Loading...
HomeMy WebLinkAbout092710_ca04 Department of Public Works o Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request From: Board of Commissioners Philip Morley, County Administrator Frank Gifford, Public Works Director !Jf(f September 27,2010 Local Agency Agreement Supplement with the Washington State Department of Transportation (WSDOT), Upper Hoh Road Emergency Repair, M.P. 4.0, X01736, Federal Aid Project No. ER- 0701 (051) To: Agenda Date: Subject: Statement of Issue: The attached Local Agency Agreement Supplement with (WSDOT) is necessary in order to proceed with completion of the Upper Hoh Road, M.P. 4.0 emergency repair project. Analysis/Strategic Goals/Pro's 8: Con's: Emergency repairs were completed at Upper Hoh Road MP 4.0 in March, 2007, with construction of 400 lineal feet of armored bank protection. Remaining work consists of mitigation as required by the Washington State Dept. of Fish 8: Wildlife (WDFW). Mitigation will be satisfied by replacing the fish-passage barrier culvert at Dismal Creek, Upper Hoh Road MP 9.19, with a 3-sided concrete box culvert. A Local Agency Agreement Supplement is necessary in order to fund the engineering consultant design fees. FiscallmpactlCost Benefit AnalYSis: This supplement will increase the Preliminary Engineering funding from $105,000 to $170,000. The total estimated cost of the mitigation work, including engineering and construction is $913,000. This will be funded at 86.5% by the Federal Highway Administration, and 13.5% by County road funds. Recommendation: The Board is requested to sign the Local Agency Agreement, and return to Public Works. Department Contact: Monte Reinders, County Engineer, 385-9242. %~o inistrator Date