HomeMy WebLinkAboutBLD2005-00255 BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD05-00255 Received Date 04/22/2005
SITE ADDRESS: 2365 EGG & I RD Issue Date 05/19/2005
CHIMACUM, 98325
APPLICANT: GERALD L BISHOP PHONE: 360-732-4863
2691 EGG& I RD
CHIMACUM WA 98325-9724
SUBDIVISION: ARTHUR BISHOP SHORT PLAT Block: Lot: 2
PARCEL NUMBER: 801012022 Section: 1 Township: 28 N Range: 01 W
CONTRACTOR: RIGGS CONSTRUCTION PHONE:
PO BOX 3
PORT GAMBLE WA 98364-0003
Contractor's License: RIGGSC"028RW Expires: 5/2/2006
PROJECT DESCRIPTION: NEW DETACHED GARAGE - UNHTD, NO PLUMBING
CALL IN FOR THE REQUIRED w SPECT� THAT APPLY TO YOUR PROJECT.
SETBACKS: Q 4/3/€
UFFER: /�la /
Footing: Dk_ 4/016'
Foundation: OR �)1,'/1/fji'^s // D�;",
Stormwater FINAL Approval:
Underground Plumbing:
Undergroun nsulation:
Shear Wall :
Sheathing:
Framing: ?_.-'712.310')
Plumbing:
Propane Tank/ Lines:
Insulation:
Sheetrock:
Septic Sytem Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: /9A "i'Or— 44114 V.yoi,HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL RUIRIOR TO FINAL
INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
•
SPECIAL CONDITIONS FOR CAA BLD05-00255
1.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
2.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC)Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
3.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
4.) All construction activities shall not encroach upon the buffer. This includes the storage or
preparation of materials.
5.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
6.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
7.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
9.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
10.) Maximum lot coverage is not to exceed 10%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
11.) The building height is not to exceed 35 feet.
12.) Minimum setback from the edge of the private easement is 20 ft. Minimum setbacks from
the designated Commercial Forest Lands are 250 ft. Minimum setbacks from the western
and southern boundaries are 120 ft and 10 ft, as depicted on the site plan.
13.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
14.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
Iminwimmmmmwm
15.) A stormwater plan for a medium roject has been submitted and approved Phe
Department of Community Development. Once the subject permit has been issued the
applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
16.) A minimum of two (2) on-site parking spaces are required for the single family residence.
•
I:\F_BLD_Permit_Buildng.rpt 10/29/19
GILDING PERMIT APPLICATION MLA05-00244
Review
Type:
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD05-00255 Received Date: 4/22/2005
SITE ADDRESS: 2365 EGG & I RD
CHIMACUM, 98325
OWNER: GERALD L BISHOP PHONE: 360-732-4863
2691 EGG& I RD
CHIMACUM WA 98325-9724
SUBDIVISION: Block: Lot: GL3+
PARCEL NUMBER: 801012001 Section: 1 Township: 28 N Range: 01 W
CONTRACTOR: RIGGS CONSTRUCTION PHONE:
PO BOX 3
PORT GAMBLE WA 98364-0003
Contractor's License RIGGSC*028RW Expires 5/2/2006
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOr NEW DETACHED GARAGE - UNHTD, NO PLUMBING
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 28,284.00 ADD'L: HEAT TYPE: UH
CODE EDITION: 2003 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL:
WATER SYSTEM:
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: 0 Prop: 0
Total: 0 Total: 0
Routing Date:
4l arilo 5(
Type Amount Paid Bv: Date: Receipt: Approved/Date
Permit • $441.75 BAC 04/22/05 71892 APPROVED
Plan Check $287.14 BAC 04/22/05 71892
State Building Code $4.50 BAC .04/22/05 71892 MAY 1 9 2005
Total: $733.39 Jefferson County Planning
g Department
•
re:?::°14--cOJEFFERSON C!UNTY
• _
,74 DEPARTMENT OF COMMUNITY-DE-V€-LO M€NT
`-4 ' `� 621 Sheridan Street •• Port Townsend ••Washington 983.68
360/379-4450 • 360/379-44,! 51 F ))I I •
44 c$ www.cojefferson.wa.us/coirimdevelopment
f
sl �S APR 2 2 2005
Master Permit Application
MLA: 05-:�`A `�
PIKVescriptingb,tda s pa s s necessary): �— i
, po A).
