Loading...
HomeMy WebLinkAboutBLD2004-00696 • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00696 Received Date 11/3/2004 SITE ADDRESS: 383 SUGAR HILL RD Issue Date 12/17/2004 CHIMACUM, 98325 APPLICANT: FELTON LLC PHONE: 17011 LEMOLO SHORE DR POULSBO WA 98370 SUBDIVISION: SUGAR HILL ESTATES Block: Lot: 7+ PARCEL NUMBER: 901135007 Section: 13 Township: 29 N Range: 01 W CONTRACTOR: FELTON LLC PHONE: 17011 LEMOLO SHORE DR POULSBO WA 98370 PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: p<_1( UFFER: Footing: Foundation) P13 W) c r J' I'177-1_1 0 Lk Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : tX-rF ap._ $Ft R__ OTC t�CGs��/��i&n4 3/6/OS 1 Framing: ell &leo0/` /; S Plumbing: Ok y/2/45 - •j!//2/45# Propane Tank/ Lines: Insulation: dK W/eeytI,� �S 41/iz/5fr Sheetrock:Ox 7 of f Septic Sytem Final Ap royal (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: 1-' 1--3 HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE SPECIAL CONDITIONS FOR IRE # BLD04-00696 • 1.) A setback of 100-feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the wetland or its buffer is allowed. 2.) Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100)feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer- Do Not Remove or Alter Existing Vegetation." 3.) A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator. 4.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 5.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 6.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13)or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 7.) Maximum lot coverage is not to exceed 10%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 8.) The building height is not to exceed 35 feet. 9.) Minimum setback from Sugar Hill Rd right-of-way is 20 ft. Minimum side and rear setbacks (adjacent land designated Rural Forest) is 35 feet. Environmentally sensitive areas further impact setback. 10.) A stormwater plan for a medium project has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 11.) A minimum of two (2)on-site parking spaces are required for the single family residence. 12.) The wetland, wetland buffer and open space shown on the plat shall be maintained in their naturally vegetated state. This shall mean that vegetation within the wetland protection area shall not be disturbed or mowed. All wetland stakes in the field shall be maintained and replaced as necessary. I:\F_BLD_Permit_Buildng.rpt 10/29/19 *DING PERMIT APPLICA MLA04-00628 Review Type: Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00696 Received Date: 11/3/2004 SITE ADDRESS: 1,9c;SUGAR HILL RD CHIMACUM, 98325 OWNER: HARRY PROPERTIES LLC PHONE: (206) 232-3510 C/O ROR SIMPPSON 9725 SE 36TH ST STE#400 MERCER ISLAND WA 98040 SUBDIVISION: SUGAR HILL ESTATES Block: Lot: 7+ PARCEL NUMBER: 901135007 Section: 13 Township: 29 N Range: 01 W CONTRACTOR: FELTON LLC PHONE: 17011 LEMOLO SHORE DR POULSBO WA 98370 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NEW SFR W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,084 VALUATION 142,000.00 ADD'L: 638 HEAT TYPE: EEE CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 431 SETBACK: DECK: 108 BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion _ Prop: 3 Prop: 3 Seismic Streams Total: 3 Total: 3 Flood Way Floodplain Routing Date: F&W Landslide ��`��0(k °16 Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,368.00 BAC 11/04/04 68701 APPROVED Plan Check $889.20 BAC 11/04/04 68701 State Building Code $4.50 BAC 11/04/04 68701 DEC 17 2004 Potable Water Application $52.00 BAC 11/04/04 68701 Total: $2,313.70 Jefferson County Planning & Building Department NER BUILDER STATEMENT The signer of this statement does hereby certify that triey ane Owners of the parcel referenced herein,that.-y Mot licensed contractors and that they WI be assuming the responstbTdy of the General Contractor for the proposed project. NOV - 3 Signature: Date: - GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLEIt: PHONE: ,. ` FAX: >�e\•, a4 1--k—C. (3i0O) 340•-351_2 (.3icO)3(14-)gP1l- MAILING ADDRESS: 140 i I k^II O\ S\•`Qt`�+ r.I�131 1X1 EMMIL: CONTRACTOR'S LICENSE WAINS NUMBER: �L L' 10 I-- 4 C Ck 2 D 5 NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: X New Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: Bank ❑ y System ❑ Alteration/Remodel ❑ Concrete Total: i/�. Height Individual System ❑ Repair ❑ Demolition O Masonry SEP Permit# O Other Bedrooms: Water Supply: Type of0 Private Heat:,_, Proposed: CI Public well Two Party ,t3.�1�tC 1C t �tr, Total: Name of System:0�i-22 if this Is a Commercial Protect you must answer Vve fotlawinq: Number of Parking Spaces: Current Proposed: Number of qDA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy. IBC Type of construction: Will you have Food Service? Yes / No 1f this is a Propane Tank andYor Appliance Installation permit,mark all items below that apply: O Underground Tank 0 Above ground Tank Size of Propane Tank: O Heat Stove 0 Cook Stove ❑ Woodstove 0 Fireplace Insert 0 Hot Water Tank 0 Pellet Stove 0 Other is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,,all property lines,tank location and size,distances from the propane tank to all property lines,butl r:rigs and septic system components, including the reserve area. Square Footage mouse Only _ Current Proposed Amount;_ Main Floor 1024- i ,►5g G ortsisber t# Viewli' 2m)Floor - fee: 3 Floor is ;Additional Section: j Mezzanine: • Plan( cik fee: -- • ,...1.; Tappt ao Heated Basement /Uyn,h�e�ated Basement pot water Reiiidy"fee.' , . . > _65, , --" Iktheated 91 tpt ,ch fee: Garage/Carport L13 I 10 I 41 T13TAL: $ `-1 U Decks -*coo timber: W.,76_,f Other •sCe . , .3 ESTIMATED COST(REQUIRED) l cv , c141.a1 `' *Fair malice/value of ail labor and materials • f s" � •r G\Pem itf art=r\FORMS\DRD FORMS\Mast r Pcatit Aaalnaition 7-8-04_ctoc I 0 z d ._!:'; 43.J ,:'1:4 ''''..7.." •••• gli 1,:: %,...46 ,-`------11 .4 FA a. < ;I)Z Le Q VI 41 C"';1 1-1- I-a-3 ..--• . .....0 cat pei . i) •..---)° t------------c7 :e., oi .4...)ct.. „, . .....L— vi't 1 13 .3 . Y.79 • , . . *----....-- .. . . R .. it i 1-jt I"- . 1.6dric,\, 1117\1\ • I . • ,), :.....ve4iii:tif -IP i . 10.. ..-, ' CO dr CRi0013/..:10.4,1.04WA,OD.0 Lai 1 ,U),41100 NO.C.33p3L.' ,. . 1 . . 1 A -.=t4 /,:c i N•:; * ;.1 i 4,•3 , .t .'.; ,..i i :. ..:. ••.. • k Ye. -inms --- -- . dira : SO trO ', I