Loading...
HomeMy WebLinkAboutBRIEFING re Annual Road Program TIP and bridge report Department of Public Works O Regular Agenda: (afternoon) Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Monte Reinders, PE, Public Works Director/County Engineer Agenda Date: September 22, 2025 Subject: 2026 Annual Road Program, Draft 2026-2031 Jefferson County 6-Year Transportation Improvement Program (TIP), and 2025 Bridge Condition Report Briefing Statement of Issue: Public Works will brief the County Administrator and Board of County Commissioners on the 2026 Annual Road Program, the 2026-2031 Jefferson County 6-Year TIP, and the 2025 Bridge Condition Report. Analysis / Strategic Goals / Pros a Cons: Per RCW 36.81.130 and Ch. 136-16 WAC the county engineer, on or before the first Monday in October, shall file with the county legislative authority a recommended plan for laying out, construction, and maintenance of county roads for the ensuing fiscal year. The plan, known as the Annual Road Program, consists of three components, the Annual Construction Program, an annual road maintenance plan, and a road equipment purchases Et major repairs plan. The Annual Construction Program shall meet the requirements of WAC 136-16-020 and conform as nearly as is practicable to the upcoming 6-Year TIP. RCW 36.81.121 requires the annual adoption of a 6-Year TIP after holding a public hearing. The purpose of the law is to, "assure that each county shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated transportation program". Additionally, and as required by WAC 136-20-060, the County Engineer shall furnish the county legislative authority with a written report of the annual bridge inspection findings. This report shall be made available to said authority and shall be consulted during the preparation of the proposed 6-Year TIP. The report shall include the county engineer's recommendations as to replacement, repair or load restriction for each deficient bridge. Fiscal Impact / Cost-Benefit Analysis: There is no direct cost related to the briefing. Fiscal impact is evaluated through the bi- annual budgeting process including adoption of an Annual Road Program. Recommendation: Discussion item, no action required. Department Contact: Eric Kuzma, 360-385-9167 Reviewed By: çi7 . 16 .E 6) 17 gS Josh-Peters, County Administrator Date Agency:Jefferson County DRAFT SIX-YEAR Hearing Date: XX/XX/2025 County No.16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2025 2026-2031 Resolution No.XX-XXXX-25R a PROJECT COSTS IN DOLLARS yw rn g FUNDING SOURCE INFORMATION EXPENDITURE SCHEDULE tu M U _FEDERAL FUNDS STATE FUNDS Q N g PROJECT IDENTIFICATION I- )2 < O = rn o - G I- •Road Log Number/Bridge Number w i w 80 a LL O Oz w •Road Name(s)&Beginning/End Milepost w CI °e J r- >< _, O w = p w OTHER ROAD TOTAL YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 TOTAL F �O •Project Number z = w i y a w w.1 REVENUES FUND 2026 2027 2028 2029 2030 2031 2026-2031 u a. •Description of Work ce o C (2 r- ,O i❑ w w w a F w n z • z > w z ❑0- o F 0- a LL F •Total Cost(incl.prior/future)&Fund Source f a w E a a LL 'Li'm y ti N m US 101&County Roads MP 294.6 to MP 295.0 (18019330) PIF Quilcene Complete Streets-Phase 1 PE 1/13 10,000 10,000 10,000 10,000 03 1 Publicly driven ped/bike improvements involving.US 101,traffic calming, 28 S E T-3 0.50 R/W 3/20 0 0 sidewalk.crosswalk&lighting improvements with a focus on connecting CN 6/26 PBP 695,350 302,767 998,117 998,117 _ 998,117 to the school campus. Total=$1,186,932(WSDOT+$302,767 PIF) Total . 0 695,350 302,767 10,000 1,008,117 1,008,117 0- 0 0 0 0- 1,008,117 34230 MP 1.6 (18020850) Lords Lake Loop Road-Slide Repair PE 6/22 FEMA FEMAm 8,000 8,000 8,000 8,000 09 2 An approx.300 ft.long.11-12 ft.vide road realignment to repair 04 S/P 1 T-5 0.1 R/W 8/24 FEMA FEMAm 0 f 0 an embankment slide that occurred during a 2021 storm event. CN 4/26 FEMA 621,110 FEMAm 34,506 34,506 690,122 690,122 690,122 Total CN=$698,122(FEMA) _ - Total 621,110 34,506 0 42,506 698,122 698,122 0 0 0 0 0 698,122 50540 MP 0.84 (18020890) ARPA Shine Road-Slide Repair PE 6/22 FEMA 7,200 FEMAm 400 400 8,000 8,000 8,000 09 3 Shift 800ft.0 of road away from bluff as a corrective measure following 04 S/P I T-0 0.75 RMI 10/22 FEMA FEMAm 0 0 2021 storm damage.Project also includes potential work to repay nprap. CN 8/26 FEMA 418,000 FEMAm 22,000 100,000 540.000 540,000 540,000 Total=$448,000 incl.$100k(FEMA+$100k ARPA) _ Total 425,200. 22,400 100,000 400 548,000 548,000 0 0 0 0 0 548,000 93150 Center Road MP 14.55 to MP 14.70 (18020970) Little Quilcene River Bridge Replacement PE 1/22 BRR 47,750 0 47,750 20,000 20,000 7,750 47,750 07 4 Replacement of a 1955,64-ft concrete bridge with structural 11 S/P I T-3 0.5 R/W 1/25 BRR 80,000 0 80,000 80,000 80,000 deficiencies,through a FHWA Local Bridge Program grant. CN 5/28 BRR 6,211,114 0 6,211,114 6,211,114 6,211,114 Total=$6.338,864(FHWA) Total_ 6,338,864 0 0 0 6,338,864 100,000 20,000 6,218,864 0 0 0 6,338,864 13430 MP 8.50 to MP 10.98 (18020840) Oil City Road Engineering Assessment-FLAP Project PE 1/21 FLAP 1,000 1,000 1,000 1,000 09 5 Local funds for infrastructure protection,planning project performed 18 S E T-5 2.48 R/W 0 0 by FHWA Western Federal Lands division,thru FLAP program. CN 0 0 Total FLAP=$250,000(uses toll credits) Total 0 0 0 1,000 1,000 1,000 0 0 0 0 0 1,000 5R19 MP 9.56 to MP 10.1 (18020760) Rhody Drive Ped-Bike Improvements-North Segment PE 8/21 TAP 1,500 1,500 1,500 1,500 04 6 Pedestrian&bicycle facilities along SR19 connecting HJ Carroll Park/ 28 5 E T-3 0.45 R/W 8/24 0 0 Rick Tollefson Trail to existing facilities at Chimacum Schools Campus. CN 5/26 TAP 461,135 461,135 461,135 461,135 Total PE grant=$109,907(FHWA) Total CN grant=$461,135(TAP) Total 461,135 0 0 1,500 462,635 462,635 0 0 0 0 0 462,635 SR19 MP 8.94 to MP 9.56 (18020950) Rhody Drive Ped-Bike Improvements-South Segment PE 7/22 TAP 64,643 SWCC 220,768 10.089 295,500 275.000 20.500 295,500 04 7 Pedestrian&bicycle facilities along SR19 connecting the Chimacum 28 S/P E T-3 0.62 R/W 11/25 SWCC 60,000 60,000 60,000 60,000 School Campus to the Chimacum Crossroads commercial corridor CN 6/27 PBP 1,421,000 1,421,000 1,421.000 1,421,000 Total PE grants=$1,776,500(FHWA&WSDOT) Total 64,643 1,701,768 0 10,089 1,776,500 335,000 1,441,500 0 0 0 0 1,776,500 85020 Olympic Discovery Trail-PS2P Project (18021300) Planning&Design for 5 segments of the ODT:Old Hwy.9(Final PS&E); PE 12/25 RAISE 2,070,000 2,070,000 270,000 450,000 450.000 450,000 450.000 2,070,000 N/A 8 Disco.Bay-Seg.B(Planning):Fairmount to Eaglemounl(Planning), 28 5 I N/A N/A R/W 0 0 Eaglemount to ALSP(Planning);STO to ODT(Planning) CN 0 0 Jeff.Co.Grant Total-$2,080.000(from$16,130,000 FHWA Grant) Total 2,070,000 0 0 0 2,070,000 270,000 450,000 450,000 450,000 450,000 0 2,070,000 30130 MP 0.42 (18021240) Big Quilcene River Bridge Replacement Project PE 1/24 RAISE 0 0 09 9 A JST&HCSEG project to restore a 1.1 mile segment of the Big Quilcene 10 S S T-4 0.2 R/W 0 0 River&floodplain,including a new 1140 ft.Linger Longer Road Bridge. CN 4/25 RAISE 10,000 10,000 10,000 10,000 Total=$39.145,699(FHWA RAISE&Tnbal Bridge Program Grants) Total _ 10,000 0 0 0 10,000 10,000 0 0 0 0 0 10,000 601507/625309/698619/SR19 (18021480) 03 Port Townsend Gateway Project PE 1/25 SS4A 395,000 12,500 407,500 10,500 2,000 130,000 130,000 130,000 5,000 407,500 07 10 Joint City,County,WSDOT intersection safety improvement project 21 S/P 1 T-3 0.33 R/W 3/27 SS4A 50,000 50,000 25,000 25,000 50,000 09 including South Discovery Rd..Jacob Miller Rd.,Mill Rd.,and 5R20 CN 6/31 SS4A 3,880,000 3,880,000 3,880,000 3,880,000 Total=$225.000 SS4A Planning i$9,550,000 SS4A Implementation Total 4,325,000 0_ 0 12,500 4,337,500 10,500 2,000 130,000 155,000 155,000 3,885,000 