HomeMy WebLinkAbout34_Prelim Civil Plans_06.20.25 SIGNEDHIGWAY 101WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69 70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
UNITS
62
63
64 66
67
65
LEGEND
150BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSBL
BSBLBSBLBSBLBSBLBSBLBSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUMJEFFERSON COUNTY
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-covENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030250125 250 5000
SCALE: 1" = 250'1" = 250'N/APLEASANT HARBOR RESORT
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY COVER SHEETPROJECT PROPONENT
STATESMEN GC, LTD
7370 SIERRA MORENA BLVD SW
CALGARY, ALBERTA
CANADA T3H 4H9
(403) 256-4151
VICINITY MAP
1
308913 US-101, BRINNON, WA 98320
N
HATTON
GODAT
PANTIER
SHEET INDEX
Sheet Number Sheet Title
1 PRELIMINARY COVER SHEET
2 PRELIMINARY TEMPORARY EROSION & SEDIMENT CONTROL PLAN
3 PRELIMINARY TESC NOTES & DETAILS - 1
4 PRELIMINARY TESC NOTES & DETAILS - 2
5 PRELIMINARY STREET LAYOUT PLAN
6 PRELIMINARY OVERALL GRADING & DRAINAGE PLAN
7 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 1
8 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 2
9 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 3
10 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 4
11 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 5
12 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 6
13 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 7
14 PRELIMINARY ENLARGED GRADING & DRAINAGE PLAN - 8
15 PRELIMINARY ROADWAY SECTIONS
16 PRELIMINARY DRAINAGE BASINS
17 PRELIMINARY GRADING & DRAINAGE DETAILS - 1
18 PRELIMINARY GRADING & DRAINAGE DETAILS - 2
19 PRELIMINARY GRADING & DRAINAGE DETAILS - 3
20 PRELIMINARY OVERALL WATER PLAN
21 PRELIMINARY OVERALL RECLAIMED WATER-IRRIGATION PLAN
22 PRELIMINARY OVERALL SEWER PLAN
23 PRELIMINARY ENLARGED UTILITY PLAN - 1
24 PRELIMINARY ENLARGED UTILITY PLAN - 2
25 PRELIMINARY ENLARGED UTILITY PLAN - 3
26 PRELIMINARY ENLARGED UTILITY PLAN - 4
27 PRELIMINARY ENLARGED UTILITY PLAN - 5
28 PRELIMINARY ENLARGED UTILITY PLAN - 6
29 PRELIMINARY ENLARGED UTILITY PLAN - 7
30 UTILITY DETAILS - 1
31 UTILITY DETAILS - 2
32 GOLF COURSE ROUTING PLAN
BLAC
K
P
O
I
N
T
R
O
A
D
US HIGHWAY 101HOOD
C
A
N
A
L
HOOD CANAL
PLEA
S
A
N
T
H
A
R
B
O
R
ROBI
N
S
O
N
R
D
HOOD
CANALBLAC
K
P
T
R
DMT. JUPITER RD110
SITE
N.T.S.
PROPOSED SITE FOR
THE WASTEWATER
TREATMENT PLANT
WETLAND B
PROPOSED NEW WELL #2 STORAGE
RESERVOIR, & BOOSTER PUMP STATION
PROPOSED RECLAIMED
WATER PUMP STATION
PROPOSED
RECLAMED WATER
POND
'H
' ROAD
PROPOSED STORM
WATER PUMP &
SEWAGE LIFT STATION
OLYMPIA
HOUSE
CASCADIA
HOUSE
SEA VIEW
VILLAS
GOLF
VISTAS
EAGLES
NEST
THE INN
BY THE
SEA
CONFERENCE
& EVENT
CENTER
200' S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
& CON
S
E
R
V
A
T
I
O
N
E
A
S
E
M
E
N
T
WETLAND D
PROPOSED STORAGE / MAINTENANCE /
ASSEMBLY BUILDING
FUTURE INTERSECTION
REVISION
FUTURE PARK & RIDE
PROPOSED STORMTECH
INFILTRATION GALLERY
#1
#9
#2
#3
#4
#5
#6
#7
#8
B
LA
CK
PO
IN
T
ROADRECREATION RUN
(
'A
'
ROAD
)RECREATION RUN ('B' ROAD)(
'D
'
ROAD
)
'
E
'
ROAD
'B
'
ROAD
'C' ROAD
'G'
R
O
A
D
'
A
'
R
O
A
D
'F' ROAD
'C' ROADSTORM POND 3
STORM POND 2
(NATURAL DEPRESSION)
STORM POND 6
STORM POND 5
STORM POND 4
STAFF HOUSING
4
14
9
10
12
12
12
13
13
13
11
5 6
7
8
('A' ROAD)100 CLEARWATER LANDINGMEADOW PARK
GROVE('H' ROAD)200 CLEARWATER LANDINGTHE HAMLET ELEMENTS: 888 UNITS
NAME
MARITIME VILLAGE
UNITS
66
INN BY THE SEA & RECREATION CENTER 225
EVENT CENTER -
STAFF HOUSING 52
AGRA CENTER -
CASCADIA HOUSE 126
OLYMPIA HOUSE 126
EAGLES NEST 56
SEA VIEW VILLA 107
GOLF VISTAS 43
WASTEWATER TREATMENT PLANT -
GOLF COURSE -
ID
4
5
6
7
8
9
10
11
12
13
14
15
DESCRIPTION
UNIT MOTEL & RETAIL
HOTEL & SPORTS ARENA
PARKING GARAGE & CONFERENCE CENTER
TWIN SUITES
OPERATIONS BUILDING
CONDOMINIUMS
CONDOMINIUMS
HOMES FOR SALE
HOMES FOR SALE
CONDOMINIUMS
HOLE #
EX. POWER POLE
EX. MONITOR WELL
EX. 4" BOLLARD
EX. FIRE HYDRANT
EX. WATER VALVE
EX. GUY WIRE
EX. SIGN
EX. FENCE
EX. CABLE TELEVISION PEDISTAL
EX. WATER WELL
EX. WATER VALVE
EX. UNDERGROUND UTILITIES
EX. MAJOR CONTOUR
EX. MINOR CONTOUR
100
103
100
103
FINISH MAJOR CONTOUR
FINISH MINOR CONTOUR
NEW SEWER CLEAN OUT
NEW STORM CLEAN OUT
NEW WATER LINE
NEW STORM LINE
NEW ROOF DRAIN LINE
NEW SEWER LATERAL LINE
NEW FIRE HYDRANT
NEW WATER METER
NEW GATE VALVE
NEW CATCH BASIN, TYPE 1
NEW CB TYPE 1 W/ SOLID LID
LEGEND
NEW CATCH BASIN, TYPE 2
NEW CB TYPE 2 W/ SOLID LID
NEW SEWER FORCEMAIN
NEW SEWER MANHOLE
NEW BLOWOFF ASSEMBLY
NEW BLOCKING
NEW RECLAIMED WATER LINE
FUTURE GOLF COURSE
FUTURE PEDESTRIAN PATH
FUTURE BUILDINGS
NEW IRRIGATION LINE
TOPOGRAPHIC NOTE:
THE EXISTING TOPOGRAPHIC DATA SHOWN ON THESE DRAWINGS
HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED
TO BE RELIABLE, HGP CANNOT ENSURE ITS ACCURACY AND THUS
IS NOT RESPONSIBLE FOR THE ACCURACY OF THAT INFORMATION
OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN
INCORPORATED INTO THESE DRAWINGS AS A RESULT.
STORM POND 1
BSBL 20 FT BUILDING SETBACK PER JCC 17.65.040R100'WELLRADIUSR100' WELLRADIUS20' SETBACK
'I' ROAD
17
16
18
THE MANOR VILLAGE 1416CONDOMINIUMS
THE VIEWS 1817
HAWKS LANDING 5518
CONDOMINIUMS
CONDOMINIUMS
100' STEEP SLOPE
BUILDING SETBACK
PROPOSED
WATER WELL #3
EXISTING ACG WELL
06.20.2025
Exhibit 34
GATE
GATE
GAT
E
MONITOR
WATER
TOWER
POND
TEST
PIT
MONITOR
SIGN
"PLEASANT
HARBOR
RESORT"
WATER
TANK
DRIVEWAYHOOD CANAL
EX 12"
METAL
CULVERT
EX 12"
METAL
CULVERT
SIGN
"CORMORANT
VIEW DRIVE"
SIGN "DEAD
END"
140
80
20
210240290270230
220
200
170
15012013
0
100
90
90
90100120130
901201
6
0
15
0
180200190
170180190
1301
4
0150160180
190
140180
190
180
150170200
2402
3
0
260240220
200
2302
1
0
160
1
5
0
19021018
0
1
7
0
210
1601
5
0
1
3
0
1
2
0
13
0
12
0
60
10
60
120
13050
1
0
140
200
260
2
7
0
2
8
0
28
0
3
0
0
2102
4
0
2
0
0
150100301031
0
320 32030
0
200
240
2
2
0
230240 230220210200220
190
2402201
5
0
1
4
0
701
0
1
2
0 180
18
0
22024020019
0
12
0
8
0
6
0
170180
160 1101301401501802001
5
0 160 140200180
1802001
9
0
190
200
19010090
60
170
60
70
170
190
200
190 190240
240
240
200190190
190 1401
8
0
1
9
0
200200
2202202
2
0220 210
180
1
7
0
160 150140
140130120120110
100
140150180220
250
2101801702
1
0
190190210210220240260250
240
2402101
5
0
150
180
200
21022025019021022020022024025025
0
230140130180
1601601
7
0
180240260270 260240210190150
180
20
0
210
230250270270
260
2202102001901801701902302102
2
0 210130130200250270270 2002202
4
0
230240160110220
220
70
1
0
190
200180
1
7
0
100
23
0
240 190240270280260
220
240200180180180 17016017019021
0
240 2702501901
8
0
170180170 160150 120120140160220250190
210
240
280290250250
200200180220 260
240
230
240
18
0
19
0
20
0
160
150 160170
160
170200240250230
210200
200
200240
2
1
0210210200190180170150
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-ecENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY TEMPORARY EROSION &SEDIMENT CONTROL PLAN2
N
HATTON
GODAT
PANTIER
SILT FENCING
INLET SEDIMENT PROTECTION
CLEARING LIMITS
LEGEND
STRAW WATTLE
TEMPORARY EROSION CONTROL DITCH
NATIVE VEGETATION DISPERSION
REMOVE EXISISTING DRY UTILITY SERVICES.
(POWER, CABLE, TELEPHONE, GAS, ETC.)
INCLUDING POLES, CONDUITS, PIPING, ETC.
CONTRACTOR TO COORDINATE REMOVAL
WITH APPROPRIATE UTILITY PROVIDERS.
REMOVE EXISTING SEPTIC TANKS AND DRAINFIELDS PER
WASHINGTON DEPARTMENT OF HEALTH AND JEFFERSON
COUNTY STANDARDS. PROVIDE A COPY OF ANY SEPTIC
SYSTEM DECOMMISSIONING CERTIFICATES TO THE
BUILDING DEPARTMENT.
DEMOLISH & REMOVE ALL EXISTING IMPROVEMENTS INCLUDING
BUT NOT LIMITED TO ALL BUILDINGS, FENCING, SIDEWALKS,
DRIVEWAYS, PARKING AREAS, UTILITIES, TANKS, GATES ETC.
DEMOLISH & REMOVE ALL EXISTING
IMPROVEMENTS INCLUDING BUT NOT
LIMITED TO ALL BUILDINGS, FENCING,
SIDEWALKS, DRIVEWAYS, PARKING
AREAS, UTILITIES, TANKS, GATES ETC.
BLACK PT RD
US HIGHWAY 101B
LA
CK
PO
IN
T
ROAD
REMOVE EXISTING DRY UTILITY SERVICES.
(POWER, CABLE, TELEPHONE, GAS, ETC.)
INCLUDING POLES, CONDUITS, PIPING, ETC.
CONTRACTOR TO COORDINATE REMOVAL
WITH APPROPRIATE UTILITY PROVIDERS.
PROTECT EXISTING WATER TANK DURING
DEMOLITION AND CONSTRUCTION
HOOD
C
A
N
A
L
EXISTING CONTOURS (TYP)
REMOVE EXISTING SEPTIC TANKS AND DRAINFIELDS PER
WASHINGTON DEPARTMENT OF HEALTH AND JEFFERSON
COUNTY STANDARDS. PROVIDE A COPY OF ANY SEPTIC
SYSTEM DECOMMISSIONING CERTIFICATES TO THE
BUILDING DEPARTMENT.
1.CONSTRUCTION ON THIS SITE SHALL BE CONDUCTED
SUBSTANTIALLY IN ACCORDANCE WITH THE APPROVED PLANS.
DEVIATIONS FROM THESE PLANS SHALL BE SUBMITTED TO THE
PROJECT ENGINEER AND REVIEWING AGENCY. DEVIATIONS
MUST BE APPROVED PRIOR TO ANY SITE DISTURBING ACTIVITY
NOT CONTAINED WITHIN THE APPROVED PLANS.
2.FOR DEVELOPMENT OF THIS SITE, THE FOLLOWING GENERAL
SEQUENCE SHALL BE OBSERVED:
A.INSTALL STABILIZED CONSTRUCTION ENTRANCE TO PROVIDE
SITE ACCESS AT INDICATED CONSTRUCTION ENTRANCE
B.LOCATION. INSTALL FILTER FABRIC FENCE AND CLEARING
LIMITS FENCING AS SHOWN IN THESE PLANS.
C.INSTALL INLET PROTECTION FOR EXISTING INLETS IN THE
VICINITY OF AREAS TO BE DISTURBED AS INDICATED ON
PLANS.
D.CALL FOR INSPECTION BY THE REVIEWING AGENCY AND
PROJECT ENGINEER.
E.BEGIN TREE CLEARING AND GRUBBING OF AREAS WHICH ARE
TO BE GRADED.
F.BEGIN GRADING OF AREA TO SUBGRADE AS SPECIFIED.
G.INSTALLATION OF STORM DRAINAGE FACILITIES (I.E., PIPING,
CATCH BASINS, AND OTHER UTILITIES.)
H.STRUCTURE CONSTRUCTION
I.PERMANENT EROSION CONTROL MEASURES (I.E.,
HYDROSEEDING, GRASSING, PLANTINGS, ETC.)
3.ONCE THE SITE HAS BEEN DISTURBED, CONTINUE OPERATIONS
DILIGENTLY TOWARD COMPLETION AND STABILIZATION OF THE
SITE.
4.MONITOR ALL EROSION CONTROL FACILITIES, REPAIR, MODIFY,
AND ENHANCE AS DIRECTED OR AS REQUIRED.
CONSTRUCTION SEQUENCE:
2:1 MAX CUT OR FILL SLOPE (TYP)
FINISH GRADE CONTOURS (TYP)
MONITORING WELL LOCATIONS
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
EROSION CONTROL INTERCEPTER DITCH
SEE DETAIL SHEET 3
STORMWATER PUMP STATION POND
TO BE USED AS TEMPORARY
SEDIMENT POND SILT FENCE / CLEARING LIMITS
SEE DETAIL SHEET 3
SILT FENCE
SEE DETAIL SHEET 3
SILT FENCE
SEE DETAIL SHEET 3
EXISTING
GRAVEL ACCESS
ROADS - AMERICAN
CAMPGROUND
(TYP)
STRAW WATTLES
SEE DETAIL SHEET 4
STRAW WATTLES
SEE DETAIL SHEET 4
NATIVE VEGETATIVE DISPERSION
NATIVE VEGETATIVE DISPERSION
NATIVE VEGETATIVE DISPERSION
UTILIZE EXISTING ASPHALT AS
STABILIZED CONSTRUCTION ENTRANCE
EXISTING AMERICAN
CAMPGROUND
WATER WELL
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-ecENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/A3 N/A1.EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE
BEGINNING OF CONSTRUCTION. THE PROJECT ENGINEER AND THE
REVIEWING AGENCY SHALL INSPECT AND APPROVE THE
INSTALLATION OF EROSION CONTROL MEASURES PRIOR TO
BEGINNING CONSTRUCTION.
2.EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS
SHOWN ON THIS PLAN. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION
CONTROL MEASURES. SILTATION OF EXISTING OR PROPOSED
DRAINAGE FACILITIES SHALL NOT BE ALLOWED. CARE SHALL BE
TAKEN TO PREVENT MIGRATION OF SILTS TO OFF SITE
PROPERTIES.
3.THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL
EROSION CONTROL MEASURES AND MAKE ANY NECESSARY
REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES AS
REQUIRED. THE CONTRACTOR SHALL PROVIDE ADDITIONAL
EROSION CONTROL MEASURES AS DETERMINED NECESSARY BY
THE INSPECTOR OR PROJECT ENGINEER. FAILURE TO COMPLY
WITH ALL LOCAL AND STATE EROSION CONTROL REQUIREMENTS
MAY RESULT IN CIVIL PENALTIES BEING LEVIED AGAINST THE
CONTRACTOR.
4.DURING THE WET SEASON, OCTOBER 1 TO APRIL 30 INCLUSIVE, ALL
DISTURBED SOILS SHALL BE STABILIZED WITHIN 48 HOURS AFTER
STOP OF WORK. EROSION CONTROL MEASURES SHALL
INCLUDE,BUT ARE NOT LIMITED TO, COVERING THE AFFECTED
AREA INCLUDING SPOIL PILES WITH PLASTIC SHEETING, STRAW
MATTING, JUTE MATTING, STRAW MULCH, OR WOOD CHIPS.