i tV 6 'a - ....)-- cl,kcetir-e - ut) -..ff otc-t4t T1 uo4A i' l,
____,
Tax Parcel j Property .1 - `"1 p ,.%r
Number: U 1 — L) 1 `- D T I Size: l,`. 1\ f z, (acres/square feet)
Site Address and/or Directions to Property: t ,�.A L 7 1 .�— i-14.'r r L '-1 j i li- j L.,L;in
Property Ow er(s)of Re-c�pord Li c ir. I � i1 Y -1 t f f✓ 6
Telephone: .) C' '-_ 1 „J 4. - 4 S'C -' Fax email: -
y• ryF A..' 7 -�
1$ Mailing Address: -i--(i 'f i Pie f-!. (, ! (..{}rf?,- , s.r 1 tt J:{
�!! i T
Applicant/A9,ent-(if different from o'irvner):, fit^r t i I, ± r !4 t I, s,% ' VI 0 °i),
Telephone: ')al ` /l 'I - U (. I 1 Fax 1 ,� email:
Mailing Address: _ v. j ;?`.)
w at kind of Perm ti(•Check each box that applies)'
Building ❑Variance(Minor,Major or Reasonable Economic Use)
❑Demolition Permit 0 Conditional Use[C(a),C(d),or C]**
❑ Ingle Family 0 Discretionary"D"or Unnamed Use Classification
Garage Attache Oetached ❑Special Use(Essential Public Facilities)**
, Manufactured Homti-`' ❑Boundary Line Adjustment
❑Modular ❑ Short Plat**
❑ Commercial* ❑ Binding Site Plan**
❑ Change of Use ❑ Long Plat**
i Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments**
Propane ❑ Plat Vacation/Alteration**
❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions**
❑ Stormwater Management ❑Shoreline Management Substantial Development**
❑ Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance
❑Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment
❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre-Application Conference **Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and
expenses which -in-any- accrue against Jefferson County as a result of or in consequence of the granting of this permit
I further agr access a right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any req 'red later ins . ccess d right of entry to this property shall be requested and shall occur only during regular business
C
hours.
Signature: \ I Date: ~ -
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has be issued wi violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even' qu are in comp' ce with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-transf ra e r sibif d e t a plying� with the ESA. The Applicant has read this aime and signs and da it below.
Signature: _ nlii�t-x-'' Date: /.2'-- a
G:\PemvtCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc
, ,
. OWNER BUILDER STATEMENT •
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
GENE ONTRACTOR O UFAC,TURED HDMEJNSTALLER: PHONE: FAX:
14CCrUCCc`Ohh (
EMAIL:
) ( )
MAILI ADD E S: AIL:
CONTRACTOR'S LICENSE WAINS
NUMBER: CC1 J S C 6 21 KW NUMBER
D kr
ARCHITECT/ENGINEER: .. .,, t '.a i(y>, TC PHONE („�b�21(;51")'FAX ( )
MAILING ADDRESS: ? L ." EMAIL
_5-;.2,_6 6
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
X New X Wood Existing: ❑ Sewer
❑ Addition 0 Steel Proposed: Bank ❑ Community System
❑ Alteration/Remodel ❑ Concrete Total: Height: [I Individual System
❑ Repair ❑ Masonry SEP Permit#
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: Setback: [1 Private well ❑ Two Party
Type of Heat: Proposed: ❑ Public
Total: Name of System:
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: __ Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
[1 Underground Tank ❑ Above ground Tank Size of Propane Tank:
[I Heat Stove ❑ Cook Stove ❑ Woodstove ❑ Fireplace Insert [ Hot Water Tank ❑ Pellet Stove ❑ Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage For OffiFe Use Only
Current Proposed ; — `-'' „ Amount
Main Floor Consistency Review:
2Nu Floor Base` fee: /1� t�
7 11
3r°Floor Additional Section:
Mezzanine: Plan Check fee: -
Heated Basement State Surcharge fee: i 5 0
Unheated Basement Pot Water Review fee: �} ls
Other Unheated 911/Rd Approach fee: -^
Garage/Carport i z1 _r6 30- `c TOTAL: $ P1' A
Decks LJJ(UI �c'�1
--` eceipt Number. 1 I t)C1 d\
Other Cash/Check Number: Qt
ESTIMATED COST(REQUIRED) Date: J
.Fair et value of all labor and materials foundation to finish ( Q�J
'l w c) �� Initials: IC I
G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc