Loading...
HomeMy WebLinkAboutBLD2005-00368 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00368 Received Date 06/6/2005 SITE ADDRESS: 200 N STROMBERG AVE Issue Date 08/11/2005 PORT TOWNSEND, 98368 APPLICANT: MERIDIAN MTG INVESTORS FUND II PHONE: 206-621-9301 605 5TH AVE S STE 850 SEATTLE WA 98104-4438 SUBDIVISION: IRONDALE Block: Lot: PARCEL NUMBER: 962115128 Section: 35 Township: 30 N Range: 01 W CONTRACTOR: MERIDIAN GREENFIELD LLC PHONE: (206)621-9301 605 5TH AVE S STE 850 SEATTLE WA 98104-4438 Contractor's License: MERIDGL973BG Expires: 1/11/2007 PROJECT DESCRIPTION: NSFR W/ATT GARAGE - PLAN 3, ELEVATION "B" CALL IN FOR THE REQUIRED I SPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: de $/3//S UFFER: .6731/DS Footing: QkL/3// S Foundation: „Q— p5" Stormwater/FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : ( -9—a. Sheathing ) Framing: J r.�.�rc�,., fkAu/ . fr' /tV3/n"j/ c✓/l /. +0,<- Plumbing:b/per ` Propane Tank/ Lines: Insulation: V.11 14iv4* 1>4._ k-26 Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: -// Final/Occupancy Approval: 2/00 HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPEC TION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • • SPECIAL CONDITIONS FOR CASE A BLD05-00368 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 3.) VOLUNTARY MEASURES OF COASTAL&AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 5.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 6.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 7.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 8.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. • 10.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 12.) The building height is not to exceed 35 feet. 13.) Minimum setback from North Stromberg Avenue right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 14.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 15.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 16.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 IIIIUILDING PERMIT APPLICA ON ML Ty 344 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00368 Received Date: 6/6/2005 SITE ADDRESS: N. STROMBERG AVE PORT TOWNSEND, 98368 OWNER: MERIDIAN MTG INVESTORS FUND II PHONE: 206-621-9301 605 5TH AVE S STE 850 SEATTLE WA 98104-4438 IRONDALE SUBDIVISION: Block: Lot: PARCEL NUMBER: 962115128 Section: 35 Township: 30 N Range: 01 W CONTRACTOR: MERIDIAN GREENFIELD LLC PHONE: (206)621-9301 605 5TH AVE S STE 850 SEATTLE WA 98104-4438 Contractor's License MERIDGL973BG Expires 1/11/2007 REPRESENTATIVE: KEITH HAMMER PHONE: 206=6214NQ 605 5TH AVE S STE 850 SEATTLE WA 98104 PROJECT DESCRIPTION NSFR W/ATT GARAGE - PLAN 3, ELEVATION "B" TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,485 VALUATION 147,600.00 ADD'L: HEAT TYPE: CODE EDITION: 2003 HEAT BASE: HEAT TYPE: EFA OCCUPANCY: R-3 UNHEATED: # OF STORIES: OCCUPANCY: CONST TYPE: 5-1HR OTHER: SHORELINE: CONST TYPE: GARAGE: 483 SETBACK: DECK: 140 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 3 Prop: 2 Total: .3 Total: 2 Routing Date: Type Amount Paid By: Date: Receipt: A fe i eel/ E D Permit $1,262.55 BAC 06/06/05 73253 Plan Check $820.66 BAC 06/06/05 73253 AUG 1 1 2005 State Building Code $4.50 BAC 06/06/05 73253 Jefferson County Planning Potable Water Application $53.00 BAC 06/06/05 73253 &Building Department Total: $2,140.71 (;aQQitA,r‘ 0uLtc 4pr A N/a . • � sn— soiv � I ps, 6, JEFFERSON COUNTY �p -� —,-' ti DEPARTMENT OF COMMUNITY DEVEI.QP_M_ENT I� .. I il, 621 Sheridan Street• Port Towmsend ••;Washington 98368 1-.a " ., 360/379-4450 • 360/379-4451 Pax _« ---- -- 1S NG'p www.co.]efferson.wa.us/commdOvelo4ment i.. I JUN - 6 2u`JI j Master Permit Application E MLA: S-3 444 Project Description(include separate sheets as necessary): +.- --- ,, Tax Parcel Property Number: G(92 IIS i D Size: 17 {, (acre square f-e-9) Site Address and/or Directions to Property: Lcr, 35-_3C 'out. 1-1 SI-rC.c)v,n -a� AVE. Property Owner(s)of Record: M€I'tc---1 Cs�C-� _ �� ���;� /� Telephone: ��� Cp7_�C� Fax: ZC�Co Coil C1 JU email: ( r iG_'�_ - e Id•-c},- Mailing Address: (sr— -z;3'--P,�c c 524 -6j <-�;,A'-i-2 2 'J& 4j\ Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) Building 0 Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑ Conditional Use[C(a),C(d),or C]** Single Family 0 Discretionary"D"or Unnamed Use Classification Garage Atta /Detached ❑ Special Use(Essential Public Facilities)** ❑ Manufactured Home ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat** ❑ Commercial* ❑ Binding Site Plan** ❑ Change of Use ❑ Long Plat** ❑ Address I Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments** id Propane 0 Plat Vacation/Alteration** ❑ Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management 0 Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance O Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment ❑ Wireless Telecommunication* ❑ Jefferson County Shoreline Master Program Amendment O Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate Ks-i,—to 4-14:4 ., - to act as my agent in matters relating to this application for permit(s). OWNER§J.GNATufr i — 3, (} �J Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hour Signs. ��� `f _._- f Signature: `Sign "' Date: -a ;U(/ Or— The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transfe bl res onsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer nd si;_ns and dates it below. Signature; Date: C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc • ID J t OWNER BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Csr4tractor for the propose_ d project.Signature: _ -_ --- - —Date: _= ' O 7c16---- GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: PAX: rlEeit143-G¢.=__3--1'F1I 4) .x.._•,-ram: tir r:->rti- (2G9)C9ZI 9j 01 (zo(o)621 c'( Q MAILING ADDRESS: / --s� 7 c mow_ <_ EMAIL: CONTRACTOR AINS S LICENSE �i�IJ 1 W e�te.nalan c�fPPvt P� •CO�tn NUMBER: � 1OUL9}5ag 1/1/6/ NUMBER ARCHITECT/ENGINEER: µ r-r-E40 PHONE (201/4_0(.n3 3MAX: c)(023 Z } MAILING ADDRESS: EMAIL `"`''LL 7�L�` tc��t:►t.A, ter" , c.o.". _ Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: New c, Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: 2 Bank 0 Community System 0 Alteration/Remodel 0 Concrete Total: Z Height: Individual System 0 Repair U Masonry- `� EP Permit# OS.-Ci^t 0 Demolition I Other: Bedrooms: Water Supply: 1 Existing: Setback: 0 Private well 0 Two Party Type of Heat: 1 Proposed: 5 .&Public Tota: Name of System: -- ...1/1)-1 I 1 JUN - 6 /W j 1 I - If this is a Commercial Projeetyou must answerthfe following: 1 Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: i Underground Tank I Above ground Tank Size of Propane Tank: Heat Stove I Cook Stove I Woodstove I Fireplace Insert I Hot Water Tank I Pellet Stove i Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size, distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage For Office Use Only Current Proposed Amount Main Floor Consistency Review /�: �O 2-Floor Base fee: "� 3fd Floor Additional Section: ..-^"'�� Mezzanine: Plan Check fee: Heated Basement State Surcharge Unheated Basement Pot Water Review fee: sl co Other Unheated 911/Rd Approach fee: 00 Garage/Carport .4�Qj_v3 TOTAL $+Z„ t s t , Decks inJ` �` Nr.s t`T3 • a sl Receipt Number: �32.t73 Other Cash/Check Number: t162- ESTIMATED COST(REQUIRED) Date: .Fair market value of all labor and materials foundation to finish (0,CO( D Initials: ll[ I Aq C Ctx' ) �.; C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc Cr)0 LT- cozVW- �co, ao • NNE 22.28' �� 45.64' "� Li Li CC 0 c, 32.08' Ili j 100.00' S 8:td32'33" E y U o . 11 'ice' _ L S • LZ.Z�IOW _� fa 11 PLAN 3—B — S _it �- i II 1 U4 CO 20' i 11FRONT YARD / , QS SETBACK - H co in Al JIA. Z Ct oe II OWE g �O •� 0N I' _ *r°j 2 o ' II00 x -U 144 J , _. i �grAmiga I . J ~ � DRIVEWAY ill�2 wo CO Citl/rG" '� �k'u/'ne✓� ZO � "2 3c/ / It I N n -stz../E APPRO I ') MLA �.��� � all In L.0JLD ozQ . JUL 2 6 2C, 1c;E J �z pI o �o * • C W vo Q DEPT. • �•1!y .11►� r 100.00' S 88032 �6' Ea��►�. ii J . u, SITE PLAN: LOT 1• —� - 0 1„=20' SOX° I �E PRILFVT TITIF 5 0 3 0 vVy�SAT PROJECT NO. DRAWING TITLE 7� T� ISSUED 00 LOT a 1P]LO PLAN ISSUED //��/� LLl�l! !L.[7LLV 4�'�It��2005 -- - -- ---- / ✓/,ele L 2 //J - / REVISED 1.1 I T H U N SCALE: e ix 20 FILE REF: SHEET REF: DRAWN BY: CHECKED BY: SKETCH NUMBER Architects+Designers+Planners Pier 56,1201 Alaskan Way,Ste.200 Seattle,WA g810i TEL 206 623.334.4 FAX 206 623.7005 C 2004 M(THUN,INC. Jun-06-05 07:55am From-Mer'idian Group of Companies 2066219750 T-918 P:001/018 F-906 S itr= l • 1(127.415 -M • JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street• Port Townsend•Washington 98368 '�'� 360/379-4450.360/379-4451 Fax 9 http://www.co.jefferson.wa.uskommdeyelopment/ STORMW►ATER SITE PLAN SUBMITTAL TEMPLATE MLA# �� -77,41+ PROJECT/APPLICANT NAME: 1'k LIMIAZ Please answer all of the'following questions to the best of your abRlty. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements Into the•general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview • 1. .Describe the proposed develooed conditions otthe site. Indicate position and relative-size of ornnnxed improvements on the site map. -NI. 1a $% I...4 Sac' � STTINS FI�9 2 C n.poirigh.6se '3F2%JT<..1444 w L.4++S=e Existing Conditions Summary • 2. Describe the existing topography. Indicate contours on the site map. l .fit J - igL4 u 1.c wy s1epe,nsi l�.,t1c,1. srk - • 3. Describe the•existing vegetation. Indicate nativ ve�tetion areas an the site map. • gY..4k YrAIiC. `t-% +C? -j grbs ..+�' ^��JC 1`vb ,,e4 -ektCN. 4. Describe the existing soils. Indicate soil type on the site map. _ ;�, c �"iS 15),61(1r9 1 ri Sa 1 1®0.. - �1. } 1rars.l a.c,‘,/ �loc..kc t43 - 4 • S. Describe the existing site hydrology 0.e.,drainage:behavior of water on the site--above.below,and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, If applicable,and Indicate a reage of each. `5 et 0-j-#t mac M r T x � ' .� 4k{ _Weeks 143* 1 c I • • 6. Descrl a any excess levels of noise generated by the.proposed use or activity: !.e►� t � deist_ r�f'tICkArn �' �e llyt %tut Q APPROVED - STORMWATER PLAN scarmy.Wor.IN plan gsplaMRoy-rev.1G1?i'Op7 ' e JUL 262005 i s 1 'i JUN - 6 td,i5 Stormwat Required IEFF N TUN DEPT.OF C . EvE PmENT SIGNATURE:• Jun-06-05 OT:55am `From-ller'idian Group of Companies 2066219750 T-918 P.002/016 F-906 • • • 7. Describe significant geographic features and critical areas (I.e., environmentally sensitive areas such as wetlands,streams, steep slop ss etc.)on the site. Indicate location on the site maw 8. Describe the general vicinity of the site,Inducing adjacent lend uses and structures.utilities,roads,and sensitive/critical areas (streams,wetlands lakes,steep slopes.etc.). l_occ.�� ice, IraAric•ie. '1ivisuan. s 'v191e J�,oag,i e s e. • • Permanent Stormwater Control Plan • This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. 'Medium"size projects are required to have the totals calculated of all impervious surfaces, pollution-generating Impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology,as proposed. Indicate whether stormwater will be fully dispersed(I.e., per BMP T5.30 • in the Manual)or.If not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the Ftts plan and differentiate praposesf facilities from song facilities. • • Use 404 . 0 -N&ti• l cr_tint • ‘ Oret .i o 1 da• ate+ I� fJ M • • 10. If the project requires the use of atormweter treatment facilities,describe the types of stormweter treatment facilities proposed for use on the site. Locate these facilities on the site plan add differentiate proposed facilities from existing facilities. [This Is normally for"large"projects or firejects that Involve the p ntlal for dispersion of contaminants.