Loading...
HomeMy WebLinkAboutWORKSHOP Natural System Design NSD_JeffCoBOCC_072825Jefferson County BOCC | July 28, 2025 Dosewallips River – Powerlines Reach July 28, 2025 1 Brinnon Reach Assessment and Conceptual Design: RCO# 23-1062 Dosewallips River: Lazy C - Powerlines Reach RCO# 18-1228 Dosewallips River: Rocky Brook Reach RCO# 21-1024 FUNDED Powerlines Sub-reach Proposed Final Design RCO# 25-pending Dosewallips River Project Reaches July 28, 20252 Powerlines Reach Project Update July 28, 20253 Powerlines Reach Project Update July 28, 20254 July 28, 20255 July 28, 20256 July 28, 20257 Powerlines Reach Project Update 2-Year Flow (5,239cfs) July 28, 20258 Powerlines Reach Update – Next Steps Funding PENDING: •Step 1: Complete and Submit Project Permit Applications •Step 2: Field Reconnaissance and Complete Draft Final Design •Step 3: Complete Final Design, Specifications, and Bid Documents •Step 4: Complete FEMA analysis and Conditional Letter of Map Revision (CLOMR), and then the final LOMR (following construction). Future Steps: •Obtain Construction Funding •Complete Project Construction