Loading...
HomeMy WebLinkAboutBLD2004-00799 Stormwater Management Plan STORMWATER CONTROL PLAN CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN RYAN RESIDENCE LOT 59 WOODLAND HILLS NO. 2 PORT TOWNSEND JEFFERSON COUNTY PERMIT # OLD 04 - 0799 JEFFERSON COUNTY DCD 9 'F� ` w iza3/d¢ prepared by ASP '`OVE. APPROVED a MICHAEL.I. ANDERSON SITE 'L • STORM WATER PLAN PE&PLS No. 27665 JAN 2 • JAN 2 6 2005 �� IEFFER •N CO, DEPT.OF COM !TY D VELOPMENT JEFFERSON CO NTY sti;NATURE: 1I:PT.OF(':+t�, -_, AATURE:/� ���/.:%�/ I'Nt SHAM r r L :CO4 TABLE OF CONTENTS PROJECT OVERVIEW PAGE 3 EXISTING CONDITIONS SUMMARY PAGE 3 OFFSITE ANALYSIS PAGE 3 NEW DEVELOPMENT PAGE 4 3.1.1 STEP 1 ; 3.1.2 STEP 2 -3.1.3 STEP 3 - 3.1.4 STEP 4- PAGE 5 CONSTRUCTION SWPPP 3.1.5 STEP 5 - PAGE 7 3.1.6 STEP 6 ; 3.1.7 STEP 7 ; 3.1.8 STEP 8- PAGE 8 PERMANENT STORMWATER CONTROL PLAN PAGE 9 SPECIAL REPORTS AND OTHER PERMITS O &MMANUAL BOND QUANTITIES WORKSHEET ATTACHMENT NO. 1 - STORMWATER PLAN ATTACHMENT NO. 2 - JEFFERSON COUNTY BMP PACKET ATTACHMENT NO. 3 - HYDROLOGY CALCULATIONS ATTACHMENT NO. 4 - OPERATIONS &MAINTENANCE MANUAL INSTRUCTIONS FOR PROPOSED FACILITIES 2 of 9 r , STORMWATER CONTROL PLAN ENGLE RESIDENCE WOODLAND HILLS EC 1 5 2004 PROJECT OVERVIEW The site is located in the community of Woodland Hills, Jefferson County and consists of Lot 59 of Woodland Hills Phase No. 2 on Parkridge Drive. The site is also known as Assessor's APN 999 900 159. Currently, the property is undeveloped with ground cover consisting of native grasses, shrubs and several trees of varying species. The property slopes from north to south with a modest grade of approximately 4%toward the rear of the property away from Parkridge Drive. Current storm water runoff is characterized by sheet flow. There is no contributing offsite storm water affecting the site. The proposed site drainage system consists of runoff from the roofs and gravel driveway areas being directed to an underground infiltration trench. The drainage components will comply with the "Large Project" standards of Jefferson County and with the"STORMWATER MANAGEMENT MANUAL for WESTERN WASHINGTON" (SMM) dated August, 2001. EXISTING CONDITIONS SUMMARY There are no natural drainage features within or adjacent to the site. The soils are classified as "Clallam gravelly sandy loam" (CmC) as shown on the Soil Survey of Jefferson County prepared by the United States Department of Agriculture Soil Conservation Service. The existing trees located outside of the building envelope,the septic field areas and the gravel driveway area will be incorporated into the final landscaping of the property. OFFSITE ANALYSIS The downstream conditions consist of paved streets with roadway ditches and an underground storm drain system that deposits the storm water onto the adjacent Rhody Drive, SR 19. This system of graded roadway ditches do provide a measure of storm water quality by the flow through the native grasses before the storm water enters Chimacum Creek and Port Townsend Bay two miles downstream. With the proposed infiltration of the storm water on-site, it is not anticipated that storm water drainage from the site will have any affect to the offsite setting. NEW DEVELOPMENT As provided in the SMM, Section 3.1.1: STEP 1- Collect and analyze Information on Existing Conditions: As noted above,the site is characterized as undeveloped forested land, sloping to the southwest 3 of 9 at an approximate rate of 4 percent. The soil was identified in Clallam(CmC) soils. There are no areas of high potential for erosion or sensitive/critical areas on the site. Section 3.1.2 STEP 2-Prepare Preliminary Development Layout The site plan has been prepared with the goals outlined in the SMM by setting the proposed buildings at locations to minimize land disturbance. Please see attached site plan. Section 3.1.3 STEP 3-Prepare Offsite Analysis As noted,the