SEEDING OF THE DISTURBED AREAS SHALL TAKE PLACE AS
WEATHER PERMITS.
5.ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY
TO ENSURE VEGETATIVE COVERAGE IS COMPLETE. AREAS SHALL
BE REPAIRED, RESEEDED, AND FERTILIZED AS REQUIRED.
6.TRACKING OF SOIL OFF SITE WILL NOT BE ALLOWED. IF SOIL IS
TRACKED ON TO A PUBLIC STREET, IT SHALL BE REMOVED BY THE
END OF THAT WORKING DAY. ANY FURTHER TRACKING OF MUD
HALL THEN BE PREVENTED BY SWEEPING OR WASHING OF THE
VEHICLE'S TIRES BEFORE DRIVING ON A CITY STREET.
7.NO MORE THAN 300LF OF TRENCH SHALL BE OPENED AT ONE TIME.
8.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF
TRENCHES.
9.TRENCH DEWATERING DEVICES SHALL BE DISCHARGED IN A
MANNER THAT WILL NOT ADVERSELY AFFECT FLOWING STREAMS,
DRAINAGE SYSTEMS, OR OFF SITE PROPERTIES.
10.ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE
PROJECT DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT-LADEN WATER WILL BE FILTERED BEFORE ENTERING
THE CONVEYANCE SYSTEM.
11.ALL OFF SITE CATCH BASINS IMMEDIATELY ADJACENT TO THE SITE
SHALL BE PROTECTED FROM SILTATION.
12.ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED UPON
COMPLETION OF WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE TO ENSURE THAT COMPLETE COVERAGE OF THE
DISTURBED AREAS IS PROVIDED AND THAT GROWTH OF
VEGETATION IS ESTABLISHED.
GENERAL EROSION CONTROL NOTES:
MAINTENANCE OF EROSION CONTROL FACILITIES:
IN GENERAL, ALL BMP'S SHALL BE CHECKED WEEKLY AND AFTER A
SIGNIFICANT RAINFALL (MORE THAN APPROXIMATELY 1 INCH IN 24
HOURS). THE FOLLOWING ITEMS SHALL BE CHECKED IN PARTICULAR:
1.SEDIMENT BASINS SHALL BE CLEANED OUT WHEN THE LEVEL OF
SEDIMENT REACHES 1-1/2-FEET FROM THE TOP.
2.DIVERSION DIKES AND SWALES SHALL BE CHECKED FOR
BLOCKAGE AND DAMAGE ON A REGULAR BASIS. WATER SHALL
MOVE FREELY BEHIND DIKES AND IN SWALES AT ALL TIMES.
3.PIPE SLOPE DRAINS SHALL BE CHECKED FOR STABILITY. NO
UNDERMINING OF THE PIPE SHALL BE ALLOWED.
4.FILTER FENCE SHALL BE CHECKED REGULARLY FOR UNDERMINING
AND SEDIMENT BUILDUP. SEDIMENT SHALL BE REMOVED ONCE IT
REACHES A DEPTH OF 1-FOOT.
5.EROSION CONTROL BLANKETS SHALL BE CHECKED FOR STABILITY.
BLANKETS SHALL BE HELD IN PLACE AND HAVE GOOD CONTACT
WITH THE FILL SLOPE AT ALL TIMES.
6.ALL SEEDED AND SODDED AREAS, ESPECIALLY FILL SLOPES,
SHALL BE CHECKED REGULARLY TO MAKE SURE VEGETATIVE
COVERAGE IS COMPLETE. AREAS SHALL BE RESEEDED AND
FERTILIZED AS NEEDED.
7.TRACKING OF MUD OFF-SITE WILL NOT BE ALLOWED. IF
EXCESSIVE MUD IS TRACKED OFF SITE, IT SHALL BE CLEANED
WITH A STREET SWEEPER. FURTHER TRACKING SHALL THEN BE
PREVENTED BY WASHING TRUCK TIRES OR SWEEPING
CONTINUOUSLY.
FILL AREA STABILI=ATION:
1.ALL FILL AREA SLOPES SHALL BE ROUGHENED USING ONE OF THE
METHODS FROM BMP C130 AS FILL IS BEING PLACED.
2.ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED PER THE
NOTES AND DETAILS IN THIS PLAN SET AND PER BMP'S C120 AND C121.
3.IN NO CASE SHALL DISTURBED SOILS REMAIN UNSTABILIZED AND
UNWORKED FOR MORE THAN 7 DAYS DURING THE DRY SEASON (MAY 1
TO SEPTEMBER 30) OR MORE THAN 2 DAYS DURING THE WET SEASON
(OCTOBER 1 TO APRIL 30)
1.MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL BE
APPLIED AT THE RATE OF 2 - 3 TONS / ACRE OR OTHER WOOD FIBER
CELLULOX MATERIAL TO BE APPLIED AT THE RATE OF APPROXIMATELY
100 TONS / ACRE.
2.MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SOILS.
3.MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS
WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON.
4.ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1.
5.MULCH MUST BE MAINTAINED UNTIL SITE HAS ESTABLISHED 80% GRASS
COVERAGE.
MULCH NOTES : (BMP C121)
1.SEED MIXTURE SHALL BE: 40% CHEWINGS OR ANNUAL BLUEGRASS, 50%
PERENNIAL RYE, 5% RED TOP OR COLONIAL BENTGRASS AND 5% WHITE
DUTCH CLOVER APPLIED AT THE RATE OF 120 POUNDS PER ACRE.
2.SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE
IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND
PROTECT THE ROOT STRUCTURE.
3.FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30,
ARMORING OF THE SEED BED WILL BE NECESSARY (E.G.,
GEOTEXTILES,JUTE MAT, CLEAR PLASTIC COVERING).
4.BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL
MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES,
SWALES, LEVEL SPREADERS AND SEDIMENT BASINS.
5.THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING
SURFACE ROUGHENING. PERFORM ALL CULTURAL OPERATIONS ACROSS
OR AT RIGHT ANGLES TO THE SLOPE.
6.FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS
RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED,
ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS.
EROSION CONTROL SEEDING NOTES: (BMP C120)
1.ANYTIME CONCRETE IS USED THESE MANAGEMENT PRACTICES SHALL
BE UTILIZED.
2.CONCRETE PROJECTS INCLUDE BUT ARE NOT LIMITED TO CURBS,
SIDEWALKS, ROADS, DRIVEWAYS, BRIDGES, FOUNDATIONS, FLOORS,
STREET LIGHT BASES AND UTILITY BLOCKING.
3.CONCRETE EQUIPMENT SHALL BE WASHED OUT ONLY IN FORMED
"WASH OUT" AREAS.
4.UNUSED CONCRETE SHALL BE RETURNED TO THE BATCH PLANT FOR
RECYCLING.
5.CONCRETE WASHOUT AREAS SHALL BE CHECKED AND REPAIRED DAILY.
CONCRETE HANDLING NOTES: (BMP C11)
1.SAW CUTTING AND SURFACING OPERATIONS GENERATE SLURY AND
PROCESS WATER THAT CONTAIN FINE PARTICULATES AND HIGH PH.
2.ANYTIME SAW CUTTING AND SURFACING OPERATIONS TAKE PLACE,
THESE BEST MANAGE PRACTICES SHALL BE UTILIZED.
3.SAW CUTTING AND SURFACING OPERATIONS INCLUDING BUT NOT
LIMITED TO CONCRETE SAWING, CORING, GRINDING, ROUGHENING
OR HYDRODEMOLITION.
4.SLURRY AND CUTTINGS SHALL BE VACUUMED DURING OPERATIONS.
5.SLURRY AND CUTTINGS SHALL NOT REMAIN EXPOSED TO THE
ELEMENTS OVERNIGHT.
6.SLURRY AND CUTTINGS SHALL NOT BE ALLOWED TO DRAIN TO
NATURAL OR CONSTRUCTED DRAINAGE CONVEYANCE PATHS.
7.COLLETED SLURRY AND CUTTINGS SHALL BE DISPOSED OF IN A
MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE
WATER QUALITY STANDARDS.
8.WASTE MATERIAL AND DEMOLITION DEBRIS MUST BE HANDLED IN A
MANNER THAT DOES NOT CAUSE CONTAMINATION OF WATER. IF THE
AREA IS SWEPT WITH A MECHANICAL SWEEPER, THE MATERIAL MUST
BE HAULED OUT OF THE AREA TO AN APPROVED DISPOSAL SITE.
SAW CUTTING AND SURFACING POLLUTION
PRE9ENTION NOTES: (BMP C12)
1.ALL DEWATERING FROM OPEN CUT EXCAVATION, TUNNELING,
FOUNDATION WORK, TRENCHING OR UNDERGROUND VAULTS SHALL
BE DISCHARGED INTO A CONTROLLED CONVEYANCE SYSTEM PRIOR
TO DISCHARGE TO A SEDIMENT TRAP OR POND.
2.CHANNELS USED FOR THIS PURPOSE WILL BE STABILIZED WITH
EROSION BLANKETS, CHECK DAMS, SEEDING, SODDING, MULCHING,
OUTLET PROTECTION AND/OR ANY OTHER MEANS DEEMED
NECESSARY BY THE PROJECT CESCL TO ENSURE EROSION AND
SEDIMENT CONTROL STANDARDS ARE MET.
3.HIGHLY TURBID DEWATERING WATER FROM SOILS KNOWN OR
SUSPECTED TO BE CONTAMINATED, OR FROM USE OF CONSTRUCTION
EQUIPMENT, WILL REQUIRE ADDITIONAL MONITORING AND TREATMENT
FOR THE SPECIFIC POLLUTANT(S) BASED ON THE CONTAMINATION.
4.WHEN DEWATERING WATER IS BEING DISCHARGED TO A WATER BODY
WITH A POLLUTANT(S) OF CONCERN, THE DEWATERING WATER MUST
BE MONITORED IN ACCORDANCE WITH CHAPTER 6 OF THE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN
(SWPPP) FOR THE PROJECT.
5.SUCH MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR.
6.THE DEWATERING OF SOILS KNOWN TO BE FREE OF CONTAMINATION
WILL, AT A MINIMUM, TRIGGER BMP'S TO TRAP SEDIMENT AND REDUCE
TURBIDITY.
7.AT A MINIMUM, GEOTEXTILE FABRIC SOCKS/BAGS/CELLS WILL BE USED
TO FILTER THIS MATERIAL PRIOR TO ITS RELEASE TO A RELATIVELY
LEVEL VEGETATED AREA.
8.WHERE NOT COST PROHIBITIVE, DEWATERING WATER, AFTER BEING
FILTERED BY A GEOTEXTILE FABRIC SOCK/BAG/OR CELL, SHOULD BE
DIRECTED TO ONE OF THE PONDS FOR INFILTRATION OR METERED
RELEASE.
9.OTHER BMP'S TO BE USED FOR SEDIMENT TRAPPING AND TURBIDITY
REDUCTION INCLUDE:
·CONCRETE HANDLING BMP C151
·TEMPORARY SEDIMENT POND BMP C241 (POND 'B')
·INFILTRATION (POND 'A')
·USE OF A SEDIMENT BAG WITH OUTFALL TO A VEGETATED SWALE
FOR SMALL VOLUMES OF LOCALIZED DEWATERING
·CONSTRUCTION STORMWATER FILTRATION BMP C251
THE PROJECT CESCL SHOULD DETERMINE WHICH BMP'S ARE MOST
APPROPRIATE FOR SPECIFIC DEWATERING USES.
CONSTRUCTION STORMWATER FILTRATION SHOULD ONLY BE USED AS
A LAST RESORT WHEN ALL OTHER OPTIONS HAVE BEEN EXHAUSTED
AND THE SITE CANNOT MEET TURBIDITY/POLLUTION MONITORING
REQUIREMENTS OTHERWISE.
DEWATERING NOTES:
ANCHOR POSTS MUST BE INSTALLED
TO A DEPTH OF NO LESS THAN 1/3 OF
THE TOTAL HEIGHT OF POST
USE 8" WIRE
'U' TO SECURE
FENCE BOTTOM
6' FT MAX
HIGH 9ISIBILIT< CLEARING LIMITS FENCING
BMP C103
THE CONTRACTOR SHALL PERFORM THE FOLLOWING BEFORE THE
START OF ANY LOGGING, GRADING, OR CLEARING ON-SITE:
A.SURVEY / LOCATE THE CLEARING LIMITS AS DELINEATED ON THE
APPROVED SITE PLAN AND TREE PROTECTION PLANS.
B.INSTALL POSTS FOR THE CLEARING LIMITS FENCING. T-BAR METAL
POSTS, 6 FEET ON CENTER, INSTALLED AT THE LIMITS OF
CLEARING.
C.THE TOP 2 FEET OF THE CLEARING LIMITS FENCING POSTS SHALL
BE PAINTED BRIGHT PINK OR ORANGE.4' MIN.PLASTIC MESH SHALL BE
FASTENED TO POST EVERY
6 INCHES WITH A
POLYETHYLENE TIE
ANCHOR POSTS SHOULD
BE MINIMUM 6' TALL
"T" BAR FENCE POSTS
ORANGE MESH PLASTIC
ON LONG CONTINUOUS RUNS,
A TENSION WIRE SHALL BE
USED AS A TOP STRINGER TO
PREVENT SAGGING
INLET SEDIMENT PROTECTION
BMP C220
1.INSTALL INSERT PER THE MANUFACTURER'S
SPECIFICATIONS
2.MAINTAIN AND REPLACE INSERTS AS RECOMMENDED BY
THE MANUFACTURER, AS REQUIRED BY THE INSPECTOR OR
PROJECT ENGINEER, AND AS OTHERWISE NECESSARY.
AS MANUFACTURED BY
STREAMGUARD (#3001) BY
FOSS ENVIRONMENTAL OR
EQUIVALENT
INLET SEDIMENT PROTECTION NOTES: (BMP C220)
OIL SORBENT FILTER PACK
GEOTEXTILE FABRIC
ADAPTER SKIRT
RETRIEVAL STRAP
SEDIMENT ACCUMULATION
UNDERFLOW
DISCHARGE
OVERFLEW
(TO BYPASS
PEAK STROM
VOLUMES)24"
48"36"
SIDES OF INTERCEPTOR SWALE TO BE SEEDED
AND MULCHED AT A MINIMUM.
(SEE NOTE SHEET 5)
BLANKETS, NETTING, OR ADDITIONAL MEASURES
MAY BE REQUIRED TO CONTROL EROSION.
2'
MIN.
2'
MIN.
1' MIN.
SIDES OF V-DITCH TO BE SEEDED
AND MULCHED AT A MINIMUM.
(SEE NOTE SHEET 5)
BLANKETS MAY BE REQUIRED
TO CONTROL EROSION.
SUBGRADE
2' MIN. BERM
INSTALL CHECK DAMS WHERE SLOPE EXCEEDS 2%
(SEE DETAIL THIS SHEET)
1'
8'
STRAW WATTLES INSTALLED
AT PROPERTY LINE
(SEE DETAIL SHEET 5)
8'2'
20' EASEMENT
8'2'
INSTALL CHECK DAMS WHERE
SLOPES EXCEED 2%
(SEE DETAIL THIS SHEET)
ROAD SUBGRADE TO BE SEEDED AND
MULCHED. SEE NOTES SHEET 5. BLANKETS,
NETTING, OR ADDITIONAL MEASURES MAY
BE REQUIRED TO CONTROL EROSION.
10'1'COMPACTED NATIVE
ESTABLISHED
VEGETATION
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY TESC NOTES & DETAILS - 1TEMPORAR< EROSION CONTROL DITCH DETAIL
NTS
1' MIN.
2
:
1
3:1
2
:
1
M
A
X
.
2
:
1
TO
E
X
I
S
T
ING
1.5%
TEMPORAR< INTERCEPTOR DIKE SWALE DETAIL
NTS
SUBGRADE
2:1P/L
GRASS-LINED ALLE< SUBGRADE SECTION
NTS
C/L
2:1 2%2:12%
TEMPORAR< BERM DETAIL
NTS
06.20.25
Exhibit 34
4 N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY TESC NOTES & DETAILS - 2INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-ecENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/A1.FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL
CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF
JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL
BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A
MINIMUM 6-INCH OVERLAP, AND SECURELY FASTENED AT BOTH
ENDS TO POST.
2.POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND
DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 12 INCHES).
3.A TRENCH SHALL BE EXCAVATED APPROXIMATELY 4 INCHES
WIDE AND 4 INCHES DEEP ALONG THE LINE OF POSTS AND
UPSLOPE FROM THE BARRIER.
4.WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE
MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO
THE UPSLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE
STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS.
THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4
INCHES AND SHALL NOT EXTEND MORE THAN 24 INCHES ABOVE
THE ORIGINAL GROUND SURFACE.
5.THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED
OR WIRED TO THE FENCE, AND 20 INCHES OF THE FABRIC
SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL
NOT EXTEND MORE THAN 24 INCHES ABOVE THE ORIGINAL
GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO
EXISTING TREES.
6.WHEN EXTRA-STRENGTH FILTER FABRIC AND CLOSER POST
SPACING IS USED, THE WIRE MESH SUPPORT FENCE MAY BE
ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED
OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER
PROVISIONS OF ABOVE NOTES APPLYING.
