Loading...
HomeMy WebLinkAboutExhibit 61A_2025 10 14 Second Declaration of Phil Cecere CombinedFIRST DECLARATION OF PHIL CECERE, JEFFERSON COUNTY FIRE MARSHAL AND BUILDING OFFICIAL Page 1 of 2 Jefferson County Prosecuting Attorney 1820 Jefferson Street/P.O. Box 1220 Port Townsend, WA 98368 360-385-9180 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 BEFORE THE HEARING EXAMINER FOR JEFFERSON COUNTY In the Matter of the Unit Lot Subdivision Application Submitted by HABITAT FOR HUMANITY OF EAST JEFFERSON COUNTY Parcel No. 901-023-007 (Port Hadlock) Project File No. SUB2025-00012 SECOND DECLARATION OF PHIL CECERE, JEFFERSON COUNTY FIRE MARSHAL AND BUILDING OFFICIAL I, PHIL CECERE, hereby declare as follows: 1.I am over the age of 18 years, competent to be a witness herein, and make this declaration based upon my personal knowledge. 2.I am the Fire Marshal and Building Official for Jefferson County, Washington. 3.I previously submitted a First Declaration of Phil Cecere, Jefferson County Fire Marshal and Building Office, dated August 6, 2025, Exhibit Number 44. 4.I also submitted a professional Resume on September 15, 2025, Exhibit Number 51. 5.Please see the attached letter dated October 8, 2025, that I wrote in response to the Second Case Management Order issued by the Hearing Examiner on September 29, 2025. My FIRST DECLARATION OF PHIL CECERE, JEFFERSON COUNTY FIRE MARSHAL AND BUILDING OFFICIAL Page 2 of 2 Jefferson County Prosecuting Attorney 1820 Jefferson Street/P.O. Box 1220 Port Townsend, WA 98368 360-385-9180 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 sincere hope is that this additional letter answers the Hearing Examiner’s remaining questions, as set forth in Section III(3), Fire-Official Testimony or Exhibit, of the Second Case Management Order. 6. I have also reviewed the electronic documents titled MSN – Fire Safety Analysis Tech Memo, MSN-EMS_150Hose, MSN-EMS_v2-FireAerial-AT, MSN-EMS_v2FirePumper-AT, and MSN-Water_Fire. 7. Please also note that I will be transitioning to different employment and my last day as the Jefferson County Fire Marshal and Building Inspector will be October 31, 2025. As such, I am respectfully requesting the Hearing Examiner accept this written verification in lieu of live testimony and formally excuse me as a witness at the future hearing, which is not currently scheduled and is likely to be scheduled for a time after which I will be engaged with new employment. I hereby declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct to the best of my knowledge. EXECUTED at Port Townsend, Washington, this 14th day of October, 2025. PHIL CECERE Fire Marshal, Building Official 1 Jefferson County Community Development Office of the Building Official Office of the Fire Marshal Phil Cecere 621 Sheridan St • Port Townsend WA 98368 Desk: 360.379.4461 co.jefferson.wa.us/1687 October 8, 2025 Jefferson County Hearing Examiner 1820 Jefferson St. Port Townsend, WA 98368 It is my understanding through receipt of the second case management order that further testimony is requested by the hearing examiner . The plans submitted by the applicant are in this examiners opinion superior to a typical submittal and open communication with the applicant has been ongoing long before submittal of documents. Jefferson County, through JCC 15.05.030(2)(6) adopts WAC 51-51 and WAC 51-54A respectively. This is the state ammended version of the International Residential Code (IRC) and the International Fire Code (IFC), again, respectively. WAC 51-51-0313 states an ammendment to the national standard of the IRC R313.1 TOWNHOUSE AUTOMATIC FIRE SPRINKLER SYSTEMS. An automatic residential fire sprinkler system shall be installed in a town house unit. However this state amendment contains two exceptions, in exception (2) states: Townhouse buildings containing no more than four townhouse units. By this exception the applicants proposal of 4 townhouse units, the applicants proposal is under th e threshold for this requirement. Futhermore, JCC 18.10.060 (2) states that fire flow requirements shall be as specified by the Jefferson County Fire Marshal. I have deemed all r eports received to be of sufficient capacity for the intended use, this includes the location and quantity of fire hydrants as well as suitable fire flow. The proposed development was first reviewed through a large meeting, with representatives in attendance from: Jefferson County Public Works, Community Development, PUD and EJFR. This meeting was conducted August 28, 2024 and served as the first review with the applicant, with feedback and revisions to follow. Below is an abbreviated list of reviews and submittal dates: • 1/05/2024 Draft hydrant locations, hose lays and truck turning movements received and reviewed . • 1/09/2024 Review meeting with EJFR and Jefferson Fire Code consultant Tom Aumock. • 11/26/2024 An updated autoturn movement version was received and reviewed. 2 • 12/1/2024 Civil, landscape and architectural site plans were received and reviewed. • 6/23/2025 Addressing plan reviewed with Jeffcom, EJFR, Fire Marshal As a result of numerous reviews and collaboration sessions with the applicant and their representatives, I am satisfied with the proposal as submitted at prliminary plat. Specific structural requirements will be addressed through reviews at the time of submittal. The submittal documents provide sufficient information to satisfy a reccomendation of approval from a life safety perspective. Phil Cecere, Jefferson County Fire Marshal, Building Official