Loading...
HomeMy WebLinkAbout63_Resubmittal Cover Letter 2025-0623June 23, 2025 Jefferson County, RE:Permit No: SUB2023-00025 (Preliminary Plat Application for Pleasant Harbor Master Planned Resort). Explanation of Preliminary Plat Changes and Response to REVISED Technical Review Comments This letter outlines changes made to Pleasant Harbor Master Planned Resort (“MPR”), Preliminary Plat Application SUB2023-00025 (“P-Plat”) and the rational for the changes. This letter also provides responses to the County’s Revised Technical Comments dated August 16, 2024. A. CHANGES Pleasant Harbor made a number of changes to original preliminary plan of subdivision to further achieve goals Development Agreement (herein “DA”) and further minimize it’s environmental impact. Listed below is the changes and the reason for the change. 1.Waste Water Treatment Plant A.Action Taken: Because of the reasons above the MPR has moved the Waste Water Treatment Plant from TRACT I to a new TRACT X-8 on the North East side of the property. Pleasant Harbor moved the Waste Water Treatment Plant (herein “WWTP”) for the following reasons: (1)Appendix K, Ordinance 01-0128-08, Paragraph (63 w) requires us to save, where possible, trees that have a diameter greater the 10 inches at breast height (herein “DBH”). The location previously proposed area would have required the removal of around .50 of an acre of relatively undisturbed native vegetation including a number of trees larger then 10” DBH. The new location for the WWTP does not require removal of more trees in excess of 10” DBH. (2)Title 17 of the MPR encourages designs that minimize greenhouse gas (herein “GHG”) emissions. Moving the WWTP to the new location will greatly reduce the amount of electricity required for pumping. The new location allows for more gravity flow and decreases pumping distances. The new location eliminates the the need for a sewer lift station that was required for the prior location. In addition to reducing electrical demand, by increasing the amount of gravity feed and limiting the amount of pumping overall system reliability is improved. Pleasant Harbor MPR 1 of 12 SUB2023-00025 Exhibit 63 2.Green House A. Action Taken: The green house has been relocated from TRACT X-7 to TRACT I for the following reasons: B.The green house had to be moved to accommodate the relocation of the WWTP as noted above. C.The new location of the green house requires very little modification to the existing topography and vegetation. This location was previously cleared when it was the campground, thus making it a suitable location for placement of the green house to be in the best alignment with the tree preservation requirements of paragraph 63(w) of Ord. No 10- 0128-02. 3.Moving Service Road H Entrance A.Action Taken: The MPR will use the existing road entrance off Black Point Road into TRACT X-7. B.On the East side of the property there is the MPR’s service road entrance. That entrance was planned to go all the way to the North property line. There is an existing road entrance off Black Point Road. C.The relocation of the road will save a number of large trees grater than 10” DBH by following the existing road entrance in accordance to 63(w) of Ord. No 10-0128-02. It will also save around .30 of an acre of natural area. 4.Moving Road B West of TRACT X-7 A.Action Taken: Road B is relocated south about 45 feet, and reshaped to follow the existing contours of the land. This change was made for the following reasons: B.To save a 1.08 acre pocket of trees with a DBH greater than 10” in accordance with paragraph 63(w) of Ord. No 10-0128-02 located on the north central portion of the property. C.As required by Title 17 of the DA this movement will lower the GHG Emissions. The new location eliminates the need to move around, 47,000 yd³of dirt that the prior road location would have required. It keeps sequestered carbon in the existing grove of 10” DBH trees intact. The relocation also eliminates the need for a large retaining wall and the carbon foot print of 2,445 yd³ of concrete and over 50,000 lb of steel. Finally, it will also allow revegetation of a larger portion of land on the West side of TRACK X-7. D.Preserves a higher quality habit area that is more beneficial to wildlife. 5.Moving Convention Center and Hotel/Recreation Center A.Action Taken: The Hotel/Recreation Center moved to the South about 45 feet and the Convention Center/Parking Structure rotated 90° and move to the south in between two ridges for the following reasons: Pleasant Harbor MPR 2 of 12 SUB2023-00025 Exhibit 63 B.These revisions were necessitated to allow for the relocation of Road B as noted above. C.The two buildings are located to fit the contour of the land better. This will also advance the goals of paragraphs 63 (u)&(v) of Ord. No 10-0128-02 D.The new building sites will also lower GHG Emissions by reducing the amount of grading by around 13,000 yd³ of dirt for the Convention Center and 18,000 yd³ of dirt for the Hotel/Recreation Center. 6. Boundary Line Adjustment A.Action Taken: This BLA is on the north east side of the MPR property. The MPR is exchanging the property to the South, for a strip of property to the North for the following reasons: B.The owner of an adjacent parcel filed a suit to quiet title alleging adverse possession in Jefferson Superior Court No. 24-2-000214-16 The adjoining owner and Pleasant Harbor have agreed to resolve the dispute by exchanging land through a boundary line adjustment. C.This case is not final, however, the parties are in agreement and it is just a matter of the paperwork being finalized. This is why it is being added at this time. 7. Storm Pond Movement A.Action Taken: The storm pond in TRACT F, moved to the east and the TRACT was adjusted to reflect that change for the following reasons: B.Do to the above BLA and removal of the Sewer Lift Station the MPR is moving to existing storm pond to the East. C.This should eliminate the need for an additional access onto Black Point Road. With the road access eliminated it will keep the existing vegetation along Black Point Road. 8. Housing Density A.We adjusted the single family house lot density down to better work with the land topography. The following changes where made: (1) Road E (a)The MPR removed all the house lots along Road E on the West side of the property. (b)With hearing the need from Commission Dudley-Nolette that Jefferson Co needs Senior Living, the MPR replaced the lots with a full time Senior Living Center location, that fits the topography of the land better with about 5,000 yd³ less dirt moved. (2) Road F (a)To excavate less and work with the topography of the land better, the lots where rearranged and a multi-family TRACT X-13 was added. This will reduce the overall foot print on the land. Pleasant Harbor MPR 3 of 12 SUB2023-00025 Exhibit 63 (3) Road A, C and G Lots (a) The lot density was lowered on Roads A, C and G to allow for less excavation and work more with the lands natural topography. (b)On Road G lots where added the to North side of the road. (c)On the North End of Road C the road was moved closer to the property line to decrease the required excavation. (4) Road B Lots (a)Along Road B the lots were decreased from 52 to 43. The lots were adjusted to work with the topography of the land and save more of the natural existing vegetation. (b)We dropped a few of the lots to allows us to keep open two natural infiltration locations as well as open up some wildlife corridor crossings. (c)With the movement of Road H to the South we Lost 2 lots as well. (d)Since the reduction in house lots we added a Multi-Family location on North end of Road B, TRACT X-11 (5) TRACT X-12 (a)At the East end of Road C, TRACT X-12 was adjusted to work with the topography of the land to require less excavation and land retention to allow for more vegetation. (b)The building is planned to be smaller and that density to be spread out across multiple Multi-Family buildings, thus decreasing the building footprint. B.The County commented that the ERU numbers of the Plat where wrong. The Plat shows that the housing density is 822 ERU. The 822 ERU is because the Plat does not encompass the entire MPR. When you add the numbers not included in this Plat, of 66 ERU for the Maritime Village and the 2 BnB’s by the marina, you reach the 890 ERU for the entire MPR. Also to clear up any confusion on the Plat Cover Sheet reference to parts of the project not included in this Plat have been removed. Please note that the Civil Plans references the entire MPR because its calculation are to the entire MPR. C.The total Single Family house density decreased and the MPR is placing it into Multi- Family. We went from 216 Single Family Lots down to 150 Single Family Lots. (1)This will also help lower the water usage for the MPR, as historically Multi-Family homes use less water. 9. Southern Sewer Lift Station A.Action Taken: The Sewer Lift Station was moved from the far West side of Road C, to the Southern Storm Retention Pump Station location for the following reasons: Pleasant Harbor MPR 4 of 12 SUB2023-00025 Exhibit 63 B.This change will work with the with the topography of the land, so less earth moving is required, thus lowering the GHG emissions. C.This move will work to prevent the need of two standby generators by combining the Storm Water Lift Station and the Sewer Lift Station standby power into one system. This will help to lower the GHG emissions by an entire generator and overall carbon footprint of the MPR. 10. Wildlife Corridors A.Jefferson Co in its May 27, 2025 BOCC letter, mentioned that we where “4. Moving the wildlife corridor,”. The wildlife corridors were opened up more then moved. B.With the lowered density of home lots on Road C & E and the removed lots, this will preserve more of the trees as well as keep more of the wildlife corridors naturally forested and open to the wildlife. C.The movement of Road B South is also opening up the North side of the property to more wildlife habitat in a larger well established forest area. D.The larger lot size of the lots to the South will allow for easier movement of wildlife through that area. 11. Wetland C Buffer A.Ms. Hayworth noted that the Wetland C buffer did not match the updated boundary by Geo Engineers. After further review Ms. Hayworth was correct, the buffer was the right size, but the wrong shape. B.Action Taken: The buffer was updated and the lines where adjusted. The two other buffers where checked and they are correct. 12. Injection Well Locations A.There are three wells shown on the Northwest side of the property. Ms. Hayworth noted that the recharge wells were located in the golf course. She also noted that a golf course was not allowed to be within the 100’ radius. B.The wells are not planned to be installed at this time. The wells would only be installed in the event of saltwater intrusion into the aquifer. The exact well location would be chosen by the hydrologist at that time. C.While looking at the code, the 100’ radius pertains to Potable Wells. A golf course is not called out by the code, however, chemical usage would need to be restricted within the area. D. Action Take: We have moved the proposed location outside the golf course. The exact location may be adjusted by the Hydrologist and time of permitting. 13. Golf Course A.There was some updates to the Golf Course to work with the topography of the land better and allow different levels of player to play, do to the elevation changes. This will allow Pleasant Harbor MPR 5 of 12 SUB2023-00025 Exhibit 63 junior players to be able to learn to play. 14. Main Entrance Road Access A.Action Taken: The MPR has listed the road entrance as an easement so that it can be adjusted to fit the actual design once approved. B.The MPR is proposing to keep the main entrance to the resort in its current location, Old Black Point Road. C.Keeping the old entrance will create a better line of sight down Black Point Road. This will make it a much safer exit onto Black Point for the people turning left, which is the majority of the traffic. The entrance is at a angle now so the intersection would need to be straightened slightly to achieve optimal the line of sight. D.In 63(s) it wants us to keep the green belt along 101. By keeping the road to Old Black Point it will keep the green belt intact, by allowing the MPR to weave the utility easement through the woods vs cutting all the trees down and excavating the road out and re- vegetating. There will be over 1.1 acres of trees larger then 10” DBH saved. E.This will also lower the GHG emissions by a reduction of 9,000 yd³ less dirt moved. F.The following steeps need to happen for this change. Jefferson Co Public Works would need to release Old Black Point Road to the MPR or MPR would connect to the Co road and work with Public Works to make the intersection improvement. B. Response to August 16th County Comments Pleasant Harbor provides the following responses to the County’s comments in its August 16th letter. Comment 1—Plan Corrections: The markups have been addressed in the revised plan set. Comment 2—Plan Set Inconsistent: The inconsistencies have been corrected. Comment 3—Conservation Easement: The location of the conversation easement is noted on Plat Sheet 19, 23, 25 & 26, Comment 11. Comment 4—Setbacks: The building setback is depicted. We disagree that pedestrian paths are prohibited in the setback. The pedestrian paths are