4,337,500 Page 1 2026-21131 TIP Agency:Jefferson County DRAFT SIX-YEAR Hearing Date: XX/XX/2025 County No.16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2025 2026 -2031 Resolution No.XX-XXXX-25R u! y PROJECT COSTS IN DOLLARS N g FUNDING SOURCE INFORMATION EXPENDITURE SCHEDULE w 05 2 to FEDERAL FUNDS STATE FUNDS PROJECT IDENTIFICATION � r < Q I < ❑ , iii a •Road Log Number/Bridge Number w ¢r W c0 12 xa w~ LL o ❑ - z0 m •Road Namelz)&Beginning/End Milepost w Z °e U >-F N p a OTHER ROAD TOTAL YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 TOTAL F O •Project Number > z O x w w =y < W< REVENUES FUND 2026 2027 2028 2029 2030 2031 2026-2031 O• a •Description of Work 2 o 2 F-- 3 z❑ ce w w re w a r w ti a a z > w z ❑a ❑ ¢a •LL F •Total Cost(incl.prior/future)&Fund Source , n w ce OE a 0 0 m m> t- ,> CO u y m 91420 MP 3.5-3.8,4.0-4.4,7.5-7.8 (18019411) 'Upper Hoh Road-Dolosse Monitoring PE 3124 FLAP 0 IT 07 11 Project to monitor FLAP-Phase 2 funded dollosse installation at three 44 S E T-4 1 R/W 0 0 locations along the Upper Hoh Rd.Monitoring is required for 15 years. CN 10124 FLAP 47,400 35,200 82,600 41,600 9,000 15,000_ 1,000 15,000 1,000_ 82,600 Total=$319,900(WFL) Total 47,400 0 0 35,200 82,600 41,600_ 9,000f 15,000 1,000 15,000 1,000 82,600 62750&62810 MP 0.00 to 0.75&MP 0.00 to 0.81 (TBD) Middlepoint Rd./E.Middlepoint Rd.-Bituminous Surface Treatment PE 0 0 9 12 Project will convert existing gravel road surface to BST(bituminous 05 P E T-0 1.79 R/W 0 0 surface treatment).Work will be completed by county road crew. CN STBG(FFE) 228,819 35,712 264,531 264,531 264,531 Total=$264,531(STBG-Fed Fund Exchange) Total 0 228,819 0 35,712 264,531 0 0 264,531 0 0 0 264,531 91420 MP 8.0 (18020381) Upper Hoh Road-ER Mitigation PE 1/20 ER 12,975 2,025 15,000 15,000 15,000 07 13 Environmental mitigation/Permanent repair project in response 20 SIP S T-4 0.1 R/W 0 0 to 2020 emergency repairs. CN 6/27 ER 216,250 33,750 250,000 250,000 250,000 Total=$293,160(FHWA) Total 229,225 0 0 35,775 265,000 15,000 250,000 0 0 0 0 265,000 91420 MP 9.7 to MP 9.8 (18019880) Upper Hoh Road Spruce Creek ER Mitigation PE 11/18 ER 12,975 2,025 15,000 15,000 15,000 07 14 Environmental mitigation I Permanent repairs project in response 20 SIP S T-4 0.1 R/W 0 0 to 2015 emergency repairs CN 6/27 ER 216,250 33,750 250,000 250,000 250,000 Total=$293,160(FHWA) Total 229,225 0 0 35,775 265.000 15,000 250,000 0 0 0 0 265,000 10750 MP 1.35 (18021220) Donkey Creek Tributary Culvert Replacement,Clearwater Road PE 1/24 NOAA 1,000 1.000 1,000 1,000 08 15 A Trout Unlimited project to replace an existing PCC fish bamer culvert 44 S I T-5 N/A R/W 8/24 NOAA 0 0 with an aluminum pipe arch culvert. CN 6/26 NOAA 5,000 5,000 5,000 5,000 Total=$569.722(RCO&NOAA) Total 6,000 0 0 0 6.000 6,000 0 0 0 0 0 6,000 13430 MP 6.73 (1821470) Oil City Road-Unnamed Tributary Culvert Replacement PE 6/25 NOAA 3,500 3,500 3,500 3,500 09 16 A Trout Unlimited project to replace an existing CMP fish barrier culvert 44 S I T-S N/A R/W 1/26 26,000 26,000 26,000 26,000 with a concrete box culvert or a bridge. CN 6/26 NOAA 5,000 5,000 5,000 5,000 Total CN= $1,521,022 (PE:Private Grant&CN:NOAA) Total 34,500 0 0 0 34,500 34,500 0 0 0 0 0 34,500 13430 MP 5.96 (18021460) Oil City Road-Six Mile Creek Culvert Replacement PE 6/25 NOAA 3,500 3,500 2,500 1.000 3,500 09 17 A Trout Unlimited project to replace an existing large baffled fish barner 44 S I T-5 N/A R/W 1/26 26,000 26,000 26,000 26,000 culvert with a bridge. CN 6/27 NOAA 5,000 5,000 5,000 5,000 Total CN= $5,852,030(PE:Private Grant&CN'.NOAA) Total 34 500 - 0 0 0 34,500 28,500 6,000 0 0 0 0 34,500 91420 MP 0.00 to MP 12.04 (18020560) Upper Hoh Road Pavement Preservation-FLAP Project 56 PE 1/17 FLAP RAP 4,000 4,000 2,000 2,000 4,000 07 18 Pavement preservation&safety improvements along Upper Hoh Rd.to 21 S E T-4 12.04 R/W 0 0 Hoh Rain Forest/ONP boundary performed by FHWA,WFL division. CN 6/27 FLAP RAP 404,400 404,400 404.400 404,400 Total=$4,400,000(FLAP)+$408,400(RAP) Total 0 408,400 0 0 408,400 2,000 406,400 0 0 0 0 408,400 91420 MP 7.9 to MP 8.2 (18021170) Upper Hoh Road Bank Stabilization-FLAP Project-PE 8 ROW Only PE 1/24 FLAP 2,000 2,000 2,000 2,000 06 07 19 Approximate location of next critical area of scour along Upper Hoh Rd. 11 5/P S T-4 0.3 R/W 1/25 FLAP 45,000 45,000 45,000 45,000 To Hoh Rain Forest/ONP boundary,performed by FHWA,WFL division. CN 0 0 Total FLAP=$1,086,000(uses toll credos) Total 0 0 0 47,000 47,000 47,000 0 0 0 0 0 47,000 13430 MP 0.5 (18021180) Oil City Rd.Culvert Replacement(Bridge)MP 0.5-FLAP Project PE 6/23 FLAP 2,400 2,400 2,400 2,400 07 20 Local funds for permanent repair of Two Trout Creek washout 11 S I T-5 2.48 R/W 8/24 FLAP 0 0 by FHWA Western Federal Lands division,thru FLAP program. CN 6/26 FLAP 3,000 3,000 3,000 3,000 Total FLAP=$4,500,000(uses toll credits) Total 0 0 0 5,400 5,400 5,400 0 0 0 0 0 5,400 Page 2 2026-2031 TIP Agency:Jefferson County DRAFT SIX-YEAR Hearing Date: XX/XX/2025 County No. TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2025 2026 -2031 Resolution No.XX-XXXX-25R N 1fn PROJECT COSTS IN DOLLARS 2 5 FUNDING SOURCE INFORMATION EXPENDITURE SCHEDULE n co O n N FEDERAL FUNDS STATE FUNDS Q g u PROJECT IDENTIFICATION - , a o r a m ❑ r C •Road Log Number I Bridge Number w F W t7 = i w tt 0 O ❑ r IL z0 w •Road Names)8 Beginning End Milepost w co _ ' co I- a Q "w o NO w OTHER ROAD YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 TOTAL F O •Project Number > z O x w x N a <a O¢ REVENUES FUND TOTAL 2026 2027 2028 2029 2030 2031 2026-2031 a -Description of Work ¢ o c0 a,-- =o w w w a w I-a n F •Total Cost(incl.prior/future)8 Fund Source Z LL w cc r0 E a c U. it' w> r I-> m rn CO 93150 MP 3.23 (18020990) Center Road Culvert Replacement-Chimacum Creek PE 8/24 NFPP 60,300 FBRB 341,700 402,000 265,000 127,000 10,000 402,000 07 21 Replace non-conforming Chimacum Creek 11 S/P I T-3 N/A R/W 1/26 NFPP 5,400 FBRB 30,600 36,000 14,000 22,000 36,000 culvert with fish passable structure. CN 6/28 PROTECT 5,325,000 5,325,000 5,325,000 5,325,000. Total grants=55,944,789(RCO,USFWS,FHWA) Total 5,390,700 _ 372,300 0 0 5.763,000 279,000 149,000 5,335,000 0 0, 0 5,763,000 50360 MP 3.74 to MP 6.00 (TBD) Paradise Bay Road Overlay PE 1/26 RAP 75,600 8,400 84,000 60,000 24,000 84,000 08 22 2R overlay of Paradise Bay Road from Andy Cooper Road 05 S E T-0 2.26 R/W 0 0 to SR104 at the Hood Canal Bridge. CN 5/27 RAP 1,215,900 135,100 1,351,000 1,351,000 1,351,000 total=$1.435,000 Total 0 1,291,500 0 143,500 1,435.000 60,000 1,375,000 0 0 0 0 1,435,000 514109 MP 0,00 to 0.21 (TBD) West Valley Road Safe Routes to School Project PE 1/26 SRTS 222,000 222,000 212,000 10,000 222,000 09 23 Design and construction of a multi-use trail along West Valley Road to 28 S E T-0 0.21 R/W 6/26 SRTS 35,000 35,000 35,000 35,000 connect more neighborhoods to the 2015 SRTS sidewalk project. CN 5/27 SRTS 741,000 741,000 741,000 741,000 Total=$998,000(WSDOT) Total 0 998,000 0 0 998.000 247,000 751,000 0 0 0 0 998,000 US 101 MP 309.88-310.50 (18021260) Duckabush Estuary Restoration-Realignment Project PE 1/24 4,000 4,000 1,500 500 2,000 03 24 Project will replace US101 causeway with a bridge.Will also add 10 S/P S T-3 0.62 R/W 0 0 a US101 turn lane and realign a segment of Duckabush Road. CN 4/28 0 1,000 1,000 2,000 Total=$126 million(WDFW/USACEANSDOT) Total - 0 0 0 4,000 4.000 1.500 1,500 1,000 0 0 0 4,000 91420 MP 2.74 (18021250) Snell Creek Culvert Replacement,Upper Hoh Road PE 1/24 NOAA 6,000 6,000 1,000 4,000 1,000 6,000 07 25 A Trout Unlimited project to replace an existing PCC fish barrier culvert 44 S/P I T-4 N/A R/W 1/26 NOAA 30,000 30.000 30,000 30,000 with a bridge. CN 6/28 NOAA 5,500 5,500 5,500 5,500 Total= $1,946,124(NOAA) Total 41,500 0, 0 0, 41.500 1,000 34,000 6,500 0 0 0 41,500 85010&52710193250 (18019560) Rick Tollefson Trail-Ballfield Connection PE 1/19 PBP 122,800 1,000 123,800 1.000 12.800 80,000 30,000 123,800 07 26 Old Hadlock Road and Chimacum Road intersection realignment with 04 P E T T 0 0.30 R/W 1/25 PBP 37,400 37.400 37.400 37,400 UB multi-use trail connecting the Rick Tollefson Trail to Bob Bates Fields. 