downstream conditions are developed with streets and underground storm drains in a rural environment. There are no anticipated downstream areas unduly affected by development of this single family residence. Section 3.1.4 STEP 4-Determine and Read the Applicable Minimum Requirements As provided in Section 2.5,Section 2.4.1 All new development shall be required to comply with Minimum Requirement#2. In addition, the following developments shall comply with Minimum Requirements #1 through #10: Projects that create or adds 5,000 square feet, or more, of new impervious surface area. The project proposes 7,620 square feet of new impervious area. This proposed cover is 4.2%of the 4.22 acres (184,000 square feet) of the site, Lot59 of the Woodland Hills Phase 2. SECTION 2.5.1 MINIMUM REQUIREMENT#1 :PREPARATION OF STORMWATER SITE PLAN Please see attached "Stormwater Plan—Ryan Residence". SECTION 2.5.2 MINIMUM REQUIREMENT#2: CONSTRUCTION STORMWATER POLLUTION PREVENTION(SWPP) All new development and redevelopment shall comply with Construction SWPP Elements #1 through #12 below: Element 1:Mark Clearing Limits The SWPP plan clearing limits consist of the outside edge of the gravel driveway and 20 feet outside the proposed single family residence perimeter. Element 2:Establish Construction Access At the location of the proposed driveway, a construction access will be established with quarry spalls to minimize tracking sediments onto Parkridge Drive. See BMP C105 for details. 4 of 9 DEC 1 5 2004 .; rC94 Element 3: Control Flow Rates The proposed infiltration system is located approximately 300 feet from the southwesterly property line. Any overflow from the new catch basin would approximate sheet flow conditions and would not unduly affect the downstream properties. Further downstream, the system of roadway ditches and the underground storm culvert system should be sufficient to handle the proposed project. No net increase in flow is anticipated. Element 4:Install Sediment Controls A silt fence will be set in place along the lower southwesterly boundary of the site prior to the start of any construction to prevent siltation onto the adjoining property. Element 5:Stabilize Soils At the completion of the site grading for the building pads and subgrade for the paving areas, the areas disturbed by the new construction will be seeded and maintained during the remainder of the construction period. Upon completion of the residence and driveway construction,the final landscaping of the site will be installed to stabilize the soils. As required by the SMM, from October 1 through April 30, no soils shall remain exposed and unworked for more than 2 days. From May 1 to September 30, no soils shall remain exposed and unworked for more than 7 days. The soils will be temporary seeded or protected with plastic covering, Element 6:Protect Slopes No cut slopes are proposed. Element 7:Protect Drain Inlets The new catch basin will be protected with hay bales during construction. The driveway accessing the site will be maintained in as clean as possible state to prevent sediment tracking onto Parkridge Drive. Element 8:Stabilize Channels and Outlets The swales along the gravel driveway will be seeded upon completion of grading and maintained through out the life of the project. If necessary, hay bales will also be utilized to control sediment. Element 9: Control Pollutants As required by the SMM, all pollutants, including waste materials and demolition debris 5 of 9 that occur on-site during construction shall be handled and disposed of in a manner that does not cause contamination of storm water. Maintenance and repair of heavy equipment and vehicles involving oil changes and other maintenance work shall be conducted using spill prevention measures such as drip pans. Wheel wash or tire bath wastewater shall be discharged to a separate on-site treatment