Loading...
HomeMy WebLinkAboutBLD2004-00529 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD04-00529 Received Date 08/16/2004 SITE ADDRESS: 53 S DUQUESNE AVE Issue Date 09/10/2004 PORT TOWNSEND, 98368 APPLICANT: RONALD F DESJARDINS PHONE: (206) 799-6044 KATHRYN A DESJARDINS PO BOX 1655 PORT HADLOCK WA 98339 SUBDIVISION: IRONDALE Block: 127 Lot: 9&10 PARCEL NUMBER: 962112702 Section: 34 Township: 30 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: NEW DETACHED GARAGE REQUIRED INSPECTIONS: • [ ] SETBACKS: [ ] UFFER: [ ] Footing: [ ] Foundation: ( ] Stormwater FINAL Approval: [ ] Underground Plumbing: [ ] Underground Inds Jlattiion: [ ] Shear Wall : qT /I.IRrlyi•-z,9�01 [ ] Framing: IQpRW Eo 11�z,4le_ 4, by T.C. Plumbing: // [ ] Propane Tank/ Lines: [ ] Insulation: 11 Sheetro 11-Z3ro� [ ] Septic Syt Final Approval: 1 Road Approach Final Approval: [ ] Zoning Final Approval: 1 Final/Occupancy Approval: Of< 4 r -'wi.ci PI/4/4 HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL`REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONf Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY-SEE REVERSE SPECIAL CONDITIONS FOR C E # BLD04-00529 • 1.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements#1 through#12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 2.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 3.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 4.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 5.) Pre-existing legal lots of record less than one acre in size in Rural Residential districts are subject to the stormwater requirements in UDC Section 6.7 and must meet the"Area of Impervious Surface Coverage"to the maximum extent practicable as determined by the Administrator." Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 6.) The building height is not to exceed 35 feet. 7.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 8.) S. Duquesne Ave setback is 20 ft minimum, setback from the alley on north side of parcel 962-112-702 is 20 ft. minimum, side setbacks should be no less than 5 ft. • I:\F_BLD_Permit_Buildng.rpt 10/29/1999 .BUILDING PERMIT APPLICAION MLLA04Revie -00p494 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00529 Received Date: 8/16/2004 SITE ADDRESS: S DUQUESNE AVE PORT TOWNSEND, 98368 OWNER: RONALD F DESJARDINS PHONE: (206) 799-6044 KATHRYN A DESJARDINS PO BOX 1655 PORT HADLOCK WA 98339 SUBDIVISION: IRONDALE Block: 127 Lot: 9&10 PARCEL NUMBER: 962112702 Section: 34 Township: 30 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NEW DETACHED GARAGE TYPE OF WORK GAR SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 15,933.00 ADD'L: HEAT TYPE: UH CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: 676 SHORELINE: CONST TYPE: DECK: SETBACK: 5 BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: Prop: Seismic Streams Total: Total: Flood Way Floodplain Routing DateQ F&W Landslide G id Q1 Shoreline Aquifer Forest: Commercial Rural Type Amount Paid Bv: Date: Receipt: P440 , E 172) Permit $265.25 KAS 08/16/04 67466 Plan Check $172.41 KAS 08/16/04 67466 SEP 1 0 2004 State Building Code $4.50 KAS 08/16/04 67466 Jefferson County Planning Total: $442.16 &Building Department Ltp r 00. riSoiv cod JEFFERSON UNTY - - �; ;....7._ DEPARTMENT OF COMMUNITY DEVELOPMENT ---, 621 Sheridan Street • Port Townsend •Washington 98368 i r 360/379-4450 • 360/379-4451 Fax AUG 1 �� r { .�;q O� www.co.jefferson.wa.us/commdevelopment S$ING� _ Master Permit Application a APT. C 'r i Project Description(include separate sheets as necessary): ,' dA iti ,u Tax Parcel Y Property r Number: CI a -11,�j -7(li `./.y6. /%l ,�7G'' Size: f t''�: 1 (acres/squares eet)- Site Address and/or Directions to Property: 4:3 - '_. e-;�-ice LOA ��� ��l.,y t. �� f 1. (•:L, lv Property Owner(s)of Record: Ric,LiAL.d r J e_. C rR ci t05 / KAI- ;_,7 Telephone::(fX,)'- 99--6. )44 Fax: Lilt. '' 2 ).-3r j email: A Mailing Address: i'6- 4Sc>X I(v JS - . F.'r- a-, i,cx,.ic t Applicant/Agent(if different from owner): JS'A;M Q Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) ❑ Building ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑ Conditional Use[C(a),C(d),or C)** ❑ Single Family ❑ Discretionary"D"or Unnamed Use Classification ,(Garage Attach etached') ❑ Special Use(Essential Public Facilities)** ❑Manufactured Hom ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat** ❑ Commercial* ❑ Binding Site Plan'`* (I Change of Use ❑ Long Plat** ❑Address ❑ Road Approach c),./y LI e-,s lie ❑ Planned Rural Residential Development(PRRD)/Amendments** ❑ Propane , v f:. ❑ Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance ❑ Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium *May require a Pre-Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate Q/ to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE A.!viiis, Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. �r Signature: /"l,:n�C 'l7��z LC Date: c The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adherin to and,compilying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: (+.404 iVr3tit- %/ / _ : s ' ' Date: c G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc OWNER BUILDER STATEMENT I Ls (GI4 £ i- rti) The signer of this statement does hereby certify that ey are the Owners of the parcel referenced herein,the ey licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. , i �11 AUG 1 6 2001 s Signature: z .4'(1 li �-cLA( Ckui Date: '' `"‘i GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: } DEPNF CUi;:r;it!iei 1Y L EVELO='Hi PI" MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: /WA Shoreline: Type of Sewage Disposal: X New �.a,j 6.: ,Wood Existing: / / ❑ Sewer El Addition ❑ Steel Proposed: Bank ' ❑ Community System Li Alteration/Remodel ❑ Concrete Total: Height: Cl Individual System ❑ Repair ❑ Masonry SEP Permit# ❑ Demolition ❑ Other: Bedrooms: N/i) Water Supply: Existing: Setback: LI Private well ❑ Two Party Type of Heat: Proposed: .F ❑ Public h,�'iti Total: /t'l� Name of System: ,!,c 6y A If this is a Commercial Project you must answer the following: /ff Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank ❑ Above ground Tank 0/n Size of Propane Tank: [1 Heat Stove [1 Cook Stove i 1 Woodstove [1 Fireplace Insert t i Hot Water Tank [1 Pellet Stove [i Other Is this appliance being installed in a Manufactured I Mobile Home? Yes / No When applying for a permit to Install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. t / Square Footage For Office Use Only �l Current Proposed Amount Main Floor Consistency Review: - 11 8 2NU Floor Base fee: !} 5 •a'rj 3rd Floor Additional Section: Mezzanine: Plan Check fee: ' Heated Basement State Surcharge fee: -41 6 O a Unheated Basement Pot Water Review fee: Other Unheated 911/Rd Approach fee: / u N.)L,(a p. �d '7 C,, Sq l- 1" 4 1 g TOTAL: $ (,, l (D Decks �✓ . Receipt Number. (P 7 4f , Other Cash/Check Number: at Q(i2 49 ESTIMATED COST(REQUIRED) Date: •Fair market value of all labor and materials foundation to finish I Initials: G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc