HomeMy WebLinkAboutBLD2004-00806 1
MLA04-00707
SJILDING PERMIT APPLICATI N Review Type:
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD04-00806 Received Date: 12/20/2004
SITE ADDRESS: 200 DENNIS BLVD
PORT TOWNSEND, 98368
OWNER: TERRY W. STEBEN PHONE:
KRISTI L STEBEN
4011 HASTINGS AVE W
PORT TOWNSEND WA 98368
SUBDIVISION: Pt3gt{605E VILLAGE DIV 2 Block: Lot: 11
PARCEL NUMBER: 940200011 Section: 13 Township: 30 N Range: 02 W
CONTRACTOR: ALPINE BUILDERS PHONE: (360)385-1265
TERRY W STEBEN DBA
4011 HASTINGS AVE W
PORT TOWNSEND WA 98368
Contractor's License ALPINB*168PQ Expires 10/16/2002
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOr NEW SFR W/ ATTACHED GARAGE &
PROPANE TANK
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 872
VALUATION 94,437.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 2003 HEAT BASE: 384 HEAT TYPE: PRO
OCCUPANCY: R-3
OCCUPANCY: UNHEATED: # OF STORIES:
CONST TYPE: 5N OTHER: SHORELINE:
CONST TYPE: GARAGE: 424 SETBACK:
DECK: 104 BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: CAPE GEO PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 2 Prop: 2 Seismic Streams
Total: 2 Total: 2 Flood Way Floodplain
Routing Date: F&W Landslide Shoreline Aquifer
'4 �� tOCk ) Forest: Commercial Rural
Type Amount Paid Bv: Date: Receipt: Approved/Date
Permit $958.75 BAC 12/20/04 68931 'Enmi i # OLD
Plan Check $623.19 BAC 12/20/04 68931
State Building Code $4.50 BAC 12/20/04 68931 0 4 - 0 8 0 6
Potable Water Application $52.00 BAC 12/20/04 68931
JEFFERSON COUNTY DCD
Total: $1,638.44 CO
v
c9Q
AUG-17-05 02 :33 PM TERRY STEBEN 3603851265 P. 01
I .
1,, . � sC CjVC 1, ;
AUG 1 7 2005 , . : _ ,
' ' -
' + P
......J 1 . I '
'� ' f 1 IS?"'
�1A: V I s
t
.�_,.....t-
` Y i
it
� 11 4,
• . ' I!Y- I .
•
O`
—I 0
"1
, ..1.,....., . ..... . rN ...., ...... ...... ..... ............
,,, , , __,....._.....,,„+ h
tLI
,,.., i.!,..,... ....; :i. . .....„..........1 .,..,,.......,i,.. ... ....
N 6l ...i.iii.. ...., .e., ;: : 0
e r�p IR
VI- - 6,
'.1.'''1:::...':.........:.: ....':::..' l'.....'..'''''....,:.:'..71.:::•..::,.'.'li''''„ 4.''''''',,'
y f h
I r r
1
,
~1 N
N i .,,ft
4' Y
ley y It I;.
L
N .,
( i + 41 L
r ' , Z� ' �
' I
.. :. „:, 0 g 1
V• Y i 1 r Fr'. 1/ 9ttu 11 , z__ • : :
ft + +
4 n1 /
? y,,,,rk• + 1
r �
�r �' .11) 1 fir..
•
•
•
•
•
•
•
s, c c
,,,c.,,,,,,,_,,,,,,,,, Efl. .........,-.).
