Loading...
HomeMy WebLinkAboutBLD2005-00297 •UJLDING PERMIT APPLICA MLA05-0288 JN Review Type: Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD05-00297 Received Date: 5/9/2005 SITE ADDRESS: 660 PINECREST DR PORT TOWNSEND, 98368 OWNER: EDWARD HARMON 1240 W SIMS WAY#20 PHONE: 360 774 1077 PORT TOWNSEND WA 98368 SUBDIVISION: KALA POINT#7 Block: Lot: 399 PARCEL NUMBER: 965000259 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE PROJECT DESCRIPTIOP NEW SFR W/ATTACHED GARAGE & A/G 120 GALLON PROPANE TANK TYPE OF WORK RES SQUARE FOOTAGE TYPE OF IMP NEW VALUATION 212,049.00 MAIN: 954 ADD'L: 1,110 HEAT TYPE: EEE CODE EDITION: 2003 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R_3 OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: 5N OTHER: CONST TYPE: GARAGE: 484 SHORELINE: DECK: 240 SETBACK: SEWAGE DISPOSAL: CON BANK HEIGHT: WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 3 Prop: 3 Total: 3 Total: 3 1Routinq Date: (o /c ype Amount Paid By: Date: Receipt: 'ermit Approved/Date $1,620.95 BAC 05/09/05 73110 APPROVED 'Ian Check $1,053.62 BAC 05/09/05 73110 tate Building Code $4.50 BAC 05/09/05 73110 )table Water Application $53.00 BAC 05/09/05 73110 SUN 2 1 2005 Total: $2,732 07 Jeffers C my Planning & 8 lid' apartment • .r� • • 0 BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 s. (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00297 Received Date 05/9/2005 SITE ADDRESS: 660 PINECREST DR Issue Date 06/21/2005 PORT TOWNSEND, 98368 APPLICANT: EDWARD HARMON PHONE: 360-774-1077 1240 W SIMS WAY#20 • PORT TOWNSEND WA 98368 SUBDIVISION: KALA POINT#7 Block: Lot: 399 PARCEL NUMBER: 965000259 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE & A/G 120 GALLON PROPANE TANK CALL IN FOR THE REQUIRED IN ECTIs , THAT APPLY TO YOUR PROJECT. SE[BACKS: DJ( 8/7S UFFER: 7X 8//l'3 j Footing: ,fie Ali 7A5651,4 Foundation: PE i.A4Pr=i- f;k4P41104 (Alas Dk ez-5/4S Storrnwater FINAL Approval: Underground Plumbing: Underground Insul io • Shear Wall • N.4//7 >/-36"eV"' Sheathing/ 1-30-- / — Framing: ((((((///////Ak. years l'�an,s //oL pPlumbing: // Propane Tank/ Lines: _kr 9 ! d 5 !`O Insulation: IlQ f Like l _S/61 -DS we-cs Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: • Zoning Final Approval: Final/Occupancy Approval: . 41410(0 HEALTH DEPARTMENT A(ND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • SPECIAL CONDITIONS FOR CS A BLD05-00297 1.) Critidal Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) A Stormwater Site Plan has been submitted and approved by the Department of Cormunity Development. Once the subject permit has been issued the applicant shall fullyimplement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan:compliance. A Certificate of Occupancy will not be issued until the Department verities plan compliance. No clearing for roadways or utilities shall occur on the project site.until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 5.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than'one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code(UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any sucks unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 6.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 7.) The.building height is not to exceed 35 feet. 8.) Minimum setback from Pinecrest Drive right-of-way shall be 20 feet. Minimum side and rear:yard setbacks shall be 5 feet. 9.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 10.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 11.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. • • I:\F_BLD Permit_Buildng.rpt 10/29/19 7.1 Si . L 1-0 el ir jO 1111 5a1,4 — —i_. — — -II 2_ILI. ,_T., r- 1 A : IIn 1 4 ) I I I MAY - 9 2005 'ILE Ji! i _ 4 JEFEER ON COUNTY - -e - › DEPT.OF CONIN JITTY DEVELOPMENT , • i ,4 .... -7 )---"' I, A 51.6' ,..1 • i e4 s g g° .); •S i A. Ti.littlieW-.r..- it ' • "N 0 --- -----7=- ---- — jii N.'"" - -... 4 • 0 d , N E,4 -i,,,-• • v.. ' f • - i f I i... 4.., " I I I *)---- z-- , 1 ‘0, I At-1- •-•-."---- — ' ---4ri. Parelee Sr( 62sehz2,46 e sict(If - 1 NI r.al ..... torvu_5 Eact ,?.... ...._ _ ____ „,,..,514._1> t,--, 1 ets4zoic.. I a -.4 -1- 34' - i , 71k Slii ji vilw I . _ i 0( ' i StOrMWet i r_--.1--3e0tiired r 's ... ) • RI w ' ''..).: q I , D • ! i II f•-- 1 7 / IL 4g44(‘ 't 1 0 ts •. e 1 1 , ---- I APPROVED ie I r I /0 a SITE PLAN k, i , ti N 2 0 2005 1 I 1 ' r I JE1 E N i # DEv 1 01,v4 I 4 li( - siDarraTuRFP) ilt 4'\-- g i 1 { / Ai) • 471' /6 / t b.t• V I I i 0 PAO vccr 4.-c a•-li1/4)\---- at)a rck r-1-)tARkftACW 4-legribio- . etiv-)61/(1 p cf(oc coo S-ci <71 - ,, • Ucto pi iocefes(- Die-tuQ- Tecie 1'e -= c),"• l'Inc 0.