Loading...
HomeMy WebLinkAboutExhibit 22-02 First Declaration of Phil Cecere, JeffCo Fire Marshal FIRST DECLARATION OF PHIL CECERE, JEFFERSON COUNTY FIRE MARSHAL AND BUILDING OFFICIAL Page 1 of 2 Jefferson County Prosecuting Attorney 1820 Jefferson Street/P.O. Box 1220 Port Townsend, WA 98368 360-385-9180 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 BEFORE THE HEARING EXAMINER FOR JEFFERSON COUNTY In the Matter of the Unit Lot Subdivision Application Submitted by HABITAT FOR HUMANITY OF EAST JEFFERSON COUNTY Parcel No. 901-023-007 (Port Hadlock) Project File No. SUB2025-00012 FIRST DECLARATION OF PHIL CECERE, JEFFERSON COUNTY FIRE MARSHAL AND BUILDING OFFICIAL I, PHIL CECERE, hereby declare as follows: 1. I am over the age of 18 years, competent to be a witness herein, and make this declaration based upon my personal knowledge. 2. I am the Fire Marshal and Building Official for Jefferson County, Washington. 3. I have been employed with Jefferson County since May 2020. 4. My past employment history relevant to my current position includes: construction rental management, contracting/building plan review, inspection and application of building and life safety codes. 5. Overall, I have over 5 years of experience as a Building Official and Fire Marshal. I FIRST DECLARATION OF PHIL CECERE, JEFFERSON COUNTY FIRE MARSHAL AND BUILDING OFFICIAL Page 2 of 2 Jefferson County Prosecuting Attorney 1820 Jefferson Street/P.O. Box 1220 Port Townsend, WA 98368 360-385-9180 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 have professional certifications in: Residential Construction Review, Residential Construction Inspection, Commercial Construction Review, Commercial Construction Inspection, Commercial Plumbing, Accessibility Review, Fire Inspector I, Fire Inspector II, Commercial Energy Review, Building Official and Fire Marshal issued by the International Code Council (ICC). 6. I have reviewed the Order of Continuance and Case Management Orders dated July 22, 2025, issued by the Hearing Examiner in the above referenced matter. In compliance with Section VII(b)(2) Jefferson County Fire Marshal, I am providing the attached written analysis addressed to the Hearing Examiner. In the attached letter, I explain my analysis and certify that the preliminary plat proposed for approval meets all applicable fire safety requirements for this proposed use and configuration. In forming my professional opinion, I have reviewed all of the documents provided for this matter, including the engineer’s signed preliminary plat. 7. I am also available to testify, if requested by the Hearing Examiner, but need to respectfully make sure everyone is aware I am out of the office August 14, 2025 through September 2, 2025. I hereby declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct to the best of my knowledge. EXECUTED at Port Townsend, Washington, this 6th day of August, 2025. PHIL CECERE Fire Marshal, Building Official Mission Statement To preserve and enhance the quality of life in Jefferson County by promoting a vibrant economy, sound communities and a healthy environment. Jefferson County Community Development Office of the Building Official Office of the Fire Marshal Phil Cecere 621 Sheridan St • Port Townsend WA 98368 Desk: 360.379.4461 https: co.jefferson.wa.us/1687 August 6, 2025 Tom Erlichman Jefferson County Hearing Examiner 1820 Jefferson St Port Townsend, WA.98368 It is my understanding that the previous exhibit comments provided from my office was found insufficient and denied. In light of this, I am taking advantage of the alternative to testifying at a future hearing and providing written comments as I plan on being out of office and feel it improper to delay this hearing any further. The Mason street proposal has been meticulously thought out and input has been provided by this office through numerous, well attended meetings. I, myself representing the Fire Marshal and the Building Official duties for Jefferson County, as well as East Jefferson Fire Rescue has had ample reviews of the various portions and revisions of this project. Fire flow analysis has been discussed with the applicant and the water purveyor Jafferson PUD#1. The proposed use of the majority of the structures as residential four unit townhomes, less than three stories and less than 5,000 sq ft cumulative per structure falls under the threshold for residential automatic sprinklers. The proposed congregate buildings and the required fire protection and life safety system requirements are deferred until permit application submission and reivew. Preliminary proposed water availability via 8” mains will accommodate all hydrant locations, with hydrant flow data to be verified prior to building permit issuance. All emergency access is appropriate, with comments only as to the viability of the road construction of the wagon track style road being discussed as to the durability to withstand #75,000 water tankers. Location of the access road and access through the parking areas is found to be appropriate including turning radii analysis and hydrant placement produced by Parametrix and provided by the applicant. Addressing is deferred to a future process at the time of building application submittal.This is consistent with DCD practices, preliminary input has been provided by JeffCom dispatch for consistency with addressing compatibility. Phil Cecere, Jefferson County Fire Marshal, Building Official