Loading...
HomeMy WebLinkAboutBLD2005-00287 UILDING PERMIT APPLICA•N ML v Reviewiew T Ty 274 ype: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00287 Received Date: 5/4/2005 SITE ADDRESS: FLORENCE ST PORT TOWNSEND, 98368 OWNER: FIRENZE COURT LLC PHONE: (206) 842-9984 16221 REITAN RD BAINBRIDGE ISLAND WA 98110 IRVING PARK ADDITION SUBDIVISION: Block: Lot: PARCEL NUMBER: 963302108 Section: 16 Township: 30 N Range: 01 W CONTRACTOR: ON THE LEVEL CONSTRUCTION PHONE: 360-434-0123 4553 SE HORSEMAN RD PORT ORCHARD WA 98366 Contractor's License LEVEL*961CR Expires 2/19/2006 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NEW SFR W/ATTACCHED GARAGE & 125 GALLON A/G PROPANE TANK e-kA) h Pothu TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,710 VALUATION 169,295.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2003 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: # OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 440 SHORELINE: CONST TYPE: DECK: 240 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 3 Prop: 2 Total: 3 - Total: 2 Routing Date: /y/C) r Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,385.75 BAC 05/04/05 72944 APPROVED State Building Code $4.50 BAC 05/04/05 72944 Potable Water Application $53.00 BAC 05/04/05 72944 JUN 3 0 2005 Total: $1,443.25 Jefferson County Planning &B �� � :�artment • BUILDING PERMIT • Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00287 Received Date 05/4/2005 SITE ADDRESS: 181 FLORENCE ST Issue Date 06/30/2005 PORT TOWNSEND, 98368 APPLICANT: FIRENZE COURT LLC PHONE: (206) 842-9984 16221 REITAN RD BAINBRIDGE ISLAND WA 98110 SUBDIVISION: IRVING PARK ADDITION Block: Lot: PARCEL NUMBER: 963302108 Section: 16 Township: 30 N Range: 01 W CONTRACTOR: ON THE LEVEL CONSTRUCTION PHONE: 360-434-0123 4553 SE HORSEMAN RD PORT ORCHARD WA 98366 Contractor's License: LEVEL"961 CR Expires: 2/19/2006 PROJECT DESCRIPTION: NEW SFR W/ATTACCHED GARAGE & 125 GALLON A/G PROPANE TANK - LARSEN STK PLAN #2 CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: Footing:,fl6,,tb- c_lis '/3,yt F,1 F C}Ko0,013 &'_22-Ee Foundation: Stormwater FINAL Approval: Underground Plumbing: Drl 9-IS-0% Underground Insulation: Shear Wall : g'K.opS /p-;z i-oe- Z3tr"EQtoTz 5 ''e_ die /?J/ a5 j? Sheathing: /2As B4 / /S / Framing: i9NcsgK ,6oct3 ...)• i4 /2"or 0,,w iS,t-rceS Q�/L�9 es' Plumbing: G-0Z,M"C95: Propane T nk/ Lines: ',Jr y../2,-,2Q-o� Insulation:( ) =t6.it, t----Oe Sheetrock:61)I S gee ,js Cie 0?c34,1r Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: 3 et, HEALTH DEPARTMENT ND U LIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE SPECIAL CONDITIONS FOR CASE t BLD05-00287 • 1.) Waterline must be 10' minimum from any portion of septic system. Septic tanks to be 5' minimum from foundation 2.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 3.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) A Engineered Stomwater Plan has been submitted and approved on July 30, 2004 by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 5.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 6.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 7.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 8.) The building height is not to exceed 35 feet. 9.) Minimum setback from Florence Street right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 10.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 11.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 12.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. I:\F_BLD_Permit_Buildng.rpt 10/29/19 i • MAY - 4 2005 ....:_iii // I ilI + ttli - - 0 t i I ›eie 3 \ n rn b II ;� l'A bCri ey NS I 1 N 4? A) I ' . / '* N r N ! 4 , ` Ilk_ .".• Z k^ a Pi . 7 11 11•-..tk P.," % s- 6' 1 Ic- F,..... lb c, <, kl‘b kp? --> 14 11'\::_ti t k) 2 ,, , _i_.,-o• 11111b.4 ry () is WA74e5P. Vi -~�3 k u: N V`q„.‘i. t.1 h / (tea - hi 0 1 z. i I a - -,,ro._ 4:-, „. .„.....„. ... ,____- =- _f 4 R ir ./..• ...4) / . _ _ . _ v -.II 0 . , • . kJ.) fir ! - -lc ° . . .› , , . N0,?/r,1is4`� �,,y4, c C 01 9 -- . i-og ce __ - ` i • • OWNER BUILDER STATEMENT signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that sy will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: ( GENERAL CONTRACTOR OR MANUFACTURED HOME INSTAI I FR: PHONE: Fax: 7-kIs JL Ce:t'•I 57: (36b) ¢-O/ 3 ( ) MAILING ADDRESS: � � � 5.��.t" p1:7 - EMAIL: R CONTRACTOS LICENSE N�ai 6eC/—� 1, 478 3 (- WAINS NUMBER: .� V C-Y(- ! ( ce' �v NUMBER ARCHITECT/ENGINEER: r.x rq, t 6 PHONE (2d` )6421984. FAX_(26C )84Z 7'i 3 MAILING ADDRESS: ! �VSF `f, EMAIL I/ C t Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: X New Wood Existing: /S/.,,Q , ❑ Sewer ❑ Addition ❑ Steel Proposed: 2 Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: 2 Height: X Individual System ❑ Repair ❑ Masonry SEP Permit# CS----25 ❑ Demolition ❑ Other Bedrooms: Water Supply: Existing: Setback: ❑ Private well 0 Two Party Type of Heat: Proposed: pf Public Total: Name of System: t'T grz. If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current Proposed:— Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes I No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: i Underground Tank )4,Above ground Tank Size of Propane Tank: /25- 6, i Heat Stove I Cook Stove i Woodstove X Fireplace Insert i Hot Water Tank i Pellet Stove I Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage For Office Use Only Current Proposed Amount Main Floor Consistency Review: /7/a i53.2L1' t{-Ir <°CI 2Nu Floor Base fee: 3°Floor Additional Section: -------- Mezzanine: Plan Check fee: / Heated Basement State Surcharge fee: Unheated Basement Pot Water Review fee: Other Unheated 911/Rd Approach fee: r / '7 Garage/Carport 4 - ,'_'-( if fc-wt.C " TOTAL: $ 1 c t 3 ' Z(3 Decks Z1O St- -, (U Receipt Number: 7j'{y Ld Other c\ Cash/Check Number: �� , ESTIMATED COST(REQUIRED) Date: i 5 e"----- 'Fair market alue of all labor and materials foundation to finish l . /v 8j Initials: C:\Documents and Settings\mochil\Desktop\Master Permit Application 7$04.doc k , MAY - 4 2005 .