system. Element 10: Control De-watering No de-watering is anticipated with this project. Element 11:Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. All maintenance and repair shall be conducted in accordance with the Jefferson County BMPs schedule attached to this plan. Sediment control BMPs shall be inspected weekly or after a runoff-producing storm event during the dry season and daily during the wet season. All temporary erosion and sediment control BMPs shall be removed within 30 days after final site stabilization is achieved or after temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil areas resulting from removal of BMPs or vegetation shall be permanently stabilized. Element 12:Manage The Project No work shall commence until an approved site development and building permits have been issued for the work. All aspects of this Stormwater Control Plan and the Construction Stormwater Pollution Prevention Plan will be in place in accordance with the sequencing of the work and will be properly maintained by the contractor during construction and by the property owner upon completion and occupancy of the residence. Section 3.1.5 STEP S-Prepare a Permanent Stormwater Control Plan Existing Site Hydrology(developed area): Lot 59 Area = 183,631 sft (gross) (4.22 ac.) Soil type Clallam (CmC) -- Type "C" Land cover : Forested 2 yr flow 0.01 cfs 100 yr flow : 0.10 cfs 2004 6of9 Proposed Site Hydrology Impervious areas: Driveway 3060 sft Roof area 3840 sft Deck 520 sft Total 7620 sft 0.18 ac. The runoff calculations are based on the following 24 hour rainfall parameters as listed in the DOE Manual; 2 yr 1.00"; 10 yr 1.50"; 100 yr 2.50": 2 yr runoff 0.04 cfs developed 100 yr runoff 0.12 cfs developed 6 mo. runoff= 72% of 2 yr runoff=0.02 cfs Performance Standards and Goals The treatment facilities incorporated into this plan provide for a biofiltration swale along the gravel driveway and capture of the stormwater runoff into an infiltration trench Flow Control System The plan provides for directing the stormwater away from the proposed new residence and existing bluff area, toward the street as recommended in the referenced geologic report. The infiltration trench is located in the southwest portion of the lot, adjacent to the street, with an overflow pipe connected to the ditch in Quail Ridge Court. See attached plan for details of construction. The foundation drains will be directed to the street. Water Quality System The proposed swale along the new gravel driveway should provide treatment for the minor flows from the driveway. The roof water is considered uncontaminated and requires no treatment. Conveyance System Analysis and Design Capacity of 8"pvc outlet drain = 0.8 cfs Capacity of biofiltration swale = 2.5 cfs Section 3.1.6 STEP 6-Prepare a Construction Stormwater Pollution Prevention Plan I 400'4 7of9 As noted in the SMM,the Construction SWPP must address the elements noted above in Section 2.5.2 which addressed the 12 elements. Section 3.1.7 STEP 7- Complete the Stormwater Site Plan See attached site plan. Section 3.1.8 STEP 8- Check Compliance with All Applicable Minimum Standards This report has reviewed all the applicable requirements of the SMM and employed the appropriate techniques to achieve the goals of the SMM. SECTION 2.5.3 MINIMUM REQUIREMENT#3:SOURCE CONTROL OF POLLUTION This report and plan is consistent with the intent of the SMM to prevent stormwater from coming in contact with pollutants. As discussed above in the Elements, considerations have been employed with respect to the equipment on the site during construction to prevent pollutants entering the stormwater system. SECTION 2.5.4 MINIMUM REQUIREMENT#4:PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND OUTFALLS There are no natural drainage systems other than sheet flow across this property. The stormwater flows will be captured on-site and