7.SILT FENCES SHALL NOT BE REMOVED BEFORE THE UP SLOPE
AREA HAS BEEN PERMANENTLY STABILIZED.
8.SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL.
ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
9.SILT FENCING TO BE INSTALLED AT A MINIMUM AS SHOWN ON
THESE PLANS. ADDITIONAL SILT FENCING TO BE INSTALLED AT
ANY LOCATION WHERE RUNOFF COULD LEAVE THE SITE. WITH
INSPECTOR APPROVAL, SILT FENCING AND CLEARING LIMITS
FENCING MAY BE COMBINED BY USING ORANGE SILT FENCING.
SILT FENCE NOTES: (BMP C233)
1.MATERIAL SHALL BE 4 INCH TO 8 INCH QUARRY SPALLS AND
MAY BE TOP-DRESSED WITH 1 INCH TO 3 INCH ROCK. (STATE
STANDARD SPECIFICATIONS.)
2.THE ROCK PAD SHALL BE AT LEAST 12 INCHES THICK AND 100
FEET LONG. WIDTH SHALL BE THE FULL WIDTH OF THE VEHICLE
INGRESS AND EGRESS AREA. SMALLER PADS MAY BE
APPROVED FOR SINGLE-FAMILY RESIDENTIAL AND SMALL
COMMERCIAL SITES.
3.ADDITIONAL ROCK SHALL BE ADDED PERIODICALLY TO
MAINTAIN PROPER FUNCTION OF THE PAD.
4.IF THE PAD DOES NOT ADEQUATELY REMOVE THE MUD FROM
THE VEHICLE WHEELS, THE WHEELS SHALL BE HOSED OFF
BEFORE THE VEHICLE ENTERS A PAVED STREET. THE WASHING
SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK
AND WASH WATER SHALL DRAIN TO A SEDIMENT RETENTION
FACILITY OR THROUGH A SILT FENCE.
STABILI=ED CONSTRUCTION ENTRANCE NOTES:
(BMP C10)
1.THE MAXIMUM SPACING BETWEEN THE DAMS SHALL BE SUCH
THAT THE TOE OF THE UPSTREAM DAM (POINT A) IS AT THE SAME
ELEVATION AS THE TOP OF THE DOWNSTREAM DAM (POINT B).
2.CHECK DAMS SHALL BE CONSTRUCTED OF 2-TO 4-INCH
DIAMETER ROCK. THE ROCK MUST BE PLACED BY HAND OR
MECHANICAL PLACEMENT (NO DUMPING OF ROCK TO FORM DAM)
TO ACHIEVE COMPLETE COVERAGE OF THE DITCH OR SWALE
AND TO INSURE THAT THE CENTER OF THE DAM IS LOWER THAN
THE EDGES.
3.IN THE CASE OF GRASS-LINED DITCHES AND SWALES, CHECK
DAMS SHALL BE REMOVED WHEN THE GRASS HAS MATURED
SUFFICIENTLY TO PROTECT THE DITCH OR SWALE. THE AREA
BENEATH THE CHECK DAMS SHALL BE SEEDED AND MULCHED
IMMEDIATELY AFTER DAM REMOVAL.
4.CHECK DAMS SHALL BE CHECKED FOR SEDIMENT
ACCUMULATION AFTER EACH SIGNIFICANT RAINFALL. SEDIMENT
SHALL BE REMOVED WHEN IT REACHES ONE HALF OF THE
ORIGINAL DAM HEIGHT OR BEFORE.
CHECK DAM NOTES:
ALL SLOPES STEEPER THAN 3:1 AND GREATER THAN 5 VERTICAL
FEET SHALL BE ROUGHENED TO A DEPTH OF 2 TO 4 INCHES
PRIOR TO SEEDING.
TRACK WALKING NOTES: (BMP C130)
06.20.25
Exhibit 34
HOOD CANALHIGWAY 101WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
UNITS
62
63
64 66
67
65
LEGEND
150BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSB
L
B
S
B
L
BSBLBSBLBSBLBSBLB
SB
L
BS
B
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLG
1
5
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-hcpENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY STREET LAYOUT PLAN5
N
HATTON
GODAT
PANTIER
BLACK PT RD
US HIGHWAY 101B
LA
CK
P
T
ROAD
HOOD
C
A
N
A
L
'A
'
ROAD'B' ROAD'D
'
ROAD
'
E
'
ROAD
'B
'
ROAD
'C
'
ROAD
'
A
'
RO
A
D 'H' ROAD'C' ROAD'F' ROADE
15
A
15
A
15
A
15
F
15
E
15
A
15
D
15
B
15G
1
5
B
15 C15B15B
15
E
15
J
15
B
15
H
15B15'G'
R
O
A
D
G15E
1
5
J
15
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
'I' ROAD
'B
'
ROAD
C
15
06.20.25
Exhibit 34
WATER
TANK
DRIVEWAYHOOD CANAL
EX 12"
METAL
CULVERT
EX 12"
METAL
CULVERT
SIGN
"CORMORANT
VIEW DRIVE"
SIGN "DEAD
END"
140
80
20
210240290270230
220
200
170
15012013
0
100
90
90
90100120130
901201
6
0
15
0
180200190
170180
13014
0150160180
190
140180
190
180
150170200
2402
3
0
260240220
200
2302
1
0
160
1
5
0
19021018
0
1
7
0
210
1601
5
0
1
3
0
12
0
13
0
12
0
60
10
60
120
13050
1
0
140
200
260
2
7
0
2
8
0
28
0
3
0
0
2102
4
0
2
0
0
150100301031
0
320 32030
0
200
240
2
2
0
230240 230220210200220
190
2402201
5
0
1
4
0
701
0
1
2
0 18
0
18
0
22024020019
0
12
0
8
0
6
0
170180
160 1101301401501802001
5
0 160 140180
1802001
9
0
190
200
1901009
0
60
170
60
70
170
190
200
190 190240
240
240
200190190
190 1401
8
0
1
9
0
200200
2202202
2
0220 210
180
1
7
0160 150140
140130120120110
100
140150180220
250
2101801702
1
0
190190210210220260250
240
2402101
5
0
150
180
200
21022025019021022020022024025025
0
230140130180
1601601
7
0
180240260270 260240210190150
180
20
0
210
230250270270
260
2202102001901801701902302102
2
0 210130130200250270270 2002202
4
0
230240160110220
220
70
1
0
190
200180
1
7
0
10
0
23
0
240 190240270280260
220
24020018021023019017017019021
0
240 2702501901
8
0
170180170 160150 120120140160220250190
210
240
280290250250
200200180220 260
240
230
240
22022
0
18
0
19
0
20
0
160
150 160170
160
170200240250230
210200
200
200240
2
1
0210210200190180170150260 220230240250230
230
230230230
240
220
24
0
250
260
220 220230 230230230230230 230240250260
2602
7
0
2702102202302402
5
0
2
6
0200210220230240250 130140150
150
150 150160 1601701701501501601601601601601601601701
7
0
180180
180
1
8
0
1
8
0
1
8
0
1901902002002002002002102
2
0 150160170180190200210250
2202202202202202302302302
3
0
2
3
0 240220220 22023023023024
0
25
0
170180190200200200220230
240210220230240
160160 170170180 180 190
2
0
0
150 160 170 180
PAD EL
2000
PAD EL
2000
PAD EL
2000
PAD EL
200
PAD EL
2
28
0
250
230
220
210170 1
6
0150 12
01101001101201301401501501601401301
2
0 1101001801
8
0190
190200606070
70
80
80
90
90100
100
110
110
120
120
130
130140
140150
150160
1
6
0
17
0
110
110
110
120
120
120
130
140150
160
170
180
190
200
210220230240250260
210220230240
1902002101
6
01601
7
0
170180
180190
1
7
0
1
60
20
0 2302202
2
0
200
190
210
220230
20
0
210
15
0
12
0
40
210
200210
240 1901
9
0
2001902
0
0
2
1
0
2
3
0 24023021
0
20
0
190
1
8
0
180220240160170
180
1
9
0
15
8
16
2
164
166
168
17
2
1
7
4
176178182184186188200210220230190180210200190180170150150170160150140180190140140
130
110130
10090
90190160170230240250
200210220230240HIGWAY 101TRACT H
TRACT E1
TRACT
X-4
LAKE PLEASANT
TRACT M
TRACT X-4
TRACT
X-1
TRACT
X-2
TRACT X-3
TRACT C
TRACT R
TRACT O
TRACT G
TRACT
X-5
TRACT
X-6
TRACT
X-9
TRACT X-10
TRACT X-7
TRACT X-12
TRACT C
TRACT D
WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
TRACT X-8
TRACT F
TRACT X-13
TRACT X-11
TRACT E2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
TRACT ATRACT ATRACT ATRACT BTRACT B
T
R
A
C
T
B
TR
A
C
T
BTRACT BTRACT ATRACT ATRACT ATRACT ATRACT ATRACT A
TRACT
X-2
TRACT QTRACT PTRACT M
UNITS
62
63
64 66
67
65
TRACT
X-1
LEGEND
150
TRACT X-14
DOG PARK
TRACT
TRACT IBSBLBSBLBSBL
BSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBL BSBL BSBL BSBL
BSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSBL
B
S
B
L
BSBLBSBLBSBLBSBLBSB
L
BS
B
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grdENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY OVERALLGRADING & DRAINAGE PLAN6
N
HATTON
GODAT
PANTIER
BLACK PT RD
US HIGHWAY 101B
LA
CK
P
T
ROAD
PROTECT EXISTING OFFSITE WATER
TANK DURING CONSTRUCTION
HOOD
C
A
N
A
L
FOR PERMITTING PURPOSES ONLY
NOT TO BE USED FOR BIDDING
EARTHWORK CALCULATIONS
CUT 1,231,000 CY
FILL 925,000 CY
NET (CUT)306,000 CY
A.THE GROUND SURFACE FOR THE PLANNED FILL AREAS SHALL BE
PREPARED TO RECEIVE FILL BY REMOVING ALL TREES, BRUSH,
LANDSCAPING DEBRIS AND OTHER DELETERIOUS MATERIAL.
B.EXISTING SOILS IN FILL AREA SHALL BE EXAMINED BY SOILS
ENGINEER/GEOLOGIST RETAINED FOR PROJECT.
C.TOP SOIL AND ANY OTHER SOILS THAT CAN NOT MEET COMPACTION
REQUIREMENTS AS SHOWN IN THESE PLANS SHALL BE REMOVED
PRIOR TO THE COMMENCEMENT OF FILL OPERATIONS.
D.EXISTING SOILS IN FILL AREAS SHALL BE COMPACTED FOLLOWING
THE RECOMMENDATIONS OF THE GEOLOGIST/SOILS ENGINEER.
E.THE GEOLOGIST RETAINED FOR THE PROJECT SHOULD BE INVOLVED
IN PLANNING THE EXTENT OF EXISTING SOILS TO BE REMOVED, THE
LOCATION AND THICKNESS OF FILL PLACEMENT, OBSERVING
PLACEMENT AND COMPACTION OF FILL SOILS AND IN VERIFYING
COMPACTION REQUIREMENTS HAVE BEEN MET.
CUT FILL NOTES:
1.ALL EMBANKMENT MATERIAL SHALL CONFORM TO SECTION
9-03.14(1) GRAVEL BORROW OF THE WSDOT STANDARD
SPECIFICATIONS.
2.EMBANKMENT MATERIAL SHALL BE PLACED AND COMPACTED TO
95% OF THE MAXIMUM DENSITY PER WSDOT/APWA STANDARDS
2-03.3(14)0.
3.EMBANKMENTS SHALL BE PLACED PER WSDOT STANDARD
SPECIFICATIONS METHOD C.
4.AREAS TO BE FILLED SHALL BE CLEARED AND GRUBBED PRIOR TO
PLACING ANY FILL MATERIAL.
5.A GEOTECHNICAL FIRM CAPABLE OF SUCH WORK SHALL SUPERVISE
ALL FILL PLACEMENT AND SUBMIT INSPECTION AND COMPACTION
REPORTS TO THE PROJECT ENGINEER.
6.NO FILL SHALL BE PLACED DURING PERIODS OF UNFAVORABLE
WEATHER OR WHILE THE FILL IS FROZEN OR THAWING.
7.WHEN THE WORK IS STOPPED BY RAIN, PLACEMENT OF FILL SHALL
NOT RESUME UNTIL THE GEOTECHNICAL FIRM DETERMINES THAT
THE MOISTURE CONTENT IS SUITABLE FOR COMPACTIVE EFFORT.
8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND
REWORKING OF ANY FILL THAT HAS SOFTENED OR HAS LESS THAN
THE REQUIRED COMPACTION.
9.ALL DISTURBED SOILS SHALL BE SEEDED, MULCHED OR
OTHERWISE PROTECTED FROM SHEET WASHING AS SOON AS
POSSIBLE FOLLOWING GRADING.
10.ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED UPON
COMPLETION OF WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE TO ENSURE THAT COMPLETE COVERAGE OF THE
DISTURBED AREAS IS PROVIDED AND THAT GROWTH OF THE
VEGETATION IS ESTABLISHED. SEE ADDITIONAL REQUIREMENTS
FOR EROSION CONTROL ON SHEET 2.
GEOTECHNICAL SPECIFICATIONS:
ENLARGED GRADING &
DRAINAGE PLAN - 1
SEE SHEET 7
ENLARGED GRADING &
DRAINAGE PLAN - 4
SEE SHEET 10
ENLARGED GRADING &
DRAINAGE PLAN - 2
SEE SHEET 8
ENLARGED GRADING &
DRAINAGE PLAN - 5
SEE SHEET 11
ENLARGED GRADING &
DRAINAGE PLAN - 3
SEE SHEET 9
ENLARGED GRADING &
DRAINAGE PLAN - 6
SEE SHEET 12
ENLARGED GRADING &
DRAINAGE PLAN - 8
SEE SHEET 14
ENLARGED GRADING &
DRAINAGE PLAN - 7
SEE SHEET 13
PROPOSED SITE FOR THE
WASTEWATER TREATMENT PLANT
KETTLE B
WETLAND
EXISTING CONTOURS (TYP)
'A' ROAD
'B' ROAD'D
'
ROAD
'
E
'
ROAD
'H
'
ROAD
'
C
'
RO
AD
'G'
R
O
A
D
'
A
'
RO
A
D 'B' ROA
D
'C' ROAD'F' ROAD
GENERAL CONSTRUCTION NOTES
1.A CONSTRUCTION PERMIT FROM JC PUBLIC WORKS IS
REQUIRED PRIOR TO COMMENCING WORK WITHIN COUNTY
RIGHT-OF-WAY.
2.ANY WORK WITHIN STATE RIGHT-OF-WAY WILL REQUIRE A
STATE CONSTRUCTION PERMIT.
3.THE CONTRACTOR SHALL NOTIFY JC PUBLIC WORKS AT LEAST
24 HOURS PRIOR TO STARTING CONSTRUCTION WITHIN THE
RIGHT-OF-WAY.
4.THE CONTRACTOR SHALL PROVIDE ALL SIGNS, BARRICADES,
FLAGMEN, LIGHTS, OR OTHER DEVICES NECESSARY FOR SAFE
CONSTRUCTION TRAFFIC CONTROL IN ACCORDANCE WITH THE
CURRENT EDITION OF THE MUTCD AND AS MODIFIED BY
JEFFERSON COUNTY. A CONSTRUCTION TRAFFIC CONTROL
PLAN SHALL BE SUBMITTED TO AND APPROVED BY JCPW
PRIOR TO THE ISSUANCE OF ANY CONSTRUCTION PERMIT FOR
WORK WITHIN COUNTY RIGHT-OF-WAY.
5.CONSTRUCTION SPECIFICATION: CURRENT EDITION OF THE
WASHINGTON DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
6.THE SUBGRADE MATERIAL SHALL BE SCARIFIED OR REMOVED
TO A DEPTH REQUIRED BY JEFFERSON COUNTY PER
INFORMATION OBTAINED FROM LABORATORY TESTS AND/OR
AS REQUIRED IN THE PAVEMENT DESIGN REPORT. ADDITIVES
OR APPROVED MATERIAL MAY BE REQUIRED IF THE NATIVE
MATERIAL IS UNSATISFACTORY. THE SUBGRADE SHALL BE
COMPACTED TO A MINIMUM DENSITY AND MOISTURE CONTENT
RANGE OF 2 PERCENT BELOW OPTIMUM TO 2 PERCENT ABOVE
AS DETERMINED IN ACCORDANCE WITH AASHTO DESIGNATION
T180 OR T99 AND IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONS SECTION 203.07.
7.AGGREGATE BASE COURSE FOR SHOULDERS SHALL BE
PLACED AND COMPACTED 95 PERCENT MODIFIED PROCTOR
TEST (AASHTO T180) AFTER PLACEMENT OF ASPHALT.
8.EXISTING ASPHALT PAVEMENT SHALL BE STRAIGHT SAWCUT
OR BLADECUT WHEN ADJOINING WITH NEW ASPHALT
PAVEMENT. TACK COAT SHALL BE APPLIED TO ALL SURFACES.
