HomeMy WebLinkAboutBLD2005-00286 •UILDING PERMIT APPLICA N MLLA05 002273
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD05-00286 Received Date: 5/4/2005
SITE ADDRESS: FLORENCE ST
PORT TOWNSEND, 98368
OWNER: FIRENZE COURT LLC PHONE: (206) 842-9984
16221 REITAN RD
BAINBRIDGE ISLAND WA 98110
IRVING PARK ADDITION
SUBDIVISION: Block: 21 Lot: 1+
PARCEL NUMBER: 963302101 Section: 16 Township: 30 N Range: 01 W
CONTRACTOR: ON THE LEVEL CONSTRUCTION PHONE: 360-434-0123
4553 SE HORSEMAN RD
PORT ORCHARD WA 98366
Contractor's License LEVEL*961CR Expires 2/19/2006
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NEW SFR W/ ATTACHED GARAGE &
125 GALLON A/G PRPOANE TANK - STK PLAN # 2
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,710
VALUATION 169,295.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 2003 HEAT BASE: HEAT TYPE: PRO
OCCUPANCY: R-3
OCCUPANCY: UNHEATED: # OF STORIES:
OTHER:
CONST TYPE: 5N GARAGE: 440 SHORELINE:
CONST TYPE: DECK: 240 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: PUD
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: 3 Prop: 2
Total: 3 Total: 2
Routing Date l r„.13,
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $1,385.75 BAC 05/04/05 72946 APPROVED
State Building Code $4.50 BAC 05/04/05 72946
Potable Water Application $53.00 BAC 05/04/05 72946 JUN 3 0 2005
Total: $1,443.25 efferson County Planning
& • epartment
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD05-00286 Received Date 05/4/2005
SITE ADDRESS: 190 FLORENCE ST Issue Date 06/30/2005
PORT TOWNSEND, 98368
APPLICANT: FIRENZE COURT LLC PHONE: (206) 842-9984
16221 REITAN RD
BAINBRIDGE ISLAND WA 98110
SUBDIVISION: IRVING PARK ADDITION Block: 21 Lot: 1+
PARCEL NUMBER: 963302101 Section: 16 Township: 30 N Range: 01 W
CONTRACTOR: ON THE LEVEL CONSTRUCTION PHONE: 360-434-0123
4553 SE HORSEMAN RD
PORT ORCHARD WA 98366
Contractor's License: LEVEL*961CR Expires: 2/19/2006
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE &
125 GALLON A/G PROPANE TANK-STK PLAN #2
CALL IN FOR THE EQUI D)NSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS: ' ''
UFFER:Footing. UNIONo"7l �0'
Found i
on:
Stormwater FINAL Approval:
Underground Plumbing: '?( /
Underground Insulation: /
Shear Wall : /'iLDQbt,)4 $''q—O� :5H( f (_c�/G¢6"-c.Y, `i-ic'—es.
Sheathing:
•
Framing: aK /7/ oSi
Plumbing: PK to Slosil
Propane Tank/ Lines: lArr ?vC� J,,UE,ss 4e y SInsulation: 'JC4L kip ?� /,A, MI s I e iu) 6/5
Sheetrock: /b f —Or
Septic Syt m Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: II -z v-q..i
HEALTH DEPARTMENT D PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMI IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY -SEE REVERSE
SPECIAL CONDITIONS FOR CI A BLD05-00286 •
1.) Septic tanks to be 5' minimum from foundation
2.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
3.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
4.) A Engineered Stomwater Plan has been submitted and approved on July 30, 2004 by the
Department of Community Development. Once the subject permit has been issued the
applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
5.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
6.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
7.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
8.) The building height is not to exceed 35 feet.
9.) Minimum setback from Florence Street right-of-way shall be 20 feet. Minimum side and
rear yard setbacks shall be 5 feet.
10.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
11.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
12.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
I:\F_BLD_Permit_Buildng.rpt 10/29/19
III •
OWNER BUILDER STATEMENT
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature:
Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FA :
G// 77FLL ,( Y'L Ce,N S7: ( 6b)�j¢-O/23 ( )
MAILING ADDRESS: 165,53 ff gT „y 7 EMAIL:
CONTRACTOR'S LICENSE peiz/ czc'- ' /634` WAINS
NUMBER: LEteA-G-'IF 14( Cr NUMBER
ARCHITECT/ENGINEER: t" L I L 4 PHONE (26G )$c 1►84 FAX:('2 4 -7
)84z L '(3
MAILING ADDRESS: "�` ` EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
New Wood Existing: N.A . ❑ Sewer
❑ Addition ❑ Steel Proposed: Z. Bank ❑ Community System
O Alteration/Remodel ❑ Concrete Total: 2. Height X Individual System
❑ Repair 0 Masonry SEP Permit#
❑ Demolition ❑ Other Bedrooms: Water Supply:
Existing: ,,�- _ Setback: ❑ Private well ❑ Two Party
Proposed: , e ,Br Public
Type of Heat_L-t. TotL y"= Name of System: t T WZ-
t
,,)j i( /ft 6-4
If this is a Commercial Protect you must answer the followinq:
Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
i U• nderground Tank )(Above ground Tank Size of Propane Tank: (Z. . a.
i H• eat Stove i Cook Stove I Woodstove )i Fireplace Insert I Hot Water Tank i Pellet Stove i Other
Is this appliance being installed in a Manufactured!Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage For Office Use Only
Current Proposed Amount
Main Floor Consistency Review: �.
/7 fa 5). ti- ,c(':
2"u Floor Base fee: 1•
31a Floor -- {--:;, ` Additional Section: -
Mezzanine: 1`. Plan Check fee: p� '
l i:Itl Cji( 3(_tC--1
Heated Basement _ ,''1_J,l State Surcharge fee: q j,,,S._.`�y
Unheated Basement Pot Water Review fee: _1
Other Unheated 1 l [•
! 1 911/Rd Approach fee: iv
t1 1 C,l f 111
Garage/Carport \. (L 3- sa_ TOTAL: $ l � �'�—
Decks Z L 0 Receipt Number "7��`�Lt
Y
Other Cash/Check Number.
ESTIMATED COST(REQUIRED) r�.-./e Date: ' Ill10'...
.Fair market alue of all labor and materials foundation to finish 1
/� 89 Initials:
C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc