HomeMy WebLinkAboutWashington State Department of Transportation US 101 Duckabush Estuary Restoration Realignment - 081825Am
Washington State
•� Department of Transportation
Public Agency
Jefferson County
Construction Agreement
Contact Name Eric Kuzma
Title Asst. Public Works Director / Eng. Services Manager
Construction by WSDOT on State Highway
Address
Right of Way at WSDOT Expense
623 Sheridan Street
Port Townsend, WA 98368
Phone 360.385.9167 — 360.301.6783 (c)
Email EKuzma@co.jefferson.wa.us
Agreement Number
Project Title US 101 Duckabush Estuary Restoration Realignment
GCC 1114
State Route Number
Mile Post
Control Section
Description of Improvements
101
309.65
160300
Construction of improvements at the intersection of US101
and Duckabush Road, including the realignment of
Exhibits Attached
Exhibit A: Easement Plan & Legal
Duckabush Road.
Description
Exhibit B: Plan Sheets
Exhibit C: Turnback Agreement
This Agreement is between the Washington State Department of Transportation (WSDOT) and the above -named governmental entity
(Agency), hereinafter referred to individually as the "Party" and collectively as the "Parties."
Recitals
1. The U.S. Army Corps of Engineers ("USACE") is funding (with 35% matching funds from the Washington Department of Fish and
Wildlife and WSDOT) and constructing a project on US101, a state highway, that will replace the existing highway bridge across
the Duckabush River Estuary, referred to as the "Duckabush Estuary Restoration Project' (hereinafter the Project). The Project
requires realignment of Duckabush Road, a county road, at the intersection of US101, hereinafter referred to as "Improvements."
WSDOT is entering into this agreement with the Agency, for real property interests needed in support of the Project.
2. The Agency is willing to authorize USACE to construct the Improvements with WSDOT support subject to the terms and conditions of
this Agreement.
3. WSDOT is prohibited from paying for the costs of mitigating utilities without a real property right under chapter 47.44 RCW
Now therefore, pursuant to RCW 47.28.140, the above recitals, which are incorporated herein as if set forth below, and in
consideration of the terms, conditions, covenants, and performances contained herein, and in the Exhibits attached hereto and hereby
made a part of this Agreement, it is mutually agreed as follows:
1.0 Purpose of Agreement
WSDOT provided the Agency with its Plans and Specifications for the proposed Improvements. The Agency has reviewed and
agreed with the plans and specifications, unless otherwise modified pursuant to the terms of this Agreement. WSDOT agrees to
and shall construct, operate and/or maintain the Improvements in accordance with the terms of this Agreement.
2.0 Right of Entry
2.1 WSDOT
Page 11
GCC 1114
WSDOT hereby grants to the Agency, its employees; authorized agents, contractors, and subcontractors, a right of entry upon
all WSDOT-owned property necessary for the Agency's review of construction of the Improvements.
2.2, Agency
The Agency hereby grants to WSDOT, USACE, their authorized agents, contractors, subcontractors, and employees, a right of
entry upon state-owned highway right of way onto which access is necessary to construct the Improvements.
3.0 Temporary Work Area Easement
3.1 Temporary Work Area Easement
The Agency hereby grants to WSDOT a temporary easement and right of way in, on, over and across the land described in
Exhibit A for a period of 72 months, beginning with date when construction begins for the project, possession of the land is
granted by the Agency to WSDOT for use by the United States, its representatives, agents, and contractors as a work area,
including the right to deposit fill thereon, move, store, and remove equipment and supplies, and erect and remove temporary
structures on the land and to perform any other work necessary and incident to the construction of the Puget Sound Nearshore
Ecosystem Restoration Project, together with the right to trim, cut, fell and remove therefrom all trees, underbrush, obstructions
and any other vegetation, structures, or obstacles within the limits of the right -of way; reserving, however, to the landowners,
their heirs and assigns, all such rights and privileges as may be used without interfering with or abridging the rights and
easement hereby acquired; subject however, -to existing easements for public roads and highways, public utilities, railroads and
pipelines.
4.0 Construction
4.1 Documents on Site
Copies of this Agreement shall be kept at the USACE project office and by USACE or its contractor at the construction site.
USACE will be responsible for construction administration on behalf of WSDOT for the Project.
4.2. Pre -Construction Conference
Prior to the beginning of construction, a preconstruction conference shall be held at which WSDOT, the Agency, USACE, and
USACE's contractor (if applicable) shall be present. WSDOT shall give a minimum of ten (10) working days notice to the Agency's
representative prior to holding the pre -construction conference. Working days for this -Agreement are defined as Monday through
Friday, excluding Washington State furlough days or state holidays pursuant to RCW 1.16.050.
4.3 Construction of Improvements
4.3.1 USACE shall construct the Improvements as shown on the attached Exhibit B at USACE, WSDOT and WDFWs sole
cost and expense. The Agency shall not be required to contribute to the construction of the Improvements.
4.3.2 All material and workmanship shall conform to USACE's Specifications for the Duckabush Ecosystem Restoration,
Washington State Department of Transportation's Standard Specifications for Road, Bridge, and Municipal
Construction, current edition, and amendments thereto (Modified Standard Specifications), and shall be subject to
WSDOT inspection.
4.4 Support of Work
WSDOT shall support construction of the Improvements by USACE, its contractor, subcontractor, agent, and others, and
approve those improvements on behalf of WSDOT.
4.5 Required Permits
USACE shall obtain on WSDOT's behalf all necessary Federal, State, and Local Permits including, but not limited to, permits
required by the Washington State Department of Ecology, the Washington State Department of Fish and Wildlife, U.S. Army
Corps of Engineers, and the National Environmental Policy Act (NEPA) prior to beginning construction.
5.0 Indemnification
5.1 To the -fullest extent permitted by law, each Party to this Agreement will protect, defend, indemnify, indemnify, and save
harmless the other Party, its officers, officials, employees, and agents, while acting within the scope of their employment as
such, from any and all costs, claims, judgments, and/or awards of damages (both to persons,and property); arising out of, or in
any way resulting from, each Party's negligent acts or omissions with respect to the provisions of this Agreement. Neither Party
will be required to indemnify, defend, or save harmless the other Party if the claim, suit, or action for injuries, death, or damages
(both to persons and property) is caused by the sole negligence of the other Party. Where such claims, suits, or actions result
from the concurrent negligence of the Parties, their agents, officials, or employees, and/or involve those actions covered by
RCW 4.24.115, the indemnity provisions provided herein will be valid and enforceable only to the extent of the negligence of the
Page 2
GCC 1114
indemnifying Party, its agents, officials, or employees.
5.2 The Parties agree that their obligations under this section extend to any claim, demand, and/or cause of action brought by, or on
behalf of, any of their officers, officials, employees, or agents. For this purpose only, the Parties, by mutual negotiation, hereby
waive, with respect to each other only, any immunity that would otherwise be available against such claims under the -Industrial
Insurance provisions of Title 51 RCW.
5.3 This indemnification and waiver will survive the termination of this Agreement.
Acquisition of Right -of -Way and Exchange of Real Property. WSDOT will acquire the right-of-way necessary for the realignment of
Duckabush County Road at no cost to the Agency. Prior to completion of the Improvements, WSDOT and the Agency will enter into a
Tumback Agreement providing for the exchange of real property as shown in Exhibit C.
6.0 Payment
6.1 This is a non -financial Agreement. In no event shall either Party seek compensation for work performed under this Agreement.
7.0 Miscellaneous Terms
7.1 Assignment of Agreement
,No assignment or transfer of this Agreement in any manner whatsoever shall be valid, nor vest any rights hereby granted, until
WSDOT consents thereto in advance and in writing, and the assignee accepts all terms of this Agreement.
7.2 Records Retention and Audit
All records related to this Agreement shall be held and kept available for inspection and audit for a period of six (6) years from
the date of termination of this Agreement or any final payment authorized under this Agreement, whichever is later. Each Party
shall have full access to and right to examine said records, during normal business hours and as often as deemed necessary.
In the event of litigation or claim arising from the performance of this Agreement, the Parties agree to maintain the records and
accounts until such litigation, appeal or claims are finally resolved. This section shall survive the termination of this Agreement.
7.3 Modification .
This Agreement may be amended or modified only by the mutual agreement of the Parties. Such amendments or modifications
shall not be binding unless they are agreed to in advance and -in writing and signed by persons authorized to bind each of
the Parties.
7.4 Disputes
In the event that a dispute arises under this Agreement, it shall be resolved as follows: WSDOT and the Agency shall each
appoint a member to a Dispute Board, these two members shall select a third board member not affiliated with either Party. The
three -member board shall conduct a dispute resolution hearing that shall be informal and unrecorded. An attempt at such dispute
resolution in compliance with aforesaid process shall be a prerequisite to the filing of any litigation concerning the dispute. The
Parties shall equally share in the cost of the third Dispute Board member; however, each Party shall be responsible for its own
costs and fees.
7.5 Venue and Attorney's Fees
In the event that either Party.to this Agreement deems it necessary to institute legal action or proceedings to enforce any right
or obligation under this Agreement upon completion of the dispute resolution process set forth in Section 7.4 above, the Parties
hereto agree that any such action or proceedings shall be brought in Thurston County, Washington Superior Court. Further, the
Parties agree that each will be solely responsible for payment of its own attorney's fees, witness fees; and costs.
7.6 Independent Contractor
The Agency shall be deemed an independent contractor for all purposes under this Agreement, and the employees of the Agency
or any of its contractors, subcontractors, consultants, and the employees thereof, shall not in any manner be deemed to be
employees or agents of WSDOT.
7.7 Termination of Agreement
WSDOT may terminate this agreement in whole or in part, without penalty or further liability in the event of the following:
a) Termination for Cause
If for any cause either Party does not fulfill in -a timely and proper manner its obligations under this Agreement, or if either
Party violates any of these terms and conditions, the aggrieved Party will give the other Party written notice of such
failure or violation. The responsible Party will be given the opportunity to correct the violation or failure within fifteen (15)
working days. If the failure or violation is not corrected, this Agreement may be terminated immediately by written notice
of the aggrieved Party to the other.
b) Termination for Withdrawal of Authority
Page 13
GCC 1114
In the event that either Party's authority to perform any of its duties is withdrawn, reduced, or limited in any way, or if
funding is withdrawn after the commencement of this Agreement, either Party may terminate this Agreement by seven (7)
calendar days written notice. No penalty shall accrue to the terminating Party in the event this section shall be exercised.
Any termination of this Agreement shall not prejudice any rights or obligations accrued to the Parties prior to termination.
7.8 Counterpart and Electronic Signature
This Agreement may be signed in multiple counterparts, each of which constitutes an original and all of which taken together
constitute one and same agreement. Electronic signatures or signatures transmitted via e-mail in a "PDF" may be used in place
of original signatures on this Agreement. The Parties intend to be bound by its electronic or "PDF" signature on this Agreement,
are aware that the other Parties are relying on its electronic or "PDF" signature and waives any defenses to the enforcement of
this Agreement based upon the form of signature.
In Witness Whereof, the parties hereto have executed this Agreement as of the Party's date last signed below.
Jeff on County
Washington State
Department of Transportation
By.
z f_,
By: ge,4.,�
Printed:
}�
�� I
Prin d:
JoAnn Schueler
a��
Title:
1LJl� t_Z_`tSu��'—
Title: ARA for M2D2, Olympic Region
Date:
61 J� h
Date: 9/15/2025
Approved as to Form Jefferson
Approved as to Form
Washington State
County
Department of Trans' n Ot
By.
`rtaEt
By -
I G- 4r4
Printed:
Printed,
Title:
Title:('c.
>
Date:
Date:
Approved as to 1�.rm only:
,t� !� - -' for 06/17/2025
hilip C. Hunsucker, Date
Chief Civil Deputy Prosecuting Attorney
Page 14
GCC 1114
,5 5
1\
A EASEMENT
,SECT. 16
T.25N. R.W. W.M.
,J
D-LINE 16+53.28 P.T. \
D-LINE 16+17.47 1.
V
D-LINE 5+81.66 P.C. \\
., . A EASEMENT (2Js.se'CT , iIJ J�0'1 `\ SNEEt Easement to be conveyed b the SyF
n.an iTJ 1� H1e Y Y Fr
d EASEMENT tlry'` E L! B Local Agency
.
_ _ WB 1 92 t D LINE 11 81.15 A EASEMENT SCN� J�E 1h JT y
D LINE 11+51A5 P.I. 10P' O y
TURNBACR UN(q, „�1.;- D LINE 10+75d4 P.C. Roadway Facilities & ROW to be
z� / iRco�NrU15H;ENT7: CREEK Local Age by easement by the •END PROJECT
♦conveyed
y Agency to WSD,OT, then
6a;e,.;° Y P P otect C- 1E MP 300+1
m ♦ \Conve ed in fee ost r
US 10 ROW STA 522+15.52 =
' � 1s160 0 \ (0.
GSM 1 Ifi l 5 ` 1--I J A EA6EMENT
:=w-J ---`-- - C.I/NE asJz.Lii00 Ivz. —� p��ur (76 T— \\
Cq•L -► a LTJ 4 Lu \
D LINE 10+DD.00 P.O.B. 1 53S F z NE 114 SE 114
C LINE 531+32.56 \
-----.IWJrrrs•Js.a�as..a.� ��_ �9 SEC. 16
Lu
10
ROBI RD
�I,o zzz� � ♦" � J' C LINE 540N 5.52 P.T.
B NOTES: Rrl ♦♦
A EASEMENT
1, 'BNB\1 _;TI / \ ��
9 THE. BASIS OF BEARINGS AND DISTANCES ARE DETERMINED FROM - S
WASHINGTON STATE. PLANE COORDINATE SYSTEM NORTH ZONE (NAVD \ (� C LINE 53�fi+r 6� 3.\ Q �. a.`'. ,..y $40 \ '��a♦
• d
88).
C LINE 537+29.05 P.C.
PER R RAW' 58.09.13E ANY MONUMENT CORNER DISTURBED BY THE
CONTRACTOR'S ON SHALL BE REPLACED AT NO, COST •TO THE
CONTRACTING AGENCY. / 35
i
9 3, THE DISTANCES SHOWN ARE GROUND DIMENSIONS, GROUND
SURVEY FEET. TO
Y OBTAIN THE GRID DIMENSIONS, OF 0.9999LTIPLY THE GROUND DIMENSION BY
THE COMBINED FACTOR OF 0.9999766.
3 4. SEE SHEETS AL1 THROUGH AL3 FOR ADDITIONAL ALIGNMENT
j INFORMATION.
:I 5. 1 SEE SHEET RW1 FOR LEGEND
PRIMARY CONTROL
TABLE
•HORIZONTAL DATUM
NAD (83111) WA NORTH US FEET
PROJECT DATUM
COMBINED FACTOR 0.9999766
VIERTICAL DATUM
NAVD Be '
DESIGNATION
NORTHING
EASTING
'NORTHING
-.EASTING
ELEVATION
IS7602
245157.564
1123650.217
5730TA.750
1451280.88E
18.389.
ROBIRD
1 242923.592
1122075.975
573246.634
1 1451759.844
36.404
TRANSFORM SPC TO PDC (SPC US FEET - (11CF)) • ((39.37112)' 100000) v PDC
TRANSFORM PDC TO SPC (POC US FEET-((39.37112)• 100000))-CF a SPC
C LINE 544+10.54 P•O.E.
rift`' \
SCALE IN FEET
u FILE NAME c:luaeraWelaara\ =d.Ad016VOML6092
°�.
PS RWI.E n
TIME ,:42:14 PM
°T— FED.AID PROJ.NO.
a10x
_.
Y - Adft
us 101
vux xrs uo
DATE 7/30/2025
�/
MAP
RW3
u PLOTTED BY dalaC.A
As
DUCKABUSH ESTUARY RESTORATION,
DESIGNED BY M:TUFF
22C532
Washington State
li
REALIGNMENT
"
e ENTERED BY M. FLU RA
CHECKED BY A. DE LA CRUZ
ax.x.==
Department of Transportation
,
PROD. ENGR. O. AMUNDSEN'r BARNKOW
-
-
XL6092
re
wre
RIGHT OF WAY PLAN
ex
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
Easement to be conveyed from Local Agency, then turned back with improvements post -project
(Yellow Area in attached exhibit)
All that portion of the hereinafter described Parcel `A' lying Westerly and Southerly of a line
beginning at a point opposite Highway Engineer's Station (hereinafter referred to as HES) D
12+71.86 on the D line survey of SR 101 DUCKABUSH ESTUARY RESTORATION and 66.72 feet
and 77.82 feet Southerly therefrom; thence Northerly along said line survey to a point opposite HES
D 12+71.70 and 27.39 feet Southerly therefrom; thence Easterly along said line survey to a point
opposite HES D 12+38.92 and 27.50 feet Southerly therefrom; thence Northwesterly along said line
survey to a point opposite HES D 14+11.96 and 30.44 feet Northerlytherefrom; thence
Northwesterly parallel with said line survey to a point opposite HES 18+00 and the end of said line
description.