9.STRUCTURAL SECTION, INCLUDING SUBBASE AND ASPHALT,
SHALL BE CONSTRUCTED ACCORDING TO THE FINAL
PAVEMENT DESIGN THAT HAS BEEN PREPARED BY THE
DEVELOPER’S ENGINEER, AND APPROVED BY JCPW. EXISTING
STRUCTURAL SECTION AT THE MATCH POINT SHALL COMPLY
WITH THE MINIMUM FULL DEPTH ASPHALT THICKNESS.
KETTLE C
LINED RECLAIMED
WATER HOLDING
FACILITY
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
KETTLE A
STORMWATER
POND #1
'I' ROAD
06.20.25
Exhibit 34
182184186188174
176
1
64 166154
156
1
5
0
216200198220218240238242250248196164166168180214216210
250248252270268270268272262264266268180182184170
172 160162164166154156124126120150150160146146148148152154156158162
21421410+0011+0012+0013+001
4
+
0
0
15+00 16+00
17+00
18+00
19+00
20
+
0
0
2
1
+
0
0
22+0023+0024+0025+0015+0016+0018+007+32
8+00
9+00
10+00
11+00 12+00
13+00
14+0
0
15+0
0
16+0
0
15
0
16
0
17
0
18
0
1
9
0 200210144
14
6
14815
2
15
4
15
6
15
8
16
2
16
4
16
6
16
8
17
2
1
7
4
17
6
1
7
8
1
8
2
18
4
1
8
6
18
8
19
2
1
9
4
19
6
1
9
8 2022042062082122
1
4
1801
9
0
200
2102202302402502601741761781821841841
8
4
1
8
6
1
8
8
192 194
196
198
202
204
206208212214216218222224226228232234236238242244246248252254256258262264266150
160
170
18
0190200210
22
0
2302
4
0
120
130
1401501601701801902002102202302402501221241261
2
8
132
134
136 138142144146148152
15415615816216416616817217417617818218418618819219419619820220420620821221421621822222422622823223423623824224424624825225413014
0150
1601321
3
4
1
3
6
13814
2
1
4
414614
8
1
5
2
1541561581621642
5
0
260270280160170180190200210
220
230
240250260270190
200
21
0
18
2
1
8
4
1
8
6
188
192
194
196
198
202
20
4
2
0
6
208
212
214 16017018019015415615816216416616817217417617818218418618819219417
0 18019016616817
2
17
4
17
6 178182186188HP 222.56
LP 208.938.75%9.65%7.41%
150
FIRST FLOOR
EL 2000
210220230240250230
228
232
234
236160170180140
150
160170180190200210210220220138
138
142
144
146
148
152
154
156
158
1
6
2
164166168172174176178182184186188192194196198202204206208212212214214
216216218218222222HIGWAY 101TRACT H
TRACT E1
TRACT
X-5
TRACT D
TRACT E2
TRACT ATRACT ATRACT A
TRACT IBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBL
BSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGED GRADING& DRAINAGE PLAN - 17
N
HATTON
GODAT
PANTIER
BLACK P
O
I
N
T
R
D
US HIGHWAY 101WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
WALL NOTES:
SEE SHEET 8
MATCH LINE SEE SHEET 10MATCH LINE'A' ROAD'A
'
ROAD'B' ROAD'D
'
ROAD
EMERGENCY OVERFLOW
PATH TO SECOND POTHOLE
OVERFLOW SPILLWAY
EL. 201.00
132 LF 24" HDPE
STORM PIPE
EXISTING
POTHOLE
EXISTING
POTHOLE
STORMWATER POND #1
EXISTING POTHOLE
100% INFILTRATION
2"/HR DESIGN RATE
DWL CONTOUR 200.00
OVERFLOW 201.00
BERM END
OF SWALE
234 LF 12" HDPE
STORM PIPE
@ 0.01 FT/FT
141 LF 12" HDPE
STORM PIPE
@ 0.01 FT/FT
FL 193±
FL 193±
REMAINDER OF 'A' ROAD TO BE
DETAILED WITH SR 101/BPR
INTERSECTION REDISIGN
20' MIN
SETBACK
CATCH BASIN
TYPE 1, (TYP)
CATCH BASIN
TYPE 1, (TYP)
06.20.25
Exhibit 34
170
190188
192250248252270268270
264
266
260
256
2
3
2
2
3
4
2
3
6
2
3
8
220218222214190188212214216230210234160162234
220
218
234
236
20019619820220418018219
4 212214240 270268272250248252262264266268190192170210188188214240 26+0027+0028+0029+0030+0031+0032+0033+0034+0035+0036+0037+0010+0
0 11+0012+0013+0014+0010+00
11+00
12+
0
0
1
3
+
0
014+0015+0016
+
0017+00200240250202204206208 236238242244246248252254184184190
200210220230 240250186188192194196198202204206208212214216218222224226
228232234236238242
2
4
4
2
4
6
2
4
8
252
170
1801801801901901902002002
0
0210210 210220220
220230230
230240166
168
172
174176178178178182182182
184184184
186186186
188188188192192192194194194196196196198198
198202202 2
0
2204204
2
0
4206206
206208208
208212212
212214214214216216216218218218222222
222224224
224226226
226228228
228232232
232234234
234236236
236238238
238242244 17018019020021017217417617818218418618819219419619820220420620821022023024
0 212214216218222224226228232234236238170180190200210220164166168172174176178182184186188192194196198202204206208212214216218222140150160170180190200
138142144146148152154156158162164166168172174176178182184186188192194196198202
19020021022
0
230
240
192194196198202204206208212214216
218
22
2
2
2
4
226
228
232
234
236
238
242
2441801
9
0 18218418618
8
1921941701
8
0
19017217417617
8
18218418618825
0
26
0
270
280
242
244
24
6
248 252 254
256
25
8
262
26
4
266
26
8
27
2 274276278 PAD EL
2000
PAD EL
2000
1801902002102102202302401.00%4.87%LP 189.34
HP 213.69 1.72%5.10%4.00%
8.
0
5
%2.00%
1
9
0
200210210
19
2
194
196
198
202
204
206
208212212
190190190200210210
210220230240240240
220
216
218
222
224
226
228
220220220230240220230
240
214216218222224226228232
234
236
238
24
2
244
246
EL 240.00
TRACT
X-4
TRACT
X-6 TRACT BBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGED GRADING &DRAINAGE PLAN - 28
N
HATTON
GODAT
PANTIER
SEE SHEET 11SEE SHEET 7
MATCH LINEMATCH LINE
SEE SHEET 9
MATCH LINE
'A
'
ROAD'B' ROAD'D
'
ROAD'A' ROAD'E' ROADSE
E
S
H
E
E
T
10
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
WALL NOTES:
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
STORM POND #2
NATURAL DEPRESSION
100% INFILTRATION
2"/HR DESIGN RATE
DWL EL 190.00
OVERFLOW EL 196.00
EXISTING OVERFLOW
PATH (TYP)
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
GATE
GATE
STORM POND #3
EXCAVATE TO
BTM EL 186.00
100% INFILTRATION
5"/HR DESIGN RATE
DWL EL 189.00
OVERFLOW EL 190.00
STORM POND #3
EMERGENCY OVERFLOW
SPILLWAY EL 190.00
34 LF 12" HDPE
STORM PIPE
FL 187.0020' MINSETBACKCATCH BASIN
TYPE 1, (TYP)
CATCH BASIN
TYPE 2-48, (TYP)
06.20.25
Exhibit 34
240240194190
220
220
1
0
1
2
124
126
128
130
132
134
1
3
6
1
3
8
1
4
0
1
4
2144146 1
4
8
1
5
0
1
5
215415615
8
1
6
0
16
2
164
166
168
1
9
8
1
9
8
1
9
8
1
9
8
21437+0038+0039+0040+0041+0042+004
3
+
0
0
4
4
+
0
0
4
5
+
0
0
4
6
+
0
0
4
7
+
0
0
48+0049+0010+0
0
11+001
2
+
0
0
1
3
+
0
0
1
4
+
0
0
1
5
+
0
0
16+0017+0010+00
11+0
0
12+0
0
13+00
14+00
15
+
0
0
1
6
+
0
0
27+0028+0029+0030+0031+0
0
2
0
6
2082101781
7
8
1801
8
0
182182184184186186188188190190192192194194196196198200202172
174
17
6
19
6
198
200
202
19
6
19
8
2
0
0
176178180182184
186 188 190 192194196198200202204206208210212
212214
2148284
86
8890
92
94
9
6
98
10
0
10
2
10
4 10
6
10
8
1101121141161181201221241261281301321341
3
6
1
3
8
1
4
0
1
4
2
1
4
4
1
4
6
1
4
8
1501521
5
4156 158160162164166168170172174176178
180
182
184 186
220220222222 224224 226226 228228
230222
22
2
224224
226226 22823022622823023218
0
182184
186
18
8
19
0
19
2
19
4
19
6
19
8
20
0
2022042062082102122142162182202222242262282302322342362382402422442462482502522542562582601
9
0
192
1
9
4
19
6
19
8
20
0
20
2
20
4
206 20
8
210
212
2
1
4
2
1
6
2
1
8 220196198200202 20420618618
8
19
0
192194 1
8
6 1861
8
8 188190190192192
19
2192194194194196196196198200202204206
208
210
212
214
216218220
190
192
194196198200202204206
2
0
8
2
1
0
2
1
2
214
216
218
220
222 1982002
0
4
204
28
0
2822842862882
4
0200210220230240250198200
200200
202202
202
204204204
HP 215.00
HP 201.08
LP 195.79
HP 195.845.00%2.00%4
.
0
0%5.63%?
?
?190192194180190196196198200
202198198198200202 204206
208
210
212
214
2102101
9
0
1
9
2
1
9
4
1
9
6
1
9
8
200
20220420620821021221
4
21
6
21
8
22
0
220220
208208
210210
210
212212
212
214
216
21822
0
22
2
22
4
21
6
218
220
222
224
226
228
230
232
234
23
6
23
8
190 192192192
192 194194194
194196
196
214214216216218190192
194
196
196196
198
198
198200
2
0
0
2002022042062082102122142161
.
2
5%
186
1
8
0 188LP 195.79
HP 196.30
LAKE PLEASANT
TRACT M
TRACT X-4 TRACT G
TRACT C
20
21
22
23
24
25
26
27
28
44
45
46
47
48
49
50
51
52
53
54
55
113
114
115
116
117
118
119
120
121
122
128 129 130TRACT ATRACT A
TRACT X-14BSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
BSBL
BSBL
B
S
B
L
B
S
B
L
B
S
B
L
5.02%
PATH EL.
196.00
PATH EL.
186.00
180
182
184
186
188
190
192
194
196
198
200
202
204
206
208
210
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUMJEFFERSON COUNTY
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGED GRADING &DRAINAGE PLAN - 39
N
HATTON
GODAT
PANTIER
SEE SHEET 8
SEE SHEET 14 SEE SHEET 12MATCH LINE
MATCH LINEMATCH LINES'A' ROAD'
E
'
ROAD
'
A
'
RO
A
D
'
C
'
RO
AD 'B' ROADSEE SHEET 12
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
WALL NOTES:
8'x24' CONTECH
STORMFILTER
SEE DETAIL SHEET 19
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
STORM POND #3
EXCAVATE TO
BTM EL 186.00
100% INFILTRATION
5"/HR DESIGN RATE
DWL EL 189.00
OVERFLOW EL 190.00
SEE SHEET 8
234 LF 24" HDPE
STORM PIPE
KETTLE C
LINED RECLAIMED
WATER HOLDING
FACILITY
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
RECLAIMED WATER
PUMP STATION
100'STRUCTURALSETBACK100'2:1MAX
2:1MAX
2:1MAX
1
0
'
D
A
Y
L
I
G
H
T
B
A
S
EM
E
N
T
W
A
L
L
10'
DAYL
IGHT
BASEMENT
WALL10'
WALL
CATCH BASIN
TYPE 1, (TYP)
CATCH BASIN
TYPE 2-48, (TYP)
100' STEEP SLOPE
BUILDING SETBACK
06.20.25
Exhibit 34
WATER
TANK
164
170
210
208
160
140
138
142
140134136130120140220218226252254
2442462101801822
1
0
202204206190188192190188192196210210220222246264266254256250
25
4
25
6
252
254
256
258240238
242216270268270
264
266
260
256
2
3
2
2
3
4
2
3
6
2
3
8 234270268272156
17822622811+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+00
22+00
23+00
24
+
0
0
2
5
+
0
0
2
6
+
0
0
2
7+
0
0
28+0029+0030+0031+0032+0033+00
34+00
35+00 36+0037+0038+0039+0040+004
1
+
0
042+0043+0
0
10+0011+0012+00210206208212214
2602522542562582622642662202302402502602702182222242262282322342362382422442462482522542562582622642662682
2
0
22
0 2302402502602
2
2
22
2 22422
4 22622
6 228232234236238242244246248252254256258262
1
7
0 18019020021022023016616817
2
17
4
17
6 1781821841861881921941961982022042062082122142162182222242262282202
3
0
240
212214216
2182222
2
4
2
2
6228 2
3
2
2
3
4
236
238
242
180190200210220
230
240250260
26
0
2
7
0
270172174176178182184186188192194196198202204206208 212214216
218 222224226228232234236238242244246248252254256 258262
2
6
2
264
2
6
4
266
266
26
8
268 272272
230
240 250260270224
226228
232 2
3
4
236238
242
244 246248252254256258262264266268110
1201
3
0140150 160
170180190200210220230240250260106
108
112
114116118122124126128132134136138142144146148152154156
158
162
164164
164
166
16817217417617818218418618819219419619820220420620821221421621822222422622823223423423423623824224424624825225425625826226426627227415
0
160
170
180
1901
4
4
1
4
6
1481
5
2
154
156
158
162
164
166
168
172
174
17
617
8
1821841861881921941
2
0
130
14015
0
1
6
0
17
0
1
8
0
1
9
0
1
2
2
124
126
128
132
13
4
13
6
13
8
1421441461481521541
5
6
1
5
8
1
6
2
16
4
16
6
16817
2
1
7
4
1
7
6
1
7
8
1
8
2
1
8
4
1
8
6
1
8
8
192202204206200192
1
9
4 196198202204200210220230230
2
4
0
240
19820220420620821221421621822222422422622622822823223223423
4
23623
6
238
23
8
242
242
244
244
200
210220230240250
260
202
20
4206208212214216218222224226228232234236238242244246248252
254
256
258
262
264
222PAD EL
2000
FFE 20
PAD EL
200
FFE 2283
HP 245.45
1.72%5.10%5.08%2.15%1.42%250 250250
250
250250
250
250
250
250
250
250250250
244 244244244
244244244
246
246
246246246246
248
248
248248248
248
248248248
252252
254254254254 150150
150150150150
150150
150160140140140140140150160160 160160
160160 1601701701601601701701701701701
8
01921921941941961961961
9
6
1
5
0
150 150150
150 150150160160160160170170152152152152154154154154156156156156158158158158162162164164164164166166168168168168172172172172
150 150150 1501
5
0
160160
170170
148 148152 152152
154 154154
156 156156
158 158158
162162
164164
166166
168168
172172
1741
7
4
150150150
150160
160
170170170180190200210220220
230 230240 240250250
250
250148148152
152154154156156158158162
162164164166166
168168168172172
172
174174174
1761761
7
6
176176
178
178
178178178178178178178
178
178182184186188192194196198202204206208212214
216 216218 218222 222224224
226 226228228 232232
234 234236236 238238
242 242244 244246 246248 248248248
252
252 2
5
2
252 252252 252252
2202202202302406.27% TRACT
X-1
TRACT
X-9
TRACT X-10
TRACT X-7
TRACT X-8
TRACT F
TRACT X-11
TRACT E2
1
2
3
42
43TRACT BTRACT B
T
R
A
C
T
B
TR
A
C
T
BTRACT BTRACT ATRACT A TRACT
X-2
DOG PARK
TRACT
BSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBL BSBLBSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGED GRADING &DRAINAGE PLAN - 410
N
HATTON
GODAT
PANTIERBLACK PO
INT
RDSEE SHEET 8MATCH LINESEE SHEET 11
MATCH LINE 'B' ROAD'B
'
ROAD'B' ROADTYPE 2 CATCH BASIN
(TYP)
PROPOSED TYPE 1 CATCH BASIN
w/ SOLID COVER
(TYP)
TO POND #5
(SEE SHEET 11)
WALL NOTES:
DROP OFF ZONE
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
STORM POND #6
EXCAVATE TO
BTM EL 126.00
100% INFILTRATION
1"/HR DESIGN RATE
DWL EL 131.00
