HomeMy WebLinkAboutExhibit 27 Transmittal Email from WDFW Holtz 091825Carolyn Gallaway
From: Holtz, Michelle (DFW) <Michelle.Holtz@dfw.wa.gov>
Sent: Thursday, September 18, 2025 11:49 AM
To: Carolyn Gallaway
Cc: Nicholas, Michael D (DFW)
Subject: Pt. Whitney - Additional Hearing Materials
Attachments: Rewording Condition 11.pdf; Rewording Condition 17.pdf, SEPA Checklist.pdf; SEPA
Comment ECY.pdf, SEPA WDFW Comment to ECY.pdf, Deed_AC220018.pdf;
Deed_AC220019.pdf, Deed -Point Whitney.pdf, DNR Ownership.pdf, Project Plans.pdf
ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click
on links if you are not expecting them.
Hello Carolyn,
Below is a list of requested attachments from our 9/11 /2025 hearing:
• DNR record showing DNR ownership of aquatic lands. This also shows that no aquatic lease or right of
entry is required from DNR in this area for work above MLLW
• Deed showing WDFW ownership
• SEPA checklist
• SEPA comment from the Department of Ecology
• SEPA WDFW response to the Department of Ecology
■ Rewording of Condition 11 (approved by Donna Frostholm) to "The required in -lieu fee mitigation credits
must be purchased through the Hood Canal Coordinating Council, in full, prior to beginning construction.
Documentation such as a Final Statement of Sale, showing mitigation credits have been purchased, must
be submitted to Jefferson County priorto construction."
■ Rewording of Condition 17 (approved by Donna Frostholm) to "The permittee shall use water quality
monitoring information collected by Washington Department of Health and shall coordinate with this
agency as needed to ensure recreational shellfishing areas in the vicinity of the project area are adequately
protected."
• Project plans
o To clarify project quantities:
• Existing ramp dimensions (where new ramp will be placed on top of old)
■ 10ftx112ft=1,120sgft
■ Expansion
• Ramp expansion (1 foot on either side): 2 ft x 112 ft = 224 sq ft
■ Articulated concrete mat (4 feet on either side): 8 ft x 112 ft = 896 sq ft
• Total expansion = 1,120 sq ft
• Total Area:
■ 1,120sgft+1,120sgft=2,240sgft
I want to clarifythe requirements forthe Forage Fish survey. After a WDFW approved biologist conducts a
forage fish survey, work must begin within 72 hours and work must be complete within two weeks of the
survey. We expect work to take longer than two weeks so another forage fish survey will need to be
completed before continuing work.
I also wanted to clarify more regarding mitigation. The Corps would typically require mitigation for the
expansion below the high tide line. In this case, because NMFS is requiring mitigation for the entirety of the
boat ramp (expansion and new ramp on top of existing, both above and below the high tide line) and the
regulatory agencies do not require double mitigation, NMFS mitigation will satisfy Corps mitigation. Under
the Endangered Species Act, we are required to consult with NMFS. NMFS uses the Salish Sea Nearshore
Programmatic Conservation Calculator to determine how much mitigation is required to offset nearshore
habitat impacts from the expansion and addition of a new boat ramp on top of the existing. NMFS has
reviewed and approved the amount of credits to be purchased from the Hood Canal Coordinating Council
(HCCC). This ILF mitigation through the HCCC will improve nearshore habitat at the Beck property located
immediately south of the Little Quilcene River by preserving existing wetlands and tidelands, modifying
Levees to the extent necessary to allow for tidal exchange, and enhancing wetland buffers.
Thankyou,
Michelle Holtz
iiL Environmental Planner III, CAMP
Washington Department of Fish and Wildlife
� M_ichelle.Holtz_@dfw.wa.gov