Loading...
HomeMy WebLinkAboutRR-12 PRE2022-00031 EPH COMMENTS 10262022PRE2022-00031, Rathvon Drinking Water Emma Erickson EErickson@co.jefferson.wa.us •No approval is given nor implied for the well site shown on the site plan. •The well’s 100’ protective radius (as you have shown) is recommended to be completely located on your property. •You are required to submit a Application for Well Construction Inspection to this office prior to drilling your well. •After your well application is released, you are required to submit 24hr start notification to our office prior to beginning construction of the well. •The well must be drilled by a Washington State licensed well driller. •Prior to building permit application, you will need to drill your well and have the water tested to show it is potable. •Your property is located in a coastal Seawater Intrusion Protection Zone (SIPZ) – no known sea water intruded wells are within 1000’ of your property boundaries •Your property is located in the WRIA17 Toandos subbasin – this is a coastal management area with water conservation standard of use up to 5000 gpd. •A water meter will be required as a condition of future building permit approval. CA received 08/15/25 EXHIBIT RR12