OVERFLOW EL 132.00
EMERGENCY
OVERFLOW
SPILLWAY
EL 132.00
45 LF 12" HDPE
STORM PIPE
RETAINING WALL
HEIGHT VARIES
0' - 8'
SEE NOTE
THIS SHEET
6' WIDE BERM
RETAINING WALL
HEIGHT VARIES 0' - 30'
SEE NOTE THIS SHEET
RETAINING WALL
HEIGHT VARIES 0' - 22'
SEE NOTE THIS SHEET
PICKLE BALL COURTS
RETAINING WALL
HEIGHT VARIES 0' - 20'
SEE NOTE THIS SHEET
LINED RECLAIMED
WATER DISCHARGE
SWALE (TYP)'H' ROADCATCH BASIN
TYPE 1, (TYP)
CB - TYPE 2
RIM 157
FL 154
CB - TYPE 2
RIM 160
FL 157
06.20.25
Exhibit 34
120114
11
6
100
90
90 114116120180190
180
180
164
170 120122110
108
112
94
96
8486100
146
156 11+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+001721741
9
0
1
8
6
1
8
8
192202206200192
1
9
4 196198202204200198160170180190200162164166168172174
1761781821841861881
9
2
1
9
4
1961982
0
2
204
206
208204
1
8
0
1902001
7
8 18218418618819219419619820260
90
100
110 12013014
0
1
5
0
160
62
86 88 92 94 96 98 102104 106
108 112 114 116 118122124126128132
134
136
13
8
1
4
2
14
4
1
4
6
1
4
8
152
154
156
158
162
164 210206
2
0
8212
19
0
190
200
2
0
0
192
192
194
194 196196 1981
9
8
2
0
2
202
20
4
204
206
190
190200 2002
1
0 210192
1921
9
4
194196
19
6
198 198202 2022042062062
0
8
2
0
8
2
1
2 2122
1
4 2142162
1
6 218218
2
0
0
19
6
19
8 18017617617817818218418618818019020021
0 2201821841861881921941961982022
0
4
2
0
6
20
8
2
1
2
21
4 21
6
21
8
607080
90100 1101201301401501
6
0
1
7
0
62646668727476
78
82
8
486 88929
4
96981021041061
0
8
112114116118122124126
1281321341
3
6
1
3
8142144146148 1521
5
4
1
5
6
1
5
8
1
6
2
1
6
4
1
6
6
1
6
8172174176
15016017014214
2144
14
4146148152154156158162164166168172174176 120
1201301
4
0 118118122122
1
2
4
126
12813
2
13
4
13
6
1381
5
01601701801
9
0
20014614
8
1
5
21541561581621641661681721741761781
8
2
1
8
4
1
8
6
1
8
8
1
9
2
1
9
4
1
9
6
198202202204206150
150150
16
01701801801901902002
0
0
148152 154156158162164166168172174176178
178182
182184
184186
186188
188192192
194194
1961
9
6
1981
9
8
2022
0
2
204
2
0
4
2
0
6
206194196198190
2
0
0 200182184
18
6
188
19
2
1
9
4
1
9
6
1
9
8 2022029
0
1001108
8
9
2
9
4
9
6
98102104106108112114116130140126128132134136138142144146148140140150150160160170180132132134134136136138138142142144144146146148148152152154154156156158158162164166168172174176178182184
186
188170180
156158162164166168172174176178
182
184 186 160170158162164166168172150160148152154154154154154154154156158162162 164164166166 LP 145.77
HP 148.37
HP 153.71
LP 158.03
HP 162.77
1.28%1.25%1.25%4.04%150150160
160
1461461481481
5
2
152
154
15
4
15
6
156
158
15
8
162
162
164
160162164170
168
172
174
176
TRACT
X-2
WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
2
3
4
5
6
7
8
9
10
11
12
13
14
15
31
32
33
34
35
36
37
38
39
40
41
42
43 TRACT ATRACT ATRACT A TRACT
X-1
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGED GRADING &DRAINAGE PLAN - 511
N
HATTON
GODAT
PANTIER
SEE SHEET 10
SEE SHEET 12
MATCH LINE
MATCH LINESEE SHEET 8MATCH LINE'H' ROAD18" HDPE
CULVERT
KETTLE C
LINED RECLAIMED
WATER HOLDING
FACILITY
WALL NOTES:
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
STORM POND #5
NATURAL DEPRESSION
99.2% INFILTRATION
2"/HR DESIGN RATE
BTM EL 81.00
DWL EL 95.00
OVERFLOW EL 96.00
6' WIDE
BERM
220 LF 21" HDPE
STORM PIPE
218 LF 18" HDPE
STORM PIPE
267 LF 15" HDPE
STORM PIPE
EMEGERENCY
OVERFLOW
SPILLWAY
EL 96.00
LINED RECLAIMED
WATER DISCHARGE
SWALE (TYP)
RIPRAP
SWALE
OUTFALL
1
2
0130140 06.20.25
Exhibit 34
268272136
240284
220200
19
6
3
0
0 320224
2
2
0
240
280256220184
49+0050+0051+0052+0056+00
57+00
58+00
59+0
0 38+0039+0040+0041+0042
+
0
0
43+0
0
1
5
+
2
2
10+0011+0012+0013+0014+001
5
+
0
0
11+0012
+
0
0
13
+
0
0
14+0
0
15+00
16+0023+0024+0025+0026+0027+0028+0029+0030+0031+0
0
0
+
1
0
1+00
2+003+003+32 200204208160180
1
4
8
152156164168172176192
196200192196204208212
2121601
4
4
1
4
8
152156164168220220224224 228228 224224
228228232200
20
4
208
200
22022
0
184
1
8
8192
196
2042042082
0
8 212212 216216 224224
228
22
8
232
2
3
2 236236200220240
260
1
9
2196
2042082
1
2
216224
228
232
236
244
248 252
256
264
268
240260244248
252 2562642682722322362402
6
0
28
0228232236
2442482522562
6
4
2
6
8
2
7
2
27
6 284240260280244
248252 256264268272276284288160
18
0
200
220
24
0
26
0
144
148
152
156
164
168
172
176
184
188
192
196
204
208
212
216
224228232
236
244
248
25
2
2
5
6
26
4
26814414818
0
200220176
1841
8
8
192196204208212216224200
2
2
0
184
188
192
196
204
208
212
21
6
2
2
4
2
0
0
19
6
2
0
4
28
0
276284288280
272
2
7
6
PAD EL
200
1
8
0
1
8
4 172176HP 195.84
4.00%5.63%5.63%5.72%18.00%10.00%4.24%
220
2
4
0
212
216 22422823223624422022022020022
0
220220
1
9
2
1
9
6
20420821221
6
22
0
208208
212212
212
216
22
4
240
228232236 244220
21
6
224
228
232
23
6
240
240 240224224224
2
2
4
22
8 22822
8
228 232232
232
236
236 236244
244 244248220220212216224228240
260
244
248
252
256
264
268
272
260260
164
168
216240
13.63%TRACT M
TRACT R
TRACT X-12
TRACT X-13
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
58
59
60
61
123124125126
127
128 129 130 131 132 133
134
135
136
143
144145146
147
148
149TRACT ATRACT QTRACT M
150
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLPAD EL
2000
260
244
248
252
256
264
268
272
276
6.74%9.53%260
2602407.41%240220200CCDS
250.77170180
190
200
210 166168172174
176
178
182
184
186
188
192
194
196
198
202
204
206
208
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGED GRADING &DRAINAGE PLAN - 612
N
HATTON
GODAT
PANTIER
SEE SHEET 13
SEE SHEET 11
SEE SHEET 9MATCH LINEMATCH LINE
MATCH LINE
'A' ROAD'F' ROAD'H' ROAD'C' ROAD'G'
R
O
A
D
WALL NOTES:
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
STORM POND #4
EXCAVATE TO
BTM EL 205.00
100% INFILTRATION
1"/HR DESIGN RATE
DWL EL 211.00
OVERFLOW EL 212.00
EMERGENCY OVERFLOW
SPILLWAY EL 212.00
BIORETENTION SWALE
w/ 5' BOTTOM
(SEE DETAIL SHEET 17)
124 LF 18" HDPE
STORM PIPE
161 LF 15" HDPE
STORM PIPE
180
'I' ROAD
20' MIN.
SETBACK
06.20.25
Exhibit 34
6
284
286
220200
19
4
19
6
230232234246
2
1
01841861
7
4
1
7
6
1641
6
6
174
1762101
9
4
1
9
6
18
0
17
2
17
4
17
6
1
7
0
210242244246224226212214180
234
55+00
56+00
57+00
58+00
59+0
0
60
+
0
0
61
+
0
0
62
+
0
0
63+00
64+00
65+00
24+00
25+00
26+00
27+00
28+0
0
29
+
0
0
30
+
0
0
31
+
0
0
32+00 33+00
34+00 35+0036+0037+0038+0039+0010+0011+0012+0010+0011+0012
+
0
0
13
+
0
0
14+0
0
15+00
16+00
0
+
1
0
200
202
20
4
206
208
21
0
22
0
2042
0
6
2
0
8
212
214
216
21
8
22
2
232234
2362402502
6
0
2
7
0
28
0228238
2422442462482522542562
5
8
2
6
2
2
6
4
2
6
6
2
6
8
2
7
2
27
4
27
6
27
8
28
2
240250 260234236238242244
246
248252 254256258170
1
8
0
190172
174
1
7
6
1
7
8
182
184
186188192194196190186188
192194
180 190178
182
184
18
6 18819210
6
8 202204280
2
7
6
27
8
12
0
13
0
140
15016017018
0
1
9
0 20021
0220230
122
124
126
12
8
13
2
13
4
13
6
13
8
142
14
4
14
6
148152
15
4
156
158
1
6
2
1
6
4 16616817217
4
176
178
18
2
18
4
18
6
18
8
1
9
2
1
9
4196198202204206208
2
1
2
2
1
421621822
2
22
4
22
6
228
232
90
100 11012013084
86
88
92
94
96
98
102
104
1
0
6
108
1
1
2
114116
1
1
8
1221241261281
3
2
1
3
4
1
3
61301
4
0
1501
2
2
124
126128 132134136138142144146148152154156158190200192
1941961982
0
0
21
0
220230202204206208212214216218222224226228
23223423623
8
160170
1
8
0
16
2
164
1
6
6
1
6
8
172
1
7
4
1
7
6
1
7
8
10
20
30
40
50
60
70
80
6
8
121416
18
22
242628
32
34
3638
42
44
46
48
52
54
56
58
626466
68
7274
76
7882 LP 209.02
LP 199.27
4.00%
4.00%
2.60%
3.71%10.00%4.24%
212
214
216
218
2202162182222
2
4
2
2
6
2
2
8
200200
2
1
0210 2
2
0
230
240
202202
2042042062062082082
1
2
2
1
4
2
1
6
2
1
8
222
224
226
228
232
234
236
238
220
2
1
4
214214
2
1
6
2
1
8
222
224220230
210
220
2302
4
0
212
214
216
218
2
2
2 2242262282322342362382
4
2 244220220220
230
240
210210220212212214214216218222224226240
250
260
232232232234
236
238
242
244
246
248
252
254
256
258
262
264
260
13.63%9.79% TRACT X-3
TRACT C
TRACT O
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
123124
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
TRACT QTRACT PTRACT M
66
67
150
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL250
260
244
246
248
252
254
256
258
2629.53%7.41%
210
200
190
180
170160150140INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGEDGRADING & DRAINAGE PLAN - 713
N
HATTON
GODAT
PANTIER
SEE SHEET 12
SEE SHEET 14HOOD CANALMATCH LINEMATCH LINE
'C'
R
O
A
D 'C' ROAD'A'
R
O
A
D
'G'
R
O
A
D
OUTFALL TO SWALE LEADING TO
THE STORMWATER PUMP STATION
POINT OF CONNECTION FROM
STORMWATER PUMP
1,100 LF 12" PVC C900 FORCEMAIN
16'x20' PUMP HOUSE
SEE DETAIL SHEET 18
200' SHORELINE SETBACK
STORM POND #4
EXCAVATE TO
BTM EL 205.00
100% INFILTRATION
2"/HR DESIGN RATE
DWL EL 211.00
OVERFLOW EL 212.00
WALL NOTES:
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
TYPE 2 CB
RIM 247.00
FL 227.50
18" PVC
STORM PIPE
@ 0.005 FT/FT
END NEW ACCESS
AT EXISTING GRAVEL
CAMPGROUND
ACCESS ROAD
STORMWATER PUMP
100 YR STORM BUFFER POND
MINIMUM 24,000 CUBIC FEET
BTM EL 115.00
TOP EL 121.00
STORM PUMP
SUCTION
1,100 LF 12" PVC C900
STORMWATER
FORCEMAIN
INTERCEPTOR SWALE
SEE DETAIL SHEET 18
EXISTING CAMPGROUND
GRAVEL ACCESS ROAD
STM PIPE
DISCHARGE
RIP RAP OUTFALL
TOW 199
BW 189
TOW 179
BW 1552:12:1RIP RAP
SWALE OUTFALL
TOW 194
BW 184
TOW 174
BW 154 2:1100'(TYP)TOW 189
BW 179
TOW 169
BW 151
10'
W
A
L
L
10'
W
A
L
L
TOW 200
BW 190
TOW 169
BW 160
2:12:1TOW 202
BW 192100'(TYP)'F' ROA
D
2:1TOW 189
BW 179
06.20.25
Exhibit 34
1
0
1
2
6
136
138
140
142
144
24
2
24
4
124
126
128
130
132
134
1
3
6
220214 49+0050+0051+0052+005
3
+
0
0
54+00
55+0017+0018+0019+0020+0021+002
2
+
0
0
23+00 24+00
25+0010+0011+001+00
2+003+003+32
6 810
12
14
16
18
20
22
24
26
2830
32
34
3638
40
42444648
50
52
54
56
5858 58606264
66
68
70
7274767880
82
84
86
88
90
92
94
96
9
8
1
0
0102104
1
0
6
1
0
8
110 112
114
116
11
8
1
2
01221241261281301321341361
3
8
140
142
1441461
4
8
1
5
0
1
5
2
1
5
4
1
5
6
1
5
8
1
6
0
1
6
2164166168170172174176178180 182
184
186
18819
0
192
194
196
1981982
0
02022
0
4
204
2762
7
8
28
0
2822842862882
0
0
2
0
2
2
0
4
20
6
20
8 20220420620
8 208250252254256258260270
2
7
0
272
2
7
4
2
7
6 278
280
2
3
0
2
3
2
2
3
4
2
3
6
23
8
2
4
0
98
100
102
104
1
0
6
108 196198200HP 230.42
HP 218.223.13%
2.60%5.72%18.00%
202
130140150
160160160
170
180180
214
1
7
0
1
8
0
1801901901
9
0
190200196198200202204
206208208208208208208208208210210210212
214
218218218218218220222224
2
2
6
2
2
8
206
208
210
212
214
214216
216216216216216
218
218212
214
216
218
210228230232234236238240242 244224
226
228
230
232
234
23
6
23
8
22
6
226
22
8
22
8
228
23
0
230
232
232
234
234
236
236
238
238
240
240
242
242
244
244218
220222224224226226228228230230214216
TRACT C
54
55
56
57
58
59
60
61
68
102
103
104
105
106
107
108
109
110
111
112
113
114
123124125126
127
128 129 130 131
TRACT M
62
63
64 66
67
65
B
S
B
L
B
S
B
L
B
S
B
L
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BS
B
L
B
S
B
L
B
S
B
L
BS
B
L
BS
B
L
BSB
L
BSB
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
210
200
190
180
170160150140INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUMJEFFERSON COUNTY
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-grd-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ENLARGEDGRADING & DRAINAGE PLAN - 814
N
HATTON
GODAT
PANTIER
SEE SHEET 13SEE SHEET 9
HOOD CANAL MATCH LINEMATCH LINE
'A' RO
A
D
'I' ROAD
'C' RO
A
D
200' S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
WALLS ILLUSTRATED ON THESE PLANS ARE FOR REFERENCE ONLY.
WALLS TO BE DESIGNED AND PERMITTED UNDER A SEPARATE
APPLICATION. TOP OF WALL ELEVATION INDICATES FINISH GRADE
AFTER THE SITE HAS BEEN FULLY DEVELOPED.
WALL NOTES:
INTERCEPTOR SWALE TO
STORMWATER PUMP
BUFFER POND
SEE DETAIL SHEET 18
TOW 206
BW 170
TOW 218
BW 216
INTERCEPTOR SWALE
TO STORMWATER
PUMP BUFFER POND
SEE DETAIL SHEET 18200'
SHOREL
INE
SETBACK
10' DAYLIGHT
BASEMENT WALL
10' DAYLIGHT BASEMENT WALL
TOW 204
BW 174
100'
STR
U
C
T
U
R
A
L
SET
B
A
C
K
TOW 207
BW 170
TOW 204
BW 175
TOW 201
BW 200
2:1 SLOPE
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-detENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY ROADWAY SECTIONS15 N/A0.5'0.5'
TRAVEL
LANE
10'
TRAVEL
LANE
10'
C/L
0.5'0.5'
TRAVEL
LANE
10'
TRAVEL
LANE
10'
C/L
2%2%2%2%
TRAVEL
LANE
10'
TRAVEL
LANE
10'
C/L
SWALE
4.5'5'5.5'
2:12:1
2:1
M
A
X
.
2:1 M
A
X.
2%2%
SWALE
4.5'5'5.5'
2:1 2:1
2:1 M
A
X.
2:1
M
A
X
.
2'
TRAVEL
LANE
10'
TRAVEL
LANE
10'
C/L
2%2%2:1 M
A
X.
2:1
M
A
X
.
2:1
M
A
X
.
2:1 M
A
X.
TRAVEL
LANE
10'
TRAVEL
LANE
10'
C/L
2'
2%2%
SWALE
4.5'5'5.5'
2:1 2:1
2:1 M
A
X.
2:1
M
A
X
.
2'
TRAVEL
LANE
10'
C/L
2:1 M
A
X.
2:1
M
A
X
.
ASPHALT TRAIL
14'
2:1 M
A
X.
2:1
M
A
X
.
2:1
M
A
X
.
2:1 M
A
X.
2:1
M
A
X
.
2:1 M
A
X.
2:1 M
A
X.
2:1
M
A
X
.
ROADWA< SECTION G-G
N.T.S.