-tre5& .vIrtve., 3(00-- '114- 1077 40111*, , JEFFERSON COUNTY 1 R 444:. ' DEPARTMENT OF COMMUNITY DEVELOPMENT 4 621 Sheridan Street • Port Townsend • Washington 98368 MAY2005 ..,.....) 360/379-4450 • 360/379-4451 Fax http://www.co.jefferson.wa.us/commdevelopment/ i STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# Cc; -.2 PROJECT/APPLICANT NAME: 1/ q / /14/ —l2f/t/ _ Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. p / tAl Existing Conditions Summary 2. Describe thwxisting opography. Indicate contours on the site_ . 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. 54Ik°#51. j 7 YS Rrti t. 4. Describe the existing soils. Indi ate soil type on the sit map. ca tJ�'e,- / � 4- / cnd Si ,L 5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site—above, below,and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acr age of each. 6. Describe any excess level lie generated by the proposed use or activity: APPROVED - STORMWATER PLAN Stormwate 1S JUN 2 0 2005 stormwater site plan template—rev.10/1/2003 Require JEFFERSO 0 TY DEPT.OF C' . DE :LOP E T SIGNATURE. 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on th sit . I icate location on the site map. 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads,and sensitive/critical areas (streams,wetlands,lakes,steep lopes,etc.). Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed(i.e., per BMP T5.30 in the Manual)or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. 10. If the project requires the use of stomiwater treatment facilities,describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"projects or projects that involve the potential for dispersion of contaminants.] Die-167dt 11. Describe the performs a goals and sta9dards applicable to theproject. kii4 LL-Mi A._ 6/(-) -.SJ4t 12. Describe the flow control stem. AB Ay a 2005 i stormwater site plan template—rev.10/1/2003 6 10_ 13. Describe the water quality system. lk--( ig _.. 1 _. , , , . , , MAY - 9 2005 L', 14. Describe the conveyance syst m analysis and design. 15. Describe the source of fill material,physical characteristics of fill material, deposition n of excess material. /6 /-ji- 2 ' L C 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code (ii 17. Describe the proposed surfacing material oray.e I- QA) (_11Ziue to 18. Describe methods forestoration�ofth'jQ sit .� �t� �U' 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. A. 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. lu I 6 " 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. — 6— stormwater site plan template—rev.10/1/2003 7 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in t' template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible fu. preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will.be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Cle ring Limits. 2. Establish Construction Access. nc_ce_V-; 3. Control Flow Rates. 4. Install Sediment Controls. 122 stet" 7/1-e-Se,4-`I'e .Ze4_s Aftiftet- . 04/119..frN 5. Stabilize Soils. 41 P-k‘ eeith 6. Protect Slopes. jAy' - 9 2005 Nip 7. Protect Drain Inlets. n. 1 v• stormwater site plan template—rev.1 W1/2003 8 1011- 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Cha n Is and Outlets. MAY - 9 2005 9. Control P Ilutants. • 1 tt }- � r.._ 10. Control D e[ Watering(the act of pumping groundwater or stormwater away from an active construction site). 11. Mai "nest Management Practices(BMPs). ,_ 12. Manage the Project. iki li--- • 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads) 1\i, fr_ b. Description of the wnstream drainage path leading from the site to the receiving body of water(minimum distance of 400 N. yards). h._ 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. stormwater site plan template—rev.10/1/2003 9 b. Description of special requirements for working in or near environmentally sensitive areas. I )) 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). 1\1 ba---.... 1 5. Construction Phasing. a. Construction segue e N 4 b. Construction phasing(if proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a proos construction schedule. II. Wet Season Construction Activities. a. Proposed wet eason construction activities. W 1 b. Proposed wet se son construction activities for environmentally sensitive arelWAY — 9 2005 - 7. Financial/Ownership Responsibilities. a. Identify the property ow r responsible for the initiation of bonds and/or other financial securities. fr— b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. NA 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. - a. Sediment Ponds/Traps. b. Diversions. c. Waterways. d. Runoff/Stormwater Detention Calculations storrnwater