Duckabush Surplus Area (Purple in Exhibit Map) Legal Description
All that portion of the hereinafter described Parcel "A" lying within the following described tract
beginning at a point opposite Highway Engineer's Station (hereinafter referred to as HES) C
529+99.80 on the US 101 line survey of US 101 DUCKABUSH ESTUARY RESTORATION
REALIGNMENT and 52.03 feet LT. Northwesterly therefrom; thence Northeasterly along said
line survey to a point opposite HES C 530+60.74 and 51.65 feet LT. Northwesterly therefrom;
thence Northwesterly to a point opposite HES D 12+37.92 on said line survey and 27.50 feet LT.
Southerly therefrom; thence Westerly along said_line survey to a point opposite HES D 12+71.70
and 27.39 feet LT. Southerly therefrom; thence Southerly along said line survey to a point
opposite HES D 12+71.86 and 77.82 feet LT. Southerly therefrom; thence Southwesterly along
said line survey to the point of beginning.
Parcel "A"
The following described property acquired by instruments recorded July 20, 1933, under A.F.
Nos. 70659 & 70658, respectively:
A strip of land 70 feet wide in Section 16, Township 25 North, Range 2 West, W.M., being 40
feet on the Southerly side and 30 feet on the Northerly side of a center line Westerly from the
Engineers Survey Station 23+55, extended.
Also, a strip of land 70 feet wide in Section 16, Township 25 North, Range 2 West, W.M., being
30 feet wide on the Northerly side and 40 feet wide on the Southerly side of a center line
extending from the Westerly right of way line of said road at Engineers Station 23+55 to the
West line of the Southeast quarter of the Southeast quarter in said section.
SNEEZ
MPtG�a V�015� D
J.ENT
tt
5ta.r6 s
4 �EAR MENT
n WS---
S
C1 r \
� TURN B�ACg¢KS�UNI
mm _ _' I66Sotr.\
41:
SECT. 16
T.25N. R.2W. W.M.
a,..'A.9 — — —.— — —50!!L i
_ IS160 ` 1 %LT)
CLINE ieTi�tn Ira e.2``
D LINE 10+00.00 P.O.B. S3S
R z ^�s�--`T'
C LINE-531t]2.5610
c I
\\
RT.)
\_— q
NOTES; A EASEMENii `�
1. THE BASIS OF BEARINGS AND DISTANCES ARE DETERMINED FROM
WASHINGTON STATE PLANE COORDINATE SYSTEM NORTH ZONE (NAVD (—C LINE
88).
2. PER RCW 58.09.130;ANY MONUMENT OR CORNER DISTURBED BY THE
CONTRACTOR'S OPERATION SHALL BE REPLACED AT NO COST TO THE
'- CONTRACTING AGENCY.
9 3, THE DISTANCES SHOWN ARE GROUND DIMENSIONS, US SURVEY FEET. TO
OBTAIN THE GRID DIMENSIONS, MULTIPLY THE GROUND DIMENSION BY
THE COMBINED FACTOR OF 0.9999766.
3 4. SEE SHEETS ALI THROUGH AL3 FOR ADDITIONAL ALIGNMENT
j INFORMATION.
_ 5. SEE SHEET RW1 FOR LEGEND.
3-T1n4 ♦♦
m 9C EASEMENT
112.69'Li.l ♦
'T'
W ♦
%j W/'''`���♦♦
PRIMARY CONTROL TABLE
HORIZONTAL DATUM PROJECT DATUM
NAD (83111) WA NORTH US FEET COMBINED FACTOR 0.9999766
ERTICAL DATUM
NAVD 88
DESIGNATION
NORTHING
EASTING NORTHING
EASTING
ELEVATION
IS1602
7A51S7.5r'4
1123650.217 573024.750
1451280.880
18.389
ROBI RD
242923.592
1122015.935 573246.634
1451759.844
36.404
TRANSFORM SPC TO PDC (SPC US FEET • (11CF)) + ((39.37112) - 100000) = PDC
TRANSFORM PDC TO SPC (POC US FEET-((39.37H2)- 100000))• CF a SPC
XL6092
0
C-LINE STA 540+15.52 =
US 101 ROW
STA B 33+14.22 (0.83' RT.)
NE 114 SE 114
SEC. 16
♦ 35
♦
6....... dl�\tea �1-
O 50 100
SCALE IN FEET
us 101
-'/
DUCKABUSH ESTUARY RESTORATION
RW3
Washington State
REALIGNMENT
Department of Transportation
a,
RIGHT OF WAY PLAN..
.5 SN�ES
N,PSGNO �N� �•0,
13+79.28 P.I.
SS°50'74.44'
G-LINE 60-33.74 P.C.'.
CLINE 60+49.31 P.I.
(`..
D-LINE 60.61.58 P.T.
c
s�
A
�
vl
C-LINE 529-70.62 P.I.
4
F 1 >
1}Y
\ IIi
\
C 2
N I✓ 1
" yN
E1
��-���
m
D-LINE
L. w^
G•LINE 61.6294 P.O.S. 1. 2.
D-LINI
p sU
y
�
y _l•_ ..--
, ......,....__
...__:--mod---_
T
US got Row_
9
`e
FILL -Ft
.FILL"
D-LINE 10+00.1
C
_
TC-LINE 58+24.65 P.C. c C-LINE S
------------zl. PC
NOTES:
1. THE BASIS OF BEARINGS AND DISTANCES ARE DETERMINED FROM
WASHINGTON STATE PLANE COORDINATE SYSTEM NORTH ZONE (NAVD
88).
�I 2. PER RCW 56.09.130,ANY MONUMENT OR CORNER DISTURBED BY THE
CONTRACTOR'S OPERATION SHALL BE REPLACED. AT NO COST TO THE
CONTRACTING AGENCY.
3. THE DISTANCES SHOWN ARE GROUND DIMENSIONS, US SURVEY FEET. TO
OBTAIN THE GRID DIMENSIONS, MULTIPLY THE GROUND DIMENSION BY
THE COMBINED FACTOR OF 0.9999766.
4. SEE SHEETS RW1 THROUGH RW3 FOR ADDITIONAL RIGHT OF WAY
INFORMATION.
5. SEE SHEET AL1 FOR LEGEND.
SECT. 16
T.25N. R.2W. W.M.
CURVE DATA
P.I. STATION
DELTA
RADIUS
TANGENT
LENGTH
S
C-LINE 529+70.62
34°07'78.57" RT
.2400.00
736.55
1429.29
4.76%
C-LINE 538+72.30
1.57'14.30" LT
8400.00
143.25
286.47
WA
D-LINE 11-51.45
28.32'35" LT
300.00
76.31
149A5
4.0%
D-LINE 13+79.28
12.3T02" RT
600.00
66.31
132-13
4.0%
D-LINE 16W7A7
1-4119"LT
2430.00
35.B7
71.62
4.D%
G-LINE 60.49.31
63'48'55" LT
25.00
19.57
27.B5
WA
PCA-LINE 34+28.47
24-47'57.19" RT
50.00
10.99
21A4
WA
PCA-LINE 34+88.09
15'31'07.BT' LT
100.00
11.63
27.DBB
WA
PCA-LINE 36.66.39
90•44'38.71" RT
1 50.00
1 10.13
15.84
WA
. D-UNE 11.81.15
TEMPORARY CURVE DATA
,.' P.I. STATION
DELTA RADIUS TTANrENT
LENGTH S
TC-LINE 61+24.86
23°52'10.90" RT 1420.00 1 300.21
591.72 4.76%
.PCA-LINE 34+74A7 P.C.
N78'31'58.54"E
\
1.51.45 P I 'PCA-LINE 34-39.11 P.T.
PCA-LINE 74+28.47 P.I.
.. \
0+75.14 PC PCA-LINE
CONSTRUCTION N53°4d'01.75"E
PCA•LINE ]6K6:
ND
c.l wei.,n nn 1 'I,
\
PCA-LINE 16.6E
C'citie PCA•LINE 34+00.00
P. SB FAL ^�
5
0
0 - 30'S5'48.83"
TC-LINE 66+00.43 P.O.E.
I " US101 ROIW B 29+52.05 1
=L C`UNE S71
1.36 P.T.
DW3668-LINE 1+00
c r.-I IUP
Form
C-LINE STA 540+15.52 =
US 101 ROW
STA B 33+14.22 (0.83' RT.)
DW-7668-LINE 1+31.fi1 A.P.
S3846.24"E -LINE 538+72.30 P.I.
OW-36MLINE 1+65.54 P.O.E. DW-3857-LINE 1+00.00 P.O.B.
1+0
S26-3446.71"E 7 s C-LINE 538-72.30 \\ .3$ -
C-LINE 577.29.05 P.C. C-LINE 544+10.84 P.O.E. --
DW-3779-LINE 1*41,95 A.P.,`
DW7767-LINC•LINE 577 670A6 S48°28'27.60"E \ M61`48'79.08°F
DW-3779•LINE 1+74.M P.O.E. ` \
0 50 100
SCALE IN FEET
FEDAID PROJ NO US 101
��a DUCKABUSH ESTUARY RESTORATION AL3
77 Washington%?State REALIGNMENT ....
Dopartitient of Transportation
;M92 ALIGNMENT PLAN ...
BEAM
TYPE 3
CONSTRUCTION NOTES
SEE WALL SHEETS ST1 TO ST13 FOR
1
WALL LIMITS AND CONSTRUCTION DETAILS
MINOR STRUCTURES • SHEET ST14 AND
OSEE
WSOOT STANDARD PLAN E-20.10-00 FOR
CULVERT DIMENSIONS
SEE BRIDGE SHEETS BA1-BA117 AND BBi-BB46
3
FOR STRUCTURE LIMITS AND CONSTRUCTION
bOSEE
DETAILS
PAVING SHEETS PV1-PV3 FOR VARIABLE
WIDTHS
SO
SEE SHEET RS14 FOR VARIABLE SLOPES
i Fr.FNn
OCL 12" PG 58H-22 FINAL LIFT
0.15, 1
OHMA
CL. 12" PG 581-1-22
PROFILE GRADE
I 0.35'
O7 CRUSHED SURFACING BASE COURSE
6 PIVOT POINT
2
0.50'
O4 PLANING BITUMINOUS PAVEMENT
I
1
3
1
O SELECT BORROW INCL HAUL
EXISTING
NOTES:
----------
—
GRADE
1. ALL DIMENSIONS ARE IN FEET UNLESS NOTED OTHERWISE.
I 2. ALL SURFACING AND PAVING DEPTHS SHOWN ARE FINAL COMPACTED
STATION
—�
DEPTHS. INDIVIDUAL LAYERS SHALL NOT EXCEED MAXIMUM NOMINAL
COMPACTED DEPTHS DEFINED IN THE WSDOT STANDARD
D 10+24.8 TO D 12+17.7
' SPECIFICATIONS.
1. HST: NOT STEEPER THAN
—'
LINE
STATION RANGE
A
B
C
4. VAR: VARIES
5. MFD:MEDIA FILTER DRAIN.SEE DRAINAGE SHEET OD4 FOR MORE
D
0+ 4.B TO 11+31.8
82.6'-17.5'
62.6'-t2.6'
DETAILS.
6. SEE WSDOT STANDARD PLANS A-50.10 FOR WIDENING AT GUARDRAIL
D
1 D 1
t1«318 TO 11+503
11+50.3 TO 11+75.1
115'-11'
11
1
TRANSITION SECTIONS AND C-22.40 FOR EMBANKMENT WIDENING AT
GUARDRAIL END TREATMENTS.
7. CONSTRUCT WITH UP TO 0.35'LIFTS OF CSBC AT A TIME.
FILE NAME Ipw tl Btl03Bx7111XL609x P9 RS&d n
'1mw
7 tz 3900 Pm
_''
"�'0 1°
FEDAID PROD
NO
1
r...
'-
?
U$ 101
.u. .v w
RSB
DATE vts2oxs. ^ M--
-+ ;_.,. ` .
I PLOTTED BY S.I f IN+',
[ yr_ 1
( t
10 As
�t
r
.,
+
tfW 41
I
DUCKABU H
3 ESTUARY RESTORATION
....,
..am
IGNED.9Y{ M,TUFF
`} v
22C$3�
t3
tl
rt
, I ,..
i4 q
it �] {
t Washingtoni State
REALIGNMENT
.near
1 ENTEREDBY it M. FUJIWARA it
-
Department Transportation
F CHECKED BY A. DE LA CRUZ
of
w
i PROD. ENGR. G.AMUNDSEN BARNKOW
REGIONAL ADM. S_ R01RK•
REVISION
DATE
BY
XL6092
w
ROADWAY SECTIONS
s.ena
m
BEAM C
TYPE 31
s
U U
y D LINE y
E
11' I 11'
LANE LANI
I
0.15' I
1 i 0.10' a 1
4 2 0.15'
STATION
D 15+61.6 TO 0 15+70
D LINE
11' 11'
PRECAST CONCRETE
BARRIER TYPE F, ANCHORED
'
LANE i LANE
BEAM GUARDRA
TYPE 31
0.15'
1 I 0.35'
2
EXTRUDED
0.35' ; I
CURB TYPE 4—
2 s.s i 1 0.15,
CONSTRUCTION NOTES
0'15 I
SEE WALL SHEETS,ST7 TO ST13 FOR
I O.WALL LIMITS AND CONSTRUCTION DETAILS D
STATION
12+90.66 TO D 14+90-;
4 1 0.5'
3
SHEET ST14 AND
I 0.35'
2
SEE MINOR STRUCTURES
O WSDOT STANDARD PLAN E-20.10-00 FOR
4 2
j CULVERT DIMENSIONS
,.
---------------�
i STATION
C
OSEE BRIDGE SHEETS BA1 AND BB1-BB46
D 14+90 TO D 15+61.6
------ ---
--- ------ --
FOR STRUCTURE LIMITS ANDND LCONSTRUCTION
DETAILS
I
I
L a SEE PAVING SHEETS PV1-PV3 FOR VARIABLE
i WIDTHS
BEAM GUARDRAIL i
i D LINE r•-----------------------------------
-------------------
TYPE 31
ft
' O SEE SHEET RS14 FOR VARIABLE SLOPES
LEGEND
3.5 2.5'
2. 11. ,,, 2'
3.5'
i HMA
LANE LANE
i O CL 12" PG 58H-22 FINAL LIFT
9 9
!
> >
O CL1
2 CL. 12" PG 58H-22
AEXTRUDED
uOxi x
VAR VA. R` N
O7 CRUSHED SURFACING BASE COURSE
PLANING BITUMINOUS PAVEMENT
PROFILE GRADE
'
i 8 PIVOT POINT
'
O SELECT BORROW INCL HAUL
CURB TYPE 4
0.15, 0.50' iEXTRUDED
3
J
1 3 CURB TYPE 4
' '
NOTES:
2 0.35, -'�
i I. ALL DIMENSIONS ARE IN FEET UNLESS NOTED OTHERWISE.
'�
EXISTING
7 2. ALL SURFACING AND PAVING DEPTHS SHOWN ARE FINAL COMPACTED
DEPTHS. INDIVIDUAL LAYERS SHALL NOT EXCEED MAXIMUM NOMINAL
- - - -- - - -- ---------------'-''
GRADE
COMPACTED DEPTHS DEFINED IN THE WSDOT STANDARD
SPECIFICATIONS. -
- - - -- __
-- - -- - --
0.LINE
STEEPER THAN
4,
WAY SECTION MS�CTION M
1 VAR: VARIES
i 5. MFD:.MEDIA FILTER DRAIN. SEE DRAINAGE SHEET OD4 FOR MORE
STATION
DETAILS.
6. SEE WSDOT STANDARD PLANS A-50.10 FOR WIDENING AT GUARDRAIL
D 12+17.7 TO D 15+7D
TRANSITION SECTIONS AND C-22.40 FOR EMBANKMENT WIDENING AT
GUARDRAIL END TREATMENTS.
