Loading...
HomeMy WebLinkAboutStrider Construction Company Inc. Change Order No. 4 Phase 4 - Stage 1 - 101325JEFFERSON COUNTY shcct 1 of 2 DEPARTMENT OF PUBLIC WORKS Change Da+� 10/1/2025 CHANGE ORDER Order No. 4 Ordered by County Engineer under terms of ]Section I.04.4 of the Standard Specifications Change proposed by Contractor Contract No. To: Strider Construction Endorsed by: S-[ �tL7��2 (JnrJ Kyle J. Gebhardt, P.E., President sz,Lu G iPv� a, Contractor Firm Nome 4721 Northwest Drive -__ -- Bellingham, WA 98226 Sign Lure Dote Pnesr 15,..nIT" Project Title Phase 4 - Stage 1 On -site Title Consent given by Surety: (when required) Grinder Pump By: Installation for the Attorney -in -fact Date You are ordered to perform the following described work upon receipt of an approved Copy Of this change order: The changes to the contract include increase cost to install a bar screen and the float switch for the bar screen at the county jail. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NETCHANGE CONTRACT TOTAL AMOUNT (incl. 9.1% sales tax) AMOUNT (incl. 9.2% sales tax) THIS ORDER (Intl. 9.2% sales tax) AFTER CHANGE (incl. 9.2% sales tax 2,589,588.87 $ 2,806,159.90 $I4,750.70 $ 2,830,910.60 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME (working days) CONTRACT TIME CHANGE (Add/Dell TIME 136 149 4 153 APP AL RECOMMENDED APP OVAL RE f4fivtENDEO ' Q Project Manager ate County E Dote APPROVAL RECOMMENDED YAPP JED f ❑N/A Ecology Regional Project Manager Date Chair, Jefferson County Commissioners Date JEFFERSON COUNTY Contract No 40521270 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS Date: 10/1/2025 CHANGE ORDER ESTIMATE Change Order No. 4 NEW BID ITEMS Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total N/A COP 07 - Float Switch for Bar Screen at the County Jail LS $ 6,235.09 1 $ 6,235.09 N/A COP 6 - Bar Screen Installation at the County )all LS $ 16,430.39 1 $ 16,430.39 CO 04 New Item Total $ 22,665.48 EXISTING BID ITEMS DELETED Bid DESCRIPTION Unit Unit Bid City Unit Bid Total S - CO 04 Ex. Bid Item Deleted Total $ EXISTING BID ITEMS ADDED Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total CO 04 Ex. Bid Item Added Total $ ITEMS ADDED Non Bid Items) CO 04 Ex. Added Non Bid Items Total $ ESTIMATED NET CHANGE SUBTOTAL: $ 22,665.48 9.2% Sales Tax $ 2,085.22 ESTIMATED NET CHANGE TOTAL: $ 24,750.70 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: October 13, 2025 Subject: Change Order No. 4, Phase 4 - Stage 1 On -site Grinder Pump Installation for the PHUGA, Project No. 405-2127-0, Ecology Agreement No. WQC_2024_JCoPWE-00034 Statement of Issue: Change Order No. 4 with Strider Construction of Bellingham, Washington. Analysis/Strategic Goals/Pro's 8t Con's: This change order changes the contract to include increased cost for the installation of a float switch for the bar screen and the bar screen at the county jail. The float switch will provide a high level alarm, which will sound when the liquid/solid level within the bar screen reaches a certain elevation. The bar screen will collect garbage for removal, prior sending the influent into the grinder pump. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 4 is $24,750.70. The contract amount will increase from $2,806,159.90 to $2,830,910.60. NOTE, the cost includes 9.2% sales tax. The project is funded at 100% by the Department of Ecology combine funding package (Centennial grant, State Revolving Fund (SRF) loan and SRF forgivable loan). Recommendation: Public Works recommends that the Board authorize Change Order No. 4 with Strider Construction, and return one original to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewed By: Josg Peters, County Administrator Date