site plan template—rev.10/1/2003 10 Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall I submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revises, drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction S PPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my k edge. I also certify that this application is being made with the full knowledge and consent of all owners of the ected rty. ( ER 0 ED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: MAY - 9 2005 \Li jEFFEFiSGN COUNTY Irr Di ELOPMENT stormwater site plan template—rev.10/12003 12 lorvi, zi:-0 ON co JEFFERSONIUNTY •� - 1 , ‘ l r , , ' DEPARTMENT OF COMMUNITY DEVELOPMENT ' = ~ 621 Sheridan Street • Port Townsend •Washington 98368 • r "' Q. 'P 360/379-4450 • 360/379-4451 Fax i i j s MAY ` 9 2005 �, iiiNG'�O www.co.jefferson.wa.us/commdevelopment j' I { IErr - j .i. Master Permit Application MLA:I . c".r-. Project Description(include separate sheets as necessary): Tax Parcel rProperty Number. 1 ° 0 4)'5- Size: ,Lig /1•71:2_00 0. (acres/square feet) Site Address and/or Directions to Property: 660 / •iiii Ci' -o f "7 3' Property Owner(s)of Record: an ,. 0 4 Telephone: . •O r — O " Fax: email: ._ � I"t-- Mailing Address: - h• rt„/,�,,Y>i / e"" • Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) i -Building ❑Variance(Minor, Major or Reasonable Economic Use) ❑ Demolition Permit ❑ Conditional Use[C(a),C(d),or C]** *Single -:••. �� ❑ Discretionary"D"or Unnamed Use Classification Garage -•`�l L it'/Detached ❑ Special Use(Essential Public Facilities)** Al Manufacture. Home ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat** ❑Commercial* ❑ Binding Site Plan** I I Change of Use ❑ Long Plat** ❑Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRDyAmendments** If-Propane ❑ Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance ❑Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of e try to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later ns ctions.A and right of entry to this property shall be requested and shall occur only during regular business hours. - _ Signature: '&If/ ---- Date: ' z ��'� The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential lake"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson Cou• makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. •• individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in , pli-•ce wi a I e -fferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable =a a sibi. f. .d •ri . to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: .Ai �, t__ Date: '- 2 ._e er G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04-doc iii OWNER BUILDER STATEMENT • The signer of this statement does hereby ce 'fy thatiey are the Owners of the parcel referenced herein,that they are not licensed contractors and that :::e assumin res liGeneralContractor for the proposed projec: �` ,�j �li/�,, Date: /�C6 GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: i p .HONE: FAx _. `; 11 I t 't ( ) ( ) MAILING ADDRESS: [`;-- ;! 1 EMAIL: CONTRACTOR'S LICENSE MAY - 9 2005 I , , + %MAINS NUMBER: ' NUMBER ARCHITECT/ENGINEER: SHONE ( ) FAX:( ) MAILING ADDRESS: i s r t , , , 1'` 1 MI F' I;, T r f'-t f ti'`t -I,1 MAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: . New K Wood Existing: _ D Sewer Addition 0 Steel Proposed: 1, ' Bank 0 Community System O Alteration/Remodel ❑ Concrete Total: Z. S Height: [it.Individual System ❑ Repair ❑ Masonry SEP Permit# O Demolition 0 Other: Bedrooms: Water Supply: Existing: Setback: 0 Private well ❑ Two Party Type/of.Heat: Proposed: 3 �. Public C ctv°,r: Total: 3 Name of System: t. ''' Ce,( r 1-t. ��p. I I�(.v (,t2 CL I If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank X Above ground Tank Size of Propane Tank: / 0 t. q-LC e,*U i l Heat Stove ❑ Cook Stove ❑ Woodstove 1)4..Fireplace Insert 0 Hot Water Tank ❑ Pellei Stove 0 Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property ines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components, ncluding the reserve area. _. Square Footage -For Office Use Only Current Proposed Amount ain Floor imi i s65.j0 Consistency Review: 4 i ---‘. u Floor Base fee: 1 ! 1C LOCI1411 1I!Oao: �5 Floor Additional Section: zanine: Plan Check fee: / 053. r 3 (Da led Basement State Surcharge fee: ' Cj( ,ated Basement Pot Water Review fee: e Unheated 911/Rd Approach fee: VOIe, " e/Carport ' j 1 % 111401. TOTAL: $ p� $ ' 5 . t7 t )y 6 �� Receipt Number: 7 7) (t �, Cc/, 04°l ashlCheck Number 1 ►TED COST(REQUIRED) I e— �! ket value of all labor and materials foundation to O finish �� .1 13 O I c Initials. t ' )1,:c.3 iter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc