Loading...
HomeMy WebLinkAboutBLD2004-00384 BUILDING PERMIT• Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00384 Received Date 06/11/2004 SITE ADDRESS: 121 MT CONSTANCE WAY Issue Date 06/22/2004 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 4 PARCEL NUMBER: 978800004 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2006 PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE & DECK ALSO 120 GAL AG PROPANE TANK REQUIRED INSPECTIONS: X SETBACKS: K. UFFER: k" Footing: " - `-(-[�,--�� K] Foundation:t=r>— 1 - 22 ' ] Stormwater FINAL Approval: gUnderground Plumbing: K Underground Insulation: Shear Wall : 04 girl/?41 el J Framing: w((4.40\- 1,0"&tit Vj Plumbing: k)V, Nut Q/r'yHr [r Propane Tank/Lines: iV1X 304 tRV.tolk Kr Insulation: _`/4 /e/z yeml !i Sheetrock: _ [ ] Septic Sytem Final Approval: 011. Setw)e,ir X Road Approach Final Approval: 'Rj{I OL{—1'J [ ] Zoning Final Approval: ?l( I 0 ixt Final/Occupancy Approval: d X 4 -'»../ /2-5/65,2' HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE SPECIAL CONDITIONS FOR At A BLD04-00384 1.) The application was reviewed by the Jefferson County Department of Community Development staff on June 21, 2004 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Osprey. 2.) The applicant is proposing to create or add 3599 square feet of impervious surface and 10,170 square feet of land disturbing activities. 3.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 5.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i). 6.) The site plan as submitted with the building permit application on June 11, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 11, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 7.) This approval is for a single family residence with attached garage and deck and a 120 gallon above-ground propane tank only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 9.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC)Section 6. Outdoor storage of thirteen (13)or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 10.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) Minimum setback from Mt. Constance Way right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 13.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 14.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 15.) Per email dated March 15, 2004 from Jeff Davis, WDFW Biologist, Osprey are no longer a priority species. 16.) A minimum of two (2)on-sitearking spaces shall be provided for the singSamily residence. 17.) Per MPR Code Section 3.17, Accessory dwelling units (ADU's)shall not be allowed in the MPR-SF zone. 18.) The parcel has been designated as MPR SF4:1 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 19.) An address of 121 Mt. Constance Way, Port Ludlow has been assigned to the lot. Mt. Constance Way is a county local access road. 20.) The lot was created through the Olympic Terrace Division 1 Subdivision on March 11, 2003 under AFN 466745. 21.) The lot is served by Port Ludlow water and sewer. 22.) A road approach permit(RAP04-0140)will be issued with the building permit. I:\F_BLD_Permit_Buildng.rpt 10/29/19 APPROVED . ' MI2'€„ VI t SIT _ • -id Ori-_ _ 1-- \ , meb-r r- ---- JUN 211 2004 .vr- La4-i- 1 . _' 1- ` ReqV-0 - ' ." bill t✓ SIGNATURE: _ 4 ,1 .-_ . , • ( ! r� r- r TH r t. PERMIT # BIi. , 3e, r 04 - 384 s c N JEFFERSON COUNTY UtD- 3 Q � iv 111+ b . ci I • - ....; ..... i , ; ' ' *f/R Z2-r x14134141/ . ' ________ ,„„. 42vigg. -:. ..4 - - ' :44 • 1 , H "t 117)01,0gb-74A-. - • 7. .i. I,, . ... % _. - g '2v:0 1'. gef"v.i, -,-. ' ' P)t-,:.-- . :___-_. : )t . e4c, taJerarri' 7 ' :: ! . AppROV � STORMW ATEl f H 2 1 - JEFFERSON COUNTY �` I j t'tr ;i ; JA STORMWATER MANAGEMENT • ' . 'CEL EROSION AND SEDIMENT CONTROL PLAN iff f tfk§ON C:UNT 1 _ ' • :1 ON • t SEDIMENT CONTROL WORKSHEET ,EVE NI .8i :,A��1�► ' -�`��' operty a ` • �s .L . I o. ssoc i ates Telephone: 437-2101 Address: 70 Breaker Lane, Port Ludlow, WA 98365 Assessor's Parcel Number: 9,71-800-OO V Building Permit or Septic Permit Application Number(if applicable): Brief Project Description: New. Single Family Residence W/ attached garage. . (717-7/0/e__ 2 aee 2i✓. (r Zo s4. V Site Location: ? /12{. t-P/I.c/Q,)ce a/ayi Ar- 44lt/,- tV/9 993k5 Person Responsible for BMP Installation and Maintenance:Jeff Evangel- (-----) Address: Same a R above Telephone:Same as above 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan.You may also propose measures other than.those listed. Attach additional sheets,if more space is required. [] Stabilize construction access route. Limit construction vehicles to one route,if feasible. - Provide a stabilized construction access by applying quarry spans,ballast,or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [] Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas,landslide or erosion hazard area,etc.). SPESC Instructions—Short Form Revised July 17,2002 3 (1 )Tc (—) FPEROSION AND SEDIMENT CONTROL WORKSHEET [ J U N 1 1 2004 I f. J FEta sot,. lt? c;;v r�= [] Phase clearing so that only areas that are actively being worked are unco4ePeT OF r !, N'TY o „ELOPA [1 Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. f Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [1 Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [1 Place gravel base on roads,driveways,and parking areas after clearing and subgrade preparation. [f Protect adjacent properties and water bodies from sediment deposition: f] Place straw or hay bales in ditches and drainage ways down slope from areas. of land disturbing activity to filter runoff before it leaves the project site or enters water bodies.(See attached illustrations from Stormwater Management Manual.) [] Install a filter fence down slope:from areas of land disturbing activity:to.filter runoff `1 before it leaves the project site or enters water bodies. (See attached illustration from 1 Stormwater Management Manual.) EX Regularly inspect and maintain all BMPs especially after storms events. [1 Describe other erosion and sediment.control Best Management Practices. Be specific as to design and specifications. Site is very flat with sanely snils. So I helieve the above. measures will be sufficient. SPESC Instructions—Short Form Revised July 17,2002 4 CT) EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized(seeded,landscaped,apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line 3. Describe how runoff from impervious surfaces will be.controlled(disperse to vegetated areas to_ - ... infiltrate,dry well,infiltration trench,route runoffto existing drainage facilities,etc.). . All impPrviniic rfare. will . he run to roof drarins and catch basins as designed into the plat requirements. w Y . • E a 11 11 SPESC Instructions—Short Form ,, Revised July 17,2002 5 i ip( Ej At A • C EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices.Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be Installed. Silt fence will be left in place until we are ready to landscape and all roof drains/ catch basins are in. Landscaping will be installed as - early as possible on the exterior of the building when aII exterior concrete work is completed..6, C-) The Best ment Practices proposed above will be implemented to control erosion, sediment, and sto I notify the Jefferson County for inspections as Signature f Owner/Agent Da ``E SPESC Instructions--Short Form • i f Revised July 17,2002 %374 6 • BUILDING PERMIT APPLICA ION MLA04-00344 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00384 Received Date: 6/11/2004 SITE ADDRESS: r" \ MT CONSTANCE WAY PORT LUDLOW, 98365 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360) 437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 4 PARCEL NUMBER: 978800004 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2006 REPRESENTATIVE: PHONE: PROJECT DESCRIPTION NEW SFR W/ATTACHED GARAGE & DECK ALSO 120 GAL AG PROPANE TANK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,818 VALUATION 245,587.00 ADD'L: 719 HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: #OF STORIES: 2 OCCUPANCY: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 497 SETBACK: DECK: 275 BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: ' C , F&WLandslide ql Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: , pLrQvg�/D�ev E Permit $1,811.35 KAS 06/11/04 64529 O�JJ,{.�100 State Building Code $4.50 KAS 06/11/04 64529 Potable Water Application $52.00 KAS 06/11/04 64529 JUN 2 2 2004 Total: $1,867.85 Jefferson County Planning & Building Department i Jefferson County Department of Community Development 621 Sheridan Street,Port Townsend WA 8836813601370-4450 Ca � F __PerMatApp _ . 0 ,cD0On Project Description: (L@n9/e+a)-ycz4 rt Building Type: Project Type: Frame Type: )� Single Family X New )(Wood X Garage Attached/Detached Addition Steel Modular Alteration/Remodel Concrete Commercial Repair Masonry Multi-family/#of Units Demolition Other: Industrial Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing. ' Existing. -� x Sewer Community System Electricity Oil Proposed: 2 Proposed: 3 Individual System Woodstove Propane Total: Z Total: 3 If not sewer,fill out the following: X Heat Pump Conventional Alternative — X Other "'vane ' (-5,ohcr: Permit# SEP Water Supply: + Private well Two Party Well Public:Name of water system: 04) Square Footage: Edit Office`Use Only Main Floor I I Consistency Review: itg I( C,✓ 2ND Floor 7/9 Base fee { a 3rd Floor Plan Check fee , 1 • Htd Basement — State Surcharge fee rrq Unhtd Basement Subtotal b Garage/Carport Y917 Pot Water Review fee -CEO Decks .275 911/Rd Approach fee t Commercial TOTAL 12 g( Industrial t Receipt# _ 1 Other � �l • Cash/Check# 15 c{ ve Total Valuation: \\\'\ �UN I�iuhals Or 1b` cl� t W } f Estimated Cost /77,SY� If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide acce. . rig n t Jefferson County and it's employees,representatives or agents for the purpose of appl. ation r iew and any required later inspections. Access and right of entry to s ic. ••pro r or 3 re shall be requested and shall occur during regular business hours. Signature: Date: OVER ► H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpemritApplication 11-8-01