7. CONSTRUCT WITH UP TO 0.35'LIFTS OF CSBC AT A TIME.
O
7' VAI l l
STATION �— CEMENT
D 13+85.4 TO D 15+70 CONCRETE
GUTTER
y�O
STATION
D 12+86.4 TO D 13+86.4
TIME 12 40 0o 1
°
w ^"°
FEDAID PROJ NO
M092
° �II
n
r '-
-'
urt
��
-
f
toWasIhing+n�,State
Depaitinment of TranspoRitlon
US 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
^"" °6 "_
RS9
DATE 511=025 "
10 AS
PLOTTED BY rl
OEBIGNED BY ;,, 'i
ENTERED,BY m.FwrvRAat�
CHECKED BY A. DE LA CRU2
_ it
zMTUFE
—
==��a=�
PROJ. ENGR. G.AMUNDSEN BARNKOW
ROADWAY SECTIONS
REGIONAL ADM. S.ROARK
REVISION
DATE
BY
D LINE
ci
A I
LANE
5.5,
EXTRUDED CURB
EXTRUDED CURB `AR TYPE 4 0.50, 3
CONSTRUCTION .NOTES TYPE a
OJHP
1 SEE WALL SHEETS ST1 TO 5T13 FOR 1 0.15' V j _ - Y'taO
EXISTING
O WALL LIMITS AND CONSTRUCTION, DETAILS GRADE
" OSEE MINOR STRUCTURES SHEET ST14 AND 2 0.35' ug
2 WSDOT STANDARD PLAN E-20.10-00 FOR
CULVERT DIMENSIONS ix,, I 0.50. 1 4 0.10 MATCH EXISTING
TTION
O SEE BRIDGE SHEETS BAI-RA117 AND BBI-BB46 D 16+54.7ATO D 16+70 3 STATION DITCH BOTTOM
3 FOR STRUCTURE LIMITS AND CONSTRUCTION STATION Dt6+00.15 TO D 16+70
a DETAILS D 16+25 TO D 16+70 i
p- a SEE PAVING SHEETS PVI-PV3 FOR VARIABLE
3 O WIDTHS L--- D LINE PRECAST CONCRETE
° O SEE SHEET RS14 FOR VARIABLE SLOPES BARRIER TYPE F, ANCHORED
L
LEGEND D A ' B 0 VAR 1.5'
O SHOULDER LANE i LANE SHOULDER 4 t
1 HMA 4
3 CL 12" PG 5BH-22 FINAL LIFT i PROFILE GRADE
3 HMA BEAM GUARDRAIL 5.5' S.5' d PIVOT POINT �� EXISTING
OCL 12" PG 5SH-22 TYPE 31 GRADE
1 VVVARVARCRUSHED SURFACING BASE COURSE a DtoCEMENT CONCRETE GUTTER
PLANING BITUMINOUS PAVEMENT
3SELECT BORROW INCL HAUL 0.32
NOTES: 3EXTRUDED CURB1. ALL DIMENSIONS ARE IN FEET UNLESS NOTED OTHERWISE. TYPE a
2. ALL SURFACING AND PAVING DEPTHS SHOWN ARE FINAL COMPACTED j]_LINE
DEPTHS. INDIVIDUAL LAYERS SHALL NOT EXCEED MAXIMUM NOMINAL ROADWAY SECTION N
- COMPACTED DEPTHS DEFINED IN THE WSDOT STANDARD
SPECIFICATIONS. STATION
3 43. NS NOT , VAR: VARIES STEEPER THAN D 15+70 TO D 16+70
j 5. MFD: MEDIA FILTER DRAIN. SEE DRAINAGE SHEET DD4 FOR MORE
DETAILS. LINE STATION RANGE A B C D
6. SEE WSDOT STANDARD PLANS A-50.10 FOR WIDENING AT GUARDRAIL D 16+45 TO 16+70 11'-MATCH EXISTING 11'-MATCH EXISTING
TRANSITION SECTIONS AND C-22.40 FOR EMBANKMENT WIDENING AT
GUARDRAIL END TREATMENTS.
7. CONSTRUCT WITH UP TO 0.35LIFTS OF CSBC AT A TIME.
i
> FILE NAME 1 ao0B018271111ILfi092 PS RS10.tl n
I TIME 1240 29 PM em 'r•'" FEMAID PROD NO _ US 101
> DATE I Stl9202s r .:_ -� " .. _ ; "< • 1 RS'10
PLorTED av I r lµ 10 aS ! I i _ Ts DUCKABUSH ESTUARY RESTORATION
DESIGNED SYI M.TUFF .. rv—' @� 4 '' .� 1 t [ d �F L q it t q 4 I
L Waahln tool State REALIGNMENT
i ENTEREO(BV '.' M.FUJ ARA:`b $i ! .6 ..1 $„ ..r" 'L,EC5,32 1 '6' t t„ , r} �„!` !� } 9
? CHECKED BY A. DE LA CRUz Depa`rt iient of Tranaportatlon
i PROJ.ENGR. G.AMUNDSEN eaRNKOw XL6092 ROADWAY SECTIONS .."
REGIONAL ADM. S. ROAR K REVISION DATE BY
20
w
qa
m
q
...
....
: . .
....
. : . .
....
. : ..
. . . .
....
. . .
....
. . . . . .
. . .
. . .
ROAD
AM
. . . .
. . .
SECTION.
SECTION
�l
s
TION -M
SECTIO
I N:
. . .
....
....
...
.
.4..
-A LT
q
p
w
.t.0%. I
T . . . .
. . .
.
. .
. . .
. . . . .
PROM
dkkbg
. . . .
. . .
. . .
. . . .
. . . .
.
. . .
. . . .
. . . .
. . . .
. . . .
. . .
. . . . .
. . .
. . . .
. . .
& PIVo
POINT
q—
q—
.
.2c
-
V. LT &
a p
-4.0-4
LT
.
.
. . . .
. . . .
FIT
. . .
. . .
. . . .
a
. . .
. . .
. . .
O.
. .
.
. . . .
. . . .
a...
. .
. . . .
. . . .
. . . .
. .
....
. . . .
...
. . . .
. .
. . . . . .
. . .
. . . .
. . .
. . . .
. . .
. .
. . . .
. . .
. . . .
z.
JN
1Z
12....
x
q.I...
T
..
z
...
.3
.
..
......
...
.r..
...........
........
..m.........
..w..
....
.....
....
.
.
...
....
.....
...:
...w.
....w.
..
...7.
q..I...
.....
...w.
.....
........
....
.....
.... ...
�Ll
L
...
........
...........
...........
..........
I
.......
.
.
. .
.......
........
.....
............
.........
.
......w...
..........
.........
....
........q
.........
....
......
.......
.....
....b ...I.
......
...........
...... .q....
....m...
. ..
..... ....
A:..
.
..........
.......
.2....
...
...
...
.. ..
..
..
.....
�IR.....
ri
..
..iiNE:
F.....
P....
Di.....IIL
GRAD
_7...
.....
0....
1....
51.
V....C..r....
......
CENTERLIN
..I..
.,...
P.RI.....
O........
E.........
OI %........
D
r
............
.......
.
1996
q
•
VE..�....
RT......
�....
IqZ....
A5
EXISTING—
GRO
ND.
GROUN
3
a
. . . .
. . . .
.
. . .
. . . .
.
. . . .
. .
. .
. . . .
. . .
. . . .
. . . .
. . ..
. .. .
. . . .
. . .
. . . . . . .
FIC
.
. .
RIZONTAL
. . . .
. . . .
1*=5
. v
. . . .
. . . .
. . . .
. .
. . . .
. .
. . .
. . . .
CLEARINC
i AND OF
�....N
. .
. . . .
. . . .
ROADWAY
EXC,
WATION
L.
I D;1.�L
2 C.yd*
.
. . . .
. .
DATUM
SELE
CT BORROWio
00
.11
....
oo� .
....
�3*
RD: : :
: :
:�: :
: : �ljoqo:
:15--RD'
. ��:
-RD:
t
....
....
....
....
.. ..
am:
::::
.�:m
mm..
�
FEDAID _PROJ.NO.
us 101
DATE
2
WAIL
"v
WashingtwState
Department of Tmnaporttion
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
2726_5h
OF
E
CNTERED,;BY" K FLI IWARA 0
HECKED EIV A.DEJLA CRUZ
XL6092
PROJ. ENOR. 0. AMUNDSEN BARNKOW
I
ROADWAY PROFILES
REGIONAL ADM. S. ROARNI
REVISION
O
SNAES
tN`S,m
BIORETENTION
FACILITY 2
1 1 I
1
11
1
/ BIORETENTION
FACILITY 1
1
530
CONCRETE GUTTER
FROM STA D 13+86.4
TO STA D 15+70
SOP ,
FILL"F4
---L-- --
SECT. 16
T.25N. R.2W. W.M.
S35 _\
uslo7
\
DITCH FROM STA C
W 536.49.8 TO STA C 539+13
2 \
END PROJECT
US 101 MP 309.83
C-LINE STA 540+15.52 =
US 101 ROW
STA B 33+14.22 (0.83' RT.)
NOTES
��
\
<�
\
?_ 1. SEE D01 - ODS FOR DETAILS ON THE
\\
COMPOST AMENDED B10FILTRATION SWALE
5
AND THE BIORENTENTION FACILITIES.
3 2. SEE SHEET DR7 FOR LEGEND.
\
3. SEE SHEET BA102-BA106 FOR BRIDGE DECK
DRAINS.
4. SEE SHEET DD6 FOR DETAILS ON ENERGY
0 50 100
DISSIPATER AND DITCHES.
SCALE IN FEET
S.SEE SHEET RS9-RS1D FOR CONCRETE GUTTER.
i
i FILE NAME 1 wetlo11tl0182719D(Lfi092 PS DR3.CRn
a
TIME 21122
'. .'_
•1E
FEDAID PRDJ NO
U$ 01
we ev ea
5 _..
5 GATE - ".—N1912025
1 r0w2nm +
li -•.
!
__
'j
10 WAs
Ii.
if t,!
F
I ,
m-..,y
',:
DUCKABUSH ESTUARY RESTORATION
DR3
9 PLOTTED By t
a' DESIGNED BY.t'A.OE LA"CRUZ.
ENTERED M.FUJNVARA- rt
I , ,s y
—_ ti
_
-
t`
1
I
{ i
Washingtoni'State
REALIGNMENT
•ems*
CHECKED BY M.TUFF
eoe.wer
,:`3
,�' ,,3
Department of Transportation
a,
y PROJ. ENGR. G. AMUNDSEN BARNKOW
XL6092
ITI
wTe
DRAINAGE PLAN
seven
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
- — ---------
...... .........
IN 1k.
....... ...
....
.......
.
Im
..... . ........ to
A
NIA
I
NN
P
89� Og.
....... ....IW
.... .... ....
..........
........
...
ulW12"
jr -I
wl
VW
VIz
lz
3
MElj
Oldrc
m OCI11
al
SO.T
...... . .....
....
.......
................ ......... ....
I.
FINISHED
65 45
......... . ... . �+ 45
..........
25
:GRADE
6 011.
EXISTING
40
- 40
-40-
_20—
GROUND
......... .. ...
i
I:611
-35
15
............
. ....
....
- - - - - - - - - -
-30
...
30 . . .....
io
25
25
4A 25 t
....... ....
. .....-70
9T... SEWER PIPE I
HOPE
STORM SEWER PIPE
S695DILE
(STORM SEWER �PIPEI
I.
IN.;DIAM.
2 IN. OLAIVL
1�114:D
-2012
.. ......
20
01;
-J.
..... . ... ......
STORM SEWER PIPEij
zc� A
12 IN. DIAM.
....... .. .
....... . .......
EWER PI -PE
IN. omm.
E STIORVI PIP
12 INDIAM.
.. ....... .... ...............
.......... ..
...............
...... ...................
ki.
.. _j ....... ..... .. . ....
.... .... ...
....... .. ..
4
4
4! j
...
.......
.......... .... ......
.............
.................
.... ........
----------
............
5
VERTICAL V=10'
0 25
...........
HORIZONTAL 1' 50'::
..........
NOTES
- -- --
DATUM
q 1. ALL OFFSETS ARE TO; CENTER
':OF GRATE,
. ... . .......
2. ALL SCHEDULE A STORM SEWER, SHALL SE CONCRETE.
. .....
...........
......
. .. ......... .
(NAVP) 88
us 101
III) PROD NO
DUCKABUSH ESTUARY RESTORATION
d
Washi on State
REALIGNMENT
,rtng
nIsn I
6.paof Transportation
XL6092
a,.
DRAINAGE PROFILES
...........
- -- ----------
0
...
.... ...
. ..... .........
0.
-''C)2!i
...........
pz
mz
>
mm;
Q
:�CATCH BASIN TYPE I
.
..... ....
...
;RIM 21.53'
F.L. 9.70'
CATCH BASIN TYPE 1
...............
...... ............
. .. ....... ... ...... .
. 7F.C. 9376---
��U WE I;Wl 2391 �(i IS 3�Tj
1�1
w RIM 21.W
0.
DD
loz
IT!
.. . ........... ...............
........ . ... .
.. .. ..... .
wo
4
... ............
....... ...
. ....... . .
... ..... . -- ----
'Z
I F.L. 9.93''CATCH
--------------
)NE 99
BASIN TYPE 1_ _
D-LINE 12 29 1 (13.63. RT)
9
.... .. ..... ... -
M 24.11'+
i3m'.
G)
2A
ON
.. .........
....... ...
. ...... ....
.S..
c
T.L. 9 70
F.L. 9.70-
D-UNE 12+12.91 (i3�63'RT)
RIM 21.1
... ..... .. - ........... ..
.. .. ......... --- - ---------- ---
---- ------
o
. . .........
VI
. . ......... .......... .....
'
F.L WAY
BASIN TYPE I
.... ..
... . - -----
.. ..............
.......... 1; ....... ...... --:'1
_:CATCH
3
RIM 17AT
..... ..... . ......
p A
........... v � ............ .... ..... .
r.L 1p.7W - ---
...... .. . .... .........
. ....... ....
.... .........
f-L- 10.76'. .
INL-15-3b.19, (11.65! NIX-
Im 15.91,
o
........... . .....
- ------- ----
I.....
.....
-----------
Zyo
—
X
A
00
—1-5
DITCH
F.L.-2 3,
PCA-LINE
-F
................ .
........... - . ...........
;RIM 21.35
film
...........
--
--;CATCM..BASIN .-T.YPE 1.
-- -----
F.L. 1I.Sr
D-ONE16+66.17 (8.70 RT)
RIM 14.7T
---------------
C IN �L EASU _MPE�_ 1
-- -----------
DITCH
-LINE 16.6
PCA-39;10
RIM 14.51�-
0
;RIM IT.7A
............
..... . ....
ox
;yl
. .......... ... —'> ... .. .........
.... ... ... ...
- .. .........
... .... ..........
. ..... ...
. .. .. ....
.. ....
...........
BIORETENTION FACILITY
2
DR3-11
INLET PIPE
15 COARSE
COMPOST
QUARRY DEPTH 3"
SPALLS
i+ 4+-+a- 4+ �i- i+ * -µ *- +F * -a- -H- -I+ +1- * * * -H- * -H�4i- * -1+-
BIORETENTION SOIL
++ ++ * ++ ++ ++ ++,++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++
MIX DEPTH 18"
++ ++ ++ ++ ++ ++ i+ ++ ++ ++ ++ ++ ++ ++ ++ ++
6"
c
6"
UNDERDRAIN PIPE
MINERAL AGGREGATE DIAMETER 6"
BIORETENTION FACILITY 2 - CROSS SECTION
3
NOT TO SCALE
c
d
8
1 I
I
yl
1
1 I
1 1
1 I
P9 I
I
I
U
1 I
1 PS
1
10
I
1 1
�
i 15i
1 I
I
1
P6 I
P7
SEE
`g
OVERFLOW
I�
STRUCTURE i
P1
p
DETAIL, DDS I
yy
1 I
1 I
I
I
1
—.10
I
J
P4 17
Lq
1
1
P2
—6
0 it
12
E
1
O
I
e
I I P7
1
I P71
E
1
1
1�
q
I
PB 1 0 6 10
p
I i
SCALE IN FEET
1 I
PLAN - BIORETENTION GRADING POINTS
e FILE NAME 49 vl�tleAtl04269751KLfi092
PS OD7.tl n
1 ,.
+ •.
'
$ 1 I f
,, �
Washingtoh,State
us 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
DD3�
TIME 145.06 PM
•
P
FEDAIDaDJNoI
�.
E DATE --.., f "5179/2D25 ,1 . •,:^.
9 PLOTTED BY ,.� rjlwaremt ;, r
__.. t,,;:^. .-
, • `� ! I
.'_., __
,_
10 AS
m DESIGNED BY -� A. DE LA CRUZ E'-'
a I'
22C532
acee
e ENrEREO-Bv ,"�. M.'FUJIWARAt 'i
+ :, r .,
,
,�. r
::; ,.? 11
j
T CHECKED BY, M.TUFF
eonuei
XL6092
„
d,e
DepaTl Bnt of Transportation
o,
..e.m
i PROJ.ENOR. 'G,AMUNDSEN BARNKOW
DRAINAGE DETAILS
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
POINT LAYOUT TABLE
POINT
STATIONIOFFSET
ELEVATION
Pt
STA D-UNE 12+88.75 47.74' LT.
9.50'
P2
BTA O-LINE 12+77.75 47.79'
P7
STA D•LINE 12+BB.70 28.74' LT.)
9.60'
P4
STA O-LINE 12+77.T0 28.79' LT.
9.50'
PS
STA DUNE 12+94.47 44.59' LT.)
1200'
P6
STA 0-UNE 12+89.7fi 49.1T LT.
12.00'
P7
STA DUNE 12+72.50 49.11' LT.
1200'
PB
STA DUNE 12+67.96 44A9' LT.
1200'
P9
STA DUNE 12+94.54 27:78 LT.
12.00'
P10
STA DUNE 12+89.70 22.53' LT.
