HomeMy WebLinkAbout090710_ca04 TO: FROM: DATE: RE: JEFFERSON COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST Board of County Commbwiollel'll Sheriff Anthony Hernandez (by Larry Southwiek, Project Manager) September 7, 2010 JEFFCOM 9-1-1 Radio System Improvements CJumge Order Request No. IS STATEMENT OF ISSUE: Approval and execution of Change Order Request (COR) No. 15 in the amount of$8,212.00 for BlIchan"1'l General Contracting Company (Contmctor). ANAL~: On January 25, 2010. the BoardofCQunty CommiAAioners approved and executed a contract with Buchanan General Contracting Company, P.O. Box 40069, Bellevue" W A 98015 for the construction of the Jet'fCom 90.1-1 Radio System Ln1"ul/ement Project. Construction started at the South (Coyle) and Maynw:d Peak sites on February 8. Work began at the Green Mountain site the first week of March. The following COR is essential for the completion of construction at the let'fCom 911 fucllity site. Change Order Request No. 15 is attaclted for your approval and execution. There is a radio tower adjacent to the Port Hadlock JefiComIDepartme of Emergency Management fucllity with numerous cables coming from the tower, through an existing 'port' and into the facility. That port is entirely full and Additionll1 radio cables need to be installed as part of the project. COR No. 15 provides for the Contmctorto excavate adjacent to the easterly wall of the facility, core drill 3 -6" holes through the concrete wall into the mechaniad eqW,jnn.mt room, and install 2 ~ 4" conduits (one each per 6" hole) and 3 - 2" conduits (in one of the 6" holes) from the radio tower into the <1juipment room for the current project and future needs. Change Order No. IS was approved by the Jet'fCom A,dm1n1mauve Board on August 26, 2010. FISCAL IMPACT: Funds will be provided by the JeffCom Enbam:ement Fund 121 which was funded by a 2007 bond i$ue. The total amount of the original contract with sales tax is $364,728.08. Change Order Requests No. 1 through 14 increased the current approved cost to $453,697.08. The addition oCCOR No. 15 in the amoun1of$8,212.oo brings the new total to $461,697.08. The total ofCORs 1 through 15 is $97,181.00 or 24.65% of the original contract. Sufficient funds are available. RECOMMENDATION: Move to approve and execute Change Order Request No. 15 to the Jet'fCom 911 Radio System Improvement Col11rlwt with Buchanan Geneml CQl11rlwting Company. 'ZS~/~ Date JEFFCOM 9-1-1 Radio System Improvements CHANQE ORDER REQUEST No. IS On January 25,2010, Jefferson Couuty ClI""olfed a Cwttna:t with BlIC"J""llm GeneJal Con1ractiug Company (Coul,,,.;b.~) for the public works wm>tnwtionofJem::om 911 Radio System Ir.oprovements in the amount of $364,728.08 including local and state $Illes tu. Previously appnmlll ~ Order Requesls (COR) No. I through 14 bring the "PJUo"ed project total to $4S3,697.08 to date. Proposed COR No. IS in the amount of $8,212.00 would bring that total to $461.9ll9.08 (a total of24.6S% inerease) The scope of work for the project is desedbed in the Contract. AJnendrneftt8 to StlIndard Speci:6CAti9DS and on the Plans that are included in the original 0,.11,,,,,1. That scope ofwork is hereby A1'I!I'I'ldP.fl as fi>llows: Provide labor, equll"l'.