Loading...
HomeMy WebLinkAbout21_Superseding Water Right Permit - S2-30437 (2007)_2023-1120SUPERSEDING WATER RIGHT PERMIT State of Washington SUPERSEDING WATER RIGHT PERMIT File NR S2-30437 WR Doc ID 4464571 PRIORITY DATE 10/11/2007 WATER RIGHT NUMBER S2-30437 MAILING ADDRESS PLEASANT HARBOR MARINA AND GOLF RESORT 308913 US HIGHWAY 101 BRINNON WA 98320 SITE ADDRESS (IF DIFFERENT) Quantity Authorized for Withdrawal or Diversion WITHDRAWAL OR DIVERSION RATE UNITS ANNUAL QUANTITY (AF/YR) 0.67 CFS 133.0 Purpose PURPOSE WITHDRAWAL OR DIVERSION RATE ANNUAL QUANTITY (AF/YR) PERIOD OF USE (mm/dd) ADDITIVE NON- ADDITIVE UNITS ADDITIVE NON-ADDITIVE Turf Irrigation 0.67 0 CFS 105.0* 0 04/01 – 09/30 Fire Smart Program Irrigation 28.0* 0 04/01 – 09/30 *The irrigation allocation under Water Right G2-30436 is non-additive to diversions under this authorization. IRRIGATED ACRES TYPE OF IRRIGATION ADDITIVE NON-ADDITIVE Turf Irrigation 61 0 Fire Smart Program Irrigation 120 0 Source Location COUNTY WATERBODY TRIBUTARY TO WATER RESOURCE INVENTORY AREA JEFFERSON POND 16-SKOKOMISH-DOSEWALLILLPS SOURCE FACILITY/DEVICE PARCEL TWP RNG SEC QQ Q LATITUDE LONGITUDE KETTLE C (SOUTH KETTLE) 502153023 25N 2W 15 SW SE 47.651139 -122.917500 Datum: NAD83/WGS84 Place of Use (See Attached Map) LEGAL DESCRIPTION OF AUTHORIZED PLACE OF USE PLEASANT HARBOR MARINA & GOLF RESORT located in Jefferson County, WA, all within portions of Sections 15 and 22, both in T.25 N., R. 2 W.W.M. and Government Lot 7 of said Section 15, and Government Lots 2 and 3 of said Section 22; Lots 1, 2, and 3 of Watertouch Short Plat, as recorded in Volume 2 of Short Plats, Pages 205 and 206, Records of Jefferson County, Washington, being a portion Exhibit 21 SUPERSEDING WATER RIGHT PERMIT 2 S2-30437 of Section 15, T. 25 N., R. 2 W.W.M., Jefferson County, Washington; and Lots 1 and 2 of Pleasant Harbor Marina Short Plat, as per plat recorded in Volume 2 of Short Plats, Pages 221 to 223 and amended in Volume 3 of Short Plats, Pages 8 to 10, Records of Jefferson County, Washington. Proposed Works Irrigation pumping station at Kettle C (South Kettle) designed to capture and store reclaimed domestic wastewater and surface water runoff from the project site. Outtake will be equipped with a pump capable of producing 0.67 cfs for irrigation supply. Development Schedule BEGIN CONSTRUCTION COMPLETE CONSTRUCTION PUT WATER TO FULL USE Started December 1, 2032 December 1, 2037 Measurement of Water Use How often must water use be measured? Weekly How often must water use data be reported to Ecology? Annually (by January 31) What volume should be reported? Total Annual Volume & Total Monthly Volume What rate should be reported? Annual Peak Rate of Withdrawal (gpm or cfs) Provisions Project Withdrawal Limit Diversions/withdrawals under all water rights for this project shall not exceed 254 acre-feet per year. Measurements, Monitoring, Metering and Reporting An approved measuring device must be installed and maintained at the outtake from Kettle C in accordance with Chapter 173-173 WAC, "Requirements for Measuring and Reporting Water Use, which describes the requirements for data accuracy, device installation and operation, and information reporting. Chapter 173-173 WAC also allows a water user to petition the Department of Ecology for modifications to some of the requirements. Weekly and annual diversions from this source shall be reported annually, by January 31, via the Internet. To set up an Internet reporting account, contact the Southwest Regional Office Water Resources Program. Reclaimed Water Permit The use of reclaimed water under this authorization is subject to compliance with the requirements of Chapters 90.46 RCW and 173-219 WAC. Proof of Appropriation The water right holder shall file the notice of Proof of Appropriation of water (under which the certificate of water right is issued) when the permanent distribution system has been constructed and the quantity of water required by the project has been put to full beneficial use. The certificate will reflect the extent of the project perfected within the limitations of the permit. Elements of a proof Exhibit 21 SUPERSEDING WATER RIGHT PERMIT 3 S2-30437 inspection may include, as appropriate, the source(s), system instantaneous capacity, beneficial use(s), annual quantity, place of use, and satisfaction of provisions. Schedule and Inspections Department of Ecology personnel, upon presentation of proper credentials, shall have access at reasonable times, to the project location, and to inspect at reasonable times, records of water use, wells, diversions, measuring devices and associated distribution systems for compliance with water law. Permit Subject to Cancellation This permit is subject to cancellation for failure to comply with the above development schedule and/or give notice to the Department of Ecology on forms provided by the Department documenting such compliance. Given under my hand and the seal of this office at Olympia, Washington this 23rd day of November, 2022. Department of Ecology OK/MP by Michael J. Gallagher Section Manager Exhibit 21