infiltrated. SECTION 2.5.5 MINIMUM REQUIREMENT#5: ON-SITE STORMWATER MANAGEMENT The SMM principle goal is to infiltrate where possible. This plan has incorporated infiltration as a part of the storm water system. In addition, the owner will investigate the possibility of incorporating the captured stormwater into on-site irrigation system thereby further reducing any potential hydrologic downstream disruption that might accrue to this proposed development. SECTION 2.5.6 MINIMUM REQUIREMENT#6:RUNOFF TREATMENT To mitigate the storm water flow greater than 5000 sf1 , all the roadway ditches on-site will be planted with a native grass to provide biofiltration of the storm water flow prior to entering the catch basin and the infiltration trench. SECTION 2.5.7 MINIMUM REQUIREMENT#7: FLOW CONTROL The infiltration of the increase in the 100 year flow will provide the flow control required by the SMM. EC 81492004 J i SECTION 2.5.8 MINIMUM REQUIREMENT#8: WETLAND PROTECTION No wetlands are associated with this project. SECTION 2.5.9 MINIMUM REQUIREMENT#9:BASIN/WATERSHED PLANNING There are is no designated basin stormwater plan for this area. SECTION 2.5.10 MINIMUM REQUIREMENT#10: OPERATION AND MAINTENANCE An Operation and Maintenance Section has been added below to this plan to provide guidance to the property owner on their responsibilities with regard to the maintenance of the grassy swales, the culverts,the catch basins and the infiltration trenches that constitute the proposed system. PERMANENT STORMWATER CONTROL PLAN As noted,this entire report,the attachments and the plan provide for the Permanent Stormwater Control Plan. SPECIAL REPORTS AND OTHER PERMITS There is no current Jefferson County master plan for this area. O & M MANUAL The attachments from Volume V,Section 4.6 provide for the Operations and Maintenance Manual for the project. BOND QUANTITIES WORKSHEET As required by the Jefferson County. ra P fiO4 ATTACHMENT I SITE PLAN DEC 1 5 2004 • ♦♦•♦♦•♦•♦ o r a lira z 1. � Pir A] OD. Z -000 2 CNNN. 1.. � �, o 7r` r - acr- zcn o �j arn D rng � o O y 1 a -I p 0 GI on z z z V) Pi P N �g9 95 y 1). ` 21 y- 6' I-- y 2�3A o k5 i. m I rn N o' rp- r*1 o oti C OA] rOnm o D x � 4 ra U -� '� -n s z a aF rn rn rnF 0 ti 0 0 rn �y :cam a �.. a u) rT1 nxin O s ro* R' �I �c�i)� zC �R. c (C,,,�� • o �2� �A In2 lye cn � NCA Co h ~ "I� �'` �� No 0 0 0 i o oa!`'y Z cn y Z co D h _ O 2 ]nxA] otiw N h N . o z � 1 m . 2 m b 1... i 9 h Is ra rrel v� y -----N__ Z r o h rh- O 1 1 1 I rn I L ____ \ / 0 N 32 N h � , _ \\ Z N D m 1 a xi rrl socZz� �rh r 0. -) Z 1�-, At �tiw '_ o it Fi 1-a 6 R \ w m 4,„. ° ��ott, "din1111111111; Ill O Z OV. �i N 04'11'59" IlL N M 0 N O\P 8428 Ra L� 162.98 \ • r+- 171 Os \ ' h; i �� tT3.02 W ' — —__ y N 0 T� � � ` Drive ; b �� r'i Al z o,„).-2 y age R u �^lr x y R Parks / o "zN w o C 15 2 c) a co CO � � Ci=9171 ) CO NORTH U. CD I I 03 3 c-,y o cry OM"* r\� O♦♦♦♦• CD ♦♦♦♦♦ iiii♦ i� ♦♦•♦•♦•♦.♦ ♦♦i♦♦♦♦♦♦ r , •••.••• •••••••••• a O tl ! lU b •ri \ *\i „, ,, ei / ® 6 . . Q . , al .,v. / o II N1 <\ ga m V W3 O O w` N . 6 dO taw .4..4 a 5o11 = 3. Q a. I. ,,00Ln a of ) '•'40 anj z 3 r �1 i3 3 V o c a a4 of i t U 3 3 Z O `. W U N , W O CC in l) ZQ Qi Q >- 4- W cc y LY Q I U H l_ Q CK H J I W W J O > >O Z Q O 0 LY Q U Z l7 (Y W Q = > , (1J ~, Q W 1.0 Q Q Qw • le ICI 1 • (/) W Q q U Ir O J a L1 I F-- .W —.. CO F— U 0 Q / o . Z Q < (Y W zaa 1— (Y CY W _J F-- o 0 Li_ Q H \ H D Q LY W ,�.11 d : ATTACHMENT III HYDROLOGY CALCULATIONS DEC 200d Michael J.Anderson PE&PLS No. 27665 330 Cleveland Street Port Townsend, WA 908368 SHEET 1 of .44 RYAN RESIDENCE DRAINAGE PLAN LOT 59, WOODLAND HILLS PHASE 2 IMPERVIOUS AREAS: New residence 3840 sft Deck 500 New driveway 3260 Total 7620 Al = 0.18 Ac Total Lot Area 4.22 Ac SOIL TYPE: CmC—Clallum Series— TYPE C TYPE C RUNOFF CRITERIA: Open 86 Impervious 98 WASHINGTON DOE MANUAL STORM DATA: 2 yr, 24 hour i = 1.00 in/hr 10 yr, 24 hour i = 1.75 in/hr 100 yr, 24 hour I = 2.50 in/hr 2 z SBUH/SCS METHOD FOR COMPUTING RUNOFF HYDROGRAPH STORM OPTIONS: 1 - S.C.S . TYPE-lA 2 - 7-DAY DESIGN STORM 3 - STORM DATA FILE SPECIFY STORM OPTION: 1 S.C.S. TYPE-lA RAINFALL DISTRIBUTION ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES) 2 ,24 , 1 . 00 ******************** S.C.S. TYPE-1A DISTRIBUTION ******************** ********* 2-YEAR 24-HOUR STORM **** 1 . 00" TOTAL PRECIP. ********* ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1 0 . 18 , 86, 0 . 00 , 98 , 5 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN . 2 .2 86 . 0 . 0 98 . 0 5. 0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) . 00 7 . 83 129 ENTER [d: ] [path] filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: c : 2yr .pre FILE ALREADY EXIST; OVERWRITE (Y or N) ? Y SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP n STORM OPTIONS : - S.C.S. TYPE-lA ? - 7-DAY DESIGN STORM 3 - STORM DATA FILE y ' ;PECIFY STORM OPTION: ;.C.S . TYPE-lA RAINFALL DISTRIBUTION LATER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES) 00 , 24 , 2 . 50 ******************* S. C.S. TYPE-lA DISTRIBUTION ******************** ******** 100-YEAR 24-HOUR STORM **** 2 . 50" TOTAL PRECIP. ********* NTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1 . 18 , 86 , 0 . 00 , 98 , 5 . 00 ATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) 3/; A CN A CN . 2 . 2 86 . 0 . 0 98 . 0 5 . 0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) . 06 7 . 67 812 ENTER Ed: ] [path] filename[ .ext ] FOR STORAGE OF COMPUTED HYDROGRAPH: c : l00yr.pre FILE ALREADY EXIST; OVERWRITE (Y or N) ? y SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP n STORM OPTIONS: 1 - S.C.S. TYPE-1A 2 - 7-DAY DESIGN STORM 3 - STORM DATA FILE SPECIFY STORM OPTION: 1 S.C.S. TYPE-lA RAINFALL DISTRIBUTION ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES) 2 , 24 , 1 . 00 ******************** S .C.S. TYPE-lA DISTRIBUTION ******************** ********* 2-YEAR 24-HOUR STORM **** 1 . 00" TOTAL PRECIP. ********* ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1 0 . 00, 86 , 0. 18 , 98 , 5 . 00 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) . 2 A CN A CN . 0 86. 0 . 2 98 . 0 5. 0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) . 04 7. 67 516 ENTER [d: ] [path] filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 2 : 2yr.pst FILE ALREADY EXIST; OVERWRITE (Y or N) ? k SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP ;TORM OPTIONS: - S.C.S. TYPE-1A - 7-DAY DESIGN STORM - STORM DATA FILE aPECIFY STORM OPTION: . C. S . TYPE-1A RAINFALL DISTRIBUTION NTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES) 100 , 24 , 2 . 500 ‘ /‘ ******************** S .C. S. TYPE-1A DISTRIBUTION---------------------- ********* 100-YEAR 24-HOUR STORM **** ******************** 2 . 50" TOTAL PRECIP. ********* ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1 0. 00 ,86 , 0 . 18 , 98 , 5 . 00 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN . 2 . 0 86 . 0 . 2 98 . 0 5 . 0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) . 12 7. 67 1483 ENTER Ed: ] [path] filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH: c: 100yr.pst FILE ALREADY EXIST; OVERWRITE_ (Y or N) ? y SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP s KING COUNTY DEPARTMENT OF PUBLIC WORKS Surface Water Management Division HYDROGRAPH PROGRAMS Version 4 . 21B 1 - INFO ON THIS PROGRAM 2 - SBUHYD 3 - MODIFIED SBUHYD 4 - ROUTE 5 - ROUTE2 6 - ADDHYD 7 - BASEFLOW 8 - PLOTHYD 9 - DATA 10 - RDFAC 11 - RETURN TO DOS CNTER OPTION: 0 ID FACILITY DESIGN ROUTINE PECIFY TYPE OF R/D FACILITY: - POND 4 - INFILTRATION POND - TANK 5 - INFILTRATION TANK - VAULT 6 - GRAVEL TRENCH/BED VTER: EFFECTIVE STORAGE DEPTH( ft ) BEFORE OVERFLOW 2 . 0 ENTER: VERTICAL PERMEABILITY(min/in) 10 . 0 ENTER Ed: ] [path] filename[ .ext] OF PRIMARY DESIGN INFLOW HYDROGRAPH: c: 100yr.pst PRIMARY DESIGN INFLOW PEAK = . 12 CFS ENTER PRIMARY DESIGN RELEASE RATE(cfs) : 0 . 06 ENTER NUMBER OF INFLOW HYDROGRAPHS TO BE TESTED FOR PERFORMANCE ( 5 MAXIMUM) : 1 ENTER [d : ] [path] filename[ .ext] OF HYDROGRAPH 1 : c: 100yr.pst ENTER TARGET RELEASE RATE(cfs) : 0 . 06 ENTER: NUMBER OF ORIFICES, RISER-HEAD( ft) , RISER-DIAMETER( in) 1 , 2 . 0 , 6 RISER OVERFLOW DEPTH FOR PRIMARY PEAK INFLOW = . 08 FT SPECIFY ITERATION DISPLAY: Y - YES, N - NO n SPECIFY: R - REVIEW/REVISE INPUT, C - CONTINUE c INITIAL STORAGE VALUE FOR ITERATION PURPOSES: 576 CU-FT SINGLE ORIFICE RESTRICTOR: DIA= 1 . 25" PERFORMANCE: INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE DESIGN HYD: . 12 . 06 . 06 2. 00 TEST HYD 1 : . 12 . 06 70 . 06 2 . 00 70 SPECIFY: D - DOCUMENT, R - REVISE, A - ADJUST ORIF, E - ENLARGE, S - STOP 3 PERFORMANCE: INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE DESIGN HYD: . 12 .06 . 06 2. 00 TEST HYD 1 : . 12 .06 70 . 06 2 . 00 70 ;TRUCTURE DATA: GRAVEL TRENCH/BED (30 PERCENT VOID VOLUME) tISER-HEAD GRAVEL-BED-AREA STOR-DEPTH STORAGE-VOLUME 2. 00 FT 127. 4 SQ-FT 2 . 00 FT 76 CU-FT ;INGLE ORIFICE RESTRICTOR: DIA= 1 . 25" tOUTING DATA: TAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) EC, ' ;V;,; . 00 . 00 . 0 . 0 . 20 . 02 7. 6 127 . 4 . 40 . 03 15 . 3 127 . 4 . 60 . 03 22 . 9 127 . 4 . 80 . 04 30 . 6 127 . 4 • 1 . 00 . 04 38 . 2 127 .4 S 6/‘,, 1 . 20 . 05 45 . 9 127. 4 1 . 40 . 05 53 . 5 127 . 4 1 . 60 . 05 61 . 2 127.4 1 . 80 . 06 68 . 8 127. 4 2 . 00 . 06 76 . 5 127. 4 2 . 10 . 22 76 . 5 127 . 4 2. 20 . 49 76. 5 127 .4 2 . 30 . 58 76 . 5 127. 4 2 . 40 . 66 76 . 5 127. 4 2 . 50 . 74 76 . 5 127. 4 AVERAGE VERTICAL PERMEABILITY: 10 . 0 MINUTES/INCH SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE, S - STOP s KING COUNTY DEPARTMENT OF PUBLIC WORKS Surface Water Management Division HYDROGRAPH PROGRAMS Version 4 . 21B 1 - INFO ON THIS PROGRAM 2 - SBUHYD 3 - MODIFIED SBUHYD 4 - ROUTE 5 - ROUTE2 6 - ADDHYD 7 - BASEFLOW 8 - PLOTHYD 9 - DATA 10 - RDFAC 11 - RETURN TO DOS dh • ATTACHMENT IV OPERATIONS & MAINTENACE MANUAL INSTRUCTIONS FOR PROPOSED FACILITIES DEC' rt `; 2004 No. 2- Infiltration • Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed General Trash & Debris See"Detention Ponds"(No. 1). See"Detention Ponds" (No. 1). Poisonous/Noxious See "Detention Ponds"(No. 1). See"Detention Ponds" Vegetation (No. 1). Contaminants and See"Detention Ponds"(No. 1). See"Detention Ponds" Pollution (No. 1). Rodent Holes See"Detention Ponds"(No. 1). See"Detention Ponds" (No. 1) Storage Area Sediment Water ponding in infiltration pond after Sediment is removed rainfall ceases and appropriate time and/or facility is cleaned allowed for infiltration. so that infiltration system works according to (A percolation test pit or test of facility design. indicates facility is only working at 90% of its designed capabilities. If two inches or more sediment is present, remove). Filter Bags(if Filled with Sediment and debris fill bag more than 1/2 Filter bag is replaced or applicable) Sediment and full. system is redesigned. Debris Rock Filters Sediment and By visual inspection,little or no water flows Gravel in rock filter is Debris through filter during heavy rain storms. replaced. Side Slopes of Erosion See"Detention Ponds"(No. 1). See"Detention Ponds" • Pond (No. 1). Emergency Tree Growth See"Detention Ponds"(No. 1). See"Detention Ponds" Overflow Spillway (No. 1). and Berms over 4 feet in height. Piping See"Detention Ponds"(No. 1). See"Detention Ponds" (No. 1). Emergency Rock Missing See"Detention Ponds"(No. 1). See"Detention Ponds" Overflow Spillway (No. 1). Erosion See"Detention Ponds"(No. 1). See"Detention Ponds" (No. 1). Pre-settling Facility or sump 6"or designed sediment trap depth of Sediment is removed. Ponds and Vaults filled with Sediment sediment. and/or debris • August 2001 Volume