-t, maImials and "Ul"'l.ision to excavate IKllrt to the easterly wall of the Jeflt:om/Dept of Emergency Ma.tIagennmt fudIity in Port J.led1nck. core drlll3 - fl' boles through the IXblMlte wall into the me<>.h'l,l1i-t equipment room and iDstalI two mns of 4" conduit and 3 mns ofl" conduit fi:o.m the equipment room to the base of the radio tower for the fbture iMtt>ll9finn ofmicrowave "J'~ and other related facilities on the tower. per the provided plans and ~0lIIi0llS. The 0'''''''''1 amount is hereby "",,,,,dP.fl as fi>1lows: On August 19, 2010, the Contractor provided llpDeequoteof$8,2I2.00 for CORNo. IS (c:opyattached) for the extra costs telated to the msmn9fi()J1 of the conduit mns as descn'bed above. The total Co1lb.....t amount is hereby ameqdlJd to $461,909.08. There is no change to the Cu1lb._1 time ofninety (90) lWrldng days. There are no changes to any other . provisions of the Cu1lb.....t than stated herein. Ry_-\J1l:d by the CwdloWtul August~ 2010 ~aL4J.AN ~. ~. Co. Contractnr By: -r:"d~ u/ )'p~ ~4ca- Approved as to form only: . . ~J311jo SEAL: COUNlY OF JEFFERSON BOARD OF COMMISSIONERS David W. Sullivan, Chair Phil Johnson, Member John Austin, Member A1TEST: Erin Lundgren, Deputy Clerk of the Board ~~!. ....~!. BUCHANAN GENERAL CONTRACTING COMPANY ~'. - . -~ *' .~ .~.~. ~.~. . August 19,2010 Little Construction 2009 4th Street Port Townsend, W A 98368 Attention: Alex Little Reference: JEFFCOMM 911 CEl5 - Conduit for Waveguide. Port Hadlock Dear Alex, We are pleased to submit a lump swn quotation of$8,212.00 to provide all of the labor, material. equipment and supervision to install conduit for microwave waveguide at the Port Hadlock fiwility per the document you issued via email. A copy of our breakdown is Attached. Please issue an authorization to proceed with this additional work. Thank you. VeryTruIyYours, Buchanan General Con1:ract.IDg Company Terry Buchanan Project Manager Cc: Larry Southwick PO Box 40069, Bellevue, WA 98015 Phone 425 462-1326 fax42S 462-9468 www.btlc1Ilm"'lgc.com BUCHAGC 159CF Buchanan General c:...lbadh'll Co. Jeflcom 911 - Green Mountain EsIImaIor. DennIs PrInl_: 8/13/10 CE1& - ConduIt for PLIladJock BGC Labor MaIeriaI SuIlv . dioolllr ToIaI Noles Code .o-.iplltnl Unit ToIaI Unit ToIaI Unit ToIaI CIlsl GENERAL CONDITIONS SUPERINTENDENT s......Ld.."d.d 18 hr 49.63 794 0.00 0 0.00 0 794 Mt.aUlIg& & Reporting 2hr 0.00 0 0.00 0 0.00 0 0 SlIe Walks 2hr 0.00 0 0.00 0 0.00 0 0 PROJECT MANAGEMENT BuildIng permIl and Ilcense 1 Is 0.00 0 0.00 0 0.00 0 0 nIc As buill drawings 1 Is 0.00 0 0.00 0 50.00 50 50 Ad_ bIueprlnts 1 Is 0.00 0 0.00 0 0.00 0 0 Projeol manager_ 1 Is 0.00 0 0.00 0 0.00 0 0 E.dhudlh'lI PrevaIlIng wages 11s 0.00 0 0.00 0 0.00 0 0 Project Managlng 1 Is 0.00 0 0.00 0 0.00 0 0 TELEPHONE Telephone 0.15mo 0.00 0 225.00 34 0.00 0 34 FAX equipment 11s 0.00 0 0.00 0 0.00 0 0 TEMPORARY CONSTRUCTION ISl'''''lpnce SU....bdl..dllIIl 2da 0.00 0 10.00 20 0.00 0 20 lllIIs ~lIl....lt..f 'ICe Craft 3da 0.00 0 25.00 75 0.00 0 75 fuel & lllIIs Tl'lI'I8Itrucks 2ea 0.00 0 75.00 150 0.00 0 150 Job oIIlce 