ROADWA< SECTION B-B
N.T.S.
ROADWA< SECTION A-A
N.T.S.
ROADWA< SECTION C-C
N.T.S.
ROADWA< SECTION F-F
N.T.S.
ROADWA< SECTION E-E
N.T.S.
3" HMA
CONCRETE
TRAFFIC CURB
6" CSBC
18" COMPACTED
NATIVE
COMPACTED
SUBGRADE
3" HMA
CONCRETE TRAFFIC CURB
w/ WEEP HOLES
25' O.C. FOR TRAIL
6" CSBC
18" COMPACTED
NATIVE
COMPACTED
SUBGRADE
3" HMA
6" CSBC
18" COMPACTED
NATIVE
COMPACTED
SUBGRADE
COMPACTED
SUBGRADE
3" HMA
6" CSBC
18" COMPACTED
NATIVE
COMPACTED
SUBGRADE
3" HMA
6" CSBC
18" COMPACTED
NATIVE
COMPACTED
SUBGRADE
EXISTING PAVING
SAWCUT EX. ASPHALT TO A
CLEAN VERTICAL EDGE AND SEAL
JOINT WITH EMULSIFIED ASPHALT
SEE PAVING SECTION FOR
STRUCTURAL DATA
51
2"1'-4"73
4"6"PAVEMENT
1" R
POURED IN PLACE
CONCRETE TRAFFIC CURB
N.T.S.
EXISTING PA9ING -OINT DETAIL
N.T.S.
ASPHALT WEDGE CURB
N.T.S.
2:1
2:1
4"
18"
A.C. WEDGE CURB
AS SPECIFIED
CRUSHED SURFACING TOP COURSE
0.5'
ASPHALT CONCRETE
GRAVEL BASE
18"18"
ASPHALT WEDGE CURBASPHALT WEDGE CURB
ASPHALT TRAIL
14'
18"
TRAVEL
LANE
10'
SWALE
4.5'5'5.5'
2:12:1
2:1
M
A
X
.
2:1 M
A
X.
2%
3" HMA
6" CSBC
18" COMPACTED
NATIVE
ASPHALT TRAIL
14'
ASPHALT WEDGE CURB
2%
SWALE
4.5'5'5.5'
2:12:1
2:1
M
A
X
.
2:1 M
A
X.
2%
1' MIN.
DRI9EWA< SECTION ---
N.T.S.
2:1
M
A
X
.
2:1 M
A
X.
18"
2:12:1
2:1 M
A
X.
2:1
M
A
X
.
15'
2%
2" ASPHALT PAVING
ON SLOPES >10%
2" CSTC
6" CSBC
COMPACTED
SUBGRADE
18" DEEP V DITCH
w/ 2:1 SLOPES
2%
2%
06.20.25
Exhibit 34
140
80
20
210240290270230
220
200
170
15012013
0
100
90
90
90100120130
901201
6
0
15
0
180200190
170180
1301
4
0150160180
190
140180
190
180
150170200
2402
3
0
260240220
200
2302
1
0
160
1
5
0
19021018
0
1
7
0
210
1601
5
0
1
3
0
12
0
13
0
12
0
60
10
60
120
13050
1
0
140
200
260
2
7
0
2
8
0
28
0
3
0
0
2102
4
0
2
0
0
150100301031
0
320 32030
0
200
240
2
2
0
230240 230220210200220
190
2402201
5
0
1
4
0
7
0
1
0
1
2
0 18
0
18
0
22024020019
0
12
0
8
0
6
0
170180
160 1101301401501802001
5
0 160 140180
1802001
9
0
190
200
1901009
0
60
170
60
70
170
190
200
190 190240
240
240
200190190
190 1401
8
0
1
9
0
200200
2202202
2
0220 210
180
1
7
0160 150140
140130120120110
100
140150180220
2502101801702
1
0
190190210210220260250
240
2402101
5
0
150
180
200
21022025019021022020022024025025
0
230140130180
1601601
7
0
180240260270 260240210190150
180
20
0
210
230250270270
260
2202102001901801701902302102
2
0 210130130200250270270 2002202
4
0
230240160110220
220
70
1
0
190
200180
1
7
0
10
0
23
0
240 190240270280260
220
24020018021023019017017019021
0
240 2702501901
8
0
170180170 160150 120120140160220250190
210
240
280290250100 90220
250
200200180220 260
240
230
240
22022
0
18
0
19
0
20
0
160
150 160170
160
170200240250
230
210200
200
200240
2
1
0210210200190180170150260 220230240250
230
230
230230230
240
220
24
0
250
260210
220
220 220 220
220230 23023023023024025026
0
2602
7
0
2702102202302402
5
0
2
6
0110120130140150160170110
120
130
140
150
160
170180
200210220230240250130140150
150
150 150160 1601701701501501601601601601601601601701
7
0
180180
180
1
8
0
1
8
0
1
8
0
1901902002002002002002102
2
0 150160170180190200210250
2202202202202202302302302
3
0
2
3
0 240220220 22023023023024
0
25
0
170180190200200200220230
240210220230240
160160 170170180 180 190
2
0
0
150 160 170 180
28
0
250
230
210170 1
6
0150 12
01101001101201301401501501601401301
2
0 1101801
8
0190
190200606070
70
80
80
90
90100
100
110
110
120
120
130
130140
140150
150160
1
6
0
17
0
110
110
110
120
120
120
130
140150
160
170
180
190
200
210220230240250260
210220230240
1902002101
6
01601
7
0
170180
180190
1
7
0
1
60
20
0 2302202
2
0
200
190
210
220230
20
0
210
15
0
12
0
40
210
200210
240 1901
9
0
2001902
0
0
2
1
0
2
3
0 24023021
0
20
0
190
1
8
0
180220240160170
180
1
9
0
15
8
16
2
164
166
168
172
1
7
4
176178182184186188200210220230190180210200190180170150150170160150140180190140140
130
110130
10090190160170230240250
200210220230240HIGWAY 101TRACT H
TRACT E1
TRACT
X-4
LAKE PLEASANT
TRACT M
TRACT X-4
TRACT
X-1
TRACT
X-2
TRACT X-3
TRACT C
TRACT R
TRACT O
TRACT G
TRACT
X-5
TRACT
X-6
TRACT
X-9
TRACT X-10
TRACT X-7
TRACT X-12
TRACT C
TRACT D
WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
TRACT X-8
TRACT F
TRACT X-13
TRACT X-11
TRACT E2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
TRACT ATRACT ATRACT ATRACT BTRACT B
T
R
A
C
T
B
TR
A
C
T
BTRACT BTRACT ATRACT ATRACT ATRACT ATRACT ATRACT A
TRACT
X-2
TRACT QTRACT PTRACT M
UNITS
62
63
64 66
67
65
TRACT
X-1
LEGEND
150
TRACT X-14
DOG PARK
TRACT
TRACT IBSBLBSBLBSBL
BSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBL BSBL BSBL BSBL
BSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSB
L
B
S
B
L
BSBLBSBLBSBLBSBLBS
B
L
BS
B
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBLACK
P
T
R
D
US HIGHWAY 101B
LACK
P
T
ROAD
HOOD
C
A
N
A
L
'A
'
ROAD'B' ROAD'D
'
ROAD
'
E
'
ROAD'B' ROAD
'
C
'
RO
AD
'G'
R
O
A
D
'
A
'
RO
A
D 'H' ROAD'C' ROAD'F' ROADBASIN 4
BASIN 6
BASIN 5
BASIN 3
BASIN 10
BASIN 2
BASIN 8
BASIN 9
BASIN 7
BASIN 1
KETT
L
E
B
KETT
L
E
C
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-basinsENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'
N
HATTON
GODAT
PANTIER 1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY DRAINAGE BASINS16
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
KETTLE B
BASIN
BYPASS BASIN
BYPASS BASIN
KETTLE C
BASIN
BYPASS BASIN
'I' ROAD
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-detENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY GRADING & DRAINAGE DETAILS - 117 N/A1.A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO THE START OF LAND DISTURBING ACTIVITY, CONSTRUCTION OR STAKING OF THE SITE. THE
PRECONSTRUCTION MEETING SHALL INCLUDE STAFF FROM STORMWATER, WATER AND SEWER UTILITIES IF APPLICABLE.
2.ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE THURSTON COUNTY DRAINAGE DESIGN AND EROSION CONTROL MANUAL, OTHER
COUNTY STANDARDS AND THE MOST CURRENT COPY OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION (WSDOT/APWA) IN THAT ORDER.
3.CONSTRUCTION SWPPP CONSISTENT WITH THE REQUIREMENTS SET FORTH IN VOL II IN THE DDECM AND INCLUDES ALL 13 ELEMENTS OR AS REQUIRED IN THE
CONSTRUCTION STORMWATER GENERAL PERMIT. BMPS SELECTED FOR IMPLEMENTATION ARE TO BE APPROVED BY ECOLOGY AND ARE TO CONFORM TO THE
CURRENT STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON.
4.A CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND A COPY OF THE APPROVED STORMWATER PLANS SHALL BE ONSITE AT ALL TIMES
WHEN CONSTRUCTION IS IN PROGRESS. WHENEVER INSPECTION AND/OR MONITORING REVEALS THAT THE BMPS ARE INADEQUATE, DUE TO DISCHARGE, TRACK
OUT, OR POTENTIAL TO DISCHARGE, BMPS OR DESIGN CHANGES SHALL BE IMPLEMENTED AS SOON AS POSSIBLE.
IF DEFICIENCIES ARE IDENTIFIED THE FOLLOWING ACTIONS SHALL BE TAKEN BY THE COUNTY. IT SHALL BE AT THE DISCRETION OF THE INSPECTOR WHICH
ACTION WILL BE TAKEN BASED ON THE SEVERITY OR HISTORY OF THE SITE.
A.1ST ACTION TAKEN IS A VERBAL WARNING TO THE FOREMAN OR PERSON OVERSEEING THE SITE.
B.2ND ACTION TAKEN IS A WRITTEN INSPECTION WITH ACTIONS TO BE TAKEN SIGNED BY THE FOREMAN OR PERSON OVERSEEING THE SITE.
C.3RD ACTION TAKEN IF CORRECTIVE ACTIONS ARE NOT TAKEN, COMPLETED OR ISSUES CONTINUE TO BE FOUND WILL BE A WRITTEN NOTICE AND A STOP
WORK ORDER SHALL BE POSTED.
5.SEASONAL WORK LIMITATIONS – FROM OCTOBER 1 THROUGH APRIL 30, CLEARING, GRADING, AND OTHER SOIL DISTURBING ACTIVITIES WILL NOT BE PERMITTED
UNLESS IT IS SHOWN TO THE SATISFACTION OF THE COUNTY THAT SILT-LADEN RUNOFF WILL BE PREVENTED FROM LEAVING THE SITE THROUGH A COMBINATION
OF THE FOLLOWING:
• SITE CONDITIONS INCLUDING EXISTING VEGETATIVE COVERAGE, SLOPE, SOIL TYPE, AND PROXIMITY TO RECEIVING WATERS; AND
• LIMITATIONS ON ACTIVITIES AND THE EXTENT OF DISTURBED AREAS; AND
• PROPOSED EROSION AND SEDIMENT CONTROL MEASURES THE COUNTY MAY EXPAND OR RESTRICT THE SEASONAL LIMITATION ON SITE DISTURBANCE BASED
ON SITE INSPECTIONS, LOCAL WEATHER CONDITIONS, OR OTHER INFORMATION.
• IF, DURING THE COURSE OF ANY CONSTRUCTION ACTIVITY OR SOIL DISTURBANCE DURING THE SEASONAL LIMITATION PERIOD, SILT-LADEN RUNOFF LEAVING
THE CONSTRUCTION SITE CAUSES A VIOLATION OF THE SURFACE WATER QUALITY STANDARD; OR
• IF CLEARING AND GRADING LIMITS OR EROSION AND SEDIMENT CONTROL MEASURES SHOWN IN THE APPROVED PLAN ARE NOT MAINTAINED, THE COUNTY MAY
TAKE ENFORCEMENT ACTION, INCLUDING BUT NOT LIMITED TO A NOTICE OF VIOLATION, ADMINISTRATIVE ORDER, FINE/PENALTY, STOP-WORK ORDER, OR
CORRECTION NOTICE.
6.EXPOSED SOILS SHALL NOT BE LEFT EXPOSED AND UNWORKED FOR MORE THAN 2 DAYS BETWEEN (OCTOBER 1 – APRIL 30) OR 7 DAYS BETWEEN (MAY1 – SEPT.
30).
7.ASSURE THAT CONCRETE WASHING AND CURING WATERS, WASTE STREAMS GENERATED FROM CONCRETE GRINDING AND SAWING, EXPOSED AGGREGATE
PROCESSES, DEWATERING CONCRETE VAULTS, CONCRETE PUMPING AND MIXER WASHOUT IS PERFORMED OFFSITE OR IN DESIGNATED CONCRETE WASHOUT
AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS. DO NOT DUMP
EXCESS CONCRETE ON SITE, EXCEPT IN DESIGNATED CONCRETE WASHOUT AREAS. REFER TO THE DRAINAGE DESIGN AND EROSION CONTROL MANUAL OR
STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON FOR BMP’S. CONCRETE SPILLAGE OR CONCRETE DISCHARGE TO STORMWATER FACILITIES
IS AN ILLICIT DISCHARGE.
8.APPLICANT SHALL COMPLY WITH ALL OTHER PERMITS AND OTHER REQUIREMENTS OF THE GOVERNING AUTHORITY OR AGENCY.
9.ALL STORM MAINS AND RETENTION/DETENTION AREAS SHALL BE STAKED FOR GRADE AND ALIGNMENT BY AN ENGINEERING OR SURVEY FIRM LICENSED TO
PERFORM SUCH WORK.
10.STORM DRAIN PIPE MATERIALS SHALL BE AS SPECIFIED IN THE DRAINAGE DESIGN AND EROSION CONTROL MANUAL. PIPE SIZE, SLOPE, COVER, ETC., SHALL BE
AS SPECIFIED IN VOLUME III OF THE DRAINAGE DESIGN AND EROSION CONTROL MANUAL.
11.THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO APPROVED PLANS ON FILE WITH THE JURISDICTION. ANY MATERIAL DEVIATION FROM
THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE JURISDICTION.
12.SPECIAL STRUCTURES, OIL/WATER SEPARATORS, AND OUTLET CONTROLS SHALL BE INSTALLED PER PLANS AND MANUFACTURER’S RECOMMENDATIONS.
13.WASHINGTON LAW REQUIRES THAT THE RULES ADOPTED BY WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION BE FOLLOWED. THOSE RULES ARE
SET FORTH IN RCW 19.122 AND REQUIRES ANYONE PERFORMING ANY TYPE OF DIGGING TO CALL AT LEAST TWO BUSINESS DAYS BEFORE DIGGING. DIAL 811 OR
1-800-424-5555 OR VISIT WWW.CALLBEFOREYOUDIG.ORG .
14.ALL SURVEYING AND STAKING SHALL BE PERFORMED BY AN ENGINEERING OR SURVEYING FIRM CAPABLE OF PERFORMING SUCH WORK. THE ENGINEER OR
SURVEYOR DIRECTING SUCH WORK SHALL BE LICENSED BY THE STATE OF WASHINGTON.
15.THE MINIMUM STAKING OF STORM SEWER SYSTEMS SHALL BE AS FOLLOWS:
A.STAKE LOCATION OF ALL CATCH BASINS, MANHOLES AND OTHER FIXTURES FOR GRADE AND ALIGNMENT.
B.STAKE LOCATION, SIZE, AND DEPTH OF RETENTION/DETENTION FACILITY.
C.STAKE FINISHED GRADE OF ALL STORMWATER FEATURES, INCLUDING BUT NOT LIMITED TO CATCH BASIN/MANHOLE RIM ELEVATIONS, OVERFLOW
STRUCTURES, WEIRS, AND INVERT ELEVATIONS OF ALL PIPES IN CATCH BASINS, MANHOLES, AND PIPES THAT DAYLIGHT.
16.FINAL ELEVATIONS, LOCATIONS, SLOPES, GRADES, ROADWAY ALIGNMENTS, ETC. SHALL BE BASED ON A FIELD SURVEY CONDUCTED BY A LICENSED
PROFESSIONAL SURVEYOR AND SHALL BE STAMPED BY THE SURVEYOR AS A RECORD OF THE FINAL CONSTRUCTED LOCATION AND ELEVATION OF FACILITIES
SHOWN.
17.A CONTINUOUS TONING WIRE SHALL BE BURIED THE ENTIRE LENGTH OF ALL STORMWATER PIPE AND BE LOCATED AND ATTACHED TO THE TOP OF THE PIPE. THE
TONING WIRE SHALL BE 12 GAUGE INSULATED GREEN TONING WIRE. THE TONING WIRE SHALL END IN CATCH BASINS, MANHOLES, OTHER STRUCTURES, AND BE
PLACED IN A ORGANIZED MANNER ON A STAINLESS STEEL CONCRETE WEDGE ANCHOR AND/OR HOOK WITHIN SIX (6) INCHES OF LID OR GRATE OR END OF PIPE
IF NO STRUCTURES PRESENT I.E., CROSS CULVERT WITH A MINIMUM OF FIVE (5) FOOT COIL OF WIRE SO IT WILL NOT FALL OFF AND CAN BE ACCESSED WITHOUT
ENTERING THE STRUCTURE. THE TONING WIRE SHALL BE TESTED FOR CONTINUITY PRIOR TO ACCEPTANCE. ALL SPLICES WILL BE MADE WITH COPPERHEAD
SNAKEBITE CONNECTORS OR 3M DBR MOISTURE DISPLACEMENT CONNECTORS SPLICE KITS DESIGNED FOR IN-GROUND USE.
