Creating a County project
designated as CR1873
x
x
x
RESOLUTION NO. 41- 10
IT IS HEREBY RESOLVED that Paradise Bav Road. County Road No. 503608, from M.P. 0.37 to
M.P.1.53 , be improved as follows:
This project provides for shoulder widening. grading. drainage. surfacing. asphalt paving. signing. striping.
and other work. This resolution creates a new County road proiect designated as CR1873. Paradise Bay
Road. Phase II. M.P. 0.37 to M.P. 1.53.
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget, based on the
County Engineer's estimate, is hereby made in the amounts and for the purpose shown:
PURPOSE PREVIOUS APPROPRIATION PRESENT APPROPRIATION
$ 225,000 Rural Arterial Program (RAP.)
Engineering $ 0 $ 25.000 (Countv)
$250,000 (total)
Right of Way $ 90,000 (RAP.)
$ 0 $ 10.000 (CounM
$100,000 (total)
$1,297,800 (RAP.)
Construction: $ 0 $144.200 (Conntv)
$1,442,000 (total)
$1,612,800 (RAP.)
TOTAL $ 0 $179.200 (ConnM
$1,792,000 (total)
X This project is included in the officially adopted annual road program as Item No.-1Q....
The project is hereby made a part of the officially adopted annual road program in accordance with R.C.W.
36.81.130.
IT IS FURTHER RESOLVED that:
X The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq.
The construction is to be accomplished by County forces in accordance with R.C.W: 36.77.065 and WAC.
136.18.
PASSED AND ADOPTED TIllS 4th DAY OF OCTOBER. 2010.
TRANSPORTATION IMPROVEMENT PROGRAM 2011-2016
PARADISE BAY ROAD: MP 0.37-1.53 PHASE 2 Capita/Project 1
Project Location and Setting
The projectlocalion Is Paradise Bay Road from milepost 0.37 (Ludlow Creek) to 1.53 (Teal Lake Road).
Project Scope
The project will construcl4-ft.-wlde shoulders and overlay the road with asphalt concrete pavement. LocaI Road Funds
and state Rural Arterial Program funds are securad for this project.
Project Impetus
Pavement condition and ride quality have deteriorated on this well-traveled rural collector roadway. Widening the road
shoulder to a 4-toot paved width will provide for a safer driving experience and allow for the safer use of the shoulder by
non-motorized users. The project was very competitive within the northwest region of counties and was awarded Stele
Rural Arterial Trust Account grant funds In the 2009-2011 biennlum.
Status
EngIneering is planned for 2011 with constructlon taking place In 2012 and 2013.
PROJECT STATISTICS
Road Number............................503608
Milepost Start......... ... ... ............ ......0.37
Milepost End..................................1.53
Total Mileage.................................1.16
ExIsting Conditions
Lane Wldths..............11 ft paved (BSl)
Shoulder Widths......... 3 ft gravel (ACP)
Pavement RatIng (2006).............51-100
Traffic Count
2008... ... ................ ...... ....3,100 ADT
5-Year Accident History (2004-2008)
Property........................................7
Injury;..... ..................... ............... ...0
Project EstImate 2011-2016
Preliminary Engineering..... $ 250,000
Right-ot-Way...................$ 100,000
Construction................... $1.442.000
TOTAl.......$1,792,QOO
Project T1mellne
Preliminary Engineering.............. 2011
Right-of-Way... ...... ................... 2011
Construction............ ......... .2012-2013
Project Funding
State (Rural Arterial
Program)........... ............ $ 1,613,000
LocaI Road Funds ........... $ 179,000
,
i"
VICINI1Y MAP
The Paradise Bay Road
Phase 2 projacl begins
where the award-winnlng
Phase 1 projacl ended.
The proJacl win provide a
safer traveling experiance
and rehabilitate tha road
pavement
TYPICAL ROADWAY SECTION
""""'F"""
11"1.ANE
1'. LANE
.'
LDER
.~
. PAVEIIENT
VARIES .SEE PLAN
,
,
VARIES SI:E PLAN
7
JEFFERSON COUN1Y PUBUC WORKS
Department of Public Works
Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
From:
Board of Commissioners
Philip Morely, County Administrator
Frank Gifford, Public Works Director \1-P1
October 4, 2010
Paradise Bay Road - Phase II
Co. Rd. No. 503608, CR1873
M.P. 0.37 to M.P. 1.53
To:
Agenda Date:
Subject:
Statement of Issue:
The issue is adoption of the Resolution creating County Road project CR1873 to improve Paradise
Bay Road from mile post 0.37 to mile post 1.53.
Analvsis/State1!ic Goals/Pros & Cons:
This project is item number 18 on the 2010-2015 Six Year Transportation Improvement program and
. number 16 on the 2010 Annual Construction program. The purpose of this project is to construct
shoulders, eliminate roadside hazards, and overlay the road surface with asphalt concrete. This
project will provide engineering, right of way acquisition, construction engineering, and the actual
construction.
Fiscal Impact/Cost Benefit Analvsis:
The estimated total cost of this project is $1,792,000. Rural Arterial Program (RAP) funding of
$1,612,800 will be provided through the County Road Administration Board.. The remaining
estimated amount qf $179,200 will be matched from the County's road fund. This project is
included in the 2010 Roads budget and proposed 2011 Roads budget.
Recommendation:
The attached. Resolution is recommended for Board adoption. This action
will allow for design and construction of this project.
The Board is asked to sign the original Resolution where indicated, and return one signed copy to
Public Works (attn. John Wayand).