not “structures” as within the meaning of JCC 17.65.040. The purpose of the setbacks was to minimize visibility of buildings from public areas (US 101, Black Pt Road, Hood Canal etc.). The setbacks were not intended to preclude non-buildings. Indeed, one of the mitigation measures requires installation of a fence on or close to the west property boundary to prevent elk from entering the Property. This fence would be installed within the setback area and confirms that intent of prohibiting “structures” in JCC 17.65.040 Pleasant Harbor MPR 6 of 12 SUB2023-00025 Exhibit 63 was not intended to prohibit passive recreation improvements (like paths) or mitigation measures (like the elk fence). There are no minimum lot size requirements imposed in the MPR. Therefore, there is no need to calculate buildable area. We are comfortable with the lots and tracts as they have been outlined at this preliminary level. Lot and tract adjustments may be made at final plat approval as site infrastructure is fully designed, as is customary, consistent with state law and applicable County regulations. Note, Please see Comment 6 below, Plat Comments, for Tracts and Lots with building on them. Setbacks have been noted pursuant to JCC 17.65.040. Comment 5—Vegetation Management: a. Blending of Buildings. The preliminary plat application outlines the general layout where lots and roads will be located. It does not authorize construction of buildings. Per the plain terms of the ordinance condition “buildings must be constructed and placed in a such a way that they blend into the terrain and landscape with park like greenbelts between buildings”. The County says “not enough information has been provided to determine compliance with this requirement” without specifying what else is required. Clearly, actual building design is premature at this early stage. Addressing how buildings will be constructed to blend in like building height, materials, architectural features and landscaping are more appropriately addressed during building permit review when building plans (including grade, elevation, and design) are actually prepared. The lot layout leaves room for building design that can satisfy this requirement. Additionally, a landscaping plan will be provided for each lot when the permit is applied for to demonstrate compliance with 63 (u) & (v). Nevertheless, as noted in the changes above, Pleasant Harbor has made a number of changes to the original plat design to follow existing land contours where possible to minimize the amount of grading required. b. Tree Preservation. As noted above, the tree preservation requirement is not applicable to preliminary plat. Nevertheless, the preliminary plat layout strives to avoid trees in excess of 10 inches dbh. The Vegetation Management Plan (Appendix L) (“VMP”) rated forested areas based on the age of trees (which roughly correlates to the size of trees). The forest areas with the oldest growth and thus, the highest densities of trees exceeding 10” dbh are rated BP-1 and shown Figure 13 of the VMP. The preliminary plat avoids those areas where possible. For example, and without limitation, Tract H, I, E-1, E-2 and X-4 are working to preserve most of the BP-1 trees. Second, when laying out roads for the preliminary plat effort was made to track the location of the existing roadwork through the property to further minimize impacts to forested areas. This is partly due to necessity because, as the County is aware, terrain on the property is uneven and following the existing road network minimizes the amount of grading required. It is also worth pointing out that when the Ordinance was adopted the master planned resort contemplated an 18-hole golf course. Since then, the golf course has been reduced to 9 holes which has allowed for even greater retention of trees than what was possible when the Ordinance was initially adopted and this condition contemplated. The golf course has been updated to work with the already cleared areas of land as best possible. Pleasant Harbor MPR 7 of 12 SUB2023-00025 Exhibit 63 PHMPR has a staff arborist on site. Although not required by the ordinance, prior to conducting work on roads and related infrastructure to achieve final plat approval the arborist will mark any qualifying trees that must be removed for road and related infrastructure improvements needed to achieve final plat. This will allow for potential plan deviations to preserve trees where possible. Finally, the applicant is