Board of County Commbwiollel'll
Sheriff Anthony Hernandez (by Larry Southwiek, Project Manager)
September 7, 2010
JEFFCOM 9-1-1 Radio System Improvements CJumge Order Request No. IS
STATEMENT OF ISSUE: Approval and execution of Change Order Request (COR) No. 15 in the amount
of$8,212.00 for BlIchan"1'l General Contracting Company (Contmctor).
ANAL~: On January 25, 2010. the BoardofCQunty CommiAAioners approved and executed a contract
with Buchanan General Contracting Company, P.O. Box 40069, Bellevue" W A 98015 for the construction of
the Jet'fCom 90.1-1 Radio System Ln1"ul/ement Project. Construction started at the South (Coyle) and Maynw:d
Peak sites on February 8. Work began at the Green Mountain site the first week of March. The following COR
is essential for the completion of construction at the let'fCom 911 fucllity site. Change Order Request No. 15 is
attaclted for your approval and execution.
There is a radio tower adjacent to the Port Hadlock JefiComIDepartme of Emergency Management fucllity
with numerous cables coming from the tower, through an existing 'port' and into the facility. That port is
entirely full and Additionll1 radio cables need to be installed as part of the project. COR No. 15 provides for the
Contmctorto excavate adjacent to the easterly wall of the facility, core drill 3 -6" holes through the concrete
wall into the mechaniad eqW,jnn.mt room, and install 2 ~ 4" conduits (one each per 6" hole) and 3 - 2"
conduits (in one of the 6" holes) from the radio tower into the <1juipment room for the current project and
future needs. Change Order No. IS was approved by the Jet'fCom A,dm1n1mauve Board on August 26, 2010.
FISCAL IMPACT: Funds will be provided by the JeffCom Enbam:ement Fund 121 which was funded by a
2007 bond i$ue. The total amount of the original contract with sales tax is $364,728.08. Change Order
Requests No. 1 through 14 increased the current approved cost to $453,697.08. The addition oCCOR No. 15 in
the amoun1of$8,212.oo brings the new total to $461,697.08. The total ofCORs 1 through 15 is $97,181.00 or
24.65% of the original contract. Sufficient funds are available.
RECOMMENDATION: Move to approve and execute Change Order Request No. 15 to the Jet'fCom 911
Radio System Improvement Col11rlwt with Buchanan Geneml CQl11rlwting Company.
'ZS~/~
Date
JEFFCOM 9-1-1 Radio System Improvements
CHANQE ORDER REQUEST No. IS
On January 25,2010, Jefferson Couuty ClI""olfed a Cwttna:t with BlIC"J""llm GeneJal Con1ractiug Company
(Coul,,,.;b.~) for the public works wm>tnwtionofJem::om 911 Radio System Ir.oprovements in the amount of
$364,728.08 including local and state $Illes tu. Previously appnmlll ~ Order Requesls (COR) No. I
through 14 bring the "PJUo"ed project total to $4S3,697.08 to date. Proposed COR No. IS in the amount of
$8,212.00 would bring that total to $461.9ll9.08 (a total of24.6S% inerease)
The scope of work for the project is desedbed in the Contract. AJnendrneftt8 to StlIndard Speci:6CAti9DS and on the
Plans that are included in the original 0,.11,,,,,1. That scope ofwork is hereby A1'I!I'I'ldP.fl as fi>llows:
Provide labor, equll"l'.-t, maImials and "Ul"'l.ision to excavate IKllrt to the easterly wall of the Jeflt:om/Dept of
Emergency Ma.tIagennmt fudIity in Port J.led1nck. core drlll3 - fl' boles through the IXblMlte wall into the
me<>.h'l,l1i-t equipment room and iDstalI two mns of 4" conduit and 3 mns ofl" conduit fi:o.m the equipment room
to the base of the radio tower for the fbture iMtt>ll9finn ofmicrowave "J'~ and other related facilities on the
tower. per the provided plans and ~0lIIi0llS.
The 0'''''''''1 amount is hereby "",,,,,dP.fl as fi>1lows:
On August 19, 2010, the Contractor provided llpDeequoteof$8,2I2.00 for CORNo. IS (c:opyattached) for the
extra costs telated to the msmn9fi()J1 of the conduit mns as descn'bed above. The total Co1lb.....t amount is hereby
ameqdlJd to $461,909.08.
There is no change to the Cu1lb._1 time ofninety (90) lWrldng days. There are no changes to any other
. provisions of the Cu1lb.....t than stated herein.
Ry_-\J1l:d by the CwdloWtul August~ 2010
~aL4J.AN ~. ~. Co.
Contractnr
By: -r:"d~ u/
)'p~ ~4ca-
Approved as to form only:
. . ~J311jo
SEAL:
COUNlY OF JEFFERSON
BOARD OF COMMISSIONERS
David W. Sullivan, Chair
Phil Johnson, Member
John Austin, Member
A1TEST:
Erin Lundgren,
Deputy Clerk of the Board
~~!. ....~!.
BUCHANAN
GENERAL CONTRACTING COMPANY
~'. - . -~ *' .~
.~.~. ~.~. .
August 19,2010
Little Construction
2009 4th Street
Port Townsend, W A 98368
Attention: Alex Little
Reference: JEFFCOMM 911
CEl5 - Conduit for Waveguide. Port Hadlock
Dear Alex,
We are pleased to submit a lump swn quotation of$8,212.00 to provide all of the labor, material.
equipment and supervision to install conduit for microwave waveguide at the Port Hadlock fiwility
per the document you issued via email. A copy of our breakdown is Attached.
Please issue an authorization to proceed with this additional work. Thank you.
VeryTruIyYours,
Buchanan General Con1:ract.IDg Company
Terry Buchanan
Project Manager
Cc: Larry Southwick
PO Box 40069, Bellevue, WA 98015
Phone 425 462-1326 fax42S 462-9468 www.btlc1Ilm"'lgc.com
BUCHAGC 159CF
Buchanan General c:...lbadh'll Co.
Jeflcom 911 - Green Mountain
EsIImaIor. DennIs
PrInl_: 8/13/10
CE1& - ConduIt for PLIladJock
BGC Labor MaIeriaI SuIlv . dioolllr ToIaI Noles
Code .o-.iplltnl Unit ToIaI Unit ToIaI Unit ToIaI CIlsl
GENERAL CONDITIONS
SUPERINTENDENT
s......Ld.."d.d 18 hr 49.63 794 0.00 0 0.00 0 794
Mt.aUlIg& & Reporting 2hr 0.00 0 0.00 0 0.00 0 0
SlIe Walks 2hr 0.00 0 0.00 0 0.00 0 0
PROJECT MANAGEMENT
BuildIng permIl and Ilcense 1 Is 0.00 0 0.00 0 0.00 0 0 nIc
As buill drawings 1 Is 0.00 0 0.00 0 50.00 50 50
Ad_ bIueprlnts 1 Is 0.00 0 0.00 0 0.00 0 0
Projeol manager_ 1 Is 0.00 0 0.00 0 0.00 0 0
E.dhudlh'lI PrevaIlIng wages 11s 0.00 0 0.00 0 0.00 0 0
Project Managlng 1 Is 0.00 0 0.00 0 0.00 0 0
TELEPHONE
Telephone 0.15mo 0.00 0 225.00 34 0.00 0 34
FAX equipment 11s 0.00 0 0.00 0 0.00 0 0
TEMPORARY CONSTRUCTION
ISl'''''lpnce SU....bdl..dllIIl 2da 0.00 0 10.00 20 0.00 0 20 lllIIs
~lIl....lt..f 'ICe Craft 3da 0.00 0 25.00 75 0.00 0 75 fuel & lllIIs
Tl'lI'I8Itrucks 2ea 0.00 0 75.00 150 0.00 0 150
Job oIIlce 1 Is 0.00 0 25.00 25 0.00 0 25
SlInItary convenIen<:e 1 Is 0.00 0 0.00 0 0.00 0 0
Temp power_up lis 0.00 0 35.00 35 0.00 0 35
Temp power 11s 0.00 0 0.00 0 0.00 0 0
TempMalher~ 1 Is 0.00 0 0.00 0 0.00 0 0
W!ntllr P"-' & ImpacIs lis 0.00 0 0.00 0 0.00 0 0
Temp__up lis 0.00 0 0.00 0 0.00 0 0
Temp_ 1 Is 0.00 0 0.00 0 0.00 0 0
Local yard (compcsIIe rate) 3hr 40.03 120 32.50 98 0.00 0 218
DIsposal lea 0.00 0 0.00 0 37.50 38 38 BGCC
M_& llemabIIIze 3hr 40.03 120 32.5D 98 0.00 0 218
FlnaI cleanup lis 0.00 0 0.00 0 0.00 0 0
T,,",pl'em:e 1 Is 0.00 0 0.00 0 0.00 0 0
CONCRETE PLACING EQUIP.