V—Runoff Treatment BMPs 4-33 No. 1 — Detention Ponds Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed Beaver Dams Dam results in change or function of Facility is returned to design function. the facility. (Coordinate trapping of beavers and removal of dams with appropriate permitting agencies) Insects When insects such as wasps and Insects destroyed or removed from site. hornets interfere with maintenance activities. Apply insecticides in compliance with adopted IPM policies Tree Growth Tree growth does not allow Trees do not hinder maintenance and Hazard maintenance access or interferes activities. Harvested trees should be Trees with maintenance activity(i.e., slope recycled into mulch or other beneficial mowing, silt removal,vactoring, or uses (e.g., alders for firewood). equipment movements). If trees are not interfering with access or Remove hazard Trees maintenance,do not remove If dead,diseased,or dying trees are identified (Use a certified Arborist to determine health of tree or removal requirements) Side Slopes Erosion Eroded damage over 2 inches deep Slopes should be stabilized using of Pond where cause of damage is still appropriate erosion control measure(s); present or where there is potential for e.g., rock reinforcement, planting of continued erosion. grass,compaction. • Any erosion observed on a If erosion is occurring on compacted compacted berm embankment. berms a licensed civil engineer should be consulted to resolve source of erosion. Storage Area Sediment Accumulated sediment that exceeds Sediment cleaned out to designed pond 10% of the designed pond depth shape and depth; pond reseeded if unless otherwise specified or affects necessary to control erosion. inletting or outletting condition of the facility. Liner(If Liner is visible and has more than Liner repaired or replaced. Liner is fully Applicable) three 1/4-inch holes in it. covered. .'1 • Aloe:pFis August 2001 Volume V—Runoff Treatment BMPs 4-31 No. 8—Typical Biofiltration Swale S Maintenance Defect or Condition When Recommended Maintenance to Correct Component Problem Maintenance is Needed Problem General Sediment Sediment depth exceeds 2 Remove sediment deposits on grass Accumulation on inches. treatment area of the bio-swale. When Grass finished,swale should be level from side to side and drain freely toward outlet. There should be no areas of standing water once inflow has ceased. Standing Water When water stands in the Any of the following may apply: remove swale between storms and sediment or trash blockages, improve does not drain freely. grade from head to foot of swale, remove clogged check dams, add underdrains or convert to a wet biofiltration swale. Flow spreader Flow spreader uneven or Level the spreader and clean so that flows clogged so that flows are not are spread evenly over entire swale width. uniformly distributed through entire swale width. Constant When small quantities of Add a low-flow pea-gravel drain the length Baseflow water continually flow through of the swale or by-pass the baseflow the swale, even when it has around the swale. been dry for weeks,and an eroded, muddy channel has formed in the swale bottom. Poor Vegetation When grass is sparse or bare Determine why grass growth is poor and Coverage or eroded patches occur in correct that condition. Re-plant with plugs more than 10% of the swale of grass from the upper slope: plant in the bottom. swale bottom at 8-inch intervals. Or re- . seed into loosened,fertile soil. Vegetation When the grass becomes Mow vegetation or remove nuisance excessively tall (greater than vegetation so that flow not impeded. 10-inches);when nuisance Grass should be mowed to a height of 3 to weeds and other vegetation 4 inches. Remove grass clippings. starts to take over. Excessive Grass growth is poor because If possible,trim back over-hanging limbs Shading sunlight does not reach and remove brushy vegetation on swale. adjacent slopes. Inlet/Outlet Inlet/outlet areas clogged with Remove material so that there is no sediment and/or debris. clogging or blockage in the inlet and outlet area. Trash and Trash and debris Remove trash and debris from bioswale. Debris accumulated in the bio-swale. Accumulation Erosion/Scouring Eroded or scoured swale For ruts or bare areas less than 12 inches bottom due to flow wide, repair the damaged area by filling channelization,or higher with crushed gravel. If bare areas are flows. large, generally greater than 12 inches wide,the swale should be re-graded and re-seeded. For smaller bare areas, overseed when bare spots are evident, or take plugs of grass from the upper slope and plant in the swale bottom at 8-inch intervals. • August 2001 Volume V—Runoff Treatment BMPs 4-39 r No. 5-Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When • Component Maintenance is performed General Trash& Trash or debris which is located immediately No Trash or debris located Debris in front of the catch basin opening or is immediately in front of blocking inletting capacity of the basin by catch basin or on grate more than 10%. opening. Trash or debris (in the basin)that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free blocking more than 1/3 of its height. of trash or debris. Dead animals or vegetation that could No dead animals or generate odors that could cause complaints vegetation present within or dangerous gases(e.g., methane). the catch basin. Sediment Sediment(in the basin)that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes • Damage to inches or cracks wider than 1/4 inch and cracks. Frame and/or Top Slab (Intent is to make sure no material is running into basin). Frame not sitting flush on top slab, i.e., Frame is sitting flush on separation of more than 3/4 inch of the frame the riser rings or top slab from the top slab. Frame not securely and firmly attached. attached Fractures or Maintenance person judges that structure is Basin replaced or repaired Cracks in unsound. to design standards. Basin Walls/ Bottom Grout fillet has separated or cracked wider Pipe is regrouted and than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Basin replaced or repaired Misalignment function, or design problem. to design standards. Vegetation Vegetation growing across and blocking more No vegetation blocking than 10% of the basin opening. opening to basin. Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. 0 ,,,,_ , 4-36 Volume V—Runoff Treatment BMPs '`" August)1001 r • No. 5— Catch Basins • Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed Contamination See"Detention Ponds"(No. 1). No pollutionpresent. resent. and Pollution Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid Cover can be removed by to Remove after applying normal lifting pressure. one maintenance person. (Intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate opening Grate with opening wider than 7/8 inch. Grate opening meets (If Applicable) Unsafe design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s)of the Grate is in place and • Missing. grate. meets design standards. No. 6— Debris Barriers (e.g.,Trash Racks) Maintenance Defect Condition When Maintenance is Results Expected When Components Needed Maintenance is Performed General Trash and Trash or debris that is plugging more Barrier cleared to design flow Debris than 20% of the openings in the barrier. capacity. Metal Damaged/ Bars are bent out of shape more than 3 Bars in place with no bends more Missing inches. than 3/4 inch. Bars. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% Barrier replaced or repaired to deterioration to any part of barrier. design standards. Inlet/Outlet Debris barrier missing or not attached to Barrier firmly attached to pipe Pipe pipe 1 III i DEC 2004 August 2001 Volume V—Runoff Treatment BMPs 4-37