not required to preserve all trees exceeding 10” dbh. Condition 63(w) states that construction of buildings will be completed in a manner that “strives to preserve trees” that have a 10”dbh. It does not, as the comment suggests, require preservation to the “maximum extent possible”. Nevertheless, Pleasant Harbor took a hard look at where additional design changes could be made to reduce potential impacts to stands of trees with a dbh greater than 10 inches. As noted in the changes section, Pleasant Harbor made a number of changes to accommodate this comment including, but not limited to, moving the WWTP and relocating roads. Comment 6—Building Envelopes: The building envelope requirement in JCC 18.35.400(4)(g) does not apply. The purpose of this requirement is to map code-required setbacks on each lot. The MPR ordinance does not require internal lot setbacks except for any lots located within 20 feet of an exterior MPR boundary (which have been marked). The MPR only requires 10 feet of separation between buildings. The building envelope is, therefore, the lot boundary. That does not mean, however, that an applicant can cover the four corners of the lot with a building. As noted above, buildings must be seperated a minimum ten feet and designed to blend into the terrain and provide green areas between buildings as well as preserve trees 10” dbh, among other things. Setting a building pad/envelope at this stage will arbitrarily limit development of actual buildings to a specific pad and may impede designs that better achieve other design goals on a lot-by-lot basis as actual construction plans are developed and submitted to the County including tree preservation and aesthetic considerations. The following notation has been added to Plat Sheet 10, to address the 10’ foot separation requirement: [Plat Note:] All buildings in the plat shall maintain a minimum 10’ foot separation from adjacent buildings. (a)Lots 1-150, shall have a building envelope setback of 10’ from a neighboring building and shall be restricted from building in any easement within the lot, per JCC 17.65.040(2). (b)Lots 108-117, shall have an additional setback restriction to the above restrictions. No building shall be placed within the 100’ Steep Slope Building Setback that is indicated on the Plat maps. (c)Tract I, X-12 & X-14, shall have a 20’ from MPR Boundary Line building restriction, per JCC 17.65.040(1). (d)Tract D, shall have a building setback of 35’ from US HWY 101 right-of-way, and a 20’ setback from the Black Point Road right-of-way, per JCC 17.65.040(1). (e)Tract X-7 and F, shall have a building setback of 20’ from the Black Point Road right-of-way, per JCC 17.65.040(1). Pleasant Harbor MPR 8 of 12 SUB2023-00025 Exhibit 63 (f)All lots and tracts associated shall be follow JCC 17.65.040(1)(2) setbacks. (g)Final Plat, may have further restrictions placed on a lot at time of Final Plat application and shall be bound to the MPR Development Agreement. (h)There are no front, side or rear yard restrictions and shall follow MPR Development Agreement. Comment 7—Geologically Hazardous Areas: a.Geotechnical Study . PHMPR disagrees that a new geotechnical report is required. The prior report delineated the areas deemed geologically hazardous on the property. That has not changed. Nevertheless, Pleasant Harbor commissioned a report review from Krazan & Associates, Inc. dated October 15, 2024 (“Krazan Review Report”). The Krazan Review Report concludes that geologically hazardous areas from the prior report remain unchanged. The cut and fill on page 46 of the 2008 report shows, the cut and fills in the same locations, as will be done in this current Plat. The only Seismic, Erosion and Land Slide hazard areas listed in the report, on Page 47, for the project, are outside of the areas proposed for development. b.Recommendations . The top of bluff along the southern property edge was resurveyed by Krazan and now is depicted on both the preliminary plat and the preliminary civil engineering plans. While we do not believe the cart path is prohibited in this area we have relocated it. c.Phasing . The Krazan Review Report concludes that Pleasant Harbor’s current construction sequencing phases will not undermine existing potentially geologically hazardous areas. Please note that while the Krazan Review Report references “phases” that is not intended to deviate or establish phases that differ from those set out in the Development Agreement. Rather, the reference was