Loading...
HomeMy WebLinkAboutBLD2004-00718 0 BUILDING PERMIT 9 Jefferson County Department of Community, Development 621 Sheridan Street, Port Townsend WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD04-00718 Received Date 11/10/2004 SITE ADDRESS: 761 LUDLOW BAY RD Issue Date 12/28/2004 PORT LUDLOW, 98365 APPLICANT: RUTH/JENNIFER IRVIN PHONE: (360)437-0559 RONALD/STEVEN/TRACY HOYT PO BOX 65299 PORT LUDLOW WA 98365 SUBDIVISION: LUDLOW BEACH TRS 2 Block: Lot: 9 PARCEL NUMBER: 969000009 Section: 16 Township: 28 N Range: 01 E CONTRACTOR: ERNST CUSTOM PHONE: (360)437-8095 85 GARTEN RD PORT LUDLOW WA 98365 Contractor's License: ERNSTC*960PA Expires: 10/1/2006 PROJECT DESCRIPTION: NEW UNHEATED DETACHED GARAGE CALL IN FOR THE REQUIRED JNS ECD9NS THAT APPLY TO YOUR PROJECT. SETBACKS: / 3o oil UFFER: OK /2/30 0y >i• Footing: fyirdy1G / i Foundation: zfe /27604y��Li 5y....110 / 17# 65 * SiA8 ae 0/0.5-1Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : �S -XT se/EAE Framing: OK Zeds Plumbing: Propane Tank/Lines: Insulation: Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: 2,ie -c - ' na( V2-77 45. HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE • BUILDING PERMIT APPLICATION MRLA04N00p638 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD04-00718 Received Date: 11/10/2004 SITE ADDRESS: 761 LUDLOW BAY RD PORT LUDLOW, 98365 OWNER: RUTH/JENNIFER IRVIN PHONE: (360) 437-0559 RONALD/STEVEN/TRACY HOYT PO BOX 65299 PORT LUDLOW WA 98365 SUBDIVISION: LUDLOW BEACH TRS 2 Block: Lot: 9 PARCEL NUMBER: 969000009 Section: 16 Township: 28 N Range: 01 E CONTRACTOR: ERNST CUSTOM PHONE: (360) 437-8095 85 GARTEN RD PORT LUDLOW WA 98365 Contractor's License ERNSTC*960PA Expires 10/01/2006 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP NEW UNHEATED DETACHED GARAGE TYPE OF WORK GAR SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 780 VALUATION 36,769.00 ADD'L: HEAT TYPE: UH CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: # OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: 780 SHORELINE: CONST TYPE: SETBACK: 65 DECK: BANK HEIGHT: 30 SEWAGE DISPOSAL: WATER SYSTEM: PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: Prop: Seismic Streams Total: Total: Flood Way Floodplain Routing Date: F&W Landslide Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: Approved/Date Permit $512.45 KAS 11/10/04 68681 APPROVED Plan Check $333.10 KAS 11/10/04 68681 State Building Code $4.50 KAS 11/10/04 68681 DEC 2 8 2004 Total: $850.05 Jefferson County Planning & Building Departme o 4 Sedvbi SPECIAL CONDITIONS FOR COE # BLD04-00718 • 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs)and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 3.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 5.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 6.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 7.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 9.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 10.) Maximum lot coverage is noexceed 25%. Lot coverage is defined asount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) Minimum setback from Ludlow Bay Road right-of-way shall be 20 feet. Minimum side yard setbacks shall be 5 feet. Minimum rear(shoreline)setback shall be 65 feet as depicted on the submitted site plan. 13.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 14.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. I:\F_BLD_Permit_Buildng.rpt 10/29/19 („--soN00,, JEFFERSON C NTY ' DEPARTMENT OF COMMUNITY DEVELOPMENT t � r , �' ' `� 621 Sheridan Street • Port Townsend;j Washington 98368 I 360/379-4450 • 360/379-4451 Fax H I - I �<yO� .dojefferson.wa.us/commdevelOpient S'I NG't I NOV 1 0 2004 i Master Permit Application 1 ` MLA: ( --(O E Project Description(include separate sheets as necessa Rcs/ Je 17,« i (:•?a t-Cir7'C. Tax Parcel Property Number: 9.6 9 C CO - C'C 7 Size: /_, ®,,.y (acres/square feet) Site Address and/or Directions to Property: 7 e / I t .,, ac f, I Property Owner(s)of Record: R rr7 k J-v/,-. Telephone: ..3 e 0 4/J 7 1,.c 9 Fax: email: , Mailing Address: 7 c / L 0./j,4 150 y 4,./ f„r T i.,,,,,/,.w toe,. qtr3t-.1 Applicant/Agent(if different from owner): 0,,.,„ ,', L 1-At s r l f3A L:L.-r r f C'v s 47.,E Telephone: J e O y 3 7 9'2 Y-3 Fax: email: Mailing Address: S J 0...j,...... f , /...-7" A.,//. h,, w . tj g 5G S What kind of Permit?(Check each box that applies) [? uilding ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑ Conditional Use[C(a),C(d),or C]** ❑ Single Family ❑ Discretionary"D"or Unnamed Use Classification ErGarage Attached/Detached ❑ Special Use(Essential Public Facilities)** ❑ Manufactured Home 0 Boundary Line Adjustment ❑ Modular ❑ Short Plat** ❑ Commercial* ❑ Binding Site Plan** ❑ Change of Use ❑ Long Plat** ❑Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRDyAmendments** ❑ Propane ❑ Plat Vacation/Alteration** El Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** E Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance ❑Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment o Forest Practices Act/Release of Six-Year Moratorium *May require a Pre-Application Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate t h w S Y e a s 7.7.,.., to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURES ‘ , "'4A/ Date: // // 1/4.3 By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. =, Signature: f Date: f/—/0--C 'i The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"br"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transfer3b responsibility for adhering to an mplying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: 'ter Date: // / 4' --e 4/ G:\PemmitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc I • OWNER BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that 4yiçe nt libensed c of ractors andthey will be assuming the responsibility of the General Contractor for the proposed project / 1 Signature: Date: 111 i i l HJ �.'i NOV 1 0 2004 ;l i GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: �,-rfrrsf e .sue ` , j/ 4L 9 (3ee ) 5/37 2,5f, " . ( ) 1 ,`; f., i MAILING ADDRESS: i-S-- u..T.-- Jed / „.. ze, ,c,. g3-G 3"EMAIL: CONTRACTORS LICENSE WAINS NUMBER: A/i Al S' 7 C+ 9 ( t) PA NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: [T New a Wood Existing: ❑ Sewer ❑ Addition 0 Steel Proposed: Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: Height: , ❑ Individual System ❑ Repair 0 Masonry 3 0 SEP Permit# ❑ Demolition 0 Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well 0 Two Party Type of Heat: Proposed: _ i ❑ Public l S Total: Name of System: If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank ❑ Above ground Tank Size of Propane Tank: ❑ Heat Stove 0 Cook Stove ❑ Woodstove 0 Fireplace Insert ❑ Hot Water Tank ❑ Pellet Stove ❑ Other Is this appliance being installed in a Manufactured I Mobile Home? Yes / N� When applying for a permit to Install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage FcieOfflee Use Only i' ' . ` ,.' '°" 4a1; A " Current Proposed �I �. t ti,�. �, �. Main Floor Consistency Review: 4,�`„� " t$ -,<. ' r y 2 Floor ..7 e „ Base fee: r 3`°Floor Additional Section: `` �'',��4 ,� �.s¢ '� fin= e Mezzanine: Plan Check fee: • i▪ "- " i 7 - , ▪K y')F Heated Basement "-State Surcharge fee - , if+ T Unheated Basement R.ot Water Review fee: :, ▪ 1 ;� r Other Unheated �f11/Rd p� 1 '�iR iSS� ' f 5 Garage/Carport 4 t' _ ,w r . I Decks Receipt Number • i ( D ° +�, '` ".,, ` .M a Other ( Th;shICheck Number: 1'' ��c�'�r° 4 ,.� ESTIMATED COST(REQUIRED) Date: I1 ,1 ,� '' r � �,1 .Fair arket value of all labor and materials foundation to fine 1 ''`" '..,,r�°.s�a d.-e t . x C h 2 , Initials: .P , G:\PecmitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc %. • • . C:I ca C— I-r, —r91 ,..• L oil,V I ,4 ,' 4.. 4-0 LLI .= .... = = = aa • -ir r1.1 "12, (5r4t,,','"•/•\.,., ....1.' al I =2 CZ) rri an 49 ,',_ (:'-,, , ." „,..,- , • ,, -- ,- ', ,•-, ., '-, 1,,--, , - , ' ' , ,-1 i ' ,-4,-,, ,-,,. , ,',X:r", le)6"- c, ,::,k Y('-!,, -D..., .0 a° g tgl I ..... ,. / ...4., ...,.. .-) a. c la ....= , "r•-,, -• , o' C7,-„,:i: oz, ,_ LU ,,, s ....j Co / ' .. C:3 .cr, co ..4 CIN = ces ea —3< ez-..-,, ez2 c , ,•• , ,, + t.... w.N ,. Ar -..... ... 111. /'1'4 ' • 1 t 1 ‘A, .„„. t• , e'lks• CZ; ir ',,, L '• - / ; 1 I\r 2 / 1 t ••c. ' , I s4 -7\--,,,....,-`;i - „4-, -•1, ./S / T..t , ••S / Ci‘i 63' / , ; ft,,,l' I* 't • , ., . ,„,.. /t ‘1,•. • ,(3;„ a it ir .•, ,, , It G') . i •<,,, g / --, /' ,lip. q.A•1 ••••4s, ih r4\ ,•7 A / ; *) ,,, •13 k...4 I- '- le n. i Cl4i t's,..4,..,.; ,. rt rii----- 5 —, • 11 / „„A, ..,,,,y,.-.1 mt -s , 1 _ - . ti. ....- , ..- . , - 3 - .",... r%<- I , f e.,.", E <•'. t- ,,• ''', . , At .14 4 ,,,,•••••• i , r •A ,„, C'i r'"`k •*1‘., 94,-.'. r -,i.• ' •'.i1P.1. Ii. 1 . t!,, '''',',- ••.,,, . 04- / ii, ; 1 c. -. • 71. 1,3, .... 74- A / ,... -1. f•x„ i . / 1 ••• i -I- "'"k, 1'/,-, • // ,.. , . . , ,IA ... • , , i.: •,‘,,.„, '44 tz' 9,01 I , - i . , It'.5 1 CD ' i •,,•.: il . , A cv.4 • ,'" f:,, , , _ .. . ,. , .. , . . l i .,,. 7,44, • ,. ) c...: , •.,,,,... r - 7i Cr) s--t- CD 0 9 XI -...% c., •:•1 pl.,, , ct23. al 1...4 p7... CD -16 tri ,< i . I ‘7- -P. Z tlii k . ' --„, 2G 0' y$+ I. qgl - 8' 911 4'— 3 4' 3 bb I } �a �� I Storage y Open above ceiling z Unfinished 1671 Sq. Ft. t m O Ed e of slab t (Y; meant. i�� x i I /ti versa -Lam or Equiv.) + .., g YP - Iy d a i I -10 1/2' CC V R.O. 9' f 9' 3 R. 0 1'' 10 1 /2 _. 5 0 g°1 I _ g, 0�, 2'-0 i , 51 _...___26._. Foundation Phan Garage Floor Plan and Workshop Storage Floor Plan 1 /4„ _ 1'-0" .GENERAL FOUNDATION. NOTES: GENERAL FLOOR PLAN NOTES- 1 - Solid blocking over supports. 1. Assume a minimum of 2 2 x 6 studs as beam supports at bearring walls 2. Double joists at parallel walls. and 2-2 x 8 studs at exterior door and window head er 3. All footings to rest on. level, undisturbed soil, that's 2. Beams c headers (interior walls) to be 4 x 8 DF 2. U.N.O. free of debris. 3. A11 window door headers to be 6 x 10 of #2 at exterior walls c 4 x 12 4.. All Wood in contact with concrete to be pressure treated, of #2 at interior walls Header height @ wind '- ' g windows only to 7 8 w/ g —0 .5. All. floor Joists to be HF #2 — 2 x 10 @ 16 O.C., plan plates and 6'-6 w/ 8'-0 plates, except as noted. indicated direction,4 Provide bearing posts or multiple studs at be p ends. 6. Contractor to. excavate as to maintain an 18' minimum 5. Lateral wall bracing per 2003 IBC. ground to girder clearance. g 7. In areas where moisture may be a problem, four inches 6. Double joists at parallel walls. l of rock or sand should be used. P 7. Solid blocking over .supports.. 8. All footings to rest on undisturbed soil. — 2000 P.S.F: min. 8. All exterior walls to be 2 x 6 studs @ 16 O.C. (t'yp. U.N.O.): 9. All wood exposed to weather to be pressure treated, cedar 9.. All interiror walls to be 2 x 4 studs @ " or redwood. 16 O.C: (typ- I U.N.O.). 0. All window 8c sliding glass. doors shown are all clad WD. SA. U-40 "Craf i " 10. Provide adequate beam and column connections per current tune code requirements. units.. 11. Glue decking to girders w/construction adhesive to minimize floor 11. Wrap posts and beams. squeak. 12. GLB = 24F V4 DF MINIMUM GAZING SUMMARY mm- MQT/CE. Plans are approved Excepting any errors or omissions. All work must Pass Inspection in conformance with ail applicable codes and regulations. Contact the Building Department at 379-4450 prior to making changes or revisions to the approVed plans Clost i E 1 JEFFEA oN COUNTY I D.EF T. ?F CTMkdtl�;P' of 'F.IOPA D!T fvt, r D E S I G N J 8, 1 DESIGN SERVICES KENNEWICK, WA 9933E TEL: (509) 438-1960 jandidesign@yahoo.com JOB NO. 2004-001 DATE 10-14-04 SCALE. UNLESS OTHERWISE NOTED DRAWN BY JENNIFER IRVIN SHEET A�2 FOUNDATION & FLR.- 2 OF 5 PAGES