Safely 2hr 0.00 0 25.00 50 0.00 0 50
eo_equipment 0.15mo 0.00 0 210.00 32 0.00 0 32
Pick uplM:k 0.15mo 0.00 0 515.00 92 0.00 0 92
TooIshmpelllllg lis 0.00 0 0.00 0 0.00 0 0
Jobpl\Gtlls 1 Is 0.00 0 10.00 10 0.00 0 10
SmaD tools 0.15 mo 0.00 0 210.00 32 0.00 0 32
FUEL, OIL & GREASE
Fuel and mab4bnwlCtl 0.15mo 0.00 0 850.00 128 0.00 0 128
Fuel adjusImsnl 0.15mo 0.00 0 0.00 0 0.00 0 0 none
BUILDING LAYOUT I SURVEY
Locales 2hr 0.00 0 0.00 0 125.00 250 250
Foreman (.......dl.) 1 Is 0.00 0 0.00 0 0.00 0 0
SUrvey and ~ SlIe 1 Is 0.00 0 25.00 25 0.00 0 25
STRUCTURALCONSULTANT
Testing and 1 Is 0.00 0 0.00 0 0.00 0 0
EQUIPMENT 1 sic 0.00 0 0.00 0 0.00 0 0
MobIdemob equIpmenI- '- only lis 0.00 0 0.00 0 250.00 25D 25D
EQRTHWORK 1 sic 0.00 0 0.00 0 0.00 0 0
580 Backhoe 8hr 0.00 0 0.00 0 125.00 1000 1,000 minimum
lID lll<ClMlleshellerface 6x4'x4' 4ey 3.75 15 0.00 0 0.00 0 15
hand lll<ClMlle@OOloge.<lloll lhr 15.00 15 0.00 0 0.00 0 15
110 lll<ClMlle to sheller pier lD'x4'x4' 8ey 2.5D 15 0.00 0 0.00 0 15
handlll<ClMlle@_,,.-.,, lhr 15.00 15 0.00 0 0.00 0 15
210 _ & compact _ maIerlaJ 10ey 3.00 30 10.00 100 0.00 0 130 peagl'll'l8l
Copy of CE15 - Conduit for Waveguide, Port Hadlock, 08-19-10
CEil - ConduIt fur PL IladIacII
BGCT Labor MalerIaI SlJb..ulhw.-' TolaI Noles
Code Unit TalaI Unit ToIaI Unit TalaI Cost
C<lll.pachl! 0.5 da 30.00 15 115.00 58 0.00 0 73
lIll8IIl8 __lfW8'IfllIm sheller lhr 15.00 11 0.00 0 0.00 0 15
_ disluJbed area 2hr 15.00 30 25.00 50 0.00 0 80
FURNISH & INSTAU.CONDUIT 1 sic 0.00 0 0.00 0 0.00 0 0
layout & COI8f1_ 3ea 5.00 15 0.00 0 105.00 315 330
calch slugs & __ con\IlI 2hr 15.00 30 0.00 0 0.00 0 30
F&! 4" schedule 40 conduIl2 x la 2011 1.50 30 2.50 50 0.00 0 80
F&l4" schedule 40 sweeps 2 x 2 4ea 7.50 30 laoo 72 0.00 0 102
F&! 'Z' schedule 40 conduIl3x1a 3011 1.00 30 1.25 38 0.00 0 68
F&I 'Z' schedule 40 sweeps 3 x 2 6ea 5.00 30 6.00 38 0.00 0 68
seal sheller pe..""., at InIeriar 3ea 5.00 15 5,00 15 0.00 0 30
seaI&_..wf@tlllIInlr 3ea 10.00 30 20.00 60 0.00 0 90
F&I puB Illpea Slc2ll1f1 10ea 3.OD 30 15.00 150 0.00 0 180
f1'caps@towerleg 2ea 3.OD 6 12.00 24 0.00 0 30
'Z' caps@towerleg 3ea 3.00 9 5.00 15 0.00 0 24
Buchanan General c...4l...A'lI Co.
JeIfcllm611.Green ~
Labor AdjlIslment
I.llborT8lCll8
TalaI Labor, MalerIaI, & SUb
Overhead & Fee
SUb TolaI
8&0, & Insurance
SUb TalaI
WSST
TolaI BId
1,439
2OIl.9S'i 646
31.65'1> 723
3,009
Copy of CE15 . Conduit for Waveguide, Port Hadlock, 08-19-10
Ellllllllllol. DennIs
Prlnl_ 6/13/10
1,569
o
o
1,S69
1,903
o
o
1,903
4,910
646
723
8,480
875
7,355
221
7,578
838
8,212