intended to identify areas that will have ground disturbance at or around the same time for purposes of assessing impacts to geologically hazardous areas. Any phasing of final plats will follow the phasing requirements in the Development Agreement. Comment 8-_Wetlands: a. Delineation. Please see the enclosed Wetland Verification Report prepared by Geo-Engineers and dated October 18, 2024. b.Establishing Buffers . Please see the enclosed Wetland Verification Report prepared by Geo-Engineers and dated October 18, 2024 addressing applicable buffers. The buffers have been placed on the revised preliminary plat. Pleasant Harbor is requesting that the buffers for Wetland C be averaged as permitted by County Code. The averaged buffers are located on Plat Sheet 16 and explanation for the averaging is on page 8 of the October 18, 2024, Geo-Engineers Wetland Verification Report. Pleasant Harbor MPR 9 of 12 SUB2023-00025 Exhibit 63 c.Buffers in Conservation Easements . The updated wetland buffers are reflected on both the preliminary plat and preliminary civil plans. A draft conservation easement is provided with this letter. Applicant will record this with final plat approval. A notation requiring recording at final plat approval is included on Plat Sheet 10 (#31). d.Buffer Encroachments . Although lot boundary may extend into wetland buffers, the proposed residential lots impacted by the wetland buffer have been modified on the revised preliminary plat and civil plans. Other encroachments have also been removed. Buffer Averaged now needs Jeff Co approval to complete the process. Comment 9—Recharge Wells: The wells on Sheet 15 and 20 are not a recharge well they are Proposed Potable Wells. Sheet 21 well is the ACG well. Fairway 3 of the golf course is relocated outside the 100’ radius. See comments in A.12. of this letter for more reference to recharge wells. Comment 10—Healthcare MOU: Float Planes: The US Navy will not allow float plans in the vicinity of Pleasant Harbor. Helicopter Landing Pad: The comment that we need to have a Helicopter Landing Pad (“Heli Pad”) because Appendix J, Memorandum of Understanding (“MOU”) with Jefferson Healthcare (“JH”). The MPR added that to its P-Plat updated submittal that was turned in on January 31, 2025. However, with a closer review of that MOU, Appendix J, Fire/EMS (“Fire”) MOU, and JCC 17.75.030 Prohibited Uses, the MPR is precluded from adding a Heli Pad to the site. The text of paragraph (7) of the JH MOU reads “Should the Resort expand and require emergency Air-Lift capabilities, a suitable landing zone will be provided to accommodate helicopter or float plane transport.” The text of paragraph (5. d.) of the Fire MOU reads “Helicopter Landing Zones will be utilized by the established landing zones already in place and approved by Airlift Northwest and Brinnon Fire Department.” Because of the above, the MPR has removed the Heli Pad from the P-Plat, however, the MPR will reserve space in TRACT H if the need arises per the JH MOU. Comment 11—Appendix P, Wildlife Management Plan. a.Report Figures . We presume you are referencing the legend on the right hand side. These figures were based off the site plan for stormwater. The legends outline stormwater improvements which have no bearing on the depicted wildlife corridors. A new map has been provided and attached to the “Pleasant Harbor Wildlife Management Plan Rev 5.pdf”. The new map depicts the current layout. Pleasant Harbor MPR 10 of 12 SUB2023-00025 Exhibit 63 b.Site Features . Amendment 1 dictates that an exclusion fence must be constructed along the western boundary of the MPR south of Black Point Road. The fence will be constructed as required. This is not an issue for preliminary plat approval, but is a condition that must be met for final plat approval. PHMPR is consulting with Dylan Bergman, wildlife biologist for the Point No Point Treaty Council about fence location. Dictating the exact fence location on the plat is premature and not necessary. Site specific design may require some deviation to achieve overall goals of the MPR including, but not limited to, tree preservation. We have added a note to Plat Sheet 10, to insure its inclusion into the plan for Final Plat. Comment 12—Appendix S Dark Sky Standards. 1.Illumination Standards . The applicant will comply with the lighting standards in Appendix S. A narrative of how we will comply is not required for preliminary plat approval. The County and Hearing Examiner can condition preliminary plat approval that all road and path lighting meet the Appendix S standards. 2.Lighting Extent . At time of construction permitting, an updated illumination sheet will be provided showing the lighting and illumination footprint. The intent of the lighting map was to demonstrate the calculation of the avg foot candle at road level. The light pole hight in the plan is wrong and is noted for correction at time of construction permitting. The road layout on the provided plans is very close to the design of the submitted Plat. The paths have changes, however, foot level illumination will be accurate. The exact lighted pathways will be denoted in the construction permit application Comment 13—Existing Wetlands. Please see response to Comment 8 above. Comment 14—Roadway Maximum Slopes. Maximum longitudinal roadway slope are not planned to exceed 10%. Actual road grades are shown on the sheets. For example, see Civil Sheet 12, Tract X-12, Road C. Comment 15—Sanitary Sewer. Appropriate easements and/or tracts for development and operation of a public sewer system and water system will be created with the final plat based on the final configuration of as- constructed systems serving the master planned resort. Pleasant Harbor has identified easements it knows will be required. See for example, Plat Sheet 20, Lots 17 & 30, show the easements across multiple lots. Comment 16—Setback Distance for Well. The County misinterprets the SWMM. Suitability of stormwater infiltration ponds must take into account any drinking water wells within 500-feet. That requirement of the SWMM does NOT require a 500-ft setback as the County asserts. Please see Steve Hatton’s response below: "In Section V-5.5 of the 2019 DOE SWMM, the 500-ft reference is NOT a setback. Rather, this section pertains to Site Characterization for Infiltration. “Documentation” must be considered Pleasant Harbor MPR 11 of 12 SUB2023-00025 Exhibit 63 for topography within 500-ft of a proposed infiltration as well as well as the presence of water wells within 500-ft, among many other elements included in this section. The SETBACK from a potable water supply well to a stormwater infiltration pond is 100-ft which the proposed pond and new well will meet." Comment 17—Stormwater Drainage Easements. The storm system has not been fully designed. As a result, we cannot provide every easement in the exact location on the preliminary plat and providing arbitrary easement locations would be fruitless as those locations would likely change. It is appropriate to condition final plat approval on construction of code-compliant stormwater facilities and identification and creation of all appropriate easements to operate the same through the MPR. Most have been already listed and may require adjustments for final system plans and will be denoted for final plat as they will have been constructed. Comment 18—Geotechnical Recommendations. Please see response to Comment 7. Comments 19-23—Roadway Widths. Please see the attached Memorandum dated October 2, 2024 from Michale Read, PE with TENW for a response to Comments 19-24. In addition to the TENW Memorandum, increasing the paved width will compromise other goals of the MPR with no material corresponding benefit. For example, increasing the paved width will impede the goal to preserve trees exceeding 10” dbh and will further reduce the open space corridors and vegetated areas with the resort, among other negative impacts. It will also increase the impervious surface and require more water to be treated, increasing the overall carbon footprint of the resort vs larger natural greenbelts. Finally, upon more detailed review it appears the reviewer compared the project against the Jefferson County Colorado Transportation Design and Construction Manual. We were unable to find any such manual in the Jefferson County Washington Code or website. Moreover, the Jefferson County Colorado Transportation Design and Construction Manual contains the sections and standards cited to in the comment letter. Comments 24-26—NFPA 1141: The NFPA 1141 comments appear to result from the use of the Jefferson County Colorado code requirements noted above. TENW and our team find no reference to this in any of the Jefferson County Washington code or the Brinnon Fire Department. Finally, the MPR will not be designing to NFPA 1141 code it will adhere to the Jefferson County Washington code listed in the attached TENW Memo. We look forward to your review. We would appreciate the courtesy of being able to review the County’s proposed conditions of approval before the application is conveyed to the Hearing Examiner. The conditions should be limited to those needed for final plat approval. Pleasant Harbor MPR 12 of 12 SUB2023-00025 Exhibit 63 520 Kirkland Way, Suite 100, Kirkland, WA 98033 (425) 889-6747 www.tenw.com MEMORANDUM DATE: October 2, 2024 TO: Cristina Haworth, AICP Jefferson County FROM: Michael Read, PE TENW SUBJECT: Minimum Roadway Width – Response to SUB2023-00025 Technical Review Comments Pleasant Harbor Master Planned Resort TENW Project No. 2901 This memorandum summarizes the roadway width requirements for the Pleasant Harbor Master Planned Resort project in response to the August 16, 2024 comments from Jefferson County that TENW received on September 12, 2024. The project proposes several roadway sections that meet the minimum requirements as outlined in the 2018 International Fire Code (IFC) and the Jefferson County Code (JCC). Overview of Design Context The Jefferson County Code (JCC) Title 18 Unified Code Development, Chapter 18.30 Development Standards, Section 18.30.080 Roads adopts the American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets. P er the AASHTO A Policy on Geometric Design of Highways and Streets, Section 5.2.2 Cross-Sectional Elements, Table 5-5, Minimum Width of Traveled Way and Shoulders for Two-Lane Local Roads in Rural Areas, the minimum width of traveled way for a volume of 400 to 2,000 vehicles per day (vpd) and a design speed of 15 to 25 MPH is 20 feet. Table 5-5 is included in Attachment A. Jefferson County code does not adopt any other roadway references to alternative geometric standards that require wider dimensions. Per the 2018 International Fire Code, Chapter 5 Fire Service Features, Section 503 Fire Apparatus Access Roads, subsection 503.2.1 Dimensions: Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and unobstructed vertical clearance of not less than 13 feet 6 inches. For internal circulation and to provide access to community amenities and residences, the project proposes to construct several internal roadways with varying sections. The proposed roadway sections for the internal roadways are shown in Attachment B. The roadway sections vary depending on anticipated use, with traveled way ranging from 20 feet to 24 feet. The posted speed of the interior private roadways at the project are all proposed to be 20 MPH. The design of the proposed roadways was based on multiple factors in addition to the minimum roadway width standards described above. These private local roads are intended to be low speed, neighborhood resort roadways. Therefore, the roadway widths provide additional traffic calming measures to achieve this intent. In addition, the roadway design minimizes stormwater generating surfaces to assist with achieving the mitigation requirement stormwater treatment on-site. Lastly, the Exhibit 63 Minimum Roadway Width Memo Pleasant Harbor Master Planned Resort (Jefferson County) October 2, 2024 Page 2 proposed design helps to achieve the mitigation requirements to blend with the natural setting and improves the ability to preserve trees and other existing natural landscape features. Conclusion As demonstrated in our review, the 2018 International Fire Code and A Policy on Geometric Design of Highways and Streets were considered in determining the minimum roadway width required for the Pleasant Harbor Master Planned Resort project. As demonstrated, these criteria would be met or exceeded with the proposed roadway sections provided in Attachment B. The proposed roadway widths provide additional benefits to the Pleasant Harbor development including traffic calming/speed control, stormwater management, and native vegetation preservation. Please contact me at (206) 361-7333 x 101 or mikeread@tenw.com with any questions. Attachments Attachment A – AASHTO – A Policy on Geometric Design of Highways and Streets, Table 5-5 Attachment B – Proposed Site Plan and Roadway Sections Exhibit 63 Minimum Roadway Width Memo Pleasant Harbor Master Planned Resort (Jefferson County) ATTACHMENT A AASHTO A Policy on Geometric Design of Highways and Streets, Table 5-5 Exhibit 63 Exhibit 63 Minimum Roadway Width Memo Pleasant Harbor Master Planned Resort (Jefferson County) ATTACHMENT B Proposed Site Plan and Roadway Sections Exhibit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xhibit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xhibit 63