Loading...
HomeMy WebLinkAboutBLD2005-00179 BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD05-00179 Received Date 03/24/2005 SITE ADDRESS: 153 MARINA DR Issue Date 04/22/2005 PORT TOWNSEND, 98368 APPLICANT: FRANKLIN H HAZLEHURST PHONE: 206-285-4407 PAMELA BEKINS 2546 37TH WEST SEATTLE WA 98199 SUBDIVISION: CAPE GEORGE COLONY DIV 6 Block: 13 Lot: 7 PARCEL NUMBER: 939301305 Section:. 12 Township: 30 N Range: 02 W CONTRACTOR: DISCOVERY BAY CONST CO INC PHONE: 385-4372 2016 WATER ST, SUITE A PORT TOWNSEND WA 98368 Contractor's License: DISCOBCO90B9 Expires: 9/9/2005 PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE CALL IN FOR THE QUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: Footing: r;L 6p 1' rayi� � s� WerY7 6" , �-(7-OS wc��' CS (asr Foundation: S iaEibNTa�kb Z,�,u�Q�.�,/,/6-- � � '�l,r �-305 0 Stormwater FINAL Approval: "Underground Plumbing: pJc 0g.64,J ,(..„( _so-ts- 9 _:)_i3 06-- Underground Insulation: Shear Wall :`C -1 7-c � Sheathing: Framing:JO77_0c 1-13 Plumbingu -7 7 -czp Propane Tank/Lines: Insulation: Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning,Final Approval: Final/Occupancy Approval(\yL 2\2.� O`t HEALTH DEPARTMENT AND PUBLI WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE IUILDING PERMIT APPLICA N MLA05-00176 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00179 Received Date: 3/24/2005 SITE ADDRESS: 153 MARINA DR PORT TOWNSEND, 98368 OWNER: FRANKLIN H HAZLEHURST PHONE: PAMELA BEKINS 2546 37TH WEST • SEATTLE WA 98199 SUBDIVISION: apt' GE COLONY DIV 6 Block: 13 Lot: 7 PARCEL NUMBER: 939301305 Section: 12 Township: 30 N Range: 02 W CONTRACTOR: DISCOVERY BAY CONST CO INC PHONE: 385-4372 2016 WATER ST, SUITE A PORT TOWNSEND WA 98368 Contractor's License DISCOBCO90B9 Expires 9/9/2005 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP NEW SFR W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW VALUATION 160,000.00 MAIN: 581 CODE EDITION: 2003 ADD'L: 484 HEAT TYPE: OCCUPANCY: R_3 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: 5N OTHER: GARAGE: 282 SHORELINE: CONST TYPE: SETBACK: DECK: 204 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 1 Prop: 1 Total: 1 Total: 1 Routing Date: -` /7 / \ (11 4) Type Amount Paid By: Date: Receipt: APPROVED Permit $1,329.75 BAC 03/24/05 71579 Plan Check $864.34 BAC 03/24/05 71579 APR 2 2 2005 State Building Code $4.50 BAC 03/24/05 71579 Potable Water Application $53.00 BAC 03/24/05 71579 Jefferson County Planning &Building Depart Total: $2,251.59 / r • • OWNER BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. ,I Signature: Date: MAR 24 • 1 GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: i FAX: DlscovE,�-r J3.�y (360)355, [437Z (36o ) 3$5, ?697-j MAILING ADDRESS: 201 b wA-7E-11._ ST, sc./?E A EMAIL: /l,O g^eAt,'YE" pISCO 1 E,a y g,.Y,Ca,,q CONTRACTOR'S LICENSE PO 2? 76 .SEA'O wq 9 1373 SS WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: 9 BA At4-4/4S 4 19EG?S PHONE ( 206)322.-7 95'9 FAx: 2O ( 6 )322.7 9 63 MAILING ADDRESS: 6// .EAST Pl t<Lc- 5?gEti, 5t7417LE EMAIL BRETf®A.8404y444M54./24,0/7-E'4,7,f_ 4-6n-t Prpject Type: Freme Type: Bathrooms: Shoreline: Type . Newer of Sewage Disposal: Wood Existing: D r?vSewer 1 Addition ❑ Steel Proposed: I Bank 0Alteration/Remodel [Ig El Individual Concrete Total: / Height: ❑ Community System Repair ❑ Masonry — SEP Permit#yO2 2 6,5 Demolition ❑ Other: Bedrooms: Water Supply: Existing: o Setback: PP y Type of Heat: Proposed: I ❑ Private well ❑ Two Party Total: f ❑ Public Name of System: If this is a Commercial Project you must answer the following: , Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants, employees,etc) Current Proposed IBC Occupancy: p IBC Type of construction: Will you have Food Service?, es / o If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: !Ali 2 '+ 2005 i Underground Tank I Above ground Tank Size of Propane Tank: I Heat Stove I Cook Stove I Woodstove I Fireplace Insert I Hot Water Tank I Pellet Stove tI. Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No r J When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. ISquare Footage For Office Use Only I Current Proposed Amount Main Floor Consistency Review: 581 3T47..1.a 44.®o 2""Floor Base fee: 481 3tSQT:Q- , t32q .7S 3`tl Floor Additional Section: Mezzanine: _. Plan Check fee: E.4 .W Heated Basement _. State Surcharge fee: rL SO Unheated Basement T • O — Pot Water Review fee: f Other Unheated " ` *60 911/Rd Approach fee: Garage/Carport Gr 28 2 4 lit TOTAL: $ 2:3�/7'[ .,s1 Decks 201 (1460t.71Receipt Number: 11 51 Q Other �• Cash/Check Number: 4-1 ESTIMATED COST(REQUIRED) Date: •Fair market value of all labor and • a ion o ' h 3(24405_ /6 D O OD Initials: 4215 C:ADocuments and Settings\mochil\Desktop Aillastcr Permit Application-S-Ild.doc -: 0—N �lill4 o� JEFFER COUNTY • ` E, et W / DEPARTMENT OF COMMUNITY DEVELOPMENT �` F' 621 Sheridan Street • Port Townsend • Washington 98368 r 360/379-4450 • 360/379-4451 FaxNAR 2 4 cq O� www.co.jefferson.wa.us/commdevelopment . _; E Master Permit Application Pit-1L' MLA: i D5--I-t- Project Description(include separate sheets as necessary): co/v5?2uC.7/a.v of n/01•v S in;6LE f.4MILy ALsio07,vcE Tax Parcel Number. 93 .5 93013 0 Property Size: /6, 2-9 2 S>`. (acres/square feet) Site Address and/or Directions to Property: /53 "AA/ZIivA p,23 vE- ('d/LT 'TbwniSEivp Property Owner(s)of Record: H Am I LT On►P Y NA Z,L.[=K c./LS7 ,4iv0 PAM LPL A B EK/HS Telephone: 2.0 6. Z ., 14O 7 Fax: email: slA.vti1._.7o.vH ®Vuc.[a-, Co,..t Mailing Address: Z 596 371H vvEST 5E-,��-rLF w,,r i'SI 99 ) Applicant/Agent(if different from owner s} /Z,1� ifA-MS .42CN/f�G%,f Telephone: 206 . 322, 7959 Fax: 206 . 322 . 7963 email: 8,-E7r® Mailing Address: 6// EAS'r i'ikt S7ZEE i S4-,4-r•"L Ut.A 98/22 A-atA-KgMSA.Qfi!/7Ec-7S,ca.2,t WIJat kind of Permit?(Check each box that applies) u Building ❑ Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑ Conditional Use[C(a),C(d),or CI** Ingle Family ❑ Discretionary"D"or-Unnamed Use Classification Garage AttacheQ/Detached ❑ Special Use(Essential Public Facilities)** Manufactured Home ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat** n Commercial* ❑ Binding Site Plan** Change of Use ❑ Long Plat** ❑ Address i Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments** E Propane ❑ Plat Vacation/Alteration** 0 Allowed"Yes'Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions-- E. Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance ❑ Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑ Wireless Telecommunication* ❑ Jefferson County Shoreline Master Program Amendment Forest Practices Act/Release of Six-Year Moratorium *May require a Pre-Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGN TION OF AGENT I hereby designateDJ$COY Z3 to as my agent in matters relating to this applica 'on for permit(s). OWNER SIGNATURE Date: !s— (J By signing this application form,the owner/agent attests that the information provid herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access nd ' t of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required t . .Access and right of entry to this property shall be requested and shall occur only during regular business hours. Signature: MX alcie Date: 31.1 .or The action or actions Applicant T (''undertake as a result of the issuance of thispermit maynegatively impact 9 Y p upon one or more threatened or endangered species and could d to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA." fferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not viola ' the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you ar , ' with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable re o • adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: "� (7 , r C:\1) cumcm.and Jcttiq:;>\mochil\114sktni`,:`.I t<tcr I'crm't c;it t :hI;I >i•nti.dnc SPECIAL CONDITIONS FOR CASE A BLD05-00179 • 1.) Any future building permit must verify actual location of primary and reserve areas of septic system and tank location prior to approval. 2.) A Geotechnical Report dated August 11, 2004 prepared by Hart Crowser, Inc was submitted in conjunction with this application. The report addressed the stability of the geologic hazard area. The geologist did not observe the presence of the possible underlying glacially consolidate lacustrine silts that are typically encountered below the advance outwash soils in areas where instability is prevalent. There is no evidence of this geologic stratigraphy at this site and no signs of flowing groundwater other than some minor surficial erosional features. It is the geologist's opinion that the potential for deep-seated slope failures at this site is low based on the geologic conditions encountered. 3.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 5.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used.as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 6.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 7.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. •8.) Not more than two (2) unlicensed or inoperable vehicles shall be than one-half acre unless totally screened from view of neighboring dwellings and n any lot less rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 9.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 10.) The building height is not to exceed 35 feet. 11.) Minimum setback from Marina Dr right-of-way is 20 ft. Minimum side and rear setbacks is 5 ft. 12.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 13.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 14.) A minimum of two (2) on-site parking spaces are required for the single family residence. 15.) A stormwater plan for a medium project has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the.Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 16.) The applicant shall fully adhere to all conditions and requirements of the Geotechnical Engineering Design Study dated August 11, 2004 by Hart Crower, Inc.. • I:\F_BLD_Permit_Buildng.rpt 10/29/1999 �I soiv ca �A JEFFERSON COUNTY PERMIT # ,p ti 1 DEPARTMENT OF COMMUNITY DEVELOPMENT ti 621 Sheridan Street• Port Townsend • Washington 98368 0 5 - 0 1 7 9 14,, �0 360/379-4450 • 360/379-4451 Fax tiNG http://www.co.jefferson.wa.us/commdevelopment/ RR= OMIT KO STORMWATER SITE PLAN SUBMITTAL TEMPLATE • I MLA# O 17 f. PROJECT/APPLICANT NAME: HAM/[xON HA ?1-Ert u4S7 .aNW rs►nAEt.4 gc111.415 Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. PAL0PO 514 2 COAI5r/ZUG710A) OF ,4. Ave,--, SEPTIC 5y$76M S/NGL.L� .4,v0 pQ1vE-vy . / F�t.H/LY �?ES/.vE-�✓CE=� �y• t12es/DENCE /5 LOC.47Fp O.v E-x157/N6 1 L.,41- L3(//LD/NG SrrE• Oft/vEwAy FdLtar.4S C1C137/NG s/7e-- ,tccFss . Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. fL 47 !3 u/LD/n/G 5 rrC w/ s rE-E]' c.a-r PFF.¢l.4E-i ' 7e 7"F A.od7N .4.,7, WEST. 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. FO/2E5? 7, .2/M L tZ „„/ cLEi+R`p $V/L,D/NG S/rE- A.viO AL-vFw,qy 4. Describe the existing soils. Indicate soil type on the site map. 4-vvA.✓CE O v1 w,t5Ail -s'Lr GED•7ECH,v/C4L Rpj'R7 5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below,and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. NO 5/6/✓S OF 6'/LOL,.�Q14..4-rex S -p.1.GE pe stk/ e AtC7/v/1r, SE-E 6Eo?E0NA✓/C4 L PO127- 6. Describe any excess levels of noise generated by the proposed use or activity: APPROVED /voNe-- STORMWATER PLAN APR 2 0 2005 stormwater site plan template.doc-rev.10/12/2003 JEFFERSON COUNTY DEPT.OF UN _ E NT 5 SIGNATURE: 1 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. STEEP St-OPES pN pE/2.IME'1 & oP 5i E. 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads,and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). SITE IS $O(4.'0E9 ON 3 SI17E5 ay nn 4.4/N44 07Q/YE. INEK.F -42E" NO Srge-A,Mj., WFT..,4N05/ ale 1—.EKES Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g_ Describe the developed site hydrology,as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual)or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. PottiNSfov1S smut- pi-HN 10 9�e-A"=HBG-oCKS 10. If the project requires the use of stormwater treatment facilities,describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"large"projects or projects that involve the potential for dispersion of contaminants.] 11. Describe the performance goals and standards applicable to the project. 7YPIC4L coN.Ptiocn lc.N 5?npN..414/2.PS 12. Describe the flow control system. N'k 6 stormwater site plan template.doc—rev.10/12/2003 PERMIT # BLD 13. Describe the water quality system. - 0 5 — 0 1 7 9 /voNC �, .. J IMSON LOOM' DED 14. Describe the conveyance system analysis and design. No/iE 15. Describe the source of fill material, physical characteristics of fill material,and deposition of excess material. A,ONE 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. /40,./E. 17. Describe the proposed surfacing material. G/LAV 2/Veit/Ay j ,vtEr4-1 2eOF, vWdOP PECK., STONE PA-71O 18. Describe methods for restoration Q, the site. codrR /QE•SFfp/NG y IQE&.',L.-» 100,2 Au_ PI S•ruu2BETJ , eon/Si/Z(C7,4',� $?OCk_P/UNG ON P/LOPOSfrD OAS✓EM/it'Y e4 AFA 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included, list the Manuals here. JA 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. GEO- TECW,4/1CAL gL-o,s2-7J 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. stormwater site plan template.doc—rev.10/12/2003 • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. 772-Ir E PENC/N6 WILL LSE Pl.4CEP 7,16- pE72/4.1E7 o/� SHE ',oz./57 a U(..1I 0N A,a.EA AA/0 A .a I.wO S/G�v/AC4r ?/e&-FS SITE PLAN. 2. Establish Construction Access. N4/N/A4 20" OF 7E.4f4.2A.1..Y GlL 4"EL AT E Js7/'G PIZtvEWAy I°E=R SMP c 105 3. Control Flow Rates. NOT iE&vl/2t--a. A RE-4 OF 01SrIJ,415ANCF /S lr-H/fED 4.vO D/IQ.4?loN /S 4. Install Sediment Controls. 4pP/1_ vL=D SE:P/MEN'T cowlRaz_ £4,G4/ES tO t3F" /..a594 WV Ai-On/6 No.27H S/P6 OF 6X+57>n/l, pg/r -.vty AN-0 -4LO,✓6 Ne1e7MERN PiabrO.¢YY /,.,/n.E Dog,At6 sEPTK s Ys7F...K iNSr.4-4-LAimrev �EQ BMP Z30 5. Stabilize Soils. MUL-C NIA(6 2G6L"ecD iiv ALL P/ST vie BE-D ,41 ,RS 75 PREVFAT EI20S/oN An pv/T J PER_ L3MP C IZI R. S+.u/L. k 6. Protect Slopes. S1vR.FACC /2-01/6/45:N/,✓G (.BMP C I3O, p2. 6-7/+F-.4. .tPP/�vcp ME?MOD. 7. Protect Drain Inlets. is/0 pi2A-/ni /n1LE"Ls n/e',412 PAoPE,2Zy stormwater site plan template.doc-rev.10/12/2003 8 PERMIT # BED 0 5 - 0 1 7 9 tfF: .._ `,, r 12 Required Elements-Construction SWPPP( EtrtniJ ON COUNTY D CD _ 8. Stabilize Channels and Outlets. J[ rt�J E • CNAAINELS .9A'P OJr'C/-1ES NrJT CJr/ECZEO 9. Control Pollutants. f)OL1-tiq,cjA173 WLLL, 66- CO/v72Oi-u5p ANp CoNSTRVLTJdN 5.17E- WILL- i MA-1Av74InrL—D in, 4 QLFA-A, AN.0 OR2OE.QLy F{-S11 c, . 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). OE w.4i& JNG 1S 4E 'i/eip IT wiu_ ,4.v01-E wr7�f CARS' -74 P/L V GIVT r Qt 5/onl .4 D aFF %J1 co/vr,4.4/.4,47ics . 11. Maintain Best Management Practices(BMPs). .k-r- CO✓6& SH1F 4NV Srrk— PL,a•v. 12. Manage the Project. SEA' covb7/L SKG6• ..ND S/TE P�1N, 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads). AAA-LJN/F PA/1/ -- b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). WA7E'12 f,L0/W TH SITE" SyEtzT PLew5 To A- PA4/.vtCE' P/Tcsl A-LONG AAA IZ/,v,4 ORI✓L AAei) 9112_D C�NDEv£LopEO FORFS1 FD L.A ND. 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. STEEP S1-4PES Iowl)/S 1101 -P) -70 111 - WE-Sr OF 71>� Bu,Lo/Ala S . stormwater site plan template.doc—rev.10/12/2003 9 b. Description of special requirements for working in or near environmentally sensitive areas. SED/n4EN7' ca N72OL5 BOVNO STEEP $L.,IF5 70 7HE- J ST• 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site ' soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). POTVW7ii-Z.. / Q E -O5Ioiv ALOiJ 6X/Sr/nr6 04/V w.4Y . 5. Construction Phasing. a. Construction sequence 7YPl CAL b. Construction phasing(if proposed)4 Avnrr f/i EP 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a proposed construction schedule. coN$1R uc-7 tan/ S7 A(2 Y,5 LA-Tr- SP,2.N vD / G .4. f /nr/SHE5' E,4,ZLY f.4LL II. Wet Season Construction Activities. a. Proposed wet season construction activities. NO CONSIR.VCl/ON Le7CP D Ear� b. Proposed wet season construction activities for environmentally sensitive areas. No NE 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. NAM/L-TON H4ZLCNvi2S7 An'O P.44 E7A SE id I"$ - b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. ivJA 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following, if applicable. a. Sediment Ponds/Traps. "'IA b. Diversions. NdA c. Waterways. N/A d. Runoff/Stormwater Detention Calculations pjA 10 stormwater site plan template.doc—rev.10/12/2003 • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the aff ted prop rty. (LA DO R O AUTHORIZED REPRESENT IVE SIGNATUR=) (D THIS SPACE MAY BE USED FOR ADDITIONAL NOTES,IF NEEDED: 12 stormwater site plan template.doc—rev.10/12/2003 c� 0 c a a� W m i 0 a U a Ld Q z w J 0 Q U O H D Q CUUN rY UEPT. OF COMMUNITY DEVELOPMENT SIGNATURE: qm^ V LLJ Loon Q OCT! 611 East Pike Street Seattle, WA 98122 Ph:206.322.7959 Q, Fax:206.322.7963 STAM P: PERMIT Lu U Z w � Q w oC L N Z c 3 v o w j •- L. _� to J � L N QIM I Ln REVISIONS: 1 DATE: 3-15-05 . I JOB #: AA04010 SCALE: 1 /8"=1 ' ' DWN: BVM CHK SITE kAN A001 ARCHITECTURAL