Loading...
HomeMy WebLinkAboutBLD2004-00631 1• BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00631 Received Date 10/4/2004 SITE ADDRESS: 226 HIGHLAND DR Issue Date 11/17/2004 PORT LUDLOW, 98365 APPLICANT: ELISABETH MILLER PHONE: (360) 692-3656 7663 NW LENOX LN SILVERDALE WA 98383 SUBDIVISION: SOUTH BAY#1 Block: Lot: 46 PARCEL NUMBER: 995500046 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: TERHUNE CUSTOM HOMES INC PHONE: 360-697-7000 PO BOX 97 POULSBO WA 98370 Contractor's License: TERHUCH984MA Expires: 7/1/2006 PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE CALL IN FOR THE REQUIRED INSPECTIONI THAT APPLY TO YOUR PROJECT. SETBACKS: DI( 12/'5/D� (/�f' UFFER: Novb" / Footing: 4k' / L7'r lJ Coridrt/at Foundation: Stormwater FINAL Approval: e;.,�_ / WAY, Underground Plumbing: Underground Insulation:� �� / /� �,Shear Wall : D/< /i �u;,n/iZ`, Dr, yila.5-U" 2 Framing: , X 1/s 4S1 Plumbing: 4k %% 0,-jig 'NA Propane Tank/Lines: Air" '- P,zw,c�,bF Z A 0 ,3 3d 05 -----1Insulation: zk !,// OSi jr Sheetrock: 1/t 42?/a5 ,..-- Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE • •UILDING PERMIT APPLICA*N MRA04/005583 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00631 Received Date: 10/4/2004 SITE ADDRESS: , HIGHLAND DR PORT LUDLOW, 98365 OWNER: ELISABETH MILLER PHONE: (360) 692-3656 7663 NW LENOX LN SILVERDALE WA 98383 SUBDIVISION: SOUTH BAY#1 Block: Lot: 46 PARCEL NUMBER: 995500046 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: TERHUNE CUSTOM HOMES INC PHONE: 360-697-7000 PO BOX 97 POULSBO WA 98370 Contractor's License TERHUCH984MA Expires 7/1/2006 REPRESENTATIVE: TERHUNE CUSTOM HOMES PHONE: (360) 697-7000 PO BOX 97 POULSBO WA 98370 PROJECT DESCRIPTION NEW SFR W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,457 VALUATION 212,154.00 ADD'L: 582 HEAT TYPE: HTP CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: # OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: GARAGE: 433 CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES _NO BEDROOMS: BATHROOMS: STORMWATER: YES _ NO AREA _ Exist: Exist: Wetland Erosion Prop: 3 Prop: 3 Seismic Streams Total: 3 Total: 3 Flood Way Floodplain Routing Date: / F&W Landslide l(�/5 Shoreline _Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: e P \/ E[4, Permit $1,626.55 KAS 10/04/04 67740 ^ !� Plan Check $1,057.26 KAS 10/04/04 67740 NOV 1 7 2004 State Building Code $4.50 KAS 10/04/04 67740 Potable Water Application $52.00 KAS 10/04/04 67740 Jefferson County Planning & Building Department Total: $2,740.31 Cr'l1 r 09/29/2004 12:53 3603794Aii JEFF CO DOD PAGE 02 Sep 29 04 09:51p Sh on Empen% 360 4111 7399 p• 2 e • • . affirm Canty leurtment of C PrOTt Apj 4 • vv...t.ku.) ._. c_", �� �� JF+cnre e 7 Bualdin c Typc ti Project T ype: ilk Sinylle Family • *New X Wood . ❑ Gsmige Attached/Detached 0 Addition 0 Steel O Modular O Alteration/ReroodeI 0 Concrete O Coremer i l 0 Repair ❑ Woozy O Multi-Stmiy/#of U nita 0 Demolition 13 Other O Industrial O Othue ...._._ _ _.... . ---.-- _ • BatluoomtF Bcdroomc Typc of Sewage Disposal: Typc of Heat Choose one 1?> v —� Exiatiat::: —4;70' j*sei.ifer 0 Community System 0 Electricity In Oil lProposed: Proposal: r -- 0.Individual SSstcsn 0 Woodstrnwe 4 Pxopant: 7 l ‘" TQm1 if not■cvytr fill . out the foliowi �.ugt Heat Pump C Convcr►tion.l 0 Alb nmtive 0 Other _ Permit# � _ _�. .. .-.. .,. Water Supply: ` f7 Private.well 0 Two Pasty Well U Public:Name of unree py.teov Square Footage: Office Usc For Office Use Only Main Floor 14 S1 _IWt�•� Consistency Review. 2N Floor �r bal m i. Base fee (o 3'd Floor Plan Cheek fee • _ 61 -uric Basket State Surcharge fee 1 Unhid Basement Subtotstl 2t 3 31 Garage/Carport `-‘9J 10+aZ.C9)./I Water Review fcc Decks 911/7RdApproach fee f Commercial _ 1e1AQlp t.3A •t�o'rAL I xcc� rill >,�l,x��i.�t ix# <..P d Other Cash/Oae�rlt# • 4"Aaa • ' e., 51 Date /01lJc ' Esdmatcd C 41 2 t'2y{5q• . If within 200 e, Dist-tncc to Rank or Ozdintuy High Water Mask ft.Bank Height — ft. Hy'Wank the appl atann lorm,rite ttppkoioti +nuer,nee that the tnfonoation peovidoe hmeio is true anal aonect en tha best of their lYiowtaige. Any.wcoal Gleebood or any omiaion of a mnteehd Itl.ct made by than apj&cant/owner with ompeet to oda appliatwo rackrt may ee .lt it this mink being mill and void. I(writer.Etta m GM,inttemni(y and hole!banlilrw.Jctknatn Cnoaty a}Ninalt aN Ii.1arTn.tn iv.It;m-Trert,oa+tt areas,rnanonubte attnm'y'a rem and eartt ara which may in'any Nmy.4,-,,Kt .iyti utJeuimtin C.a my as a usual of or in co w.iaene.of the ranting al Mir.pena:t, I fauther agree to ptovlde acxaaa and right of fanny to Jcti'a oo County and itk empinyers,crimmrntathma or.pamo foe the p.gme of apptic.tion cevin*and any acciainad Low in.r.+ctiw> Hamm*id n.ht orentrr tq the appbaat9 popery or rtrvaure ph-di he t+gaeatd.nty 04 ocevt donna etal;nlAr bu.inrw+Fromm Signature: Date: • OVER ► G:\Prat itCcatcr\FORMS\BLDG FORMS\BLDPnvt ic.Applicttion.doc 01/08/2004 SPECIAL CONDITIONS FOR CAE # BLD04-00631 • 1.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 2.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 3.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 4.) All construction activities shall not encroach upon the landslide hazard area buffer. This includes the storage or preparation of materials. 5.) The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator. 6.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 7.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 9.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13)or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 10.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) Minimum setback from Highland Drive right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. If an ESA is present, then the more restricrive setback shall apply. 13.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 14.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 15.) A minimum of two (2)on-site parking spaces shall be provided for the single family residence. 16.) Per MPR Code Section 3.10T,,ccessory dwelling units (ADU's) shall not billowed in the MPR-SF zone. I:\F_BLD_Permit_Buildng.rpt 10/29/19 q1 liersV ERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT " 621 Sheridan Street • Port Townsend•Washington 98368 1Stati GI C7 360/379-4450 • 360/379-4451 Fax r http://www.co.jefferson.wa.us/commdevelopment/ , STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# PROJECT/APPUCA F NAME: VIA 2-A0o-A Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a apparate stormwater site plan map. Project Overview 1. Descnbe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. tau td sTR PERMIT # BED 04 - 63 Existing Conditions Summary JEFFERSON COUNTY OCO 2. Descnbe the existing topography. Indicate contours on the sitemap. �p Z% of -a4,1 W co-/Q kt/1icL,u d cL LL`�e 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. by u,St�_—trYtia.Q. pY raper 4. Describe the existing soils. Indicate soil type on the site map. - n ICY VV 5. Describe the existing site hydrology(i.e.,drainage;behavior of water on the site—above,below,and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. le\ , V)CLeCt.-V\. 6. Describe any excess levels of noise generated by the proposed use or activity: APPROVED ' I ATER PLAN ,Slt — Storra�wate Nov - 8 2004 Required-, 1i stormwater site plan template—rev.10/1/2003 \ '� JEFFERSO COUNTY 5 DEPT.OF C , J1 YDFIF.LO .NT SIGNATURE. ' 1 + • a • 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. [`)O Y\.Q_ • 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads,and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). Resi dent') rve21 xtv hdrd 1 &tom. 1^. - • •--.- Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed(i.e., per BMP T5.30 in the Manual)or,if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. olp KA-f Irn0-C dirok_i_inexri-e ego • 10. If the project requires the use of stormwater treatment facilities,describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"projects or projects that involve the potential for dispersion of contaminants.] • 11. Describe the performance goals and standards applicable to the project. 12. Describe the flow control system. _..r CAA- f • L. f. stormwaar al a`plan ter~,,lata—ray.1 W1 2, } 6 13. Describe the water quality system. • • 14. Describe the conveyance system analysis and design. ► \(NI CL 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. Sa v 2JQ-C- Y\C' _ 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. �j fLko GL.LTt9� Y j hoot iCl (S v a.c f of Ve_a_LA.I N d 17. Describe the proposed surfacing material. cMck.. cN 18. Describe methods for restoration of the site. cu�src-pe @Ycu s * V\a+ u-e_. \)-e e)€_-1-cL 1&'1&. • 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. 1'�CNL-Q� 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. U1JZ stormwater site plan tenplate—rev.10/1/2003 7 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) :A The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential ' development. - - SECTION I-CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements-Construction SWPPP 1. Mark Clearing Limits. -. ,i O .k-11 CAR a jvlik a-c kV2 tustn 2. Establish Construction Access. rp r IG CI g1C na1-e 0 c n A if W-2 W 3. ontrol Flow Rates. i l v, - of k� A 4 rLd- - 4. Install Sediment Controls. N-yet-, —kbVA- WL in -F-r"J& 5. Stabilize Soils 1, V k - n.csz s d n� ( -- u ,�.zc rid . ir\o-As4isdagica oY cu.c cry, s•. ri se l I 6. Protect Slopes. r\LU, ctc - [o±- 7. Protect Drain Inlets. '-0 ; 4101A- ► n ov — o CAA-4C-1A 8 stc.^.L ter sita;Ian ternp:ata—rev.1:METZ 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. NV t� . -� c LkL�,t L it) .+e.K 9. Control Pollutants. _ - 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). NV IA- �— �lc�R-P - -Li t --t-c 11. Maintain Best Management Practices(BMPs). prcCLkAik}4,Z. Ov' VCR cvn der U-e . cjv suic pCfeck 1 12. Manage the Project. CV\ s �f'. S u Pey ►vy cx:► tt 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads). 71\ b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. stormwater site plan template—rev.10/112003 9 b. Description of special requirements for working in or near environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). 5. Construction Phasing. a. Construction sequence 1A b. Construction phasing(if proposed) /n 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a propos‘etdO�construction schedule. ('•_Li V\lEkt\ PA Ai2COS II. Wet Season Construction Activities. a. Proposed wet season construction activities. � -4e v CN W c �./ suce,e pfi R � .C c1vvcNzAe_, k&v c.rv\ b. Proposed wet season construction activities for environrrientdlly sensitive areas. Ci y 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. _1 t Soy -k-tn Y fl W k b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. tA.ciV -Q 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. a. Sediment Ponds/Traps. b. Diversions. c. Waterways. d. Runoff/Stormwater Detention Calculations stornn+ater site plan template—rev.10/12003 70 SECTION 11—EROSION AND SEDIMENT CONTROL PLAN Sediment and erosion-control measures may be depicted on the master land use application plot plan,a stormwater,site plan,and/or a separate Construction SWPPP site plan. This is a checklist to ensure that the following are depicted on a site plan:' 1. General. a. Vicinity Map b. Jefferson County Approval Block C. Erosion and Sediment Control Notes ' 2. Site Plan. a. Legal description of subject property. b. North arrow. c. Indicate boundaries of existing vegetation(e.g.,tree lines,pasture areas,etc.). d. Identify and label areas of potential erosion problems. e. Identify FEMA base flood boundaries and Shoreline Management boundaries(if applicable). f. Show existing and proposed contours. g. Indicate drainage basins and direction of flow for individual drainage areas. h. Label final grade contours and identify developed condition drainage basins. i. Delineate areas that are to be cleared and graded. j. Show all cut and fill slopes indicating top and bottom of slope catch lines. 3. Conveyance Systems. a. Designate locations for swales,interceptor trenches,or ditches. b. Show all temporary and permanent drainage pipes,ditches,or cut-off trenches required for erosion&sediment control. c. Provide minimum slope and cover for all temporary pipes or call out pipe inverts. d. Shows grades,dimensions,and direction of flow in all ditches,swales,culverts and pipes. e. Provide details for bypassing off-site runoff around disturbed areas. f. Indicate locations and outlets of any dewatering systems. 4. Location of Detention Best Management Practices(BMPs). Identify location of detention BMPs. 5. Erosion and Sediment Control Facilities. a. Show the locations of sediment trap(s),pond(s),pipes and structures. b. Dimension pond berm widths and inside and outside pond slopes. c. Indicate the trap/pond storage required and the depth,length,and width dimensions. d. Provide typical section views through pond and outlet structure. e. Provide typical details of gravel cone and standpipe,and/or other filtering devices. f. Detail stabilization techniques for outlet/inlet. g. Detail controlrestrictor device location and details. h. Specify mulch and/or recommended cover of berms and slopes. i. Provide rock specifications and detail for rock check dam(s),if applicable. j. Specify spacing for rock check dams as required. k. Provide front and side sections of typical rock check dams. I. Indicate the locations and provide details and specifications for silt fabric. m. Locate the construction entrance and provide a detail. 6. Detailed Drawings. Any structural practices used that are not referenced in the Ecology Manual should be explained and illustrated with detailed drawings. 7. Other Pollutant BMPs. Indicate on the site plan the locations of BMPs to be used for the control of pollutants other than sediment(e.g.,concrete wash water). 8. Monitoring Locations. Indicate on the site plan the water quality sampling locations to be used for monitoring water quality on the construction site. Sampling stations should be located upstream and downstream of the project site. stormwater sits plan template—rev.10/1/2003 11 • • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal - If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. 30 6�-( (LAN NER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: • 12 stormwater site plan template—rev.10/1/2003 1 r . .. • 1111c • a°a }alto "sli o • , g - '1 ,0 s., To # 11111"A ., I, T. 8 0 -IS il • REVISED SITE PLAN dated !t)i► io`f 1 Has been APPROVED I 1 I(e0 y CD by 3EFFERSo COD1UNTY i DEPT.OF CO ICO DEV M + SIGNATURE: ✓✓✓✓//1 _�... I 1 e.)-Z. Stogy° ate NJ SITE FLAN 1 /2, 56-0 Re(1uited SCALE: I" = 20'-0" ELISABETH MILLER - PARCEL #995-500-046 `IL. SOUTH BAY #1 LOT #96 PROPOSED O:P O S E D 3 TERHUNE CUSTOM HOMES `� 9/3O/O4 LR ;n BEDROOM BEDR• REV. 10/II/04 LR - D . / I I `° RESIDENCE 0 o PORdH r) 0 APPROVED gin ' '- " o STORMWATER PLAN . Cr >- I `n LC) <r o ---- --� NOV - 4 2004 10f--° Q _ 152 JEFFERSON CO NTY I• 1 U �'— DEPT.OF C I1 D. ELOP ENT oil SIGNATURE: AAJ� • • Q I 1— o N uJij 110 4 L�LI O. ,12 +— t •F--f G I I _ A \ D DRIB/ ] —.6 _ 30' GOAD EASEMENT : „ A W CD ��v....