12.00'
P11
STA D-LINE 12+67.71 7D.79' LT.
12.00'
P12
STA DUNE 12+72.25 28A1' LT.
10.00'
P17
STA DUNE 12+77.87 26.9D' LT.
10.00'
A
It —
UNDER DRAIN
F— INLET BIORETENTION
FACILITY 1
IE 16.00
STEPS OR
LADDER
R
(TVP)
DR 34 <_ OUTLET DR 3-15
IE 12.27 - IE 6.43
SECTION A -A
CB TYPE 2 - 72" DIAM.
OVERFLOW STRUCTURE - DR 3-4
NOT TO SCALE
w0tl00E042697RXL6W2 PS D05.01n
30 PM
I
3
SECTION A -A
CB TYPE 2 - 72" DIAM.
OVERFLOW STRUCTURE - DR 3-15
NOT TO SCALE
'^ FED -AID PRDJ NO dd
-
XL6092
is
15.0.0"
(TYP)
SEE DETAIL BELOW
J CROSSBARS TO 4 VERTICAL
J BARS AS SHOWN -HINGE
UPPER ENDS WITH
FLANGES/BOLTS AND
PROVIDE LOCKING
MECHANISM (PADLOCK) ON
LOWER END - LOCATE
STEPS DIRECTLY BELOW.
(241 3l4" DIA. SMOOTH ROUND
BARS EQUALLY SPACED (4. O.C.
MAX.) BARS SHALL BE WELOED
TO UPPER AND LOWER BANDS.
IU FII GRUUVE IN
TYPE 2 CATCH BASIN
DEBRIS CAGE
GENERAL NOTES:
1. WHERE THE MAXIMUM OPENING BETWEEN VERTICAL BARS
EXCEED 4".ADD CONCENTRIC HORIZONTAL RINGS AS NEEDED
SO THAT OPENINGS DO NOT EXCEED 4" IN ONE DIRECTION.
2. METAL PARTS MUST BE CORROSION RESISTANT; GALVANIZING
NOT ALLOWED. USE ALUMINUM OR STAINLESS STEEL
3. PROVIDE MAINTENANCE ACCESS BY WELDING 4 CROSS BARS
TO 4 VERTICAL BARS AS SHOWN. HINGE UPPER ENDS WITH
FLANGESIBOLTS AND PROVIDE LOCKING MECHANISM (PADLOCK)
ON LOWER END. LOCATE STEPS DIRECTLY BELOW.
� us 101
�, DUCKABUSH ESTUARY RESTORATION DDS�
,I , washington`'State REALIGNMENT .....
Department of Transportation e,
a" DRAINAGE DETAILS ...
-----�FORE
--------------
ZI Z2 �1 1� PROPOSED
DNO
OR PROPOSED
(TYP) DEPTH GRADE (TYP)
BOTTOM WIDTH
LOPE
(TYP) BACK SLOPE
(TYP)
NOTES:
1. DITCH EXCAVATION IS INCLUDED IN ROADWAY EXCAVATION INCLUDING HAUL.
2. FOR DITCH GRADING DETAILS, SEE RAODWAY TYPICAL SECTIONS IRS) SHEETS.
3. SEE DITCH TABLE, THIS SHEET, FOR DITCH LOCATIONS.
4. MAXIMUM DITCH SIDE SLOPE IS 2H:1V. DITCH. SIDE SLOPES MAY VARY FROM TYPICAL 3HAV
TO MATCH INTO EXISTING SIDE SLOPES AND ROADWAY EMBANKMENT SLOPES.
` DITCH TABLE
DRAINAGE
SHEET
DITCH LOCATION
DEPTH
BOTTOM
WIDTH
FORE
SLOPE
n
BACK
SLOPE
z2
DR1-1
C-LINE 503+67.00 TO C-LINE 504+48.35
0.63 LF
0.50 LF
3:1
3:1
DRI-I
C-LINE 504.70.50 TO CLINE 506+9D.00
1.3 LF
0.00 LF
3:1
3:1
DR1-9
C-LINE 510+4D,DD TO C-LINE 510+56.38
0.65 LF
0.00 LF
2:1
2:1
OR1.9
C-LINE 510+76,50 TO C-LINE 510+80.15
0.74 LF
0.00 LF
4.57:1
2:1
DR3-16
PCA-LINE 34+00.00 TO PCA-LINE 35+60.00
1.24 ,LF
0.00 LF
3:1
4:1
DR3-17
C-LINE 535+73.27 TO C-LINE 535-69.92
0.83 LF
0.00 LF
2:1
3:1
DR3.18
C-LINE 536+67.00 TO CLINE 537+57.50
1.84 LF
1.50 LF
4:1
3:1
DR3-19
CUNE 538+28.15 TO CLINE 539+34.00
2.50 LF
1.50 LF
3:1
3:1
ENERGY DISSIPATOR
STRUCTURE
ID
3EOTEXTILE
W1
W2
W3
D
OUTLET PROTECTION MATERIAL
S.V.
FEET
FEET
FEET
FEET
DR"
30
3.0
5.7
3.D
1.2
ROCK FOR EROSION & SCOUR PROTECTION CLASS A
DR3-1
24
3.0
6.3
4.D
2.0
ROCK FOR EROSION & SCOUR PROTECTION CLASS B
DR3-4
18
3.0
5.7
3.0
1.4
ROCK FOR EROSION & SCOUR PROTECTION CLASS A
DR3.12
18
3.0
6.3
3.0
0.6
QUARRY SPALLS
i'
w,wF XL6092 -
W2
1A
QUARRY SPALL ENERGY DISSIPATER DETAIL
NOT TO SCALE
I� IL
�_- �:.. OUTFACE PIPE DRAINAGE PROFILE
_) DEPTH OF
OUTLET
PROTECTION
MATERIAL
=11 Ill LIIII - D
I I I�LI I I III I I III III_ -I f I III 111=1I I
TILE
FABRIC
FABRIC
I, ,Washington State
Department of Transportation
SECTION A -A
US 101
DUCKABUSH ESTUARY RESTORATION DD6�
REALIGNMENT
DRAINAGE DETAILS . �.
QUANTITY TABULATION - PAVEMENT
NOTE:
THE FIRST NUMBER OF THE"CODE" BELOW
REFERS TO THE SHEET NO. OR THE SHEET
REFERENCE NO. SHOWING THE
CONSTRUCTION FEATURE.
THE SECOND NUMBER REFERS TO THE
CONSTRUCTION FEATURE FOUND ON THAT
SHEET.
w
Li
0
U
w
U
w
m
a
w
r
w
O
m
O
z
i
m
w
¢
z
O
m
O
ww
m M
00
N
m
C7
N
-
Oa
=
,`
`.
Li
<
m
¢
00=
"- c7
�
m
D
0
w
O
XKX
W
a
QQ
w O
Q a
[07z
Iaay21 0
mLL
+
a
�_
o
Q O.
(07z
i 0
mr,
w
p
<
a
�QiO
m
z
O
E
d
a
¢
L070
QW� F
mw
z
O
rn
C a
¢
L070
OQ��
mN
a ¢
Q K
Q
K W
¢
(09 S
WQ� w
mZ
N
O
Qz
K
w
w
c7
Lu
N
GENERAL NOTES:
CODE
LOCATION v 1 UNIT OF MEASURE Y
L.F.
L.F.
S.Y.
TON
TON
TON
L.F.
L.F.
L.F.
L.F.
EACH
1. SEE STANDARD PLAN C-25.20, BEAM GUARDRAIL
PV1-1
C 504+19.4 TO 507+19.2 (FIT)
87.5
112.51
1, 2, 3,4
(TYPE 31) TRANSITION SECTION TYPE 21
PV1-2
C 503+67 TO 505+00
326
18
2. SEE STANDARD PLAN C-24.10, GUARDRAIL
PV7-3
C503+67 TO 540+15.52
TEACHEACH
CONNECTIONTO BRIDGE RAIL ORCONCRETE
PVi-4
C 505+00 TO 507+60 (RT)
241
7,8
BARRIER, B CONNECTION
PV1-5
C 506+19.3 TO 507+19.3 (LT)
1
1,2,4
`3. SEE STANDARD PLAN C-20.10,
4. SEE STANDARD PLAN C-22.4D-09, BEAMPV1-6
C 507+38.4 TO 506+50.4 (R'I)
12.51
1,2,3,4
GUARDRAILTYPE 31 NON -FLARED TERMINAL (ALL
PV1-7
C 507+3B.36 TO 510+36.12 (LT)
200
1 1
1, 2, 3, 4
POSTED SPEEDS)
C 510+76.66 TO F 1+94.32 (LT)
225
2
3.4
5. SEE STANDARD PLAN C-23.70, BEAM GUARDRAIL
C 512+56.34 TO F 2+04.56 (FIT)
100
1
1
1, 2.3
(TYPE 31) ANCHOR TYPE 11
6. SEE STANDARD PLAN C-20.42-05, GUARDRAIL
C 512+32 TO 513+32 (RT)
1
1
1, 2, 3,4
P CEMENTSTRONG POSTTYPE 31 INTERSECTION
FPV1-12
C 512+70 TO 513+32 (RT)
61.5
7.8
DESIGN, SEE SHEET PDS
C 513+00 TO 514+05.1 (LT)
106
7. SEE STANDARD PLAN F-30.40-04, EXTRUDED CURB
C 513+32 TO 514+05.1 (FIT)
72PLACEMENT
C 503+67 TO 540+15.52
3002
3686
8fiB.
SEE STANDARD PLAN F-30.42, EXTRUDED CURB,
DW-520 2+04
TYPE 4
PV3-1
.9
C 530+42.92 TO 531+17.56
1
1, 2
9. SEE STANDARD PLAN C-2S.30, BEAM GUARDRAIL
PV3-2
D 10+25 17+50
TYPE 31 NON -FLARED TERMINAL (POSTED SPEEDS 45
PV3-3
C 531+19.96 TO 533+32.48 (ITT)
150
1
1 2 3
MPH AND BELOW)
PV3-4
D 10+25 TO 16+70
4491
1026
10. SEE STANDARD PLAN C-60.10, CONCRETE
PV3-5
C 530+42.9 TO 532+15.8 (RT)
BARRIER TYPE F (PRECAST)
PV3-6
C 534+74.8 TO 535+23.9 (LT)
73
11. SEE STANDARD PLAN M-20.10, LONGITUDINAL
MARKING PATTERNS
PV3-7
C 534+69.78 TO 536+12.49 (FIT)
37.5
1
1
1 2 3 4
12. SEE STANDARD PLAN F-10.12-04, MOUNTABLE
PV3-8
C 535+23.85 TO 536+48.85 (LT)
25
1
1
112, 3, 4
CEMENT CONCRETE TRAFFIC CURB
PV3-9
C538+50 T0540+15.52
783
1
1
18
13. SEE STANDARD PLAN M-24,20, TRAFFIC
PV3-10
C 538+15.5 TO 540+15.5 (RT)
75
50
1
1
3, 4, 16
ARROWS
FOR HIGH-SPEED ROADWAYSTYPE2L
PV3-11
C 538+78 TO 540+15.5 (LT)
87.5
12.5
1
3.16
14. SEE STANDARD PLAN M-65.30-03, CENTERLINE
PV3-12
D 10+43.1
RUMBLE STRIP
PV3-13
C529+88.5
1S. ALL PLASTIC PAVEMENT MARKINGS SHALL BE
PV3-14
C 530+25.4
TYPE D
PV3-15
D10+28.2 (FIT) TO C 533+32.5 (LT)
.256
16. SEE STANDARD PLAN C-25.80-05, BEAM
PV3-18
D 10+57.1 TO 10+92.6 (LT)
79
GUARDRAIL TYPE 31 TO BEAM GUARDRAIL TYPE
ADAPTOR
17. SEE STANDARD PLAN H-70.10-02, MAILBOX
SUPPORTTYPES
18. SEE "BUTT101NT PLANING DETAIL", SHEET PDI
SHEETTOTAL
586
1089
7493
4712
66
1 302.5
162.5
B7.5
925
10
2
11
19. SEE STANDARD PLAN H-60.20-01, BOLLARD TYPE 2
PROJECT TOTAL
588
1265
7493
4712
88
1109
162.5
87.5
13fi2.5
13
2
13
REGION NO.
STATE
FED. AID
PROD. NO.
Ask,DUCKABUSH
apartmantof
Dahanaportation
US 101
ESTUARY RESTORATION
QTPV 1
10
WASH
DESIGNED BY
ENTERED BY
B. ABDUSHEKUR
SHEET
OF
SHEETS
CHECKED BY
A. DE LA CRUZ
JOB NUMBER
22C532
PROJ. ENGR.
c seu eneeaw
QUANTITY TABULATION - PAVEMENT
REGION ADM.
S. ROARK
CONTRACT NO.
DATE
DATE
REVISION
BY
QUANTITY TABULATION - PAVEMENT
"
NOTE:
THE FIRST NUMBER OF THE "CODE" BELOW
REFERS TO THE SHEET NO. OR THE SHEET
REFERENCE NO. SHOWING THE
CONSTRUCTION FEATURE.
THE SECOND NUMBER REFERS TO THE
CONSTRUCTION FEATURE FOUND ON THAT
SHEET.
0C
=
z
<
j
O:
W
a
K
W
00
F z
< LL
U W
a s
W
F
0
W
O
N
a
O
O
"
O
N
a
z
zi
O
O
N
a
a
O
0]
a
m
w
w
°
0
W
N
O
J
w
U
N
GENERAL NOTES:
CODE
LOCATION v t UNIT OF MEASURE Y
EACH
L.F.
L.F.
L.F.
EACH
EACH
EACH
EACH
EACH
1. SEE STANDARD PLAN C-25.20, BEAM GUARDRAIL
PV1-1
C504+19.4 TO 507+19.2(RT)
(TYPE 31) TRANSITION SECTION TYPE 21
PV1-2
C 503+67 TO 505+00
2. SEE STANDARD PLAN C-24.10, GUARDRAIL
PV1.3
C503+67 TO 540+15.52
12764
CONNECTION TO BRIDGE RAIL OR CONCRETE
PV1-4
C 505+00 TO 507+60 (RT)
BARRIER, B CONNECTION
PV1-5
C 506+19.3 TO 507+19.3 (LT)
3. SEE STANDARD PLAN C-20.10,
.43EE STANDARD PLAN C-22.40-09, BEAM
PV1-6
C 507+38.4 TO 508+50.4 (FIT)
GUARDRAILTYPE 31 NON -FLARED TERMINAL (ALL
PV1.7
IC 507+38.38 TO 510+36.12 (LT)
I
I
I POSTED SPEEDS)
PV1-B
C 510+76.66 TO F 1+94.32 (LT)
5. SEE STANDARD PLAN C-23.70, BEAM GUARDRAIL
PV7-9
C 512+56.34 TO F 2+04.58 (RT)
(TYPE 31) ANCHOR TYPE 11
6. SEE STANDARD PLAN C-20.42-05, GUARDRAIL
PVt-10
C512+32 TO 513+32 (FIT)
PLACEMENT STRONG POSTTYPE 31 INTERSECTION
PVt-11
C 512+70 TO 513+32 (RT)
DESIGN, SEE SHEET PDS
PVt-12
C 513+00 TO 514+05.1 (LT)
7. SEE STANDARD PLAN F-10.40-04, EXTRUDED CURB
PV1-13
C513+32 TO 514+05.1 (FIT)
PLACEMENT
PVt-14
C 503+67 TO 540+15.52
8. SEE STANDARD PLAN F-10.42, EXTRUDED CURB,
PV1-15
DW-5202+04
2
1
19
TYPE
PV3-1
C 530+42.92 TO 531+17.56
1
5
9, SEE STANDARD PLAN C-25.30, BEAM GUARDRAIL
PV3.2
D 10+25 TO 17+50
2240
11, 14, 15
TYPE 31 NON -FLARED TERMINAL (POSTED SPEEDS 45
PV3-3
C531+19.96 TO 533+32.46 (RT)
1
5
MPH AND BELOW)
PV3-4
D 10+25 TO 16+70
10, SEE STANDARD PLAN C-60.10, CONCRETE
PV3-5
C 530+42.9 TO 532+15.6 (RT)
173
_
12
BARRIER TYPE F (PRECAST)
PV3-6
C 534+74.8 TO 535+23.9 (LT)
11. SEE STANDARD PLAN M-20.30, LONGITUDINAL
PATTERNS12.
PV3.7
C 534+69.78 TO 538+12.49 (FIT)MARKING
SEE STANDARD
PV3-8
IC535+23.85 TO'536+48.85 (LT)
I
PLAN F-10.12-04, MOUNTABLE
CEMENT CONCRETETRAFFIC CURB
PV3-9
C.536+50 TO 540+15.52
PV3-10
C 538+15.5 TO 540+15,5 (RT)
1SEE STANDARD PLAN TRAFFIC ARROWS
FOR HIGH-SPEED
PV3-11
C 538+78 TO 540+15.5 (LT)
1
5
TYPE
ROADWAYSAYS TYPE 21.
14. SEE STANDARD PLAN M-65.10-03, CENTERLINE
PV3-12
D 10+43.1
39
11, 15
RUMBLE STRIP
PV3-13
C 5+
1
13
15. ALL PLASTIC PAVEMENT MARKINGS SHALL BE
PV3-14
C 530+25..4
1
13
TYPE D
PV3-15
010+28.2 (FIT) TO C 533+32.5 (LT)
SEE STANDARD PLAN C-25.8 BEAM
PV3-16
D 10+57.1 TO 10+92.6 (LT)
G U ARDRAILTYPE 31 TO BEAM GUARDRAIL TYPE 1
GUAR
ADAPTOR
17. SEE STANDARD PLAN H-70.10-02, MAILBOX
SUPPORTTYPE 1
18. SEE "BUTT101NT PLANING DETAIL", SHEET PD1
SHEET TOTAL
3
173
15004
2
39
2
19. SEE STANDARD PLAN H-60.20-01, BOLLARD TYPE 2
PROJECT TOTAL
6
212.5
173
15004
2
65
4
2
B
REGION NO.
STATE
FED. AID
PROD. NO.
n Seate
• Washingt*AT.'
Department oP TYamportation
US 101
DUCKA13USH ESTUARY RESTORATION
QTPV 2
10
WASH
DESIGNED BY
ENTERED BY
B, ABDUSHEKUR
SHEET
OF
BNEETS
CHECKED BY
A. DE LA CRUZ
JOB NUMBER
22C532
PROJ. ENOR.
G.ANUNDSEN NK=
QUANTITY TABULATION -PAVEMENT
REGION ADM:
S.ROARK
CONTRACTNO.
DATE
DATE
REVISION
BY
QUANTITY TABULATION - PAVEMENT
NOTE:
THE FIRST NUMBER OF THE "CODE" BELOW
REFERS TO THE SHEET NO. OR THE SHEET
REFERENCE NO, SHOWING THE
CONSTRUCTION. FEATURE.
THE SECOND NUMBER REFERS TO THE
CONSTRUCTION FEATURE FOUND ON THAT
SHEET.
w
k
LS
z
U,
z
w
w
U
m
°<°
LL
¢
0:
~
w
m
0
z
~
Z
<J
R
w
w
z
u
o
_
m
m O
U 0
N
cy
8
a
O
2
V
x
<
a ry
<
KN
017
Z
x_
u
O
w
O
xx~
W
n
w
a
ga�
Do
< a
no
O z
u<1
m
w
a
dal-
00
< a
7L7
d z
m
wa
<
D
LO
u<7
m
0
m
z
4¢w
o a
<
7Z
Cl O
ug w
m m
O
m
z
a4w
O a
Ir
<
DZ
0o
ug w
m o
^
w
a
gn.�
On
¢
05
ug. o
m z
0
z
w
Z
w
w
m
GENERAL NOTES:
CODE
LOCATION 1 UNIT OF MEASURE ➢
L.F.
L.F.
S.Y.
TON
TON
TON
L.F.
L.F.
L.F.
L.F.
EACH
EACH
EACH
1. SEE STANDARD PLAN C-25.20, BEAM GUARDRAIL
PV3-17
0 10+92.62 TO 12+06.35 (1-7)
37.5
1
1, 2, 3, 6
(TYPE 31) TRANSITION SECTION TYPE 21
PV3.18
D 12+41.12 TO 12+90.86 (LT)
49.5
7, 8
2. SEE STANDARD PLAN C-24.10, GUARDRAIL
PV3-19
D 12+31.37 TO 16+54.65 (LT)
362.5
1
3, 4, 6
CONNECTION TO BRIDGE RAIL OR CONCRETE BARRIER,
PV3-20
D 13+86.4 TO 16+00.15 (FIT)
B CONNECTION
3. SEE STANDARD PLAN C-20.10,
PV3.21
0 14+90 TO 16+70
176
18
4. SEE STANDARD PLAN C-22.40-09, BEAM GUARDRAIL
PV3-22
D 13+86.4 TO 16+00.15 (RT)
212.5
TYPE 31 NON -FLARED TERMINAL (ALL POSTED SPEEDS)
PV3-23
D 12+86.4 TO 13+86.4 (RT)
1
1
1, 2, 4
5. SEE STANDARD PLAN C-23.70, BEAM GUARDRAIL
PV3-24
E 30+29.2
(TYPE 31) ANCHOR TYPE II
PV3.25
D 12+86.4 TO 13+86.4 (RT)
37.5
1
3, 4, 6
S. SEE STANDARD PLAN C-20.42-05, GUARDRAIL
PLACEMENTSTRONG POSTTYPE 31 INTERSECTION
PV3.26
D 12+SS -
DESIGN, SEE SHEET PDl
PV3-27
D 10+92.6 TO 11+94.2 (LT)
Be
7.8
7. SEE STANDARD PLAN F-10.40-04, EXTRUDED CURB
PV3-28
D 12+17.7 TO 16+52.7 (RT)
167.5
7, B
PLACEMENT
PV3.29
0 12+05.6
8. SEE STANDARD PLAN F-10.42, EXTRUDED CURB,
PV3-30
D 14+90 TO 16+70 (LT)
180.7
7, B
TYPE 4
PV3.31
I D 16+00 TO 16+70 (RT)
70.3
1
7.8
9. SEE STANDARD PLAN C-25.30, BEAM GUARDRAIL
PV3-32
G 60+88.55 TO 61+60.68 (R7)
TYPE 31 NON -FLARED TERMINAL (POSTED SPEEDS 45
MPH AND BELOW)
10. SEE STANDARD PLAN C-60.10, CONCRETE BARRIER
TYPE F(PRECAST)
11. SEE STANDARD PLAN M-20.10, LONGITUDINAL
MARKING PATTERNS
12. SEE STANDARD PLAN F-10.12-04, MOUNTABLE
CEMENT CONCRETE TRAFFIC CURB
.
13. SEE STANDARD PLAN M-24.20, TRAFFIC ARROWS
FOR HIGH-SPEED ROADWAYS TYPE 2L
14. SEE STANDARD PLAN M-65.30-03, CENTERLINE
RUMBLE STRIP
15. ALL PLASTIC PAVEMENT MARKINGS SHALL BE TYPE
D
16. SEE STANDARD PLAN C-25.80-05, BEAM
GUARDRAILTYPE 31 TO BEAM GUARDRAIL TYPE 1
ADAPTOR
17. SEE STANDARD PLAN H-70.10-02, MAILBOX
SUPPORTTYPE 1
SB. SEE "BUTTIOINT PLANING DETAIL', SHEET PDS
19. SEE STANDARD PLAN H-60.20-01, BOLLARD TYPE 2
SHEETTOTAL
212.5
176
566
437.5
3
2
PROJECTTOTAL
212.5
586
1285
7493
4712
86
1109
162.5
37.5
1362.5
13
2
13
REGION NO.
STATE
FED. AID
PROD. NO.
1101►
- WDeaahin9ton State
partment of Tramportation
US 101
DUCKABUSH ESTUARY RESTORATION
OTPV 3
10
WASH
I
1
DESIGNED BY
ENTERED BY
B. ABDUSHEKUR
SHEET
OF
SHEETS
CHECKED BY
A. DE LA CRUZ
JOB NUMBER
22C532
PROD. ENGEL
a. -sEN awurcrnv
QUANTITY TABULATION - PAVEMENT
REGION ADM.
S. ROARK
CONTRACT NO.
DATE
DATE
REVISION
BY
QUANTITY TABULATION - PAVEMENT
NOTE:
THE FIRST NUMBER OF THE "CODE" BELOW
REFERS TO THE SHEET NO. OR THE SHEET
REFERENCE NO. SHOWING THE
CONSTRUCTION FEATURE.
THE SECOND NUMBER REFERS TO THE
CONSTRUCTION FEATURE FOUND ON THAT
SHEET.
=
O
<
it
:
O �
W
a
w
<
m w
U It
U v
F z
¢ LL
U W
wo
a
]
W
m
:3w
g
Z
O
H
N
a
3
O
W
F-
O
H
N
a
W
z
J
O
N
O
F
N
g
O
_
W
o
g
m
W
a
lu
of
m
w
5
w
w
o
Z
w
w
0
Uwl
GENERALNOTES:
CODE
LOCATION v 1 UNIT OF MEASURED
EACH
L.F.
L.F.
L.F.
EACH
EACH
EACH
EACH
EACH
1. SEE STANDARD PLAN C-25.20, BEAM GUARDRAIL
PV3.17
D10+92.62 TO 12+08.35(LT)
1
5
(TYPE 31) TRANSITION SECTION TYPE 21
PV3-18
D 12+41.12 TO 12+90.66 (LT)
2. SEE STANDARD PLAN C-24.10, GUARDRAIL
PV3.19
D12+31.37 TO 16+54.65(LT)
1
5
CONNECTIDN TO BRIDGE RAIL OR CONCRETE BARRIER,
PV3-20
D 13+86.4 TO 16+00.15 (FIT)
212.5
10
B CONNECTION
3. SEE STANDARD PLAN C-20.10,
PV3-21
D 14+90 TO 16+70
4. SEE STANDARD PLAN C-22.40-09, BEAM GUARDRAIL
PV3-22
D 13+86.4 TO 16+00.15 (RT)
TYPE 31 NON -FLARED TERMINAL (ALL POSTED SPEEDS)
PV3.23
D 12+86.4 TO 13+86.4 (RT)
5. SEE STANDARD PLAN C-23.70, BEAM GUARDRAIL
PV3-24
E 30+29.2
1
13
1
1
1
11, 15
(TYPE 31) ANCHOR TYPE 11
PV3.25
D 12+66.4 TO 13+86.4 (RT)
1
5
6. SEESTANDARD PLAN C-20.42-05, GUARDRAIL
PLACEMENT STRONG POSTTYPE 31 INTERSECTION
PV3-26
D12+58
4
17
DESIGN, SEE SHEET PD1
PV3.27
D 10+92.6 TO 11+94.2 (LT)
7. SEE STANDARD PLAN F-10.40-04, EXTRUDED CURB
PV3-28
D 12+17.7 TO 16+52.7 (RT)
PLACEMENT
PV3.29
D 12+05.6
13
11.15
B. SEE STANDARD PLAN F-10.42, EXTRUDED CURB,
PV3-30
D 14+90 TO 16+70 (LT)
I
I
TYPE 4
PV3.31
D 18+00 TO 16+70 (RT)
9. SEE STANDARD PLAN C-25.30, BEAM GUARDRAIL
PV3-32
G 60+88.55 TO 61+60.68 (FIT)
8
TYPE 31 NON -FLARED TERMINAL (POSTED SPEEDS 45
MPH AND BELOW)
10. SEE STANDARD PLAN C-60.10, CONCRETE BARRIER
TYPE F (PRECAST)
11. SEE STANDARD PLAN M-20.30, LONGITUDINAL
MARKING PATTERNS
12. SEESTANDARD PLAN F-10.12-04, MOUNTABLE
CEMENT CONCRETE TRAFFIC CURB
13. SEE STANDARD PLAN M-24.20, TRAFFIC ARROWS
FOR HIGH-SPEED ROAD WAYS TYPE 2L
14. SEE STANDARD PLAN M-65.30-03, CENTERLINE
RUMBLE STRIP
15. ALL PLASTIC PAVEMENT MARKINGS SHALL BE TYPE
D
16. SEE STANDARD PLAN C-25.80-05, BEAM
GUARDRAILTYPE 31 TO BEAM GUARDRAIL TYPE 1
ADAPTOR
17. SEE STANDARD PLAN H-70.10-02, MAILBOX
SUPPORTTYPE 1
18. SEE "BUTTIOINT PLANING DETAIL", SHEET PDl
19. SEE STANDARD PLAN H-60.20-03, BOLLARDTYPE 2
SHEETTOTAL
3
212.5
26
4
8
PROJECTTOTAL
6
212.5
173
15004
2
65
4
8
REGION NO.
STATE
FED. AID
PROJ. NO.
Washington State
Department of Transportation
US 101
DUCKABUSH ESTUARY RESTORATION
C1TPV 4
SHEET
OF
SHEETS
10
WASH
DESIGNED BY
ENTERED BY
B. ABDusHEKUR
CHECKED BY
A. DE LA CRUZ
JOB NUMBER
22C532
PROJ. ENGR.
c NosEHauu
QUANTITY TABULATION - PAVEMENT
REGION ADM.
S.ROARK
CONTRACT NO.
DATE
DATE
REVISION
BY1
SN�ES
WALL 6
0.LINE t2+71.37 TO D-LINE 72+B6A0 TO 23 eQ
19.0.LINE 16+54.65 0.LINE 1NB6AD GUARDRAIL �•F'
GUARDRAIL °G .y'4 QP'
n
0.LINE t2+17.7 TO
�� 0.LINE 16+52.72 28
I � EXTRUDED CURB
0.LINE 12 4112 TO
0.LINE 16+51.26
EXTRUDED CURB `
2g
0.LINE 10+92.6 T(
LINE
11+94.2
EXTRUDED CURB
2
4 Or
SECT. 16
T.25N. R.2W. W.M.
= rm
D-LINE 10+57.1 TO 72.
EARTH WALL BARRIER
mm 16 0.LINE 10+926
STRUCTURAL EARTH
ST RADII
C-LINE 531+57.5
END PROJECT
+i WALL BARRIER 12
os12'
2 BEGIN 50:1 TAPER (12'LT)
C-LINE 534+74.8 TO 535+27.9 6
STRUCTURAL EARTH WALL BARRIER
p
US 101 MP 309.$3
CLINE• STA 540+15.52
S'
•,.j 3
WALL 7.
C-LINE 539+13.0D
BEGIN 50:1 EDGE LINE TAPER (12.00'LT.)
CLINE 579+63.00
END 50:1 EDGE LINE TAPER (11.00'LT.)
US101 ROW
12i
12,
CLINE TO 576+49.79 6
STA B 33+14.22 (0.83' RT.)
_-
GUARDRAIL27.85
i 7 - 17 ,4
-
WALL 8 C-LINE 577+57.5
" - C-LINE 529.38.6----- -- ----
a 14-__
_ -
-- ---_ - ____5'- - -
ENO 50:1 TAPER
' (0'LT) IU
71 C-LINE SANF8.02 TO 540+15.52
°e END 50:1 TAPER (12'LT)
0.LINE 530+4292 TO
5
- --__ -- I Z
Z
GUARDRAIL
6 C-LINE 572+15.80
c MOUNTABLE CURB
PROPOSED
'-�_ n
_� -
C-LINE 540+15.52
'o C-LINE 530+42.92 TO 531+17.56 BRIDGE 1011264
1
_
-y' '- -.. ��
r '
MATCH EXISTING
9 GUARDRAIL
7 MINE 571+19.96 TO 577+32.46
DOUBLE YELLOW LINE (0.0')
8
GUARDRAIL
H�
WHITE EDGE LINE
MATCH EXISTING LT,
C-LINE 534+69.78 TO 536+12A9
- _
_
MATCH EXISTING RT
7
GUARDRAIL
u2 2
n
q
^,
4 5•
m101
CLINE 537+57.24
l
j
BEGIN 25:1 EDGE LINE TAPER (12.00'RTJ"-
Q PLANING LIMITS
i
- SEE
SHEET PD1
a.
e
C-LINE 537-82.49
END 25:1 EDGE LINE TAPER (11.00'RT.)
C-LINE 131+15.52
540+15.52 GUARDRAIL
a
3 NOTES
�y
\
1. SEE SHEET PV1 FOR LEGEND.1001
0 50 700
E;
SCALE IN FEET
FILE NAME CI d4Dd043221BIXL6Q92
PS PVl.dgn
i
} t '. d
_ _ L. -
re
i
,�t %."
- ---
I
-
au
_
!I
,?
Washlnytonl`State
, -
Depii6 ient of Tranaportatlon
us 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
PV3
TIME 9 2106 AM
"' •^
.
ZZCS3Z
FEDAID PROD NO
}IV
)i
ES DATE=� 7 5/22I2D26 „ f
PLOTTED 8Y
"t
-
DESIGNED Bv1 M•TUFF.._
2 ENTERED BY , M. FUJIWARA`�
1
•.I _
_
exen
oe
erieen
? CHECKED BY A. DE LA CRU2'
=mow=.
XL6092
PAVING 8 MARKING PLAN
PROD. ENOR. G. AMUNDSEN BARNKOW
REGIONAL ADM. S.ROARK
REVISION
DATE
By
A
r 0.15 HMA CL. 112 IN.
