HomeMy WebLinkAboutWORKSHOP re Amendments to Sewer Utility Code - presentationProposed Amendments to
Chapter 13 JCC
(PHUGA Sewer Ordinance)
Monte Reinders, Public Works Director
Samantha Harper, Wastewater Project Manager
Mo-chi Lindblad, DCD Principal Planner
Philip C. Hunsucker, Chief Civil DPA
August 4, 2025 1
Key Takeaways
1. On September 8, 2025, UGA
zoning will apply all properties
within 200 feet of a sewer
collection line.
2. Some properties within 200
feet of a sewer collection line
will be required to hook up to
the sewer.
Key Date:
September 8, 2025.
Key Number:
200 feet.
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)2
Agenda
Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)August 4, 2025 3
1 –PHUGA Ordinances Timeline
2 –Clarification of the Sewer
Code
3 –Flipping the Switch to Turn Off
Transitional Rural Zoning
4 –When Hookup is Required
PHUGAOrdinancesTimeline
4
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)5
Clarification of the Sewer Code
6
Clarification Topics
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)7
Ordinance No. 09-1209-24 Moved “Availability” for Transitional Rural Zoning to Title 13 JCC
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)8
Ordinance No. 09-1209-24 Moved “Availability” for Transitional Rural Zoning to Title 13 JCC
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)9
Sewer “Availability”—200 Foot Rule
10
Ordinance No. 09-1209-24 –200 Foot Rule
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)11
Clarifying When Sewer Is “Available”—200 Foot Rule
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)12
There is a typo: JCC 13.04.020 should have been JCC 13.04.010.
Flipping the Switch to Turn Off Transitional Rural Zoning
13
PHUGA Sewer System Stops Within the Core Phase Boundary
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)14(2021 Sewer Plan at 4-5)
UGA Boundary
Core Phase Boundary
No Parcel Outside of the White Core Phase Boundary Line Will Have “Available” Sewer
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)15(Excerpt from Slide from October 24, 2024 BoCC Presentation)
Core Phase Boundary
Clarifying Where Transitional Rural Zoning Will Be Turned Off
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)16
Ordinance No. 03-0323-09 saved the PHUGA at the Growth Board By Adopting: (1) 2008 Sewer Plan; and, (2) Transitional Zoning.
To comply with the 2008 Growth Board decision, Transitional Rural zoning in chapter 18.19 JCC applies to all properties
within the PHUGA where the PHUGA sewer system is not “available.”
The PHUGA sewer system is within the “core area” of the PHUGA, and does not extend to the entire PHUGA.
According to JCC 18.19.110 (as amended by Ordinance No. 03-0323-09), “Effective as of March 23, 2009, the effective date of Ordinance No. 03-0323-09, Jefferson County shall apply transitional rural zoning in the Irondale and Port Hadlock Urban Growth Area for parcels that do not yet have sewer available.” Ordinance No. 09-1209-24, Appendix A, Exhibit 1 at 13.
Prior to the adoption of Ordinance No. 09-1209-24, sewer availability for purposes of determining when transitional rural zoning could be turned off was determined by chapter 18.19 JCC was when sewer service came within 200 feet of a property within the PHUGA.
Ordinance No. 09-1209-24, moved the determination of when a public sewer was available from chapters 18.18 and 18.19JCC to JCC 13.04.010,as JCC 18.18.060(4)was amended to state: “Sewers shall be considered to be available for the purposes of turning off the transitional rural zoning in chapter 18.19 JCC for the Irondale and Port Hadlock urban growth area as described in title 13 JCC” and, JCC 13.02.010 states “‘available or availability’ means that the PHUGA sewer system is available to a property as described in JCC 13.04.020 (sic).”
Clarifying Where Transitional Rural Zoning Will Be Turned Off
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)17
Clarifying Where Transitional Rural Zoning Will Be Turned Off
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)18
Transitional Rural Zoning Will Continue to Apply to All the Gray
Areas, Where None of the Properties Are Within 200 Feet of Sewer Collection Lines
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)19
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)20
In Colored Areas,
Transitional Rural
Zoning Overlay Turns Off
when PHUGA Sewer
System Becomes
Operational
Transitional
Rural
Zoning
Switch
September 8, 2025
Some Parcels Inside of the White Core Phase Boundary Will Not Have “Available” Sewer
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)21(Excerpt from Slide from October 24, 2024 BoCC Presentation)
Core Phase Boundary
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)22
When PHUGA Sewer
Expands in the Future the
Switch Will Flip Again:
Third Street Example
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)23
When PHUGA Sewer
Expands in the Future the
Switch Will Flip Again:
Third Street Example
Transitional
Rural
Zoning
Switch
Expansion to 3rd
Street
FUTURE
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)24
When PHUGA Sewer
Expands in the Future the
Switch Will Flip Again:
Carl’s Design Center &
Showroom Example
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)25
When PHUGA Sewer
Expands in the Future the
Switch Will Flip Again:
Carl’s Design Center &
Showroom Example
Transitional
Rural
Zoning
Switch
FUTURE
Expansion to
Carl’s Design
Center &
Showroom
When Hookup is Required
26
Clarifying When Hookup Is Required (No Substantive Change in List)
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)27
*
* Typo:
“(with
plumbing)”
will be
added to
next draft.
Clarifying When Hookup Is Required (Revised Sections)
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)28
Clarifying When Hookup Is Required (Changes to Notes in Table 4-1)
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)29
Comment:This was moved to a definition for clarity.
The new definition in JCC 13.02.010 says, “‘Adequate OSS’ means an
existing on-site sewage system (‘OSS’) that is not failing, as defined in
JCC 13.02.060.” The definition relies on the already existing definition of
“failing” in JCC 13.02.060.
Comment:This changes makes the language consistent with JCC
18.18.060(4)made in Ordinance No. 09-1209-24.
Comment:This note was moved to a subsection because it is a
substantive rule, not just a note and there is no other substantive rule like
it in title 13 JCC.
Comment:This note was moved to a subsection because it is a
substantive rule, not just a note and there is no other substantive rule like
it in title 13 JCC.
Comment:Definition in JCC 13.02.010 modified for clarity and making
clearer the relationship to JCC 18.18.060(4)and the urban growth area
standards in chapter 18.18 JCC.
Clarifying When Hookup Is Required (New Sections from Prior Notes)
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)30
Clarifying When Hookup Is Required (New Definition)
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)31
Clarifying When Sewer Is “Available”—200 Foot Rule Moved Here
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)32
Key Takeaways
1. On September 8, 2025, UGA
zoning will apply all properties
within 200 feet of a sewer
collection line.
2. Some properties within 200
feet of a sewer collection line
will be required to hook up to
the sewer.
Key Date:
September 8, 2025.
Key Number:
200 feet.
August 4, 2025 Proposed Amendments to Chapter 13 JCC (PHUGA Sewer Ordinance)33
Questions?
34