28 3 CN 6/29 PBP 567,500 567,500 567.500 567,500 Total =$728,700(WSDOT) Total 0 727,700 0 1,000 728,700 1,000 50,200 80,000 597,500 0 0 728,700 40390 MP 1.15 8 MP 1.23 (TBD) Tarboo Creek Culverts Replacement Project PE 1/26 FBRB 8,500 1,500 10.000 5.000 5.000 10,000 08 27 A Northwest Watershed Institute project to replace 44 S/P S T-5 N/A R/W 1/27 FBRB 4,250 750 5,000 5.000 5,000 two fish barriers on the east fork of Tarboo Creek. CN 0 0 Total PE_$980.000(RCO) Total 0, 12,750 0 2,250 15,000 5,000 10,000 0 0 0 0 15,000 13430 MP 8.76 (TBD) Oil City Road-Ruby Creek Culvert Replacement PE 1/26 1,500 1,500 1,000 500 1,500 09 28 A Hoh Tribe project to replace a 2021 ER project culvert 44 S/P S T-5 N/A R/W 0 0 on a creek later determined to be fish passable. CN 0 0 Total=$195.000(Planning/Preliminary Design)(RCO) Total 0 0 0 1,500 1,500 1,000 500 0 0 0 0 1.500 13430 MP 8.8 to MP 8.9 (TBD) Oil City Road MP 8.8-8.9 Permanent Repair PE 1/26 FEMA 150,000 FEMAm 25,000 26,000 201,000 1,000 95,000 100,000 5,000 201,000 09 29 Environmental mitigation/Permanent repairs project in response 20 P S T-5 0.10 R/W 1/28 FEMA 7,500 FEMAm 1,250 1,250 10,000 10,000 10,000 to 2015-2016 emergency repairs. CN 6129 FEMA 487,500 FEMAm 81,250 81,250 650,000 650,000 650,000 Total=861,000(FEMA) Total 645,000 107,500 0 108,500 861.000 1,000 105,000 100,000 655,000 0 0 861,000 93150 MP 3.39 to 3.49 (TBD) Yarn Bridge Replacement PE 1/28 FMSIB 700,000 700,000 140,000 300,000 250,000 10,000 700,000 07 30 Replacement of a 1955,25-ft.concrete bridge on Center Road with 11 P $ T-3 0.10 R/W 6/29 FMSIB 105,000 105,000 45,000 60,000 105,000 structural deficiencies,through a FHWA local bridge program grant. CN 6/31 FMSIB 4,920,000 4,920,000 4,920.000 4,920,000 Total=$5,725,000 SIB) Total 0 5,725,000 0 0 5,725,000 0 0 140,000 345,000 310,000�4,930,000 5,725,000 Page 3 2026-2031 TIP Agency:Jefferson County DRAFT SIX-YEAR Hearing Date: XX/XX/2025 County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2025 2026-2031 Resolution No.XX-XXXX-25R rn PROJECT COSTS IN DOLLARS cc' � FUNDING SOURCE INFORMATION EXPENDITURE SCHEDULE w co n> CO (.3 FEDERAL FUNDS STATE FUNDS coF us N 5 ¢ us al: PROJECT IDENTIFICATION r < F a o t- I- •Road Log Number I Bridge Number w F w 2 0 sa w I- 0 0 o - 2 W •Road Name's)&Beginning/End Milepost `^ f ro w r >Q w LL NO w OTHER ROAD YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 TOTAL O w c0 -+ -r w rn TOTAL F 3 •Project Number > z O 2 l' w x m 5 <¢ w w¢ REVENUES FUND 2026 2027 2028 2029 2030 2031 2026-2031 u a •Description of Work ¢ o tt (7 ,- p =o w w w y w so H y z z > w z 00. 0 ¢a E o- •Total Cost(incl.priodfuture)&Fund Source o w E a O E 2> w,- )) r> F m N F y m 1 US 101&County Roads MP 294.54 to MP 295.03 (TBD) Quilcene Complete Streets-Phase 2 PE 6/28 PBP 370,000 370,000 100,000 260,000 10,000 _ 370,000 03 31 Phase 2 project implementing plan to provide sidewalks,crosswalks,8 28 P E T-3 0.05 R/W 0 0 bicycle lanes to connect school,community center 8 local businesses. CN 6/30 PBP 1,716,000 1,716,000 1,716,000 _ 1,716,000 Total=$2,086,000(WSDOT) Total - 0 2,086,000 0 0 2,086,000 0 0 100,000 260,000 1,726,000 0 2,086,000 85020 Old Gardiner Road to Broders Road (TBD) Olympic Discovery Trail(ODT)-West PE 6128 RAISE 385.000 385,000 100,000 280,000 5,000 385,000 N/A 32 Construction of a 1.5-mile segment of the ODT from Old Gardiner 28 P I N/A 1.50 R/W 1/29 RAISE 45,000 45,000 45,000 45,000 Road,just south of Contractors Creek Bridge.to Broders Road. CN 6/30 RAISE 5,821,000 5,821,000 5,821,000 5,821,000 Total=$6,151,000(FHWA) Total 6,251.000 0 0 0 6.251,000 0 0 100,000 325,000 5,826,000 0 6,251,000 (TBD) (TBD) Elsie Lopeman Trail Extension PE 6/27 _ PBP 1.75,000 175,000 50,000 120,000 5,000 175,000 N/A 33 A 0.45 mile trail extension through the County Sewer Treatment plant 28 P I N/A 0.45 R/W 0 0 property.Project is a link in the Tri-Area Active Trans.Network. CN 5/29 PBP 650,000 650,000 650,000 650,000 Total=$743,200(WSDOT) - - Total, 0 825,000 0 0 825,000 0 50,000 120,000 655,000 0 0 825.000 50360 MP 1.52 to MP 3.74 (TBD) Paradise Bay Road Overlay-Phase 2 PE 1/28 RAP 79,830 8.870 88,700 83,700 5,000 88,700 08 34 2R(Resurface 8 Restore)overlay of Paradise Bay Road 05 P E T-0 2.22 R/W - 0 0 from Andy Cooper Road to Teal Lake Road. CN 5/29 RAP 1,628,100 180,900 1,809,000 1.809.000 1,809,000 Total=$1,892,800(CRAB) Total 0 1,707,930 0, 189,770 1.897,700 0 0, 83,700 1,814,000 0 0 1,897.700 0 Countywide Safety Improvements PE 1/28 HSIP 90,000 10,000 100,000 50,000 50.000 100.000 N/A 35 Systemic safety countermeasures applied to county network identified 21 P E N/A N/A R/W 0 0 0 in a local plan and funded thru a bienniel WSDOT federal grant program CN 6/29 HSIP 850,000 0 850,000 850,000 850,000 Total HSIP=$950,000(FHWA)(10%Local match for PE only) Total 940,000 0 0 io,00rl. 950.000 0 0, 50,000 850,000 0 50,000 950.000 0 Countywide Bridge Heavy Maintenance Progress PE 1/26 BRR 48,000 22,000 70.000 10.000 30,000 30,000 70,000 N/A 36 Protection of pnmary bridge components,seismic retrofits,etc.through 48 P E N/A N/A R/W 0 0 a bienniel WSDOT administered federal grant program. CN 6/27 BRR 280,000 70,000 350,000 50,000 150,000 150,000 350,000 Total=$420,000 Total 328,000 0 0 92,000 420,000 /0,000 50,000 30,000 150,000 30,000 150,000 420,000 Countywide Various Road Improvements 0 Venous projects countywide involving lighting,signage,intersection PE 1/26 60,000 60,000 10,000 10,000 10.000 10,000 10,000 10,000 60,000 N/A 37 control,culvert replacement/rehabilitation,drainage,surfacing upgrades, N/A P E N/A N/A R/W 1/26 30,000 30,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000 pedestnan and bicycle facilities,or other improvements. CN 1/26 150,000 150,000 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Total=$240,000 _ Total 0_ 0 0 240,000 240,000 40,000 40,000 40,000 40,000 40,000 40,000 240,000 28,493,002 16,944,923 402,767 1,065,377 46,906,069 4,284,874 5,451,100 13,264,595 6,297,500 8,552,000 9,056,000 46,906,069 PE 3,357,843 2,345,598 0 195,209 5,898,650 1,214,900 834,300 1,412,450 1,475,000 885,000 75,000 5,896,650 R/W 269,900 273,500 0 77,000 620,400 291,000 109,400 5,000 120,000 90,000 5,000 620,400 CN 24,865,259 14,325,825 402,767 793,168 40,387,019 2,778,974 4,507,400 11,847,145 4,702,500 7,577,000 8,976,000 40,389,019 Total 28,493,002 16,944,923 402,767 1,065,377 46,906,069 4,284,874 5,451,100 13,264,595 6,297,500 8,552,000 9,056,000 46,906,069 Page 4 2026-2031 TIP Jefferson County 2026 (A) Total Est. Construction $2,544,626.00 Date of Final Adoption (B) Total Est. County Forces Construction $0.00 Ordinance/Resolution Number (C) Computed County Forces Limit $1,262,437.50 Road Information & Other Funding Projects Project Name Quilcene Complete Streets-Phase 1 PE&CE $60,000.00 Right of Way $o.00 6 Year Program Number 1 Construction Annual Program Number 1 Contract $948,117.00 County Forces $o.00 Project Type Code P&T-Paths,Trails,Bikeways,etc. Total $1,008,117.00 Road Number usio1 Road Name Highway 101 County Road Funds Amount $10,000.00 BMP 294.60 From 294.6 Other Amount $695,350.00 Program Source Ped/Bike-Pedestrian and Bicycle Program EMP 295.00 To 295 Other Amount $302,767.00 Program Source County-Other County Funds(Not Road) Completed Length 0.40 FFC 05-Rural Other Freeways and Expressways Project Name Lords Lake Loop Road-Slide Repair PE&CE $51,200.00 Right of Way $0.00 6 Year Program Number 2 Construction