/ PG 64.22 OVERLAY
0.15'_
EXISTING ROADWAY
t___________ ____________ ________________._________________________
® EXISTING HMA TO BE PLANED
BUTT JOINT PLANING DETAIL
o
NTS
LINE
STATION TO
STATION
A
C
C
7
536+50.00 RT
*00.00 RT
0+15.5 RT
1T
C
539+1000 LT
539+1 .00 LT
C
539+10,00 LT
540+15.52 LT
12'
6;'iOQ4'
0
14+90.00 LT
16+70.00 LT
5.5'
JP�
/
D
15+61.61 RT
16+70.00 RT
5.5'
O
k
PT
IUS VARIES -
CONTRACT
�-6" x S" (IN) TIMBER- POST, OR W6xB.5
OR W6x9 STEEL POST
�v-(X) SPACES AT 6'-3"
(1 SPACE MIN.)
BRIDGE END
I
SPLICE BOLT IDENTIFICATION PLATE -
SLOT (TYP.) SEE DETAIL
IDENTIFICATION PLATE MOUNTING
DETAIL
(SEE NOTE 6) "
POINT A---'
J 314" ` 3/4" DIAMETER HOLE
I I
i 114" (IN) STEEL
I PLATE
I I
7 I
I I
I I
I
PC y
i i
a
a
(X) SPACES AT 6'"3"
(1 PSACE MIN.) 1
n'
1 11B"
SHOULDER
BREAK 2 314" MIN.
Z
IDENTIFICATION PLATE
w
DETAIL
(SEE NOTE 5)
Z�c
5
a7u
LL
j
y
z
NOTES:
'
a 2a
2
1. SEE SHEETS OTPV1-OTPV4
:I
KLLg
Im 1 a
2. THE RADIUS DIMENSION SHALL BE ETCHED INTO THE PLATE AS
SHOWN IN THE EXAMPLE ON THE IDENTIFICATION 'PLATE DETAIL.
NUMERALS SHALL BE 1 1/2' IIN) HIGH MINIMUM AND 3/4" WIDE
a'
(IN) .
MAXIMUM. PLATE SHALL BE GALVANIZED AFTER ETCHING AND THE
u1 y
LETTER SHALL REMAIN PERMANENTLY LEGIBLE.
LL W
3. THE GUARDRAIL IDENTIFICATION PLATE SHALL BE MOUNTED AT THE
Q y
LOWER SPLICE BOLT ON THE BACK S10E OF THE RAIL ELEMENT AT
THE PC OF THE GUARDRAIL RADIUS.
m
CASE 1
GUARDRAIL PLACEMENT
(SEE
NOTEOTE 1)
CASE
228.31
INTERSECTION DESIGN
(SEE
NOTE 1)
NTS
FILE NAME CI tl ddN3221ML6092
PB PO" n
a
,{ ' ��
,1 -
i <` ; I
I II 'i
' 7,
" n� � @
Washington',State
Us 101
DUCKABU RESTORATION
H ESTUARY RE
S GNMENT S
REALIGNMENT
PD1
! TIME 1 55 50 PM
"
FEDAIO PROJ NO
�
i�
r ;
PLOTTED BY ' r � mr'r
4
1 o As
DESIGNED BY M.,TUFF`- -.. _
7 :�
�-
i -- II
I
..e.,
ENTERED -BY 1, M. FUJIWARA:
22C532
c
,e
_� _
o.,.
of TranaportaUon
o,
F CHECKED BY A. DE LA CRUZt)epaitllient
7L:r 92
PAVING DETAILS
PROD. ENGR. O.AMUNDSEN BARNKOW
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
D.UN
LIN
0.3c
G-LINE 61-41.70
(35 .0',LT.)
G-LINE 60-83.20
1 35:0. LT.)
G-LINE 61+62.94
(D.B. RT.)-
G-LINE'
61
0 0 0 0 0 a
G-LINE 61+62,94—/
- - '
l
NORTH
PARKING LOT
0 20 40
11 SCALE IN FEET
531 C-LINE 532
US 101
--- --------- -- -
CLINE 25
(17.0 RT.)
-LINE 532+15.81
(17.0'RT.)
C-LINE 530+66.25
7" C-LINE' 53+144.41 0 20 40
(35.3- RT.)SCALE IN FEET
PI AN VIF
0 LINE 23.3'
LEGEND
H A
CL. W" PG 58H-22 FINAL LIFT
H A
112" PG 58H-22
RUSHED SURFACING BASE COURSE
-RF:('TinN A -A
TIME 1:56:19 PMFEDAID
PROD NO
. . ...
0,
o Wr
Was�lngton, State
DLpsti ant bf Tra..p.ntl.,,
us 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
PD2
DATE�'---, --511912025C,
.tL-0!T—FDBY:L
_kfiUF
f
7
a D
DESIGNED W�
SN—TCRED�4F33 ' M.FLUPWARA,
V 1;
7
exeen
CHECKED BY A. DE LA CRUZ
XL6092
PAVING DETAILS
PROD. ENGR. G.ANIUNDSEN BARNKOW
:a.
REGIONAL ADM. S.ROARK
REVISION
DATE
Y
SECT. 16 & 211 T.25N. R.2W. W.M.
40WM OF C3ROHN00 M
WALL TABLE
WALL
NAME
BEGIN STATION
ENO STATION
LENGTH
MAX. HEIGHT
IEXPOSED WALL FACE)
MIN. REINFORCEMENT
LENGTH
1
C-LINE 505.80
C-LINE 507.19.4
139A'
23.6'
16'
1A
C-LINE S0B-95
C-LINE 507-19.4
24.4'
23.2'
16'
2
C4JNE 507+38A
C-LINE 507.60
33.T
23'
Is,
2A
C-IJNE 507.38.4
C-LINE 507.63
24.9'
22X
16'
3
C-LINE 513+00
C-LINE 513+96.8
97.6'
11.7'
11'
4
C-LINE 512.70
C-LINE 513+95.7
129A'
10.7'
1B'
5
1 C-LINE 530+37.5
D-UNE 11+95A
182.8'
10.2'
13.6'
6
D-LINE 12+42
D-LINE 15+70
332X
10.5'
13.6'
7
D-LINE 11+05
CLINE 533+49.4
271.7'
20A'
'SEE SHEET ST1D
8
CLINE 534+51.9
CLINE 534+453
211A'
17.3'
BE SHEET ST11
TC
TC-LINE 57+59.5
TC-LINE 55+89.9
821.T
IL&
15,
TW
US 101 LINE 103+48.7
C-LINE 508+73.2
522.8'
1.
17.4'
FOR ADDITIONAL
INFORMATION)
NOTES:
1. SEE WSDOT STANDARD PLAN E-20.10.00,
BURIED STRUCTURE SPLIT BOX. 0 200 400
SCALE IN FEET
i
1011264
TIME t 57 to Pm
" " •r•,e
1D�WA5
22C532
FEDAID PROD NO
j' �'.
tS� i ♦
f
77
.1� 4'S" f� I.
rz
I
I "�± 1=
a 17
'
a,"
Y'
II 'j '�/d
Washington State
Department of Transportation
us 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
$Tiw
DATE §- 5119/2025 T f ......M .._.
DESIGNED BVI M.,TUFF: _... i a..
ENTERED.BY �' M.FUJONARAI I!
.., �! d ....,,
i 1.'."3 d .! r 'l f7
}, .3 ! it
:.:._
_
,^. ,.Yw
.x.e,
,.
..�..
F CHECKED BY A. DE LA CRUZ
coxr..n
J(L6092
STRUCTURE KEY MAP
I PROJ.ENGR. G.AMUNDSEN BARNKOW
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
SECT. 16
'', 'I '; i 1
t
'✓ _
;_� -� L3P.C.- �
II T.25N. R.2W. W.M. Qo
i ;
`.
l 530-3 0.09-LINE 7.5 °
BEGIN' WALL
I
I 11
�
L I
j I
t o
WALL 5 7+29.97 P C "
i�
C-LINE 530+42.37,(30.08'LT.) I
DUNE 11+95 35 (19 00
1 i 1
1
_WALL 5 1+40.15 P.1.=
/ b END OF WALL 5 k
570+52A7 (30.11'LT.)
/ •""I. _ -- \
oy
'•.1
I
WALL 51+71.31 P.C.C,
� �
�
V
+
I..
�
I
i / � /• � D-LINE 11+ 1 (19.-
71.3 00'
i
j WALL 5 1+50A9 P.C.C. .
"
C•UNE 530+6 1.68 (74.26'LT.) � '�-., _
t1I I
II
I 1
n
_. ....._.
�
II
__ -.....
1
m5 / i'
i
t WALL 5 _ .. _ -
WALL 52+12.83 P.C: 1 1 ' -_ --
t
11 v'
DUNE 10+94.04 (28.61'LT.)__-
j t -
I i
• 1J 1
I
I I�
�' 1
,
I
_ _ _
$48°27'77.89'1N - _ /
2+00,'
M1 _
WALL 5 1+79.04 P.I. \ _ _ ! q _
C-LINE 530+87.94 (46.36- LT
1
CURVE DATA
.)+ WALL 5 2+56.69 P.I.-
0 •LINE 10+55.76 (32.70' LT.) C %
I , ` D-LINE 11+38.56 (1I.89'LT.)
P.I. STATION
WALL 5 1+40.15
WALL 5 t+97.95 P.C.C.- r _
DELTA RADIUS TANGENT LENGTH D-LINE 10+92.92124.83'LT.)
23'36'70" LT 48.92 10.22 20.16
WALL 51+76.78
\'tt' \, ,
66°5216" LT 43.92 29.31 47.87 �, - _" i _ _-_.
-
WALL 5 2+03.43
66'52'16" LT 141.92 36.47 10.96
1 WALL 5 2.08.91 - I
WALL 5 2+56.69
M°79'OB" LT 138.00 43.86 72.40
; D•LINE 10+9Z92 (24.83'LT.) `t``��
WALL 5 2+96.49
4°3510" LT 281.00 57.83 22.52
I •.^ � ` tt
�~
PLAN VIEW D 10 zo
SCALE IN FEET
. ..
.,
I
w
'
. $I
.`i a
. FINISHED
GRADE
AT
30
w
-
R
. .
. .
_
ROA
SIDE'OF
WALL'
3O
. .
. .
_
TOP DF
WALL .
....
....
. .
. .
. .
. .
. .
. .
�BSe7
E7I1
TING Gk
UNb
-.
FINISIlEb
GRAD
AT
ACE OF
ALL_
20
.
.>W
--
.._ _
AT F
CE OF W
IL.
.
- 20
DATUM
. .
.
.
. .
. .
. .
".
. .
.....
..
..
. .
. .
(BOTTOM
. .
. .
.I..
:ate
. .
.
10
--.
-
__
--_
___
-_-
___
OF WALL(
-
.
. .
. .
10
' '
GRA
EL' ROR
OW FOR
STRUCT
RAC FAR
H WALL
NCLUDIN
HAUL 11�66
C.V.
VERTIC
L 1 10'
'
S
RUCTU L-EART
ALL-23
B--S
w.
�..
�...
....
.... ..
..
....
I....
...
...
...
HORIZONTAL
.....
'1°=20'
�.
'
1+00
2+00 PROFILE VIEW
3+00
WALL 5
FILE NAME 1 tloNtlD5388991KL6D92
PS STB.tl n
"
y x:=. I �. ..,,
7 E'
41 � Pi
1
r,_t1 I( I�
,. ,� . ,.
; j
� ))7 I.
it S�
i,
�p ,..,..--.:z� 1
i - i
us 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
vun °n
STB�
2B
TIME 2 0D PM
•i°
°70...
FEDAID PROD NO
`L. )
t
fit Y )
4 I, tl
DATE 1" •511912025 .t
s 4"• @s y__
..
�{.
AS
t
PLOTTED BY '1 ! JNn 4 !
.I ,�/
I X1
DESIGNED BY1; M,TUFF„-_ 1.�
d _- 11 i"1 I ({
22C532
....•
ENTERED,'BY a M.FwrvuARA
1:
+, ; ., , t1
q �.
_
I�
-')
n
,, - -
, ._Waehington(StaG7
Deparfibent of Transportation
d
einrn
CHECKED BY A.OE LA CRUZ
°°n
XL6092
WALL 5 PLAN AND PROFILE
PROD. ENGR. G.AMUNDSEN BARNKOW
REGIONAL AOM. S. ROARK
REVISION
DATE
BY
SECT. 16
T.25N. R.2W. W.M.
aall
-- WALL 6.42.24 P.O.E,
J __ •� WALL 6 5-17.31 P.T. D-LINE 15+70.01 (19.00'LT.)
// ,1 y,'
_ _ ' - / D-LINE 14+45.03 (19.00- LT.) END OF WA 6 _
gyp -� WALL 6 4+49.43 P.I:
x r
✓ o `. _ - _ - D•L NE 13t79.01 (2277' LT.) j+00- -"IN
LT.)
_ - - -
WALL 6 3+81.00 P.C. "- -
9AW'}6+�-BAWT
yy
/ •' �' r ,, _WALL fi 3+10.00 P.0 .__.. D-LINE 13+12.95 I19.00'LT� 440D ����- ._... _ __-. --- ate_'--eAW Sa LINE
_-_
°"'
.\ O.LINE 12+41.95(199 T) _--...- 6AW. SAW
TART OF WALL 6 -._ ": •�;--_. ' i '==-y= _.—_ - DUr. UP RI H RD
t
WALL 5 ,. '�. -.. 3 q0 +p0 -•_' .1 —' - Hr. -
.-. WALL 6-
__
r• 11+pp ..,tom ��nr j2 0PL°
i - r CUR TA
VE DA
�� ""' "' ' �
' '- 11'�� � �7•
� . � � ° � ° � __ P.I. STATION DELTA RADIUS TANGENT LENGTH
619.00 69A3 136.31
y'.
PLAN VIEW D 2040
SCALE IN FEET
.
.
....
....
....
40
-
'
..
40
::
::
::
::
::
.
::
:.
::
.:
30
..
..
..
..
..
..
...�
..I..
..
..
..
.,.
----
30
FINII
ROAD
HEO b
DE AT
v
.
--
9
DE OF
WA L
20
- 20
—
—�
GRADE
—
27996
.
FINISHED:
AT.
FACE C
I F. W L
. .EXISTING
- OROUND
'
..
.
.
-0
10
.
...
....
...
•>w-
' 'AT
..._
FACE'CF
WALL' '
- -
10
A
OT1'OL1F
w, ,
di
,
..S.
TH-WAL
NOTES:
1
..
G
...
VEL'Bo
ROW' FO
STRUC
URAL•EA
INCLUDI
G HAUL
529 C.Y.>u/
w.
I.WALL
BACK
ILL IN
AREAS BELOW
THE
CA
UM
'VERTIC
L 1"=20'
•
TRUCTD
L EART
WALL.
3)56 fiE .
ORDINARY
HI
6 H WATER
ELEVATION
. .
. .
T-THE
SIT
OULD-GDNSI&F-QF—
-
—
-
ERM
LAST-77
' PER
'
EABLE
BALLAST
PER WSDOT
... 2p..
'1'=40'
' '
..
.
'
...
QUA
RR SPA 460 cY
....
..
. STANDARD
S
ECIFICA
.
ION 9-03.9(2):;
�:.......P....
�A
)BB.
HORIZON
AL
.
.
.::...
...
::.......
..
1+00 2+00 3+00 4+aD PROFILE VIEW 5+00 6+00 7+00
WALL 6
FILIE NAME CW Md 84053889MI-6092
PS'ST9.tl n
j sI
I
! r a 1� �I
i ''
€ LI 9
�
pi {I�t�
�. Washington;State
US 101
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
°ST9�
TIME 20056PM
', '•
^-
FEDAID PROJNO
a
iwl
1 f` !� i
GATE='.:. ," 5r1912D25 •. .v�x<
�r :: ..; x:.:;.
°^.'.
1u qs
t,j
PLOTTED BY e / INr 1 e S.
3
t
1
DESIGNED BY M.TUFF ,- - i
22C532
ENTERED-SY ,I M. FUJIWARA i;
CHECKED BY A. DE LA CRUZ
..._.•�
XL6092
„
'-
,,,.
Depeffiltent of Transportation
..
.�•W
PROJ. ENGR. G.AMUNDSEN BARNKOW
WALL 6 PLAN AND PROFILE
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
SECT. 16
, 25N R 2W W
WALL 7 1+05.00 P.OB i \^ti4
BEGIN WALL?
'WALL 7 1+11.67 P.I.v
�f.
D-LINE 10+80.53
--',.e
Z CURVE DATA
I ICI �I.
/
J 1 P.I. STATION DELTA RADIUS TANGENT LENGTH
/ PC LINE
J"
•�
/ 1 WALL 7 1+31.67 5'0723" RT 606.08 26.67 97.71
^ II r '
_
1 1
1
WALL 7 y /1 WALL 7 1-90.19 66-10'43" LT 48.93
/ ' = WALL 5 '• i
/ '�l '1 1 WALL 7 2+7837 2°59'31" RT 2430.08
WALL 7 N59.20 0°49'74" RT 2436.93
• _
•_\•'
WALL 7 3-59.20 P.J.-
. - - - - _ + J : C-LIN 533.32.0 26.9
7 111111 P.R.C. v WALL 7 3+41.70 P.C.C.
