwater FINAL Approval: A Underground Plumbing: [�(] Underground Insulation: Shear Wall : [14 Framing: I')Q Plumbing: [ ] Propane Tank/ Lines: Nno,CIana.._ [41 Insulation: ['l Sheetrock: Septic Sytem Final Approval: 1 Road Approach Final Approval: /y/(.R [ ] Zoning Final Approval: Aft P t C [Al Final/Occupancy Approval: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE • Jefferson Gaal H ertunent of Community Development 1. ON e() 621 Sinner Street,Port Townsend WA 8636813601370-4450 e' ` ':\ i permit A 0 0 i o ppD O o o n lug CQ Project Description: Building Type: Project Type: Frame Type: Di Single Family 1X New 1 Wood ❑ Garage Attached/Detached ❑ Addition ❑ Steel ❑ Modular ❑ Alteration/Remodel APR 0 Concrete • ❑ Commercial ❑ Repair ❑ Masonry ❑ Multi-family/#of Units ❑ Demolition fl Other: ❑ Industrial ❑ Other. Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing. 0 Existing. 0 ❑ Sewer ❑ Community System ❑ Electricity ❑ Oil Proposed: i Proposed: Z- Cii Individual System El Woodstove ❑ Propane Total: ! Total: 2- If not sewer,fill out the following: ❑ Heat Pump Conventional ❑ Alternative ❑ Other Permit# SEP 01- 0 019 3 Water Supply: ❑ Private well 0 Two P Well❑ Public:Name of water system: Square Footage: i 003$5• O For Office Use Only Main Floor -` •k% Consistency Review 46.00 2ND Floor . "/"'' Base fee ( 4 2q . q J 'i ©gq•10 Qv, .22_ 3rd Floor Plan Check fee-65% Htd Basement - � State Surcharge fee L 4'f'•SO Unhtd Basement [ T 1 c' '�l Subtotal D-"[o� •�� Garage/Carport Pot Water Review fee 6---•OC) Decks 51?" "� 7 911/Rd Approach fee 725Commercial a 3 TOTAL 2 1- gF. ,7 Industrial 1 J f_2 ` Z2 Receipt# 6 4� — Other Cash/Check# V2 it,S---' �� Total Valuation: Initials Q 1 nn'--(a Or Date if-(2-ioy- Estimated Cost f 17( 7 -(� . If within 200' of the Shoreline, Distance to Bank or Ordinary High Water lyfark ft.Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. "_1 ,. 4- Signature: zii '�, � . t1 `�°��>� Date:rig u . 1 APR � 0 4 G OVER f". H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01 • SPECIAL CONDITIONS FOR CASE A BLD04-00221 1.) The application was reviewed by the Jefferson County Department of Community Development staff on April 9, 2004 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject properly: Special AQuifer Recharge Protection Areas and Coastal Seawater Intrusion Protection Zone (SIPZ). 2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aq Jifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4)All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code. 4.) Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall)and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 5.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone)according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy(Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet. 6.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs)and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 7.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 8.) VOLUNTARY MEASURES 0 OASTAL&AT RISK SIPZ: • Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 9.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 10.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 11.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 12.) A flow meter shall be installed prior to final sign off of the building permit. 13.) On-going well monitoring for chloride concentration is required. The property owner shall allow access to Jefferson County PUD or approved contractor to take samples as required. 14.) The applicant is proposing to create or add 2679 square feet of impervious surface and 11540 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a stormwater plan meeting Minimum Requirements#1 through #5 of the Stormwater Management Manual for Western Washington. 15.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 16.) The site plan as submitted with the building permit application on April 2, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 10, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 17.) This approval is for a single family residence with decks and a satellite bedroom only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 18.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 19.) Not more than two (2) unlicensior inoperable vehicles shall be stored on Slot ess than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13)or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 20.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 21.) The building height is not to exceed 35 feet. 22.) Minimum setback from Tract"A" is 20 ft. Tract"A" is described as the 40 ft wide private road easements, the 60 ft x 60 ft turnaround, the well protection easement, the 20.:t easement for pipelines and septic maintenance, and the 120 ft x 240 ft drainfield easement as shown on Robert Sperry Short Plat. Minimum setback to the east boundary line is 5 ft. 23.) This parcel has been designated as Rural Residential 1:5 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998. 24.) A septic permit (SEP01-00193)was approved on July 25, 2003 for a system of 360 gallons per day. 25.) Gybe Ho Rd is a private road (P545). The road approach is existing and an address of 151 Gybe Ho Rd has been assigned to the parcel. 26.) This parcel was created through the Robert Sperry Short Plat under AFN 397810, filed of record June 22, 1997 in Volume 4 of Short Plats, page 2-3 with Jefferson County Auditor's office. 27.) A stormwater plan for a medium project has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 28.) A minimum of two (2)on-site parking spaces are required for the single family resicence. I:\F_BLD_Permit_Buildng.rpt 1 0/29/1 9