Annual Program Number 2 Contract $646,922.00 County Forces $o.00 Project Type Code Other-Other Total $698,122.00 Road Number 34230 Road Name Lords Lake Loop Road County Road Funds Amount $34,906.00 BMP 1.61 From x Other Amount $628,310.00 Program Source FEMA-Federal Emergency Management Agency EMP 1.62 To y Other Amount $34,906.00 Program Source WA-Misc State Miscellaneous Completed Length 0.01 FFC 09-Rural Local Access Project Name Shine Road-Slide Repair PE&CE $48,000.00 Right of Way $o.00 6 Year Program Number 3 Construction Annual Program Number 3 Contract $500,000.00 County Forces Project Type Code Other-Other Total $548,000.00 Road Number 50540 Road Name Shine Rd County Road Funds Amount $400.00 BMP 0.84 From x Other Amount $425,200.00 Program Source FEMA-Federal Emergency Management Agency EMP 1.59 To y Other Amount $100,000.00 Program Source County-Other County Funds(Not Road) Completed Length 0.75 FFC 09-Rural Local Access Other Amount $22,400.00 Program Source WA-Misc State Miscellaneous Project Name Little Quilcene River Bridge Replacement PE& CE $100,000.00 Right of Way $0.00 6 Year Program Number 4 Construction Annual Program Number 4 Contract $0.00 County Forces $o.00 Project Type Code BR-Short-span or Locally Funded Total $100,000.00 Road Number 93150 Road Name Center Rd. County Road Funds Amount $0.00 BMP 14.55 From x Other Amount $100,000.00 Program Source BR-Bridge Replacement/Bridge Rehabilitation Program EMP 14.70 To y Completed Length 0.15 FFC 07-Rural Major Collector Project Name Oil City Road Engineering Assessment-FLAP Project PE &CE $1,000.00 Right of Way $0.00 6 Year Program Number 5 Construction Annual Program Number 5 Contract so.00 County Forces $o.00 Project Type Code Other-Other Total $1,000.00 Road Number 13430 Road Name Oil City Rd. County Road Funds Amount $1,000.00 BMP 8.50 From x EMP 10.98 To y Completed Length 2.48 FFC 09-Rural Local Access Project Name Rhody Drive Ped-Bike Improvements-North Segment PE&CE $64,930.00 Right of Way $0.00 6 Year Program Number 6 Construction Annual Program Number 6 Contract $397,705.00 County Forces $0.00 Project Type Code P&T-Paths,Trails,Bikeways,etc. Total $462,635.00 Road Number SR19 Road Name Rhody Dr County Road Funds Amount $1,500.00 BMP 9.56 From x Other Amount $461,135.00 Program Source TAP(R)-Transportation Alternatives Program- EMP 10.10 To Y Rural Completed Length 0.54 FFC 05-Rural Other Freeways and Expressways Project Name Rhody Drive Ped-Bike Improvements-South Segment PE&CE $275,000.00 Right of Way $60,000.00 6 Year Program Number 7 Construction Annual Program Number 7 Contract $0.00 County Forces $0.00 Project Type Code P&T-Paths,Trails,Bikeways,etc. Total $335,000.00 Road Number SR19 Road Name Rhody Dr County Road Funds Amount $10,089.00 BMP 8.94 From x Other Amount $64,643.00 Program Source TAP(R)-Transportation Alternatives Program- Rural EMP 9.56 To y Completed Length 0.62 FFC 05-Rural Other Freeways and Expressways Other Amount $260,268.00 Program Source WA-Misc State Miscellaneous Project Name Olympic Discovery Trail-PS2P Project PE&CE $270,000.00 Right of Way $0.00 6 Year Program Number 8 Construction Annual Program Number 8 Contract $0.00 County Forces $0.00 Project Type Code P&T-Paths,Trails,Bikeways,etc. Total $270,000.00 County Road Funds Amount $0.00 Other Amount $270,000.00 Program Source Fed Misc-Miscellaneous Federal Sources Project Name Big Quilcene River Bridge Replacement Project PE&CE $10,000.00 Right of Way $0.00 6 Year Program Number 9 Construction Annual Program Number 9 Contract $0.00 County Forces $0.00 Project Type Code FA-Federal-Aid Bridge Total $10,000.00 Road Number 30130 Road Name Linger Longer Rd. County Road Funds Amount $0.00 BMP 0.42 From x Other Amount $10,000.00 Program Source Fed Misc-Miscellaneous Federal Sources EMP 0.43 To y Completed Length 0.01 FFC 09-Rural Local Access Project Name Port Townsend Gateway Project PE&CE $10,500.00 Right of Way $0.00 6 Year Program Number 10 Construction Annual Program Number 10 Contract Moo County Forces $0.00 Project Type Code IS-Intersection Total $10,500.00 Road Number SR20 Road Name State Route 20 County Road Funds Amount $10,500.00 BMP 9.56 From x EMP 9.82 To y Completed Length 0.26 FFC 05-Rural Other Freeways and Expressways Project Name Upper Hoh Road-Dolosse Monitoring PE&CE $41,600.00 Right of Way $0.00 6 Year Program Number 11 Construction Annual Program Number 11 Contract $0.00 County Forces $0.00 Project Type Code Other-Other Total $41,600.00 Road Number 91420 Road Name Upper Hoh Rd. County Road Funds Amount $0.00 BMP 3.50 From x Other Amount $0.00 Program Source Federal Lands Access Program-Discretionary EMP 7.80 To y Completed Length 4.30 FFC 07-Rural Major Collector Project Name Upper Hoh Road-ER Mitigation PE&CE $1,559.00 Right of Way $0.00 6 Year Program Number 13 Construction Annual Program Number 12 Contract $13,441.00 County Forces $0.00 Project Type Code K-Environmental Mitigation Total $15,000.00 Road Number 91420 Road Name Upper Hoh Rd. County Road Funds Amount $2,025.00 BMP 7.90 From x Other Amount $12,975.00 Program Source ER-Federal Emergency Relief-FHWA EMP 8.00 To y Completed Length 0.10 FFC 07-Rural Major Collector Project Name Upper Hoh Road Spruce Creek Mitigation PE&CE $1,559.00 Right of Way $o.00 6 Year Program Number 14 Construction Annual Program Number 13 Contract $13,441.00 County Forces Moo Project Type Code K-Environmental Mitigation Total $15,000.00 Road Number 91420 Road Name Upper Hoh Rd. County Road Funds Amount $2,025.00 BMP 9.70 From x Other Amount $12,975.00 Program Source ER-Federal Emergency Relief-FHWA EMP 9.80 To y Completed Length 0.10 FFC 07-Rural Major Collector Project Name Donkey Creek Tributary Culvert Replacement,Clearwater Road PE&CE $6,000.00 Right of Way $0.00 6 Year Program Number 15 Construction Annual Program Number 14 Contract $0.00 County Forces $0.00 Project Type Code DR-Drainage Structure Total $6,000.00 Road Number 10750 Road Name Clearwater Rd. County Road Funds Amount $0.00 BMP 1.35 From x Other Amount $6,000.00 Program Source Fed Misc.Miscellaneous Federal Sources EMP 1.36 To y Completed Length 0.01 FFC 08-Rural Minor Collector Project Name Oil City Rd.-Unnamed Tributary Culvert Replacement PE&CE $8,500.00 Right of Way $26,000.00/ 6 Year Program Number 16 Construction Annual Program Number 15 Contract $0.00 County Forces $o.00 Project Type Code DR-Drainage Structure Total $34,500.00 Road Number 13430 Road Name oil City Rd. County Road Funds Amount $o.00 BMP 6.73 From x Other Amount $34,500.00 Program Source Fed Misc-Miscellaneous Federal Sources EMP 6.74 To y Completed Length 0.01 FFC 09-Rural Local Access Project Name Oil City Rd.-Six Mile Creek Culvert Replacement PE&CE $2,500.00 Right of Way $26,000.00 6 Year Program Number 17 Construction Annual Program Number 1s Contract $0.00 County Forces $0.00 Project Type Code BR-Short-span or Locally Funded Total $28,500.00 Road Number 13430 Road Name oil City Rd. County Road Funds Amount $o.00 BMP 5.96 From x Other Amount $28,500.00 Program Source Fed Misc-Miscellaneous Federal Sources EMP 5.97 To y Completed Length 0.01 FFC 09-Rural Local Access Project Name Upper Hoh Road Pavement Preservation-FLAP Project PE&CE $0.00 Right of Way $2,000.00 6 Year Program Number 18 Construction Annual Program Number 17 Contract $0.00 County Forces $0.00 Project Type Code 2R-Resurface and Restore Total $2,000.00 Road Number 91420 Road Name Upper Hoh Rd. County Road Funds Amount $2,000.00 BMP 0.00 From x EMP 12.04 To y Completed Length 12.04 FFC 07-Rural Major Collector Project Name Upper Hoh Road Bank Stabilization-FLAP Project PE&CE $2,000.00 Right of Way $45,000.00 6 Year Program Number 19 Construction Annual Program Number 18 Contract $0.00 County Forces $o.00 Project Type Code Other-Other �� Total $47,000.00 Road Number 91420 Road Name Upper Hoh Rd. County Road Funds Amount $47,000.00 BMP 7.90 From x EMP 8.20 To y Completed Length 0.30 FFC 07-Rural Major Collector Project Name Oil City Rd.Culvert Replacement(Bridge)MP 0.5-FLAP Project PE & CE $5,400.00 Right of Way $0.00 6 Year Program Number 20 Construction Annual Program Number 19 Contract $0.00 County Forces $0.00 Project Type Code DR-Drainage Structure Total $5,400.00 Road Number 13430 Road Name oil City Rd. County Road Funds Amount $5,400.00 BMP 0.50 From x EMP 0.51 To y Completed Length 0.01 FFC 09-Rural Local Access Project Name Center Road Culvert Correction-Chimacum Creek PE & CE $265.000.00 Right of Way $14,000.00 6 Year Program Number 21 Construction Annual Program Number 20 Contract $0.00 County Forces $0.00 Project Type Code DR-Drainage Structure Total $279,000.00 Road Number 93150 Road Name Center Rd. County Road Funds Amount $0.00 BMP 3.23 From x Other Amount $237,150.00 Program Source FBRB-Fish Barrier Removal Board EMP 3.24 To y Other Amount $41,850.00 Program Source NFPP-National Fish Passage Program Completed Length 0.01 FFC 07-Rural Major Collector Project Name Paradise Bay Road Overlay PE&CE $60,000.00 Right of Way $0.00 6 Year Program Number 22 Construction Annual Program Number 21 Contract $0.00 County Forces $0.00 Project Type Code 2R-Resurface and Restore Total $60,000.00 Road Number 50360 Road Name Paradise Bay Rd County Road Funds Amount $6,000.00 BMP 3.74 From x Other Amount $54,000.00 Program Source RAP-County Road Administration Board Rural Arterial Program EMP 6.00 To y Completed Length 2.26 FFC 08-Rural Minor Collector Project Name West Valley Road Safe Routes to School Project PE&CE $212,000.00 Right of Way $35,000.00 6 Year Program Number 23 Construction Annual Program Number 22 Contract $0.00 County Forces $0.00 Project Type Code P&T-Paths,Trails,Bikeways,etc. Total $247,000.00 Road Number 51410 Road Name West Valley Road County Road Funds Amount $0.00 BMP 0.00 From x Other Amount $247.000 00 Program Source SRTS-Safe Routes to School EMP 0.21 To y Completed Length 0.21 FFC 09-Rural Local Access Project Name Duckabush Estuary Restoration-Realignment Project PE&CE $1,500.00 Right of Way $0.00 6 Year Program Number 24 Construction Annual Program Number 23 Contract $0.00 County Forces $o.00 Project Type Code Other-Other Total $1,500.00 Road Number uslo1 Road Name Hwy 101 County Road Funds Amount $1,500.00 BMP 309.88 From x EMP 310.50 To y Completed Length 0.62 FFC 05-Rural Other Freeways and Expressways Project Name Snell Creek Culvert Replacement,Upper Hoh Road PE&CE $1,000.00 Right of Way $0.00 6 Year Program Number 25 Construction Annual Program Number 24 Contract $0.00 County Forces $o.00 Project Type Code DR-Drainage Structure Total $1,000.00 Road Number 91420 Road Name Upper Hoh Rd County Road Funds Amount $0.00 BMP 2.74 From x Other Amount $1,000.00 Program Source Fed Misc-Miscellaneous Federal Sources EMP 2.75 To y Completed Length 0.01 FFC 07-Rural Major Collector Project Name Rick Tollefson Trail-Ballfield Connection PE&CE $1,000.00 Right of Way $0.00 6 Year Program Number 26 Construction Annual Program Number 25 Contract $o.00 County Forces $o.00 Project Type Code PM--Paths,Trails,Bikeways,etc. Total $1,000.00 County Road Funds Amount $1,000.00 Project Name Tarboo Creek Culvert Replacement PE&CE $5,000.00 Right of Way $0.00 6 Year Program Number 27 Construction Annual Program Number 26 Contract $0.00 County Forces $o.00 Project Type Code BR-Short-span or Locally Funded Total $5,000.00 Road Number 40390 Road Name Coyle Rd. County Road Funds Amount $750.00 BMP 1.15 From x Other Amount $4,250.00 Program Source FBRB-Fish Barrier Removal Board EMP 1.23 To y Completed Length 0.08 FFC 08-Rural Minor Collector Project Name Oil City Road-Ruby Creek Culvert Replacement PE&CE $1,000.00 Right of Way $0.00 6 Year Program Number 28 Construction Annual Program Number 27 Contract $0.00 County Forces Moo Project Type Code BR-Short-span or Locally Funded Total $1,000.00 Road Number 13430 Road Name Oil City Rd. County Road Funds Amount $1,000.00 BMP 8.76 From x EMP 8.77 To y Completed Length 0.01 FFC 09-Rural Local Access Project Name Oil City Road MP 8.8-8.9 Permanent Repair PE&CE $1,000.00 Right of Way $0.00 6 Year Program Number 29 Construction Annual Program Number 28 Contract $0.00 County Forces $0.00 Project Type Code Other-Other Total $1,000.00 Road Number 13430 Road Name oil City Rd. County Road Funds Amount $1,000.00 BMP 8.80 From x EMP 8.90 To y Completed Length 0.10 FFC 09-Rural Local Access Project Name Countywide Bridge Heavy Maintenance Program PE&CE $10,000.00 Right of Way $0.00 6 Year Program Number 36 Construction Annual Program Number 29 Contract $0.00 County Forces $o.00 Project Type Code BR-Short-span or Locally Funded Total $10,000.00 County Road Funds Amount $10,000.00 Project Name Countywide Various Road Improvements PE&CE $10,000.00 Right of Way $5,000.00 6 Year Program Number 37 Construction Annual Program Number 30 Contract $25,000.0o County Forces $0.00 Project Type Code Other-Other Total $40,000.00 County Road Funds Amount $40,000.00 2026-Annual Maintenance Plan Descriptions Annual Accomplishment Plan Labor Per Equipment Materials Cost Year Per Year Per Year Days of Labor Per Equipment Per Total Misc Work Code Work Description Annual Accomplishment Materials Per Annual Cost Accomplishment Year Year Year $ 1.00 110 Preliminary Engineering 20 Days 20 r$ 15,000 �$ - �$ - $ 12,000 $ 27,000 115 Pavement Management 10 1Days 10 '$ 10,000 v'$ 2,000 IP$ - $ - $ 12,000 300 Undstributed Equip.Rental 250 Days 250 �$ - '$ 300,000 P$ - $ - $ 300,000 301 Misc.Contracted Services 6 1Days 6 $ - r$ - r$ $ 2,700 $ 2,700 320 Asphalt Hand Patching 100 Tons 33 IP$ 112,667 '$ 31,667 IP$ 12,500 $ - $ 156,833 330 Crack Sealing 10IP-CrewDays 10 r$ 40,000 '$ 2,000 '$ 3,375 $ 2,500 $ 47,875 340 Grading Gravel Roads 250 Road Miles 83 P.$ 155,000 r$ 171,667 l'$ 110,000 $ - $ 436,667 350 Dust Control 40 r Road Miles 4 '$ 2,480 r$ 1,400 P$ - $ - $ 3,880 360 Shoulder Spot Repairs 12 Crew Days 12 '$ 33,120 P$ 12,600 '5 5,280 $ - $ 51,000 370 BST Seal Coating 220,000 Square Yards 15 '$ 119,240 r$ 179,6671.$ 385,000 $ - $ 683,907 380 Asphalt Pre Leveling 350 Tons 18 '$ 72,275 r$ 58,625 r$ 35,000 $ - $ 165,900 385 Pavement Digout/Machine 500 Tons 17 '$ 89,500 r$ 55,000 P$ 70,083 $ 41,667 $ 256,250 390 Fog Sealing 220,000 r Square Yards 7 IP$ 22,293 P$ 11,733 yr$ 73,333 $ - $ 107,360 410 Spot Ditching 30 Crew Days 30 '$ 120,000 '$ 79,500 P$ - $ - $ 199,500 412 Catch Basin Cleaning 40 Each 7 r$ 19,533 '$ 9,000 '$ - $ - $ 28,533 420 Grader Ditching 45 r Shoulder Mile 30 '$ 123,900 r$ 108,000 P$ - $ - $ 231,900 420 Shoulder Grading 65 r Shoulder Mile 7 '$ 26,000 '$ 24,700 '$ - $ - $ 50,700 430 Culvert Maint. 100 Each 33 r$ 112,667 1..$ 65,000 '$ - $ - $ 177,667 440 Install Culverts 250 1 Linear Foot 8 '$ 31,292 '$ 16,667 r$ 24,083 $ - $ 72,042 450&460 Stream&Flood Control 15 Sites 3 '$ 6,420 '$ 6,450 '$ - $ - $ 12,870 470 Install Curbs 50 1 Linear Foot 1 '$ 1,690 '$ 800 P$ 335 $ - $ 2,825 480 Install Catch Basins 2 Each 2 '$ 6,270 '$ 4,000 '$ 900 $ - $ 11,170 500(all) Bridge Maintenance 7 Each 14 '$ 29,960 '$ 2,800 '$ 1,400 $ - $ 34,160 610&620 Sidewalks and Paths 15 Each 15 '$ 32,100 '$ 15,750 '$ 7,500 $ - $ 55,350 630 Street Lighting 365 Days 365 '$ - r$ - •$ $ 14,600 $ 14,600 640 Roadway Signage 750 Each 188 'S 346,875 '$ 75,000 1r$ 37,500 $ - $ 459,375 641 Roadway Striping 200Road Mile 7 '$ 6,167 P$ - P$ 126,667 $ 150,000 $ 282,833 641 RPM's 2 Road Mile 0 '$ 220 '$ - �$ - $ 1,200 $ 1,420 642 Guardrail Repair 200 r Linear Foot 4 r$ 16,000'$ 4,200 '$ 2,000 $ 2,000 $ 24,200 660 De-Ice/Sanding 1,200 v Man Hours 15 '$ 74,400 '$ 93,000 �$ 108,000 $ - $ 275,400 660 Snow Plowing 800 Man Hours 10 $ 49,600 $ 44,000 $ - $ - $ 93,600 670 Roadway Sweeping(Elgin) 250 Lane Mile 25 $ 15,500 $ 25,000 $ - $ - $ 40,500 670 Roadway Sweeping(Broce) 1,000 Lane Mile 50 $ 31,000 $ 22,500 $ - $ - $ 53,500 671 Storm Cleanup 35 Crew Days 35 $ 262,850 $ 211,750 $ - $ - $ 474,600 710 Mowing 2,500 Shoulder Mile 167 $ 103,333 $ 75,000 $ - $ - $ 178,333 720 Machine Brushcutting 225 Shoulder Mile 281 $ 364,219 $ 154,688 $ - $ - $ 518,906 730 Manual Brush/Weed Control 20 Crew Days 20 $ 9,000 $ - $ - $ - $ 9,000 740 Tree Trimming 500 Hours 50 $ 169,000 $ 45,000 $ - $ - $ 214,000 760 Road Slide/Washout Repair 10 Days 10 $ 33,800 $ 26,500 $ 8,000 $ - $ 68,300 770 Landscape Maintenance 15 Days 15 $ 6,750 $ 4,800 $ 1,500 $ - $ 13,050 780 Litter Patrol 10 Days 10 $ 9,000 $ 2,000 $ - $ - $ 11,000 910&913 MaintenanceAdmin./Super. 