+ /,
.1
/
+ 1 / 0.LINE t0+54.50 138:45'RT.) _ C-LINE•
' r
`- WALL 7 2+78.27
•
_
+ / / P.L-e'
/ + I ,' i , ' " . C-L N 5 2 52 08 29 0 L )
- - - ' - I ,-
.
•.!
/ _ _ -•.
J �'
_ _ ,� 8
j�- .. _ _ .. ;.'-�
"'"
WALL 7 2+14.81 P.R.C.v
/ -CLINE 531a89.38129A4'LT.) +1 "-
0o-:.� -,. '� .- - �3F00 - .-� -�
--
WALL 7 I+7670--
- 3+77 _ C-L NE 577+4939 2697 LT _ - WALL 8 -
y'111EN
\\/ �• ... WALL'7-1+90.19 P.Ir
_ t-
_- C-LINE .91
D-LINE 10+22.86 (32.77RT.)
"
^
_
_
`tiro
us
-
PLAN VIEW
0 15 30
SCALE IN FEET
45
,..
MIN. RENFORC
MENT
LENGTH
'
_ 45
1a50 TO
1+70
' 1+70 T
7+76
.
. ..
...
. ..
. . .
.��.
or
u�. ...
Vn
FOP
OF :WALL
.��
�
Kivu.
.
. .
. .
30
>.
°
..
...
.
30
S
...
...
FIN
SHED OR
DE AT
..
.
FINISHED
GRADE'
..
..
DS DE OF
WALL
E)USTING
GROUND
OA
UM
AT FA
E OF W
LL
15
15
.
.
.
..
:
:.
....
I BOTTOM
,..
.,
OF. IN L
.�.
;
..
..
..
11 _
. .
-
;
_
---_
5.
- _ _
;o.�
- W
—
NOTES.
1., WA
THE
_Et
..
BACK
ORDINARY
TION-t
..
FILL IN
HIGH
eT1-AF
..
AREAS,
WATER
+f Sm---
BELOW
NyA
)88
-
SHO
LD CONSIST
OF
PERMEABLE
..
. .
. .
, .110'VF.BAL
.
-AST PER
WSDO
STANDARD
VERTIC
l 1 15
GRAVEL
-BORRO
- FOR a
RUCTUR
L EARTH
WALL IN
LUDING
HAUL 310
D.Y.
. SPE
IFICATION
9-03.9
2).
0
__
0
—.
STR
CTURAL
RTH W
LL 5407 -F
0,ERML
EAB
9ALLA5
332 CY
HORIZON
AL '1'=70I
1 •
QUARRY
SPALLS.
'33.CY ;
;
.
. . .
. .
. . ;
1+00
1+60 2+20 2+-- PROFILE VIEW 3+40
4+00
WALL 7
FILE NAME 1 w4tl48tl05388991KL6092
PS ST10.tl n
7
}.-
T
US 1D1
^S 1 °0
ST10
20242 PM
1°
FED.AID PR OJ NO
r
DA E ,..
WAS
PLOTTED BY f; / 7Nn m' y'
;I
7o
) (
1 '+ _ } �
IYe�
�I _
'I �j it
{j
i
k If
'— -
..,.
Y �I
W..�hingtomstate
Department Ot Transportation
DUCKABUSH ESTUARY RESTORATION
REALIGNMENT
DESIGNED BY1, M.TUFF'•_ 7 -
ENTERED BY', NLFUJIWARA,
f t ,-' -
(
22C532
.._.+
CHECKED BY A.DE LA CRUz
ern,un
XL6092
WALL 7 PLAN AND PROFILE
PROJ. ENGR. G. AMUNDSEN BARNKOW
REGIONAL ADM. S. ROARK
REVISION
DATE
BY
SECT. 16
III 1 I
/
/
- LINE
MALL 8 5a81.33 P.I.= WALL 8 fi+3765 P.C.C.=
1 I I
__- -_- (25.59 LT /
WALLB5+2 B
` •" ^- _ -
-WALL B P.I.4 B4.54 PI' 1 CLINE 5_35_+Z3.85
6+00
CLINE _574+8775"(27.24.1T.) _
WALL 8 4+45.00 P.C. -
C-LINE 534+45.65 LT.). 4+45-' I
_ (26.92' _
'`BEGIN WALL 8 -----
_ _ _ ,. _ _-
_ --- _
_ _ n Cb o r
-38
_ -WALL-
_
_-
_ -
-
END' -WALL 8
o — - --
'"
_ = - t
C-LINE ` US101 1
_••-��'.
I
_
CURVE DATA MIN. REINFORCEMENT LENGTH
P.I. STATION DELTA RADWS TANGENT LENGTH 4+45 TO 5+27 5-23 TO 6+00 6+00 TO
WALL B 4+81,54 1.52'01" RT 2426.92 39.54 79.08 24' 24'• 16' 0 10 20
WALL 8 5+81.33 2.2T59" RT I 2431.00 1 52.33 104.65 SCALE IN FEET
WALL B 6+45.01 0-32.05" RT 1 2435.00 1 11.36 1 22.72
PLAN VIEW
..
..
..
..
..
..
.
...
....
. .
.....
. . .
i
...
...:
. . ..
._OF . .
:...
. ..
.
..
..
.V
...
1'6i56.IB
40
..
.- .
..
..
D A
..
..
..
..
..
..
—E
—1$9
40
w '
6
.
..
-
flNl
HED GRA
E AY
.�
-
.
.E
I73.72 :e
.
ROA
S,ID,E,O,F
WALL,
.
30
_
r
yN
h
DA
UM•
E%IS
ING GROUND
y w
F
....
....
....
....
....
....
....
...
-.-.'.
.
(NA
}BB .
_
.FINIS
ED.GRAD
CE OF.W
. .
LL.
:
-
.�_ .'
...
.
20
.�
.
q
. .
.ATF
.g.
�..�-;
20
?...
..
.
YERTIC
L. �.=10.
---
_ -
�--
�I
607TDN
ALL
.OF.
1
- ZD
-
RAYEL OORROW
I=OR STRUCTURAL
EARTH WALL
INC CU
ING HAUL'2510
C..
-
'
HORIZON
AL '1"=20'
' '
I 'STRUCTURAL
EART
WA
6 6 SF
.
...
...
...
.....
....
....
....
. O ARRY. SP
LLS 3911, CY. .
...
.. ..
....
...
.
..
10
4+00
5+00 PROFILE VIEW 6+00
10
WALL 8
FILE NAME E1 W.44A4D5388991KLfi092 PS
STIt.4 n
}_
` 1. .{
._
j g 'r +I
1 1
t
Ar
) Yi 9
us 101
DUCKABUSH ESTUARY RESTORATION
eux nv xo
ST11
TINE 9 24 04 AM
"
..
1D was
FEDAID PROJ NO
x �'
)p t 1
DATE'-- %' S12212035 i ":�a
n g,
..xi,
PLOTTED BV bI fu�km L 4
rrT�
Sd / �
$ ,«
§
DESIGNED .BYP M. TUFF*ri x i
F"
22C532
/ t�
';� v
i ,1 Ii
i 4 WashingtogltiState
REALIGNMENT
ENTEREDIBY 1 NFUJIWARA' Is a
p} tip.
__ •
-
y
ti
,,
a,"
D`eperthiint of Transportation
,.
CHECKED BY A. DE LA CRUZ
E..,..E,
XL6092
WALL 8 PLAN AND PROFILE
PROJ. ENGR. -G.AMUNDSEN BARNKOW
REGIONAL ADM. S.ROARK
REVISION
DATE
BY
GUARDRAIL WALL
CONTROL
FINISHED ROADWAY SURFACE. LINE
SEE ROADWAY PLANS.
TOP OF WALL
2
:____.
PRECAST
SEE__
CONCRETE
NOTE t
PANEL FACED
LIMITS OF BACKFILL :
FOR STRUCTURAL -------------
REINFORCEMENT
EARTH WALL (SEW)
INCLUDING HAUL TO GO AROUND
GUARDRAIL
WALL HEIGHT
"H"
SEW SOIL
REINFORCEMENT (TYP.)
FINAL GRADE
EXISTING CONSTRUCTION GEOTEXTILE
GROUND
AT WALL FACE
-- FOR UNDERGROUND DRAINAGE
2'-0" MIN
SEE NOTE 3
EMBED
GRAVEL BACKFILL
BOTTOM
FOR •DRAIN
LENGTH OF SOIL
REINFORCEMENT
WALLS 1 AND 2
TYPICAL SECTION
6"x1'-O" UNREINFORCED
CONCRETE LEVELING PAD
GUARDRAIL WALL
CONTROL
FINISHED ROADWAY SURFACE. LINE
SEE ROADWAY PLANS. TOP OF WALL
i
SECT. 16 WALL GUARDRAIL
T.25N. R.2W. W.M. CONTROL
LINE FINISHED ROADWAY SURFACE.
SEE ROADWAY PLANS.
TOP OF WALL ! ' - -
- - - ---------------
PRECAST SEE
_______________
CONCRETE NOTE 1
PANEL FACED : LIMITS OF BACKFILL
-"""'-"..........Fi - ----- FOR STRUCTURAL
REINFORCEMENT : EARTH WALL (SEW)
TO GO AROUND INCLUDING HAUL
WALL HEIGHT "H" GUARDRAIL
SEW SOIL
FINAL GRAIDE AT \fJ REINFORCEMENT (TYP.) i
FACE OF WALL --J- -_--------- EXISTING
CONSTRUCTION GEOTEXTILE GROUND
FOR UNDERGROUND DRAINAGE
Z-0" MIN ________
EMBED = =SEE NOTE 3
LL BOTTOM OF WALL_,
ALL71 GRAVEL BACKFILL
6"x1'-0" UNREINFORCED FOR DRAIN 7'•6"
LENGTH
CONCRETE LEVELING PAD SOIL
REINFORCEMENT
WALLS 1A, 2A. 3, AND 5(STA 2+12.83 TO STA 3+07.75)
TYPICAL SECTION
WALL
CONTROL
LINE
SEW BARRIER TO MATCH
! BARRIER ON BRIDGE
I
i FINISHED ROADWAY SURFACE.
TOP OF WALL SEE ROADWAY PLANS.
2 i
PRECAST PRECAST
________ __ _____ __ ___ CONCRETE
SEE CONCRETE PANEL FACED
PANEL FACED
NOTE 7 : LIMITS OF BACKFILL
LIMITS OF BACKFILL ____ _ _ _ _ _ _ FOR STRUCTURAL
FOR STRUCTURAL REINFORCEMENT EARTH WALL (SEW)
EARTH WALL (SEW) \ i INCLUDING HAUL
INCLUDING HAUL GU GO AROUND WALL HEIGHT "H" //-SEW SOIL
GUARDRAIL__ _ _ WALL HEIGHT "H" REINFORCEMENT
SEW SOIL I FINAL GRADE AT i EXISTING
REINFORCEMENT (TYP.) FINAL GRADE AT FACE OF WALL __
_ EXISTING CONSTRUCTION GEOTEXTILE FACE OF WALL CONSTRUCTION GEOTE%TILE GROUND
GROUND FOR UNDERGROUND DRAINAGE FOR UNDERGROUND DRAINAGE ---------
�___ _
Y-0" MIN
_ Y-D" MIN EMBED SEE NOTE 3
1'-6'• SEE NOTE 3 EMBED
BOTTOM OF WALL GRAVEL BACKFILL NOTES:
GRAVEL BACKFILL BOTTOM OF WALL FOR GRAIN f•_6•• 1. VERTICAL CORRUGATED METAL
FOR DRAIN 6"x1'-0" UNREINFORCED LENGTH OF SOIL PIPE. BACKFILL AFTER
LENGTH OF SOIL 6'Y1'-0" UNREINFORCED CONCRETE LEVELING PAD REINFORCEMENT GUARDRAIL POST IS INSTALLED.
REINFORCEMENT CONCRETE LEVELING PAD 2. SEE SPECIAL PROVISIONS FOR
SEW REQUIREMENTS.
WALL a STRUCTURAL EARTH WALL WALLS 5(STA. 1+25 TO STA, 2+08 Q11 3. UNDERDRAIN PIPE.INSTALL A
TYPICAL SECTIONS
TYPICAL SECTION TYPICAL SECTION STAINLESS STEEL DRAINSCREEN AT THE OUTFALL.
FILE NAME I Wxtl xY05388991XL6092 PS ST12.tl n
TIME 2 0210 PM •'• FEDAID PROD NO ru..v m
DATE ;-, SM91202s r „.:....;:. , US 101
1D AS i1 ° ( ST12
if r� r 1 1,, . DUCKABUSH ESTUARY RESTORATION
I P
ENr gEDo,ev1 Fwnxnr'u'. is "`�i. Il �� sl a Washington State REALIGNMENT
CHECKED BY A. DE LA CRUZ Department of Transportation w
PROJ. ENGR. G.AMUNDSEN BARNKDW XL6092 re dre WALL CROSS SECTIONS �.
REGIONAL ADM. S. ROARK REVISION DATE BY e m
WALL SECT. 16
CONTROL
LINE p W.M.BARRIER TO MATCH T.25N. R.2W. M
! BARRIER ON BRIDGE
FINISHED ROADWAY SURFACE.
TOP OF WALL � SEE ROADWAY PLANS.
WELDED WRE
FACING UNIT
_______________;
LIMITS OF
;. N
BACKFILL
r s
INCLUDING
WALL HEIGHT "H"
_______________.
' HAUL
GRID
FINAL GRADE AT------�----
EXISTING
FACE OF WALL
N GEOTEXTILE GROUND
ND DRAINAGE i
__________
2-O"MINEE
R�5,VgF.RUN.ER.R.U.1)
NOTE 1ve______EMBEDL
Bp KFI L
BOTTOM OFWALL
ILL
CHOKE ANYSURFICIAL _F
SOIL ..
STONE COLUMN
VOIDS WITH WALL BACKFILLE
EN
GROUND
5
IMPROVEMENT AREA
REPLACEMENT
ELEV.-15'
—_
_..__ _ __. .._. _._._ __.. .:_._..
RATION 0.24
WALL
CONTROL
WALLS
7 (STA. 1+70 TO STA.
3+761
LINE
BARRIER TO MATCH
8.
8 (STA, 4+45 TO STA_ 5+501
BARRIER ON BRIDGE
TYPICAL SECTION
TOP OF WALL �
Imo'
1 Ii
16
` FINISHED ROADWAY SURFACE.
/ SEE ROADWAY PLANS.
WALL
CONTROL
LINE
BARRIER TO MATCH
BARRIER ON BRIDGE
i
nl FINISHED ROADWAY SURFACE.
TOP OF WALL 1 I SEE ROADWAY PLANS.
WELDED WIRE
____
_ LIMITS OF
FACING UNIT
BACKFILL
'
INCLUDING
o•, ry.
HAUL
WALL HEIGHT "H"
________________
GEOGRID
FINAL GRADE
FACE OF
AT
WALL
" ----- — -------
'r�' CONSTRUCTION GEOTEXTILE EXISTING
' FOR UNDERGROUND DRAINAGE
..
.......................
-GROUND
2 MIN
EMBED
~;ri;. - SEE NOTE 1
1'
;G
VE BAKF
Lh
BOTTOM OF WALL
CHOKE ANY SURFICIAL
4.
VOIDS WITH WALL BACKFILL
OVEREXCAVATION AND
LE GT
R INF
O SO L
CEMENT
_ _-
REPLACE WITH QUARRY
SPALLS WSOOT 9.13.1(5)
WALLS
7 (STA_1+OS TO STA_1+701
& 8 (STA. 5+50 TO STA.6+56)
TYPICAL SECTION
WELDED WIRE
"``Y'
_______________.
LIMITS OF
FACING UNIT
BACKFILL
`
INCLUDING
WALL HEIGHT "H" r>
----------
HAUL
GEOGRID
FINAL GRADE AT
-----�-------
EXISTING
FACE OF
WALL
�_
r
CONSTRUCTION GEOTEXTILE
FOR UNDERGROUND DRAINAGE
' GROUND
y
EMBED
UNDERDRAIN PIPE
1•
G VE KF
L
BOTTOM OF WALL
1'-6" 2'
CHOKE ANY SURFICIAL
VOIDS WITH WALL BACKFILL
LE -G7 O 56 L
_
REINFORCEMENT
NOTES:
OVEREXCAVATION AND
REPLACE WITH QUARRY
WALL 6
1. UNDERDRAIN PIPE.INSTALL A
SPACES WSDOT 9-17.1(5)
STAINLESS STEEL DRAIN
TYPICAL SECTION
SCREEN AT THE OUTFALL
FILE NAME 1 WsE Atl05]80991KLfi092 PS_ST17.G A
" "
_
TIME t o117 PM
FED AID PROJ NO
US 101
ux .ex w
,ST13
DATE x,` 5119/2025 q•.WAS
PLOTTED BY ,a r)µ
°,•,
,1 ,�.x.,1 Y
'j
i
gl
,-.x,<� . #
�i
DUCKABUSH ESTUARY RESTORATION
DESIGNED ,BV wy'_M .TUFF -' it
_
�'
1. (;�
i
I f( 1
la
w t U
REALIGNMENT
ENTERED =BY ^j M. FUJMv1iRA ;
:r ?
