Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CONTRACT Hadlock wastewater change order 4
Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: August 18, 2025 Subject: Change Order No. 4, Ovivo USA, LLC Port Hadlock Wastewater Project Statement of Issue: Execution of Change Order No. 4 to the contract with Ovivo USA, LLC for supply of the Membrane Bioreactor (MBR) wastewater treatment plant equipment for Port Hadlock. Analysis/Strategic Goals/Pro's £t Con's: Change Order No. 4 adds $4,050.00 (plus 9.2% WSST) to the Ovivo contract. The proposed change to the contract includes an Ovivo provided pH analyzer and its integration into the overall plant operating program. The integration will allow automatic adjustments to maintain the pH in the treatment process. Fiscal Impact/Cost Benefit Analysis: Change Order No. 4 is for $4,050.00 (plus 9.2% WSST), therefore, the new total contract price is $1,872,185.77 (plus WSST). The project is funded at 100% by the Department of Commerce through the American Rescue Plan Act, State and Local Fiscal Reovery Funds. Recommendation: Public Works recommends that the Board sign Change Order No. 4 where indicated and return signed change order to Public Works for further processing. Department Contact: Samantha Harper, P.E., (360) 385-9175. Reviewed By: J Peters, County Administrator Date CHANGE ORDER NO.:4 Owner: Jefferson County Owner's Project No.: 405-21140 Engineer: Tetra Tech Engineer's Project No.:N/A Contractor: Ovivo USA, LLC Contractor's Project No.: Project: Port Hadlock Wastewater Contract Name: Port Hadlock Wastewater Effective Date of Change Order: Upon Execution Date Issued: 7/30/2025 by all parties The Contract is modified as follows upon execution of this Change Order: Description: Ovivo to provide pH analyzer and integrate into the overall plant operating program to allow automated adjustments to the chemical feed for pH control. Attachments: See attached proposal dated 7/29/2025 Change in Contract Price Change in Contract limes Original Contract Price: Original Contract Times: Substantial Completion: Per Article 2.02(Original Contract) $ 1,395,158.00(plus WSST) Ready for final Per Article 2.02(Original payment: Contract) Increase from previously approved Change Orders Nos. Increase from previously approved Change Orders 1-3: No.1 to No. 1: Substantial Completion: N/A $ 472,977.77(plus WSST) Ready for final N/A payment: Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: N/A $ 1,868,135.77(plus WSST) Ready for final Per Payment Schedule in payment: Change Order 2 Proposal,pp.5-6. Increase this Change Order: [Increase][Decrease]this Change Order: Substantial Completion: N/A $ 4,050.00(plus WSST) Ready for final payment: Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: Per Article 2.02(Original Contract) $ 1,872,185.77(. us WSST) Ready for final Per Payment Schedule in payment: Proposal,p.2. Reco de• by Engineer 1re uired) Accepted by Contractor �, 4 +H *VS'de c5G:/I.Cl-� Monte Reind- s P.E. Eric Schaefer 8/12/2025 Public Works Director Ovivo Project Manager EJCDC°C-941,Change Order EJCDC•C-941,Change Order,Rev.1. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 1 of 2 Authorized by Heidi Eisenhour Date Chair, Jefferson County Board of Commissioners EJCDC®C-941,Change Order EJCDC®C-941,Change Order,Rev.1. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 2 of 2 ........., Ovivo SiC Systems Ovlvo Ca 2300 Greenhill Dr.#100 Worldwide Experts in Water Treatment fVl,� Round Rock,TX 78664 0 o ECN 0113 for pH Analyzer ; Port Hadlock .._ Date Prepared By Services Performed For: VJ July 29, 2025 Port Hadlock z :hE ;,a,. 