18.UNDERGROUND WARNING TAPE SHALL BE PLACED APPROXIMATELY TWELVE (12”) ABOVE THE TOP OF PIPE INDICATING STORMWATER PIPE.
19.ALL CULVERTS SHALL BE A MINIMUM OF TWELVE (12”) DIAMETER AND OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
DRIVEWAY OR ROADWAY TO THE BOTTOM OF THE DITCH. THE CULVERT SHALL EXTEND ONE FOOT OUTSIDE THE DRIVEWAY OR ROADWAY RADIUS BEFORE THE
BEVEL TO ALLOW FOR RIPRAP ARMORING TO PREVENT SLOUGHING OF THE BASE/CRUSHED ROCK INTO THE DITCH. CULVERTS SHALL HAVE BEVELED ENDS TO
MATCH THE SIDE SLOPE. DUCTILE IRON PIPE SHALL BE CUT SHORT TO ALLOW FOR TRANSITION TO PVC OR PE BEVELED PIPE ENDS THAT ARE EXPOSED IN OPEN
CONVEYANCE SYSTEM.
20.THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO ACCEPTED PLANS ON FILE WITH THE COUNTY. ANY MATERIAL DEVIATION FROM THE
PLANS WILL REQUIRE WRITTEN ACCEPTANCE FROM THE DRAINAGE MANUAL ADMINISTRATOR OR DESIGNEE.
21.CATCH BASIN GRATES SHALL BE DIRECTIONAL GRATES WHERE GRADE OR SLOPE IS GREATER THAN OR EQUAL TO 1%.
22.A COPY OF THE ACCEPTED STORM WATER PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
23.ALL BUILDING DOWNSPOUTS ON COMMERCIAL SITES SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS OTHERWISE ACCEPTABLE TO THE
COUNTY.
24.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER
NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF
WORK. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH
LANE OF TRAFFIC AFFECTED. ALL SECTIONS OF THE CURRENT WSDOT STANDARD SPECIFICATIONS FOR TRAFFIC CONTROL OR MUTCD SHALL APPLY.
25.IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND OTHER RELATED OR REQUIRED PERMITS PRIOR TO ANY
CONSTRUCTION ACTIVITY IN THE COUNTY RIGHT-OF-WAY. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS
PRIOR TO ANY CONSTRUCTION.
26.ALL NEW STORM DRAIN PIPELINES SHALL BE CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTED AND AIR PRESSURE TESTED (APT) BY THE DEVELOPER,
CONTRACTOR OR APPLICANT AFTER ALL UNDERGROUND UTILITIES ARE INSTALLED AND COMPACTION OF THE ROADWAY SUBGRADE IS COMPLETE. REQUIRED
PRE-NOTIFICATION: THE CONTRACTOR SHALL NOTIFY THE COUNTY STORM AND SURFACE WATER UTILITY AT 360-867-2099 AT LEAST 3 WORKING DAYS IN
ADVANCE OF THE FIRST TELEVISION INSPECTION.
27.THERMO-PLASTIC DRAINAGE MARKINGS ARE REQUIRED FOR ALL STRUCTURES IN THE ROADWAY. PLEASE CONTACT THE STORM AND SURFACE WATER UTILITY
AT 360-867-2099 FOR MARKING STANDARDS.
28.THE PROJECT ENGINEER SHALL INSPECT DRAINAGE AND EROSION CONTROL FACILITIES PERIODICALLY DURING CONSTRUCTION. THE PROJECT ENGINEER SHALL
PROVIDE, AT A MINIMUM, INSPECTION CERTIFICATION FOR THE DRAINAGE AND EROSION CONTROL FACILITIES FOLLOWING ANY STORM EVENT WITH
PRECIPITATION EQUAL TO OR EXCEEDING 2 INCHES IN A 24-HOUR PERIOD. FAILURE TO SUBMIT CERTIFICATION TO THE COUNTY WITHIN 24 HOURS FOLLOWING
SUCH AN EVENT MAY RESULT IN A STOP WORK ORDER BEING PLACED ON THE PROJECT.
29.ALL CASTINGS OR STRUCTURES NOT IN PAVEMENT AREAS, AND NOT IN THE ROADWAY RIGHT-OF-WAY OF A PAVED ROAD, SHALL BE SET SIX INCHES (6") ABOVE
FINISHED GRADE. THEY SHALL HAVE A CAST IRON FRAME AND COVER GROUTED TO JUST UNDER THE TOP OF THE FRAME AND A CONCRETE PAD EXTENDING
OUT 2 FEET IN ALL DIRECTIONS.
30.ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR SIMILARLY STABILIZED TO THE SATISFACTION OF THURSTON COUNTY. FOR SITES WHERE GRASS
HAS BEEN PLANTED THROUGH HYDROSEEDING, FINAL WILL NOT OCCUR UNTIL THE GRASS HAS BEEN THOROUGHLY ESTABLISHED (90% ESTABLISHMENT),
UNLESS OTHERWISE APPROVED BY THE COUNTY.
31.NO TREES OR SHRUBS MAY BE PLANTED WITHIN 25 FEET OF INLET OR OUTLET PIPES OR MANMADE DRAINAGE STRUCTURES SUCH AS SPILLWAYS OR FLOW
SPREADERS. SPECIES WITH ROOTS THAT SEEK WATER, SUCH AS WILLOW OR POPLAR, SHALL BE AVOIDED WITHIN 50 FEET OF PIPES OR MANMADE STRUCTURES.
32.TCC 18.16.020 BONDING OF DRAINAGE IMPROVEMENTS SHALL NOT BE ALLOWED AND FACILITIES WILL BE CONSTRUCTED AND COMPLETE PRIOR TO FINAL.
-SUPPORTING DOCUMENTS FOR THE 2016 THURSTON COUNTY DRAINAGE MANUAL
GENERAL NOTES (STORM DRAIN CONSTRUCTION)
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-detENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY GRADING & DRAINAGE DETAILS - 218 N/AF L O
W2'
12' MIN.
RIPRAP OUTFALL DETAIL
N.T.S.
GEOTEXTILE FABRIC
DISCHARGE PIPE w/ TRASH RACK
EXTEND ROCK PAD A
MINIMUM OF 1' ABOVE
OUTFALL PIPE
COMPACTED
SUBGRADE
GEOTEXTILE FABRIC USED UNDER ROCK PROTECTION OF OUTFALLS AND
OVERFLOW SPILLWAYS SHOWN IN THESE PLANS SHALL BE US FABRICS
US160NW OR APPROVED EQUIVALENT.
GEOTEXTILE FABRIC NOTE:
RIPRAP SHALL CONFORM WITH TABLE 3.7 OF THE 2022 THURSTON
COUNTY DRAINAGE AND EROSION CONTROL MANUAL
RIPRAP SHALL BE REASONABLY WELL GRADED ASSORTMENT OF ROCK
WITH THE FOLLOWING GRADATION:
MAXIMUM STONE SIZE........24"
MEDIAN STONE SIZE...........16"
MINIMUM STONE SIZE...........4"
ARMOR POND A MINIMUM OF 3' EACH SIDE OF OUTFALL PIPE OR 3 x *D,
WHICHEVER IS GREATER
RIPRAP NOTE:
*D = DIAMETER OF DISCHARGE PIPE.
THE TREATMENT INFILTRATION BASIN SHALL BE SEEDED OR SODDED WITH A SEED
MIXTURE SUITABLE FOR WET CONDITIONS. THE FOLLOWING
OR EQUIVALENT MIXTURE MAY BE USED:
APPLICATION SHALL BE 120 lbs/ACRE. IN ADDITION, 500 lbs/ACRE OF 10-20-20
FERTILIZER, 200 lbs/ACRE MULCH, AND 40 lbs/ACRE SOIL STABILIZER SHALL BE
APPLIED WITH THE SEED MIXTURE.
CHEWINGS FESCUE
PERENNIAL RYE
15%
30%
15%
40%
KENTUCKY BLUEGRASS
TALL FESCUE
GRASS NOTE:
3
11
3
20'
GEOTEXTILE
FABRIC
SEE PLAN
POND O9ERFLOW SPILLWA<
NTS
NOTE:
EXTEND RIPRAP AND
FABRIC TO TOE OF SLOPE.
EMERGENCY OVERFLOW
TOP OF ROCK ELEVATION
SEE PLAN
BIORETENTION
EARTH CHECK DAM
BIORETENTION OVERFLOW
STRUCTURE
BIORETENTION SWALE WITHOUT
UNDERDRAIN
1"
20" x 24"
10" x 12"
18" x 22"6-1/4"1-1/2"MATERIAL:
DUCTILE IRON, A-536 CL 80-55-06
APPROX WEIGHT 100LBS
NOTES:
BEEHIVE GRATE
FOR USE WITH SM60 20" x 24" REV FRAME
N.T.S.
12" FM TO POND 5
GENERATOR ON
CONCRETE PAD
AUTOMATIC
TRANSFER SWITCH
4"x12" REDUCER
4" DISCHARGE PIPE
20'16'6" SUCTION PIPE
ELEC. METER
POWER SERVICE
PUMP CONTROL PANEL
6" SUCTION PIPE
60" MH
w/ OVERFLOW GRATE
RIM 212.25
FL 210.00 (6")
10 HP
PUMP
25 HP
PUMP
50 HP
PUMP
75 HP
PUMP
DOUBLE DOORS
6' WIDE
STORMWATER PUMP STATION
1
STORMWATER
PUMP POND3:13:1
200'
S
H
O
R
E
LI
N
E
S
E
T
B
A
C
K
INFLOW FROM
INTERCEPTOR SWALE
32 LF 12" HDPE
CULVERT
ASPHALT ACCESS PAD 6" MIN.
EXISTING CAMPGROUND
GRAVEL ACCESS ROAD
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-detENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY GRADING & DRAINAGE DETAILS - 319 N/A06.20.25
Exhibit 34
N8°16'8"EN88°01'15"W
N81°43'52"W
N81°43'52"W
HIGWAY 101WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
UNITS
62
63
64 66
67
65
LEGEND
150BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSBL
B
S
B
L
BSBLBSBLBSBLBSBLBS
B
L
BS
B
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-wtrENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY OVERALLWATER PLAN20
N
HATTON
GODAT
PANTIER
PROPOSED WATER RESERVOIR
AND PUMP STATION
ENLARGED UTILITY
PLAN - 1
SEE SHEET 23
ENLARGED UTILITY
PLAN - 4
SEE SHEET 26
ENLARGED UTILITY
PLAN - 2
SEE SHEET 24
ENLARGED UTILITY
PLAN - 5
SEE SHEET 27
ENLARGED UTILITY
PLAN - 3
SEE SHEET 25
ENLARGED UTILITY
PLAN - 6
SEE SHEET 28
ENLARGED UTILITY
PLAN - 7
SEE SHEET 29
BLACK
P
T
R
D
US HIGHWAY 101B
LA
CK
P
T
ROAD
HOOD
C
A
N
A
L
'A
'
ROAD'B' ROAD'D
'
ROAD
'
E
'
ROAD'B'
ROAD
'
C
'
RO
AD
'G'
R
O
A
D
'
A
'
R
O
A
D 'H' ROAD'C' ROAD'F' ROAD2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
'I' ROAD
'B
'
ROAD
06.20.25
Exhibit 34
N8°16'8"EN88°01'15"W
N81°43'52"W
N81°43'52"W
HIGWAY 101TRACT H
TRACT E1
TRACT
X-4
LAKE PLEASANT
TRACT M
TRACT X-4
TRACT
X-1
TRACT
X-2
TRACT X-3
TRACT C
TRACT R
TRACT O
TRACT G
TRACT
X-5
TRACT
X-6
TRACT
X-9
TRACT X-10
TRACT X-7
TRACT X-12
TRACT C
TRACT D
WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
TRACT X-8
TRACT F
TRACT X-13
TRACT X-11
TRACT E2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
TRACT ATRACT ATRACT ATRACT BTRACT B
T
R
A
C
T
B
TR
A
C
T
BTRACT BTRACT ATRACT ATRACT ATRACT ATRACT ATRACT A
TRACT
X-2
TRACT QTRACT PTRACT M
UNITS
62
63
64 66
67
65
TRACT
X-1
LEGEND
150
TRACT X-14
DOG PARK
TRACT
TRACT IBSBLBSBLBSBL
BSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBL BSBL BSBL BSBL
BSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSBL
B
S
B
L
BSBLBSBLBSBLBSBLBS
B
L
BS
B
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-rw-irrENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY OVERALL RECLAIMEDWATER-IRRIGATION PLAN21
N
HATTON
GODAT
PANTIER
ENLARGED UTILITY
PLAN - 1
SEE SHEET 23
ENLARGED UTILITY
PLAN - 4
SEE SHEET 26
ENLARGED UTILITY
PLAN - 2
SEE SHEET 24
ENLARGED UTILITY
PLAN - 5
SEE SHEET 27
ENLARGED UTILITY
PLAN - 3
SEE SHEET 25
ENLARGED UTILITY
PLAN - 6
SEE SHEET 28
ENLARGED UTILITY
PLAN - 7
SEE SHEET 29
BLACK
P
T
R
D
US HIGHWAY 101B
LA
CK
P
T
ROAD
HOOD
C
A
N
A
L
'A
'
ROAD'B' ROAD'D
'
ROAD
'
E
'
ROAD'B'
ROAD
'
C
'
RO
AD
'G'
R
O
A
D
'
A
'
R
O
A
D 'H' ROAD'C' ROAD'F' ROADPROPOSED RECLAIMED
WATER POND
PROPOSED
RECLAIMED WATER
PUMP STATION
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
RECLAIMED WATER
FORCEMAIN
WATER WHEEL
RECLAIMED
WATER SWALE
SEE DETAIL SHEET 31
'I' ROAD
'B
'
ROAD
06.20.25
Exhibit 34
N8°16'8"EN88°01'15"W
N81°43'52"W
N81°43'52"W
HIGWAY 101WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
UNITS
62
63
64 66
67
65
LEGEND
150BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
BSBL
B
S
B
L
BSBLBSBLBSBLBSBLBS
B
L
BS
B
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLINDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-swrENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.PRELIMINARY OVERALLSEWER PLAN22
N
HATTON
GODAT
PANTIER
SEWER LIFT STATION
ENLARGED UTILITY
PLAN - 1
SEE SHEET 23
ENLARGED UTILITY
PLAN - 4
SEE SHEET 26
ENLARGED UTILITY
PLAN - 2
SEE SHEET 24
ENLARGED UTILITY
PLAN - 5
SEE SHEET 27
ENLARGED UTILITY
PLAN - 3
SEE SHEET 25
ENLARGED UTILITY
PLAN - 6
SEE SHEET 28
ENLARGED UTILITY
PLAN - 7
SEE SHEET 29
BLACK
P
T
R
D
US HIGHWAY 101B
LA
CK
P
T
ROAD
HOOD
C
A
N
A
L
'A
'
ROAD'B' ROAD'D
'
ROAD
'
E
'
ROAD'B'
ROAD
'
C
'
RO
A
D
'G'
R
O
A
D
'
A
'
R
O
A
D 'H' ROAD'C' ROAD'F' ROAD
200' SHO
R
E
L
I
N
E
S
E
T
B
A
C
K
SEWER LIFT STATION
COLLECTION BASIN
WASTEWATER
TREATMENT
PLANT
FUTURE SEWER LIFT STATION
AT MARITIME VILLAGE
GRAVITY SEWER
COLLECTION BASIN
INDICATES GRAVITY SEWER
COLLECTION BASIN
INDICATES SEWER LIFT STATION
COLLECTION BASIN
SEWER COLLECTION BASIN LEGEND
END OF SEWER LIFT STATION #1
6" FORCEMAIN
'I' ROAD
'B
'
ROAD
4" FORCEMAIN TO GRAVITY SEWER &
WASTEWATER TREATMENT PLANT
GRAVITY SEWER
06.20.25
Exhibit 34
HIGWAY 101TRACT H
TRACT E1
TRACT
X-5
TRACT D
TRACT E2
TRACT ATRACT ATRACT A
TRACT IBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBL
BSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL1
5
0
150
180
200
21022019021022020022024025025
0
230140130180
1601601
7
0
180240260270 260240210190150
180
20
0
210
23016017019021
0
270180170 160150 120120140160220250230210210200190180170150260N8°16'8"EN88°01'15"W
N81°43'52"
W
N81°43'52"
W
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/APRELIMINARY ENLARGEDUTILITY PLAN - 123
N
HATTON
GODAT
PANTIERBLAC
K
P
O
I
N
T
R
D
US HIGHWAY 101NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.SEE SHEET 24
MATCH LINE SEE SHEET 26MATCH LINE'A' ROAD'A
'
ROAD'B' ROAD'D
'
ROAD
PROPOSED 12" WATERMAIN
(TYP)
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED FIRE
HYDRANT (TYP)
FIRE HYDRANT
POST-INDICATOR
FIRE DEPT. CONNECTION
(TYP)
PROPOSED 6" IRRIGATION
(TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
FUTURE WATER SERVICE TO
THE MARITIME VILLAGE
SEWER FORCEMAIN FROM
FUTURE MARITIME VILLAGE
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
STORM
POND #1
FFE 240
(GARAGES)
OFFSITE FORCEMAIN
DISCHARGE TO
GRAVITY SEWER
06.20.25
Exhibit 34
TRACT
X-4
TRACT
X-6 TRACT BBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL BSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL170
190190240
240
240
200190190
190 230250270270
260
2202102001901801701902302102
2
0 21023
0
240 190240270280260
220
240200180180180 170
240 2702501901
8
0
170210200
240
2
1
0
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/APRELIMINARY ENLARGED UTILITY PLAN - 224
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.
N
HATTON
GODAT
PANTIER
SEE SHEET 26SEE SHEET 23
MATCH LINEMATCH LINE
SEE SHEET 25
MATCH LINE
'A
'
ROAD'B' ROAD'D
'
ROAD'A' ROAD'E' ROADPROPOSED 12"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED FIRE
HYDRANT (TYP)
PROPOSED 2" WATER
SERVICE (TYP)
PROPOSED 8"
IRRIGATION
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 12"
WATERMAIN
PROPOSED 8"
IRRIGATION
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 12"
WATERMAIN
PROPOSED 8"
IRRIGATION
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
STORM
POND #2
FFE 240
(GARAGES)
FFE 230
(GARAGES)
GATE
STORM
POND #3
GATE
FIRE HYDRANT
POST-INDICATOR
FIRE DEPT. CONNECTION
(TYP)
PROPOSED 6" IRRIGATION
(TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED 8"
GRAVITY SEWER
(TYP)
06.20.25
Exhibit 34
LAKE PLEASANT
TRACT M
TRACT X-4 TRACT G
TRACT C
20
21
22
23
24
25
26
27
28
44
45
46
47
48
49
50
51
52
53
54
55
113
114
115
116
117
118
119
120
121
122
128 129 130TRACT ATRACT A
TRACT X-14BSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLB
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
B
S
B
L
BSBL
BSBL
BSBLB
S
B
L
B
S
B
L
28
0 230240 230220210200220
190
2402201
5
0
1
4
0
7
0
1
0
1
2
0
1
8
0
18
0
22024020019
0
12
0
8
0
6
0
170180
160 110130140150180200200
190
220
220
70
1
0
190
200180
1
7
0
10
0
220
22
0
200
200INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/APRELIMINARY ENLARGED UTILITY PLAN - 325
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.
N
HATTON
GODAT
PANTIER
SEE SHEET 24
SEE SHEET 29 SEE SHEET 26MATCH LINE
MATCH LINEMATCH LINE'A' ROAD'
E
'
ROAD
'
A
'
RO
A
D
'
C
'
RO
AD
'H' RO
A
D
PROPOSED 12"
WATERMAIN
PROPOSED 8" GRAVITY
SEWER (TYP)
PROPOSED FIRE
HYDRANT (TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
PROPOSED DOUBLE
WATER SERVICE (TYP)
PROPOSED SINGLE
WATER SERVICE (TYP)
PROPOSED LINED
RECLAIMED WATER POND
PROPOSED 4"
SEWER FORCEMAIN
RECLAIMED WATER/IRRIGATION
SYSTEM PUMP STATION
PROPOSED 8"
IRRIGATION
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 12"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 8"
IRRIGATION
PROPOSED 12"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 8"
IRRIGATION
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
STORM
POND #3
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
RECLAIMED WATER TO
IRRIGATION SUCTION LINE
TO PRESSURIZATION PUMP
2
0
0
'
S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
SE
W
E
R
B
A
S
I
N
D
I
V
I
D
E
PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
06.20.25
Exhibit 34
TRACT
X-1
TRACT
X-9
TRACT X-10
TRACT X-7
TRACT X-8
TRACT F
TRACT X-11
TRACT E2
1
2
3
42
43TRACT BTRACT B
T
R
A
C
T
B
TR
A
C
T
BTRACT BTRACT ATRACT A TRACT
X-2
DOG PARK
TRACT
BSBLBSBLBSBLBSBLBSBLBSBLBSBL
BSBL BSBLBSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL170
1
8
0
1
9
0
200200
2202202
2
0220 210
180
1
7
0
160 150140
140130120140
250
2101801702
1
0
190190210210220240250
240210220250270270
260 1301302002502702702002202
4
0
230240160
150 160170
160
170200240250
230 220230240250
250
250
250
PROPOSED TYPE 1
SEWER MANHOLE
RIM 179.41
FL 173.67 (8" S)
FL 173.57 (8" E)
FL 171.28 (8" W)
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/APRELIMINARY ENLARGED UTILITY PLAN - 426
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.SEE SHEET 24MATCH LINESEE SHEET 27
MATCH LINE
B
LACK
PO
IN
T
RD
N
HATTON
GODAT
PANTIER
'B' ROAD'B
'
ROAD'B' ROADPROPOSED 12" WATERMAIN
(TYP)
PROPOSED FIRE
HYDRANT (TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
PROPOSED DOUBLE
WATER SERVICE (TYP)
EXISTING WATER TANK
PROPOSED 8"
IRRIGATION
PROPOSED 12" WATERMAIN
(TYP)
PROPOSED 8"
IRRIGATION
PROPOSED 8"
WATERMAIN
1ST FLOOR - SPORTS ARENA- FFE 240
3RD FLOOR LOBY - FFE 260
FFE 210
(1ST LEVEL PARKING)
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
FIRE HYDRANT
POST-INDICATOR
FIRE DEPT. CONNECTION
(TYP)
PROPOSED 8"
GRAVITY SEWER
(TYP)'H' ROAD06.20.25
Exhibit 34
LAKE PLEASANT
TRACT
X-2
WETLAND
"B"
WETLAND
"C"
3
4
5
6
7
8
9
10
11
12
13
14
15
1629
30
31
32
33
34
35
36
37
38
39
40
41
TRACT ATRACT A TRACT
X-1 BSBL13
0 130901201
6
0
15
0
180200190
170180190
1301
4
0150160180
190
140180
190
1801301401501802001
5
0 160140200180
1802001
9
0
190
200
19010090
60
60
70160110
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/APRELIMINARY ENLARGED UTILITY PLAN - 527
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.
N
HATTON
GODAT
PANTIER
SEE SHEET 26
SEE SHEET 28
MATCH LINE
MATCH LINESEE SHEET 24MATCH LINE'H' ROADPROPOSED 12" WATERMAIN
(TYP)
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED FIRE
HYDRANT (TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
PROPOSED DOUBLE
WATER SERVICE (TYP)
PROPOSED SINGLE
WATER SERVICE (TYP)
PROPOSED 8"
IRRIGATION
PROPOSED 6"
IRRIGATION
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
12" WATERMAIN EXTENSION
TO FUTURE WELL
12" WATERMAIN SUPPLY
FROM BOOSTER PUMP
STATION TO SYSTEM15' ESMT.15' ESMT.GOLF COURSE & WELL,
RESEVOIR & BOOSTER
PUMP STATION ACCESS
PROPOSED 6"
IRRIGATION
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS15'PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
06.20.25
Exhibit 34
TRACT M
TRACT R
TRACT X-12
TRACT X-13
17
18
19
20
21
22
23
24
25
26
27
28
58
59
60
61
68
69
70 71 72
73
74
75
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149TRACT ATRACT QTRACT M
62
63
66
67
150
BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL240290270230
220
200
170
150
150170200
2402
3
0
260240220200
230260
2
7
0
2
80
28
0
3
0
0
31
0
320
3
2
0
30
0
200
240
2
2
0
230240 230220210200220
190
210
240
280290250250
220260
240
230
240
220
22
0
230
230
230
230
230
240
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 1" = 50'N/APRELIMINARY ENLARGED UTILITY PLAN - 628
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.
N
HATTON
GODAT
PANTIER
SEE SHEET 29
SEE SHEET 27
SEE SHEET 25MATCH LINEMATCH LINE
MATCH LINE
'A' ROAD'F' ROA
D'H' ROAD'G'
R
O
A
D 'C' ROADPROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)PROPOSED FIRE
HYDRANT (TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
PROPOSED DOUBLE
WATER SERVICE (TYP)
PROPOSED SINGLE
WATER SERVICE (TYP)
PROPOSED WATER RESERVOIR
AND BOOSTER PUMP STATION
PROPOSED 12"
WATERMAIN
PROPOSED 8"
IRRIGATION
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 8"
WATERMAIN
PROPOSED 6"
IRRIGATION
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 6"
IRRIGATION
12" WATERMAIN SUPPLY
FROM BOOSTER PUMP
STATION TO SYSTEM 15' ESMT.GOLF COURSE & WELL,
RESEVOIR & BOOSTER
PUMP STATION ACCESS
SE
W
E
R
B
A
S
I
N
D
I
V
I
D
E
STORM
POND #4
FIRE HYDRANT
POST-INDICATOR
FIRE DEPT. CONNECTION
(TYP)
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
R25'
R40'
'I' ROAD
PROPOSED TYPE 1
MANHOLE (TYP)
CONNECT 4" FORCEMAIN
PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
4" C900 PVC
SEWER FORCEMAIN
06.20.25
Exhibit 34
TRACT X-3
TRACT C
TRACT O
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
134
135
136
137
138 139 140
141
142
143
144145146
147
148
TRACT QTRACT PTRACT M
62
63
64 66
67
65
B
S
B
L
BS
B
L
BS
B
L
BSB
L
BSB
L
BSB
L
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL
BSBL BSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBLBSBL140 2402602402
20
200
2302
1
0
160
1
5
0
19021018
0
1
7
0
210
1601
5
0
1
3
0
1
2
0
13
0
12
0
10
60
120
130
140
200
260
2
7
0210
200200180220 240
18
0
19
0
20
0
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-util-enlargENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030
SCALE: 1" = 50'
50 50 10025 N/APRELIMINARY ENLARGED UTILITY PLAN - 729
NOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.
N
HATTON
GODAT
PANTIER
SEE SHEET 28
MATCH LINE 1" = 50''A' ROAD'F' ROA
D
'G'
R
O
A
D
'C' ROAD'C' ROAD
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED FIRE
HYDRANT (TYP)
PROPOSED GRAVITY
SEWER LATERAL
w/ CLEANOUT (TYP)
PROPOSED DOUBLE
WATER SERVICE (TYP)
PROPOSED SINGLE
WATER SERVICE (TYP)
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 6"
IRRIGATION
PROPOSED 8"
WATERMAIN
PROPOSED 8"
GRAVITY SEWER
(TYP)
PROPOSED 6"
IRRIGATION
IRRIGATION DISTRIBUTION MAIN
FROM RECLAIMED WATER HOLDING
POND. IRRIGATION SUPPLY TO
·GOLF COURSE
·ALL PROJECT LANDSCAPING
·"FIRESMART" WETTING OF
NATURAL FOREST AREAS
200' S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
STORMWATER
PUMPING STATION
SEE SHEET 13
SEWER PUMP
STATION
STORM PUMP
FORCEMAIN
PROPOSED TYPE 1
MANHOLE (TYP)
PROPOSED TYPE 1
MANHOLE (TYP)
GENERATOR FOR
LIFT STATION &
STORMWATER
PUMP STATION
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-detENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.UTILITY DETAILS - 130 N/ASTANDARD
BLOCKING DETAIL
THRUST LOADSSTANDARD VALVE BOX
INSTALLATION
PIPE ZONES IN ORDER OF
DESCENDING QUALITY
FIRE HYDRANT
ASSEMBLY
BLOW-OFF HYDRANT
ASSEMBLY
PIPE ZONE BEDDING FOR
ALL PRESSURE PIPES
06.20.25
Exhibit 34
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32JEG/SDHMJM/BSNSDHJUNE 2025H:\DGN\19-000\19-060\PRELIMINARY
19-060 pre-detENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERSOF THE SW 1/4 OF SECTION 15 AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2 WEST, W.M.TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 502153003N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.UTILITY DETAILS - 231 N/ATYPE 1 MANHOLE PRIVATE
CLEANOUT TYPE II
GRAVITY SEWER SERVICE
WITH CLEAN OUT
PIPE ZONE BEDDING FOR
ALL GRAVITY PIPES
4" THRU 8"
PIG LAUNCH ASSEMBLY
TYPICAL LIFT STATION
PLAN VIEW LAYOUT
3'
RELCAIMED WATER CIRCULATION
NTS18"4.5'
12'
4.5'
3:
1 3:16" TOP SOIL
3" SAND LAYER
BENEATH LINER
30MIL PVC LINER, FULL
LENGTH OF SWALE
06.20.25
Exhibit 34
HOOD CANAL
WETLAND
"B"
WETLAND
"C"
WETLAND
"D"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
68
69
70 71 72
73
74
75
76
77
78
79
80 81 82
83
84
85
8687888990
91
92
93
94
95
96
979899
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123124125126
127
128 129 130 131 132 133
134
135
136
137
138 139 140
141
142
143
144145146
147
148
149
UNITS
62
63
64 66
67
65
LEGEND
150
INDEX:
JOB:
SHEET:
AGENCY NO.
OFDRAWN BY:CHECKED BY:DESIGNED BY:SCALE:DATE:VREVISIONS:DATE:PLEASANT HARBOR RESORT308913 US-101, BRINNON, WA 9832019-060
32DLDLSDHJUNE 2025DATUMDATUM-EFFERSON COUNT<
NAVD 88 WSDOT
BASES ON AVERAGE OF WSDOT
MONUMENTS
MERIDIAN HORIZONTAL DATUMVERTICAL DATUM
H:\Landscape\19-000\19-060\
19-060 GC Routing PlanENGINEERSTEL: 360.943.1599 FAX: 360.357.6299OLYMPIA, WA 985063910 MARTIN WAY E, SUITE BHATTONSURVEYORSPANTIERhattonpantier.comGODAT ANDPORTIONS OF THE SW & NW 1/4 OF THE SE 1/4, SW 1/4 OF THE NW 1/4, AND THE NE, SE AND NW QUARTERS OF THE SW 1/4 OF SECTION 15AND A PORTION OF THE NW 1/4 OF THE NW 1/4 AND THE NW 1/4 OF THE NW 1/4 OF SECTION 22 ALL IN TOWNSHIP 25 NORTH, RANGE 2WEST, W.M.SURVEY RECORDED UNDER
JEFFERSON COUNTY AUDITOR
NO. 515230
TP# 502153020, 502153021, 502153022, 502153023, 502154002, 502153002, 5021530030200100 200 4000
SCALE: 1" = 200'1" = 200'N/ANOTE: THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR
TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE
LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION.
THIS DRAWING DOES NOT REPRESENT A RECORD DOCUMENT,
UNLESS CERTIFIED BY HATTON GODAT PANTIER.
ANY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE
REVIEWED AND APPROVED BY HATTON GODAT PANTIER.GOLF COURSE ROUTING PLAN32
N
HATTON
GODAT
PANTIER
BLACK PT RD
US HIGHWAY 101B
LACK
P
T
ROAD
HOOD
C
A
N
A
L
'B
'
ROAD
'
C
'
RO
AD
'G'
R
O
A
D
'
A
'
RO
A
D
'C' ROADPLEASANT HARBOR RESORT
308913 US-101, BRINNON, WA 98320
PRO-ECT PROPONENT
STATESMEN GC, LTD
7370 SIERRA MORENA BLVD SW
CALGARY, ALBERTA
CANADA T3H 4H9
(403) 256-4151
9ICINIT< MAP
HOOD CANAL
PLEA
S
A
N
T
H
A
R
B
O
R
ROBI
N
S
O
N
R
D
HOOD
CANALBLAC
K
P
T
R
DMT. JUPITER RDSITE
PRACTICE
PUTTING &
CHIPPING
200' S
H
O
R
E
L
I
N
E
S
E
T
B
A
C
K
& CON
S
E
R
V
A
T
I
O
N
E
A
S
E
M
E
N
T
9
5
4
3
2
1
8
7
6
9 HOLE SCORECARD
HOLE PAR YARDS
1 5 450
2 3 190
3 5 455
4 3 160
5 4 365
6 4 290
7 4 400
8 4 355
9 4 360
TOTAL 36 3025
PRACTICE
PUTTING
ALTERNATE
8 GREEN
ALTERNATE
9 GREEN
TEE BOX, TYP.
GREEN, TYP.
FAIRWAY, TYP.
CART PATH, TYP.'F' ROADEAGLES
NEST
'C' ROAD
SEA VIEW
VILLAS
(
'D
'
ROAD
)MEADOW PARK
GROVE
OLYMPIA
HOUSE
CASCADIA
HOUSE RECREATION RUN
(
'A
'
ROAD
)RECREATION RUN ('B' ROAD)THE INN
BY THE
SEA
CONFERENCE
& EVENT
CENTER
ALTERNATE
7 GREEN
VISTA
VIEWS
PROPOSED STORAGE / MAINTENANCE /
ASSEMBLY BUILDING
('H' ROAD)200 CLEARWATER LANDING'I' ROAD
PROPOSED STORM
WATER PUMP &
SEWAGE LIFT STATION
PROPOSED
RECLAMED WATER
POND
WETLAND B
WETLAND D
HAWKS
LANDING
THE
VIEWS
THE
OSPREY
STAFF HOUSING
'
E
'
ROAD
Exhibit 34