2293�2
�;',� ,,?., j d;
m
§� ,� Washington'g3tate
.xert
CHECKED BY A. DE LA CRUZ+
...,M=•
_
-v�
Department of Transportatlon
a
PROD. ENGR. O. AMUNDSEN BARNKOW
XL6O92
,<
o.,<
MINOR STRUCTURE DETAIL
REGIONAL ADM. S. ROARK
I
REVISION
DATE
BY
law
Washington State
w® Department of Transportation
Turnback Agreement
Local Agency Name & Address
Jefferson County Public Works
623 Sheridan St
Port Townsend, WA 98368
Agreement Number
Location
TB
Intersection of Duckabush Rd & US Highway 101,
Southeast Quarter of Section 16, Township 25
North, Range 2 West W.M. As shown in Exhibit A
State Route
Control Section
Region
and fully described in Exhibit B.
101
160300
Olympic
THIS AGREEMENT is between the Washington State Department of Transportation, hereinafter "WSDOT," and
Jefferson County, hereinafter the "Local Agency;" collectively hereinafter the "PARTIES."
Recitals
1. WSDOT is planning the construction or improvement of a section of the state route as identified above, hereinafter
referred to as the "Project."
2. WSDOT has acquired and/or is in the process of acquiring right-of-way needed to construct, reconstruct, or rearrange
the state route and/or certain streets or roads, frontage roads, access roads, intersections, ramps, crossings, and /or
other roadway features, hereinafter referred to as "Roadway Facilities."
3. Upon completion of the Project certain right-of-way and Roadway Facilities, as shown on Exhibit A, attached hereto and
made a part hereof, will require maintenance, operation, and ownership transfer from WSDOT to the Local Agency, or
maintenance, operation, and ownership transfer from the Local Agency to WSDOT.
4. WSDOT and Local Agency enter into this Agreement to identify the process of Roadway Facilities and right-of-way
maintenance, operation, and ownership transfer.
NOW, THEREFORE, pursuant to:
® (County) RCW 36.75.090 and WAC 468-18-040, "Design standards for rearranged county roads, frontage
roads, access roads, intersections, ramps and crossings,"
It Is Mutually Agreed as Follows:
Acceptance, and Transfer of Operation and Maintenance
1.1 Once the Project is completed and reviewed by the Parties, WSDOT will in writing transfer to the Local Agency and the Local
Agency agrees to accept the responsibility for the maintenance and operation of the Roadway Facilities and right of way until
such time as the full ownership of the right of way and Roadway Facilities are conveyed by deed pursuant to Section 2. The
Local Agency will in writing transfer to WSDOT and WSDOT agrees to accept the responsibility for the maintenance and
operation of the Duckabush Parking Lot until such time as the full ownership of the facility is conveyed by deed pursuant to
Section 2.
1.2 The Local Agency agrees to accept or transfer to WSDOT ownership of the right of way and Roadway Facilities as shaded, where
applicable, on Exhibit A, as follows:
Red Indicates access control and access rights to be retained by WSDOT
Blue (light) Indicates Roadway Facilities and right of way to be conveyed in fee to the Local Agency by WSDOT post -project
Yellow Indicates easements or turnbacks to be conveyed to the Local Agency post -project
Purple Indicates Roadway Facilities and right of way to be conveyed in fee by the Local Agency to WSDOT post -project
Green Indicates Roadway Facilities and right-of-way to be conveyed in fee to the Local Agency subject toeasement(s)
DOT Form 224-240 Page 1 of 2
Revised 01/2020
2. Recorded Conveyance
2.1 Within one year following WSDOT's written transfer to the Local Agency of the responsibility for maintenance and operations
as provided in Section 1, WSDOT will furnish the Local Agency with a recordable conveyance of right of way, including the
Roadway Facilities constructed thereon, as shown on the plans marked Exhibit A. The conveyance will be recorded pursuant to
RCW 65.08.095. The PARTIES agree that sections 2.2, 2.3, 2.4 (if checked), and 2.5 herein shall be included in the conveyance
document.
® 2.2 The Local Agency understands and agrees that the above -referenced, property is transferred for road and street
purposes only. The Local Agency shall not vacate, sell, rent or use the property (or any portion thereof) for
nontransportation uses without first obtaining WSDOT's prior written approval. The Local Agency agrees on behalf
of itself and its successors or assigns, not to revise either the right of way lines or the access control without first
obtaining WSDOT's prior written approval. Should WSDOT authorize the vacation, sale, rental or use of the property
(or any portion thereof) for nontransportation uses, the Local Agency agrees at its cost to determine by appraisal the
fair market value/economic rent of the property (or any portion thereof), and the Local Agency and state of
Washington agree to proportionally share in the value of the property in the same proportion as the purchase costs
were shared.
2.3 The Local Agency agrees to comply with, and require its successors or assigns to comply with, all civil rights and anti-
discrimination requirements of chapter 49.60 RCW, as to the right of way and Roadway Facilities to beconveyed.
❑ 2.4 Limited Access Highway - The Local Agency understands and agrees that WSDOT is retaining ownership of all
rights of ingress and egress, to, from and between the above referenced state highway route and/or Roadway
Facilities and the properties abutting said state highway route and/or Roadway Facilities, including all rights of
access, light, view and air, and access control as shown by the access prohibition symbol and as shaded pursuant to
Section 1.2, above, along the above referenced state route and/or Roadway Facilities right of way and along abutting
properties on the right of way access plans marked as Exhibit A. The Local Agency, its successors or assigns,
shall have no right of ingress or egress between the above referenced state route and abutting properties, or the
state route and the lands herein conveyed that show the access prohibition symbol and as shaded pursuant to
Section 1.2, above. The Local Agency, its successors or assigns, shall not be entitled to compensation for any
loss of access, light, view, or air occasioned by the location, construction, reconstruction, maintenance, or operation
of the above referenced state route and/or Roadway Facilities.
2.5 The Local Agency, on behalf of itself and its successors or assigns, waives and/or releases WSDOT from any past, present,
or future claims for damages directly or indirectly caused by highway drainage or runoff, and further the Local Agency, its
successors or assigns, shall have no right of compensation for damages to the property herein conveyed caused directly or
indirectly by highway drainage or runoff.
2.6 The Local Agency agrees to accept the deed transferring ownership to the Local Agency subject to all matters of record.
2.7 Within one year following WSDOT's written transfer to the Local Agency of the responsibility for maintenance and operations
for the areas identified in Exhibit A as provided in Section 1, the Local Agency will furnish WSDOT with a recordable
conveyance of right of way, including the facilities constructed thereon, as shown on the plans marked Exhibit A. The
conveyance will be recorded pursuant to RCW 65.08.095. WSDOT agrees to comply with, and require its successors or
assigns to comply with, all civil rights and. anti- discrimination requirements of chapter 49.60 RCW, as to the right of way and
Roadway Facilities to beconveyed.
3. Enclosures
3.1 Exhibit A: Map of Turnback Areas
3.2 Exhibit B: Legal Description of Conveyance Areas
In Witness Whereof, the Parties hereto have executed this Agreement on the Party's date last written below.
DOT Form 224-240 Page 2 of 2
Revised 01/2020
Signature:A�` lam' Signature:
I t I Cy--Ie-- k, 0 C--
4t
Print Name p� Print Name
Title y �.✓� �7a" �% �l/Vt(/Irt�ffV�/"r Title:
Date: Date:
DOT Form 224-240 . Page 3 of 2
Revised 01/2020
mN0
cN`S.
MPtGN�\JN a1y I D
.1 D LINE 13.79.28 P.I.
d EASEMENT
WB �
1G
t
SURPLUS PROPERTY
1 t
D d EASEMENT
s
o�
i TURNR
mm EIm
SECT. 16
T.25N. R.2W. W.M.
26111 C Rfi LTl , / v.7J 3, ' \ � ` I,......
P�1T�
,
1 ' w tex W
o m q .91 9 I 1 xL .I \1 N OREEK
W
<6> m66
�•4 jam:. (tnef 6T1
(
1 it iT.)
���
sl 1 161.21 LT.)
/-`Is(��-'
_ _ 1
1121 C LINE 53 D LINE P.O.B. S3S
------------
R �LINE 1�72.Sfi n \�
10
` � �(T9.xr RTJ •
f `� B` ROB/ l
B oo z R ♦` w.ii
NOTES: R.' 2
�� /1 1 •�
A EASEMENT �� QI1 ♦ 1 / _
1. THE BASIS OF BEARINGS AND DISTANCES ARE DETERMINED FROM C LINE 576�67
WASHINGTON STATE PLANE COORDINATE SYSTEM NORTH ZONE (NAVD (��®�
E 88).
5 2. PER RCW 58.09.130, ANY MONUMENT OR CORNER DISTURBED BY THE C
CONTRACTOR'S OPERATION SHALL BE REPLACED AT NO COST TO THE
E CONTRACTING AGENCY.
i
0 3.. THE DISTANCES SHOWN ARE GROUND DIMENSIONS, US SURVEY FEET. TO
OBTAIN THE GRID DIMENSIONS, 996 MULTIPLY THE GROUND DIMENSION BY
THE COMBINED FACTOR OF 0.9999766.
3 4. SEE SHEETS ALI THROUGH AL3 FOR ADDITIONAL ALIGNMENT
j INFORMATION.
e 5. SEE SHEET RW1 FOR LEGEND.
PRIMARY CONTROL
TABLE
HORIZONTAL DATUM
NAD (87111) WA NORTH US FEET
PROJECT DATUM
COMBINED FACTOR 0.9999766
ERTICAL DATUM
NAVD BB
DESIGNATION
NORTHING
FASTING
NORTHING
EASTING
ELEVATION
1S1602
245157.564
1123650.217
573024.750
1/51280.880
13.789
ROSI RD
1 242923.592
1122035.935
573246.634
1451759.844
3BA04
TRANSFORM SPC TO PDC (SPC US FEET - (11CFp ((39.37112) - 100000) a PDC
TRANSFORM PDC TO SPC ,(PDC US FEET-((39.77112)- 100000))- CF a SPC
XL6092 ,�
7 Roadway Facilities & �Tc
ROW to be conveyed in oYy�
i fee to the Local Agency
Easement to be conveyed by the
syFFr
Local Agency
Roadway Facilities & ROW to be
conveyed by easement by the
ocal Rgency to WSDOT, then
END PROJECT
nveyed-in fee post -project
US 101 MP 309.83
LINE STA 540+15.52US 101 ROW
)ENTi
STA B 33+14.22 (0.83'RT.)
\
\
\\
NE 114 SE 114
SEC. 16
4/
pr�•
p•
•
C LINE 540t15.52 P.T.
•••\.1C LINE 57�8�72.I0 P.I. ••••••
•••
\ 3$ C LINE 544.10.84 P.O.F••••
SCALE IN FEET
us 101
-,/ DUCKABUSH ESTUARY RESTORATION RW3
Washington State REALIGNMENT 9 T6r
Department of Transportation 9.
are RIGHT OF WAY PLAN . �.
Duckabush Surplus Area Purple in Exhibit Map) Legal Description
All that portion of the hereinafter described Parcel "A" lying within the following described tract
beginning at a point opposite Highway Engineer's Station (hereinafter referred to as HES) C
529+99.80 on the US 101 line survey of US 101 DUCKABUSH ESTUARY RESTORATION
REALIGNMENT and 52.03 feet LT. Northwesterly therefrom; thence Northeasterly along said
line survey to a point opposite 14ES C 530+60.74 and 51.65 feet LT. Northwesterly therefrom;
thence'Northwesterly to a point opposite HES D 12+37.92 on said line survey and 27.50 feet LT.
Southerly therefrom; thence Westerly along said line survey to a point opposite HES D 12+71.70
and 27.39 feet LT. Southerly therefrom; thence Southerly along said line survey to a point
opposite HES D 12+71.86 and 77.82 feet LT. Southerly therefrom; thence Southwesterly along
said line survey to the point of beginning.
Parcel "A"
The following described property acquired by instruments recorded July 20, 1933, under A.F.
Nos. 70659 & 70658, respectively:
A strip of land 70 feet wide in Section 16, Township 25 North, Range 2 West, W.M., being 40
feet on the Southerly side and 30 feet on the Northerly side of a center line Westerly from the
Engineers Survey Station 23+55, extended.
Also, a strip of land 70 feet wide in Section 16, Township 25 North, Range 2 West, W.M., being
30 feet wide on the Northerly side and 40 feet wide on the Southerly side of a center line
extending from the Westerly right of way line of said road at Engineers Station 23+55 to the
West line of the Southeast quarter of the Southeast quarter in said section.
Department of Public+arks
Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Consent Agenda Request
To: Board of Commissioners
Josh Peters, County Administrator
From: Monte Reinders, P.E., Public Works Directord/K.,/
Agenda Date: August 18 2025
Subject: Turnback Agreement between Washington State Dept of Transportation and
Jefferson County related to the Duckabush-Estuary Restoration Project
Statement of Issue:
The intersection of Duckabush Road with Hwy 101 is being relocated slightly to the north east in
order to safely accommodate a left turn lane at that intersection It as part of the estuary restoration
project.
The Board is asked to review a two-part Construction Et Turnback Agreement. Under the Construction
Agreement Jefferson County will grant to WSDOT a temporary right of entry / temporary work area
easement for a period of 72 months (the construction period) as shown in Construction Agreement
Exhibit A. Upon completion of construction the Turnback Agreement details that WSDOT will release
Et convey the easement area back to Jefferson County. WSDOT will also convey in fee the newly
constructed alignment of Duckabush Road intersecting US-101 in fee that was acquired by WSDOT for
the project. Jefferson County agrees in the Turnback Agreement to convey in fee the previously
existing Duckabush alignment area now not in use to WSDOT as shown in Turnback Agreement Right
of Way plan.
Analysis/Strategic Goals/Pro's Et 'Con's:
The attached Construction Et Turnback Agreement(s) are WSDOT's current standardized forms for the
purpose of documenting agreements related to temporary right of entry / temporary work area
easements and for the state.to relinquish certain rights -of -way and the local agency to accept such
rights -of -way. It is in the County's interest to maintain ownership of the entire road alignment.
Fiscal Impact/Cost Benefit Analysis:
Negligible, upon transfer of the subject rights -of -way following completion of the project, the
County will be responsible for future maintenance and operation of the roadway facilities within the
transferred right-of-way.
Recommendation:
Department of Public Works recommends that the Board sign both the Turnback Et Construction
Agreement in the form attached and return to Public Works to be sent to WSDOT/USACE.
Department Contact:
Josh Thornton, Real Property Specialist, 360-385-9162.
Reviewed By:
b�--
JoshWeters, County Administrator Date
CONTRACT REVIEW FORM Clear Form
(INSTRUCTIONS ARE ON THE NEXT PAGE)
POaS---ems" -
CONTRACT WITH: Washington State Department of Transportation Contract No: GCC 1114 a a - a q0
Contract For: US 101 Duckabush Estuary Restoration Realignment Term: 72 Months
COUNTY DEPARTMENT: Public Works
Contact Person: Josh Thomton / Eric Kuzma
Contact Phone: 360.385.9162 / 360.385.9167
Contact email: JThomton@co.jefferson.wa.us / EKuzma@co.jefferson.wa.us
AMOUNT: 0.00
Revenue:
0.00
Expenditure:
o.00
Matching Funds Required:
o.00
Sources(s) of Matching Funds
N/A
Fund #
N/A
Munis Org/Obj
N/A
PROCESS: Exempt from Bid Process
Cooperative Purchase
Competitive Sealed Bid
Small Works Roster
Vendor List Bid
RFP or RFQ
Other:
APPROVAL STEPS:
STEP 1:-DEPARTMENT CERTIFIES OMPLIANCE WITH JCC 3.55.080 AND CHAPTER 42.23 RCW.
CERTIFIED: ❑ N/A: FQ416_
Signature Date
STEP 2: DEPARTMENT CERTIFIES THE PERSON PROPOSED FOR CONTRACTING WITH THE
COUNTY (CONTRACTOR) HAS NOT BEEN DEBARRED BY ANY FEDERAL, STATE, OR LOCAL
AGENCY. /'
CERTIFIED: ® N/A: a lta. 6
Signature Date
STEP 3: RISK MANAGEMENT REVIEW (will be added electronically through Laserfiche):
Electronically approved by"Risk Management on 6/11/2025.
State agreement. Cannot change.
STEP 4: PROSECUTING ATTORNEY REVIEW (will be added electronically through Laserfiche):
Xe ronically approved as to form by PAO on 6/17/2025.
agreement with temporary easement and right of way during
truction.
STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND
PROSECUTING ATTORNEY(IF REQUIRED).
STEP 6: CONTRACTOR SIGNS
STEP 7: SUBMIT TO BOCC FOR APPROVAL