•Y .. M
,
i
i `
• •
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD04-00806 Received Date 12/20/2004
SITE ADDRESS: 200 DENNIS BLVD Issue Date 01/24/2005
PORT TOWNSEND, 98368
APPLICANT: TERRY W. STEBEN PHONE: (360) 385-1265
KRISTI L STEBEN
4011 HASTINGS AVE W
PORT TOWNSEND WA 98368
SUBDIVISION: CAPE GEORGE VILLAGE DIV 2 Block: Lot: 11
PARCEL NUMBER: 940200011 Section: 13 Township: 30 N Range: 02 W
CONTRACTOR: ALPINE BUILDERS PHONE: (360)385-1265
TERRY W STEBEN DBA
4011 HASTINGS AVE W
PORT TOWNSEND WA 98368
Contractor's License: ALPINB*168PQ Expires: 10/18/2006
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE &
PROPANE TANK
CALL IN FOR THE R QUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS: ,
UFFER: X C<-(A) ,J4-t i/ms`-;
Footing: 9re--- �—/,fl/t�( G.)-,i e. ..2/2.0S-
Foundation: a q'JZprns 2//f/oSifel ."Ji ZI,Z (
Stormwater FINAL Appr val:
Underground Plumbing. OS'
Underground Insul tion ,��]�c5s"
Shear Wall A Pkt(l
Framing: �1I[,®,.ro ti 616e
Plumbing:,0.7' 4t5i—nllq{ �2rf
Propane Tank/Li m� :,i/1(C-Yie/(0 -
v4
Insulation: /<- Y/S �
Sheetrock: 6 o
Septic Syt�fn Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: /6-/1.,b IBA
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY -SEE REVERSE
SPECIAL CONDITIONS FOR CASE A BLD04-00806•
1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
2.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
3.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
4.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
5.) The building height is not to exceed 35 feet.
6.) Minimum setbcak from Dennis Blvd right-of-way is 20 ft. Minimum side and rear setbacks
are 5 ft.
7.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
8.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
9.) A minimum of two (2) on-site parking spaces are required for the single family residence.
10.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP)
Elements#1 through #12 of the Department of Ecology's Stormwater Management
Manual for Western Washington to control stormwater, erosion and sediment during
construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
I:\F_BLD_Permit_Buildng.rpt 10/29/1999
I
SON Jefferson artlnent of Community Dovtth j thL
��' o � m..T ), r >: IIdan Street Polnownsend WA 88368 f360]378-4450
i
'.it ��
1s �a� 000I00�
I�N4 f
I
,.
7 fir ;r�r„1 ,.1;,
,.
Building Type: ` ` '.. _.- ':l toj{ect'Type -` Frame Type:
X Single Famil . New liC Wood
Garag Attache etached +4„,,.,,:5'-,, 0 Addition ❑ Steel
❑ Modular 0 Alteration/Remodel 0 Concrete
❑ Commercial 0 Repair 0 Masonry
O Multi-family/#of Units 0 Demolition 0 Other.
❑ Industrial
O Other:
Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: C) Existing. ❑ Sewer 0 Community System > Electricity 0 Oil
Proposed: 3- Proposed: �t ,Individual System 0 Woodstove iiI Propane
Total Total: 4, If not sewer,fill out the following: 0 Heat Pump
0 Conventional 0 Alternative 0 Other i'
Permit# SEP G ri —-).7 l3,n.f---
Water Supply:
❑ Private well 0 Two Party Walt( Public:Name of water system: (A Pe- + T)/C- 'J: -4)i S -t Cr--
Square Footage: Office Use For Office Use Only Main Floor 87A. 310 pa,-1.I coConsistency Review 4 •C,)
2ND Floor Base fee Iq 5J g, /n
3r Floor Plan Check fee (P a d /�9rr
Htd Basement -e t J ( D 1,5 a State Surcharge fee 1 - 51)
,Li Li
z Unhtd� Basement
/, (� a Subtotal
:Q i�
:7 Garage/Carport 4�4 R;�k J'b�u Pot Water Review fee , Q 5.00
Decks I 0 1 a, 4J 1 t a U 911/Rd Approach fee r r j (� r
Commercial TOTAL i tt __'G1(� ( `I ti—
Industrial Receipt# l.P D`13 I
Other __._---- —._.,., Cash/Check# /` i Q .
C 0 L\5. (0q- itials .:
,
----- I Date 6
lra
Estimated Cost: / �,Oct)"''
If within 200' of the Shoreline, /J
' �/Distance to Bank or Ordinary High Water Mark /� ( ft.Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to say;indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours.
Signature: et,a,) Date:
i yi-2/L,i1---
(__--"/ OVER ►
G:\PermitCenter\FORMS\BLDG FORMS\BLDPermit Application.doc 01/08/2004