1 Is 0.00 0 25.00 25 0.00 0 25 SlInItary convenIen<:e 1 Is 0.00 0 0.00 0 0.00 0 0 Temp power_up lis 0.00 0 35.00 35 0.00 0 35 Temp power 11s 0.00 0 0.00 0 0.00 0 0 TempMalher~ 1 Is 0.00 0 0.00 0 0.00 0 0 W!ntllr P"-' & ImpacIs lis 0.00 0 0.00 0 0.00 0 0 Temp__up lis 0.00 0 0.00 0 0.00 0 0 Temp_ 1 Is 0.00 0 0.00 0 0.00 0 0 Local yard (compcsIIe rate) 3hr 40.03 120 32.50 98 0.00 0 218 DIsposal lea 0.00 0 0.00 0 37.50 38 38 BGCC M_& llemabIIIze 3hr 40.03 120 32.5D 98 0.00 0 218 FlnaI cleanup lis 0.00 0 0.00 0 0.00 0 0 T,,",pl'em:e 1 Is 0.00 0 0.00 0 0.00 0 0 CONCRETE PLACING EQUIP. Safely 2hr 0.00 0 25.00 50 0.00 0 50 eo_equipment 0.15mo 0.00 0 210.00 32 0.00 0 32 Pick uplM:k 0.15mo 0.00 0 515.00 92 0.00 0 92 TooIshmpelllllg lis 0.00 0 0.00 0 0.00 0 0 Jobpl\Gtlls 1 Is 0.00 0 10.00 10 0.00 0 10 SmaD tools 0.15 mo 0.00 0 210.00 32 0.00 0 32 FUEL, OIL & GREASE Fuel and mab4bnwlCtl 0.15mo 0.00 0 850.00 128 0.00 0 128 Fuel adjusImsnl 0.15mo 0.00 0 0.00 0 0.00 0 0 none BUILDING LAYOUT I SURVEY Locales 2hr 0.00 0 0.00 0 125.00 250 250 Foreman (.......dl.) 1 Is 0.00 0 0.00 0 0.00 0 0 SUrvey and ~ SlIe 1 Is 0.00 0 25.00 25 0.00 0 25 STRUCTURALCONSULTANT Testing and 1 Is 0.00 0 0.00 0 0.00 0 0 EQUIPMENT 1 sic 0.00 0 0.00 0 0.00 0 0 MobIdemob equIpmenI- '- only lis 0.00 0 0.00 0 250.00 25D 25D EQRTHWORK 1 sic 0.00 0 0.00 0 0.00 0 0 580 Backhoe 8hr 0.00 0 0.00 0 125.00 1000 1,000 minimum lID lll<ClMlleshellerface 6x4'x4' 4ey 3.75 15 0.00 0 0.00 0 15 hand lll<ClMlle@OOloge.<lloll lhr 15.00 15 0.00 0 0.00 0 15 110 lll<ClMlle to sheller pier lD'x4'x4' 8ey 2.5D 15 0.00 0 0.00 0 15 handlll<ClMlle@_,,.-.,, lhr 15.00 15 0.00 0 0.00 0 15 210 _ & compact _ maIerlaJ 10ey 3.00 30 10.00 100 0.00 0 130 peagl'll'l8l Copy of CE15 - Conduit for Waveguide, Port Hadlock, 08-19-10 CEil - ConduIt fur PL IladIacII BGCT Labor MalerIaI SlJb..ulhw.-' TolaI Noles Code Unit TalaI Unit ToIaI Unit TalaI Cost C<lll.pachl! 0.5 da 30.00 15 115.00 58 0.00 0 73 lIll8IIl8 __lfW8'IfllIm sheller lhr 15.00 11 0.00 0 0.00 0 15 _ disluJbed area 2hr 15.00 30 25.00 50 0.00 0 80 FURNISH & INSTAU.CONDUIT 1 sic 0.00 0 0.00 0 0.00 0 0 layout & COI8f1_ 3ea 5.00 15 0.00 0 105.00 315 330 calch slugs & __ con\IlI 2hr 15.00 30 0.00 0 0.00 0 30 F&! 4" schedule 40 conduIl2 x la 2011 1.50 30 2.50 50 0.00 0 80 F&l4" schedule 40 sweeps 2 x 2 4ea 7.50 30 laoo 72 0.00 0 102 F&! 'Z' schedule 40 conduIl3x1a 3011 1.00 30 1.25 38 0.00 0 68 F&I 'Z' schedule 40 sweeps 3 x 2 6ea 5.00 30 6.00 38 0.00 0 68 seal sheller pe..""., at InIeriar 3ea 5.00 15 5,00 15 0.00 0 30 seaI&_..wf@tlllIInlr 3ea 10.00 30 20.00 60 0.00 0 90 F&I puB Illpea Slc2ll1f1 10ea 3.OD 30 15.00 150 0.00 0 180 f1'caps@towerleg 2ea 3.OD 6 12.00 24 0.00 0 30 'Z' caps@towerleg 3ea 3.00 9 5.00 15 0.00 0 24 Buchanan General c...4l...A'lI Co. JeIfcllm611.Green ~ Labor AdjlIslment I.llborT8lCll8 TalaI Labor, MalerIaI, & SUb Overhead & Fee SUb TolaI 8&0, & Insurance SUb TalaI WSST TolaI BId 1,439 2OIl.9S'i 646 31.65'1> 723 3,009 Copy of CE15 . Conduit for Waveguide, Port Hadlock, 08-19-10 Ellllllllllol. DennIs Prlnl_ 6/13/10 1,569 o o 1,S69 1,903 o o 1,903 4,910 646 723 8,480 875 7,355 221 7,578 838 8,212 13.5O'L 3.01'1> a_