5t CD C This External Change Notice (ECN) is issued pursuant to the current contract between Port Hadlock("Client'ii Ca and Ovivo ("Vendor"), effective July 29,2025 This ECN is subject to the terms and conditions contained in the ,..0 contract between the parties and is made a part thereof. Any term not otherwise defined herein shall have 7) the meaning specified in the contract. In the event of any conflict or inconsistency between the terms of this ECN and the terms of the contract, the terms of this ECN shall govern and prevail Proposal Overview Ovivo Scope of Supply • •, ---- .-6.=.'� , ,, ' /. . iet' - ; F- ,; em' '` Project Change Notice(ECN )for Error!Reference9ource not found.N Error!Reference source not found _ _ _ Out of Scope Items Supporting Documentation & Attachments Delivery Details Purchase Price ten, Desc iption Sell Price(CAD) 1 Probe and Probe Mounting Kit $2,850 2 8hrs programming support $1,200 Payment Schedule Pricing and Commercial Terms ' �14 I *. '.- •--.a Proj Chang.Notice(ECN )for Error!Reference9ource not found.N Error!Reference source not f� _�I_ outstanding balances. Please refer to contract terms for a reference point • Pricing are net,taxes are not included • Prices are valid for 30 days from proposal issuance date. If a formal purchase order is not received and accepted within this validity period Ovivo reserves the right t^ review and adjust pricing and lead times as necessary. • Prices are quotes in CAD unless otherwise noted • In annovvances have been included for bonds of any kind Warranty Proprietary and Confidential Information will not disclose to third parties o information supplied by Ovivo in a Any special features particular to t be treated as confidential and shah in part in other projects unless rec plot to copy in whole or in part nor "he purpose stated herein; The foregoing applies without limi. submission and the recipient ackr• and all design, manufacturing, rep ..."L • • Avea Pro ChengidMOtiee(ECN )for Error!Reference-3burce not found. N Error!Reference source not found Approval and Acceptance Port Hadlock Ovivo Project Manager s/ , • 4 \/ PrO ChAgs4Jootice(ECN )for Error!Reference n urce not found. N Error!Reference sourceotfound A? f..11k•-„,..., ApiamwegadKz:.►. � _,te , (11-0II) ITEM QTY DESCRIPTION PART NUMBER MATERIAL WEIGHT 1 1 PROBE,POLE MOUNTING KIT HACH 9253000 322-00546 304LSS 26.131 t 2 1 PROBE,PH,HACH DIGITAL,PEEK,DPD1P1 516-54 AS NOTED 0.455 TANK RAILING (REF) Mi - Mil •I •ILigt, MOUNT ON TANK TOP RAILING 0 0 cc d d Q 01 Co © I ID# 234-1253 SHOP NOTES:(UNLESS OTHERWISE SPECIFIED) QUANTITY 1.ALL DIMENSIONS ARE±1/16". MATERIAL SEE BOM 2.DIMENSIONS ARE TO CENTER LINES OF HOLES/SLOTS. FINISH SEE BOM 3.BREAK AND DEBUR ALL SHARP CORNERS AND EDGES. COST CLASS 4.DIMENSIONS WITHIN( )ARE FOR Q.C./REFERENCE ONLY. 0 WEIGHT 27.51bmass I I B ® ASSEMBLY BRACKET PROBE nS'�H SIZE SHEET PMROANGLE I 1(" DO NOT SCALE PRINTS PROJECTION P 1 : © DRAWN BY SMD ASSEMBLY DETAILS CHECKED BY OVIVO DATE Own/ad/my] 8/3/2023 PROJECT STANDARD THISORAMnc canruns CONFIDENTIN PROPRIETMv wiORMAnoN OF ovNa RND ITSNTwATES AND Is nor iO Ss DISCLOSED NOR TORE USED EXCEPT FOR EVM.UATING PROCO'S OFONVO OR INSTALLING.OPERATING ORMAINTNNWG OVIVO EQUIPMENT UNLESS REF LAW013-1-400-3 OTHERWISE AUTHORIZED IN WRITDAG BYCYIVO.UNCONTROLLED COPY IF PRINTED. INITIAL RELEASE 011691 YM SC 09/2023 A 02022 ovrvo. SHEET e ALL RIGHTS RESERVED. NOG' 234-1253 1 OF 1 /"� REVISION DESCRIPTION EN/ECO BY CHECK'D DATE REV WORNMANSHR STANDARDE5D001 APPLIES REVISION