170 Days 170 $ 378,250 $ - $ - $ 102,000 $ 480,250 930 Accounting 200 Days 200 $ 88,000 $ - $ - $ - $ 88,000 940&950 Staff Training 200 Days 200 $ 124,000 $ - $ - $ - $ 124,000 960 Staff Meetings 5 Each 5 $ 70,850 $ - $ - $ - $ 70,850 980-990 Radios&Tools 250 Days 250 $ - $ - $ - $ 25,000 $ 25,000 Legend Fillable Cell Total Annual Units $ 3,340,220 $ 1,942,463 $ 1,012,457 $ 353,667 $ 6,648,806 Formula Formula Locked Annual Cells Approx.FTE's 32.2 ,O N co Department of Public Works 623 Sheridan Street Port Townsend,WA 98368 i.�, ,:� ,►,O Jefferson County, Washington 360-385-9160 MEMORANDUM To: Board of County Commissioners From: Monte Reinders, P.E., Public Works Director/County Engineer Date: 9/16/2025 Subject: 2026 Annual Roads Equipment Purchase/Replacement Plan In accordance with RCW36.81.130 and Ch. 136-16-030 WAC, the following Roads equipment replacement/purchase plan is submitted as part of the 2026 Annual Road Program. r Department Item Description New/Replace Unit Cost JCSO Ford Explorer Interceptor(#941) R $ 90,000 JCSO Ford Explorer Interceptor(#991) R $ 90,000 Roads Wheeled Brush Cutter(#892/893) R $ 300,000 Roads Simex Asphalt Float Attachment R $ 25,000 Roads TKT5OLP Trailer N $ 60,000 Roads Ford F-450 Sign Truck(#917) R $ 100,000 Roads 5-Yard Chipper Box(#965) R $ 25,000 Roads Brush Cutter Head for Case 145 (#1012) R $ 40,000 Parks John Deere Mower(#844) R $ 60,000 JV Ford Explorer(funding from JV) N $ 70,000 Total: $ 860,000 • , A „ -;.:',-•-.' ., .....• • •, • .. '',„,"...•.- • i,• t. ,., •, , -,• .:.•0 •igi t. ,, ,., . ... N. / -. . — 4..........., •-, r 1. - • -••• • - • •••• , - .‘,, . 17.7iit• :-. ...E.. 1...ac:-.• --,;, = 'dr AL Ir: ^ •. A Irtiq- - '," , '4 I' .., 1 c • i . *, w ... 101 1 k • . , . •. .,. , •• . .,.., _ ....„ _ ..., „.• ... „, I ...., ,. . .... ....„ . . , . ., . , , .. -.,.. . ...... ..: ..., i .,. ' ... „ . • 1.1' op, • t . . -, _r , . ._.., I- '4.-- - tir,: _ . i _ ......- ,•• ... • , , . 1 •a. _ 4.-- • mr illgi- • • - .. .0:-..• - •,,,iii" - . . If „... -,.. JP It . ... • J, . .. . 1 • • • . INJ€ '' •• 1 ..- .., 4114.•.1.- se A.Pls.., "t 1• OA t•-•34:71 • • ... •-Cr lk ..... OIL. 411,•''' . • C Bridge 0 4-0 C V) rti Condition > 4-0 = k-- Report I N 0\ 0 VI 2025 4- 4- Q.)L_ a) —t JEFFERSON COUNTY 2025 ANNUAL BRIDGE CONDITION REPORT o�Z M 13&4, t.of WAS ° ti co 9N \= ;' z 1fr t`Y STEREO G��� Approved by: °NAL EN A4> Monte Reinders, P.E. Public Works Director/County Engineer Prepared by: 7 3 %cam, . 9— I5-ZS Mark Thurston, P.E. Lead Bridge Inspector/ Engineer IV As required by WAC 136-20-060, "Each county INTRODUCTION engineer shall furnish the county legislative authority with a written report of the findings of the bridge inspection effort. This report shall be made available to said authority and shall be consulted during the preparation of the proposed six-year transportation program revision. The report shall include the county engineer's recommendations as to replacement, repair or load restriction for each deficient bridge. The resolution of adoption of the six-year transportation program shall include assurances to the effect that the county engineer's report with respect to deficient bridges was available to said authority during the preparation of the program. It is highly recommended that deficient short span bridges, drainage structures, and large culverts be included in said report." Jefferson County Public Works has 38 active bridges— BRIDGE INVENTORY see the attached Master Bridge List (Appendix A) for a listing of the county bridges. Of these, 36 bridges meet the federal definition of a bridge and are subject to the National Bridge Inspections Standards. Two of the bridges do not meet the federal bridge definition, one because it is a pedestrian bridge, and one because it has less than a twenty-foot span; nevertheless, these two bridges are on Jefferson County's biennial bridge inspection program. Jefferson County Types of Bridges in Jefferson County also has two permanently closed 14 bridges. 12 10 a 6 4 0 III MIi ec ap a° 4' ec c' ec ec e2 e'y�o� a�o� \<cc ��\ `<bo+ \fie, � oce. e��c �o�o_ Lo° J\�\Q eyy Qe 5y ece cce �c QceS Lo 2025 Bridge Condition Report - 3 - The National Bridge Inspection Standards (NBIS) and BRIDGE INSPECTIONS WAC 136-20-030 mandate that public agencies inspect and report on all bridges at least once every two years (routine inspection).Jefferson County staff performs all routine inspections.Special inspections are required for bridges that cannot be inspected adequately from the ground. For these bridges an Under-Bridge Inspection Truck (UBIT) is required. Steel bridges with fracture critical members may also require special inspections with the UBIT and/or other special equipment. Jefferson County has two bridges which require the UBIT inspection and one bridge which requires both the UBIT and the fracture critical inspection (identified in the attached Master Bridge List). Jefferson County currently has a contract with the Washington State Department of Transportation (WSDOT) to perform these inspections. Jefferson County Public Works has split up the bridge inspections so that East Jefferson County bridges are inspected in odd-numbered years and West Jefferson County bridges are inspected in even-numbered years. In conformance with that schedule, Jefferson County completed the biennial inspections for all East Jefferson County bridges in 2025. The completed inspection reports were submitted to Bridge Age by Decade WSDOT, which verifies compliance 10 with the NBIS and 9 reports to the 8 Federal Highway 7 Administration 6 (FHWA). 5 4 3 2 1 0 1950-1959 1960-1969 1970-1979 1980-19891990-1999 2000-2009 2010-2019 2020-2029 2025 Bridge Condition Report - 4 - For the past twenty-plus years, all bridges were DEFICIENT BRIDGES assigned a sufficiency rating (SR), which was a calculated score based on numbers assigned to all of the bridge elements reviewed by the bridge inspector. The SR was a number from 0 to 100, with 100 being an entirely sufficient bridge, and 0 being an entirely insufficient bridge. The sufficiency rating was used to determine if a bridge was eligible for federal re- habilitation or replacement funding. WSDOT has phased out the Sufficiency Rating. Two other bridge condition designations, "structurally deficient" and "functionally obsolete" have also been phased out. WSDOT is now using the overall condition codes for deck, superstructure, and substructure, as well as the inventory rating factor, and the waterway adequacy rating to compare bridges for funding eligibility. Currently, the county has one bridge that is considered to be deficient and eligible for bridge replacement funds. This is the Little Quilcene River Bridge on Center Road, which was funded in 2021 and design is underway. POSTED BRIDGES All bridges are required to �;i• • _ ____ __, have a "Load Rating" . .^ ,� r., ,h calculation. The Load Rating 'f '- ,, establishes how much weight 1 I9 =the bridge can carry for t�` xr. several standard _-_- configurations of vehicle axle ) ' loads. If the load rating 4 �` ' calculation shows that a ,`A bridge cannot safely carry one . , or more of the legal vehicle axle load configurations, then ', ,' ` the bridge must be posted Tarr Bridge with the appropriate load limits. Jefferson County currently has five bridges that are load posted, Little Quilcene Bridge on Center Road, Yarr Bridge on Center Road, Meyers Bridge on Belfrage 2025 Bridge Condition Report - 5 - Road, Hemphill Creek Bridge on Dowans Creek Road, and Fletcher Creek Bridge on Quinault South Shore Road. In 2019 Public Works developed a new form and OVERWEIGHT/ process for evaluating and issuing overweight/ OVERSIZE VEHICLE oversize vehicle permits. A policy was written to help PERMITTING PROCESS ensure that consistent procedures are used in processing permits, and a new, more detailed application form was developed. The new application form, along with associated webpage updates, was deployed in 2019 and has been used successfully to issue permits. In 2024-2025, the responsibility for handling and processing overweight/oversize permits was transferred from the Road Maintenance Dept. to the Engineering Dept. The Old Little Quilcene River Bridge and the Maple OBSOLETE BRIDGES Creek Bridge have been placed in obsolete status and removed from the Master Bridge List. Both are permanently closed to vehicular traffic. This action removed the requirement for biennial bridge inspection. Routine maintenance of the county's bridges is MAINTENANCE conducted by the road maintenance department. ACTIVITIES Typical routine maintenance consists of deck cleaning, brush clearing, and minor miscellaneous repairs. In August 2024, a small sinkhole was discovered by the Jefferson County Road Maintenance Dept. in the south bridge approach to the Yarr Bridge, immediately adjacent to the bridge abutment. The Road Maintenance Dept. immediately performed a repair, which consisted of digging up the road adjacent to the bridge abutment, filling the hole in with quarry spalls, and patching the surface with asphalt. 2025 Bridge Condition Report - 6 - During the fall of 2024, the County Road Maintenance Dept. repaired erosion at the Donovan Creek Bridge, where the approach roadway shoulder and guardrail had previously been undermined by wave action. The erosion was repaired by replacing the rock armoring along the embankment slope. The Old Tarboo Bridge at Tarboo Creek on Old Tarboo Road has an ongoing maintenance issue associated with beaver dam construction directly underneath the bridge. Beavers were removed multiple times over the last few years, but appear to not be coming back now. Beaver dam material has also been removed from underneath the bridge multiple times. Since the last removal, there has been no additional beaver dam construction and the stream is flowing freely under the bridge. On the topside of the bridge, one bridge rail terminal and rail section is scheduled to be replaced due to collision damage. In April 2019, the County applied for $90,830 through the WSDOT/FHWA federal bridge replace- ment/rehabilitation program for a preventative maintenance project on the Hurst Creek Bridge, Clearwater Road milepost 2.66. The Hurst Creek Bridge has concrete girders with steel diaphragms between the girders at mid-span. The steel diaphragms are in need of repainting or replacement. In September 2019 we learned the project is not eligible for funding. An alternative funding source has not been found yet. The asphalt surface on Contractor's Creek Bridge at Old Gardiner Road was fog sealed during the summer of 2025. This helps seal the surface and prevent water damage to the underlying wood superstructure. No emergency repairs or inspections were performed EMERGENCY REPAIRS in 2024-2025 as of the time of this report. AND INSPECTIONS 2025 Bridge Condition Report - 7 - F 4 ; ,• t ••ft: 1.1 `, COMPLETED 1 0,rIs' fi`� .i PROJECTS , "` a.. - ihr -, . ` ,.mow `.� „-w a ,'fy.+ Y ;>� i, , N.- • _ ' _.+tea, i. New bridge at Upper Hob Road MP 4.38 (May 2024)) Current projects include the following: CURRENT PROJECTS The Little Quilcene River Bridge , - -o- Replacement project on Center Road I 1/• _—-_--._.- was funded in 2021 for design and t `r _ - - ~'' T - construction through the WSDOT/ t _ — • FHWA federal bridge replacement ----��. - program. The Little Quilcene River - _- ' _ __ Bridge is structurally deficient, and is __ load posted. The project is currently in F = �' y-- the preliminary design and permitting , 1 —.�._ 1- phase. The proposed new structure , - will be a 128.5 ft. span concrete girder __ - e moon bridge. Construction was originally ,,: ' -- --�-- �---� . _ "`IRAN/omit MINOR scheduled for 2025, but due to Little Quilcene River Bridge Replacement 2025 Bridge Condition Report - 8 - permitting delays construction is now planned for 2027 or 2028. Trout Unlimited has secured funding through NOAA, including design and construction, to replace multiple fish-barrier culverts in West Jefferson County. These projects include culvert replacements at Upper Hoh Road milepost 1 .24 (Tributary to Hell Roaring Creek), Upper Hoh Road milepost 2.74 (Snell Creek), Upper Hoh Road milepost 4.93 (Lindner Creek), Clearwater Road MP 1 .35 (Donkey Creek Tributary), Oil City Road MP 5.96, and Oil City Road MP 6.73. The new structures at all of these sites will be close to or greater than 20 ft. span, the minimum span to be federally classified as a bridge. The Upper Hoh Road MP 1 .24 project will be constructed during the summer of 2025. The remaining projects are in the preliminary design phase, and are scheduled for construction in 2026 and beyond. The Jamestown S'Klallam Tribe secured a 25 million dollar RAISE grant and combined it with $14 million from the Tribal Bridge Program, and is working with the Hood Canal Salmon Enhancement Group to replace the Linger Longer Bridge with a new 1 ,140 foot long bridge over the Big Quilcene River. Construction of this project started in May 2025, with completion planned by June 2026. Under separate contract, the project also includes restoration of the Big Quilcene River, which is occurring simultaneously with the bridge replacement. Public Works will be replacing the culvert at Center Road milepost 3.26 (Chimacum Creek) with a fish- passable structure, which will most likely meet the criteria for a bridge, given the stream width. Public Works secured 100% funding in 2024 through the FBRB and the National Fish Passage Program to fund the design phase of this project. Public Works has hired 2025 Bridge Condition Report - 9 - a consultant and is starting the preliminary design phase. After the design is completed, it will be used to apply for construction funding. As part of the Rhody Drive Ped-Bike Improvements project planned for construction in 2026, a new pedestrian bridge will be constructed over Chimacum Creek. In addition to Current Projects, the following bridge PROGRAMMED projects will be programmed in the 2026-2031 PROJECTS Transportation Improvement Program (TIP): Public Works is pursuing bridge replacement as a remedy for the load restrictions at Yarr Bridge. In 2024 Public Works applied to the Washington State Freight Mobility Strategic Investment Board for bridge replacement grant, but was not selected. In 2025, Public Works determined that based on the current funding criteria, the Yarr Bridge was not eligible for the WSDOT Local Bridge Program Call for Projects for federal bridge replacement funding. Public Works will continue to seek funding sources for bridge replacement, or other remedies for the load posting. Two or more heavy maintenance projects are RECOMMENDED anticipated during the period 2026-2031 , and are PROJECTS identified as Countywide Bridge Improvements in the TIP. With 38 bridges in its inventory, and half of them around 50 years old, the county has to plan and budget for ongoing maintenance, in addition to capital projects. Potential maintenance projects include pile bracing/stiffening at Contractor's Creek Bridge, repainting of the steel girders at Cassel Creek Bridge, and Hurst Creek Bridge steel diaphragm repainting/ replacement, as described under maintenance activities. 2025 Bridge Condition Report - 10 - APPENDIX A Jefferson County Public Works Master Bridge List LAST UPDATED: 5/12/25 Total number of open,active bridges: 38 Total number of West Jefferson County bridges: 21 NBI reportable bridges 1 short-span(non NBI)bridge Total number of East Jefferson County Bridges 15 NBI-reportable bridges 1 pedestrian(non NBI)bridge Permanently closed bridges: Old Little Quilcene River Bridge(East Jefferson Co.) Maple Creek Bridge(West Jefferson Co.) Jefferson County Public Works Master Bridge List East Jefferson County Last Updated:5/12/2025 a w m z C C z z a m p a ;.,4F :4 BRIDGE TYPE U cn F 0 L'�0W R F m.F a w I- U i- Q OyZ z a cii a o cn Q ae Q O OdQ Q V A tez j A"64 i < a c.° °o a aa z x ..4 a 00 4 g Superstructure Substructure 7996700 15E Hunts 634509 Hunt Rd. 0.15 27 Reinforced Conc. Conc.Abutment w/ 1971 4/24/25 F 24 Slab C.I.P.conc.piles 8165100 16E Little 931507 Center Rd. 14.6 64 Reinforced Conc. Conc.Pile cap, 1955 4/17/25 F 24 Bridge replacement funded in Quilcene Slab,Conc.Girder Prestress.Conc. X 2021. River piles 8464900 17E Yarr 931507 Center Rd. 3.44 25 Conc.Multiple Web Conc.Abutment w/ 1955 4/17/25 F 24 Girder Prestress.Conc. X piles 8320300 23E Linger 301309 Linger 0.42 81 Prestress.Conc. Conc.Abutment w/ 1969 4/17/25 F 24 Longer Longer Rd. Bulb-T Girder Conc.column over C.I.P.conc.piles 8381400 24E Rocky 250008 Dosewallips 3.01 47 Prestress.Conc. Conc.Abutment w/ 1964 4/17/25 F 24 Brook Rd. Bulb-T Girder Conc.Spread _ footing 8229900 25E Meyers 503409 Belfrage 0.12 30 Timber Timber abutment, 1977 X 6/30/21 F 24 Rd. timber piles 8488200 26E West Uncas 500209 West Uncas 1.89 61 Reinf.Conc.Slab Conc.Abutment, 1964 4/17/25 F 24 Rd. Conc.column over C.I.P.cons.pile 8136900 28E Leland 344009 Rice Lake 0.33 32 Prestress.Conc. Conc.Abutment, 1987 4/17/25 G 24 Creek Rd. Slab Conc.spread footing _ _ 8660000 29E Contractors 501409 Old 3.56 294 Timber Deck, Conc.Pile cap,steel 2000 7/10/24 G 24 UBIT EVERY 4 YEARS-- Creek Gardiner Timber Girders piles LAST UBIT 7/10/2024 Rd. 8754000 31E Shine Creek 447608 South Point 0.25 70 Prestress.Conc. Conc.Abutment w/ 2005 4/17/25 G 24 Rd. Slab Conc.Pile 8753900 32E Donovan 327508 E Quilcene 0.77 70 Prestress.Conc. Conc.Abutment w/ 2006 4/17/25 G 24 Creek Rd. Slab Conc.Pile Page 1 of 2 Jefferson County Public Works Master Bridge List East Jefferson County Last Updated:5/12/2025 m w m z w z 0 O } �., z z a U w O -. u W BRIDGE TYPE F x t:: O O' Q G O a m cc Pw a c) o z °' a. am w V v F z z X X E- a rn - ,_, Q C a 5 . 7 U O w .: F" = w w a cZ O W z w o a) 7 u C CC0z a a e a z < g o o O - O 7 o © a - aa z , wz aa O ? E Superstructure Substructure 8753800 33E Old Tarboo 357509 Old Tarboo 0.88 42 Prestress.Conc. Conc.Abutment w/ 2005 4/17/25' G 24 Rd. Slab steel piles 8753800 38E Andrews 352909 Snow Creek 3.78 24 Conc.3-sided Box Conc.Spread 2014 4/17/25. G 24 Creek Rd. Culvert Footing 8898600 41E RTMT 352909 Rick 0.17 80 Steel Thru Truss Conc.Spread 2017 4/24/25 G 24 Pedestrian bridge-not reported Pedestrian Tollefson Footing ' to NBI Mem.Trail 8902400 42E Wally 500209 West Uncas 0.81 80 Prestress.Conc. Conc.Abutment w/ 2018 4/17/25 G 24 Bowman Rd. Bulb-T Girder Conc.Pile 8934300 44E Thomdyke 418708 Thorndyke 4.71 35 Prestress.Conc. Conc.Spread 2022 4/17/25 G 24 Creek Rd. Slab Footing Page 2 of 2 Jefferson County Public Works Master Bridge List West Jefferson County Last Updated:5/12/2025 a as w 0 >• 4 U U z z a a a F a C.; F., O O ' BRIDGE TYPE . 0WW F al Z 0.p £ kj E O d`n U Vz F w w a O z ' o a 4• mz o x E. a a ° < z Q s - o WA X z 0O OiO ° io °z a a , a z Superstructure Substructure 8451600 01W Fletcher 911607 Quinault S. 3.19 78 Prestress.Conc.Bulb•Conc.Abutment w/ 1974 5/7/24 G 24 Creek Shore Rd. T Girder C.I.P.conc.pile X 8258500 02W Barlow 134309 Oil City Rd. 9.75 64 Prestress.Conc.Slab Conc.Abutment w/ 2005 5/7/24 G 24 C.I.P.Conc.Pile 8145800 03W Anderson 134309 Oil City Rd. 4.44 87 Prestress.Conc.Bulb.Conc.Abutment w/ 1974 5/7/24 F 24 + Creek T Girder C.I.P.conc.pile 8280100 04W Hell Roaring 914207 Upper Hoh 0.16 120 Prestress.Conc. Conc.Abutment w/ 1982 5/8/24 G 24 Creek Rd. Girder steel H pile 8298800 05W Alder Creek 914207 Upper Hoh 2.07 67 Prestress.Conc.Bulb.Conc.Abutment w/ 1972 5/8/24 G 24 Rd. T Girder C.I.P.conc.pile 8383600 06W Rock Creek 914207 Upper Hoh 6.49 83 Prestress.Conc.Bulb•Conc.Abutment w/ 1973 5/8/24 F 24 Rd. T Girder C.I.P.conc.pile 8934200 07W Tower Creek 914207 Upper Hoh 7.5 120 Prestress.Conc.Bulb.Open-ended steel 2022 5/8/24 G 24 Bridge replaced in 2022 Rd. T Girder pipe piling 8391000 08W Queets River 107509 Clearwater 0.6 844 Steel Plate Girder, Conc.Piers,Conc. 1988 7/9/24 G 24 UBIT EVERY 4 YEARS-- Rd. C.I.P.conc.deck Abutment w/steel H LAST UBIT 7/9/2024 pile 8047800 09W Hemphill 146809 Dowans 2.3 31 Timber Deck, Timber abutment, 1977 5/7/24 F 24 Creek Creek Rd. Timber Girders timber piles X Page 1 of 3 Jefferson County Public Works Master Bridge List West Jefferson County Last Updated:5/12/2025 a W as W a z o z c Fe BRIDGE TYPE F < pdU W z A • as a F g U A 0 z a A m W W F" U P E.W o . („) U z W .. E- Z z ' x U W Wd. V x Ii W 0 A W . o z ` e . a z . "a o . ) ,4Oo mo W 0 . O 0 W W C U 0 . 0> k X W w c.) z a a 7 . .a >4 w vi .4 a a o .. Superstructure Substructure 7966600 IOW Dowans 146809 Dowans 0.52 81 Prestress.Conc.Bulb.Conc.Abutment w/ 1974 5/9/24 F 24 Creek Creek Rd. T Girder C.I.P.conc.pile 8475700 11W Owl Creek 135109 Maple 1.29 69 Prestress.Conc.Slab Conc.Abutment w/ 1989 5/7/24 G 24 Creek Rd. steel H piles 8253600 13W Hurst Creek 107509 Clearwater 2.66 67 Prestress.Conc.Bulb•Conc.Abutment, 1969 5/7/24 F 24 Rd. T Girder Conc.column,Conc. footing 8339400 27W Willoughby 914207 Upper Hoh 3.52 60 Prestress.Conc.Bulb•Conc.Pile cap w/ 1962 5/8/24 G 24 Creek Rd. T Girder Prestress.Conc.piles 8659900 30W Cassel Creek 134309 Oil City Rd. 3.59 154 Steel Girder Conc.Pile cap,steel 2000 7/9/24 G 24 Fracture Critical Special Inspection-- piles X WSDOT performs inspection with UBIT biennially 8829800 34W Pole Creek 914207 Upper Hoh 8.3 37 Conc.3-sided Box Conc.Spread 2010 5/8/24 G 24 Rd. Culvert Footing 8845600 35W Dismal Creek 914207 Upper Hoh 9.19 22 Conc.3-sided Box Conc.Spread 2011 5/8/24 G 24 Rd. Culvert Footing 8853500 36W Spruce Creek 914207 Upper Hoh 9.7 22 Conc.3-sided Box Conc.Spread 2012 5/8/24 G 24 Rd. Culvert Footing 8863300 37W Alder Creek 914207 Upper Hoh 2.15 25 Conc.3-sided Box Conc.Spread 2013 5/8/24 G 24 Tributary Rd. Culvert Footing Page 2 of 3 Jefferson County Public Works Master Bridge List Last Updated:5/12/2025 West Jefferson County a w a X w O z U U U• cc BRIDGE TYPE P ,a z - ap O as a E w od zo w L) H W a <W a z a U a i- z o m7 U a • z w = Ca w (. a O C z w a w o o o o a. o ° o � w .z a a X _ a _ w _ ,4 4 Superstructure Substructure 8886600 39W Upper Hoh 914207 Upper Hoh 6.95 21 Conc.3-sided Box Conc.Spread 2016 5/8/24 G 24 Rd.MP 6.95 Rd. Culvert Footing 8903500 40W Donkey 107509 Clearwater 1.29 17 Conc.3-sided Box Open-ended steel 2015 5/7/24 G 24 Short span bridge-not reported Creek Rd. Culvert pipe piling to NBI 8924800 43W Canyon 914207 Upper Hoh 10.2 120 Prestress.Conc.Bulb.Open-ended steel 2021 5/8/24 G 24 Creek Rd. T Girder pipe piling 8950500 45W Upper Hoh 914207 Upper Hoh 4.38 20 Conc.3-sided Box Conc.Spread 2023 5/8/24 G 24 Initial inspection on 5/8/2024 Rd.MP 4.38 Rd. Culvert Footing Page 3 of 3