} '6'fCe& c,.1E. c0vp came o • . 11. Describe the performance goals and standards applicable to the project. • fZ a c.ck rfVl�sk✓ hD'�1N1 '1 �". 12. Describe the flow control system. • • •• ato mwatar alto pion templeta.dnc—rev.10112/2003 � __...J.. - E "LOiJ`J 1 • \ _Y _ Jun-06-05 OT:55am Prom-Meridian Group of Companies 2066219750 T-918 P.003/N F-906 • • 13. Describe the water quail a to . 14. Describe the conveyance system analysis and design. • 15. Describe the soprceitli material,physical characteristics of fib material,end deposition of excess material. . 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 Of the Uniform 8ubdipg rik 17. Describe the proposp(i surfacing material. 1— Cn, Al s CkY'.Y=s� 1 l�l....•p k- �,,,c.¢+ru 4av� �4s.. !J\., s .Cs..e...�Tc 18. Describe methods wa for restoration of the site. 4 it 4- VO i .ks... 1St.(1...‘ ti t reS,14[ .te A4c° . . &�_C t r . 19. An Operation and Maintenance Manual Is required for each flow control and treatment facility. [This is normally required for large"projects only a only those for which facilities are required to control flow or treat runoff.' If included.list the Manuals here. NI-ro . 20. List here and Include an special ports or etridleaffickto prepare the Stonnwater Site Plan. 21.- list other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals Include conditions that aft the drainage planar contain more restrictive drainage-reiatdd requirements,describe those conditions or restrictions here • : tvom \.1. its/starvomtar alto plan tompate.doo-nr.10ttVi2003 _ 6 2Ul)5L __.. . . ,,..—„,----:.:- . , a:. __ ._." ..� Jun-06-05 07:55am From-Meridian Group of Companies 2066219750 T-918 P,.004/0Tik F-906 • • • CONSTRUCTION STORMWATER POI.t..UTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant In the template that follows must be Installed on the ground during all construction phaees of the project. The proponent Is responsible for preventing sediment and erosion Impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. ' SECTION I-CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or • will be addressed. Identify the type and location of BMPs used to satisfy the required element. if an element Is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page • 2-15). 12 Required Elements-Construction SWPPP 1- Mark Clearing L Its. } t t C_ • • 2. Establish Construction Access. • 'F'Icar _r } P &tr•..,P..P y f VX bcj r C,r.,sL•c,1 Mac- a a.,al al,.} �^rl...�.IP-�"^q! 'mots- • 3. Control Rates. • 4. Install Sediment Controls. ' 1 ` .40440 .5, • 5. Stabillz SoNs. l i t r 04 .j 4141214 pges �-++ - "1�'`�`,, -Vs P ri.sar.— • B. Protect Sbpes. • 7. Protect{Dyaln Inlets. • • • • • • 21i�`� awusi•,�MO^UmpwU..aoc—rov.10/12l2003 '' JUG — 6 ` 1 a Jun-06-05 OT:55am +From-Meridian Group of Companies 2066219750 T-918 P.005/01, F-906 • 12 Required Elements—Construction SWPPP(continued) 6. Stabilize Channels and Outlets. (Ar • • 9. Control Pollutants. dirt (1r!` �.ut .✓ fslw cry 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). • • • 11. Maintain Best Management Practices(BMPs).. • S2e c �s� '^ • • 12. Menage the Project. • 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, reeldential areas,roads). • b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). Pit• if 3. Environmentally Sensitive Areas. .a. D tion of environmentally sensitive areas that are on or adjacent to the site. • . • 4 ' e asamtwater cotept.R ternweasivc—rw.soiszaae — 6 JUN Lb ;Rio . Jun-06-05 OT:55am From-Meridian Group of Companies 2066219750 T-418 P 006/016 F-906 • • b. Description of special requirements for working In or near environmentally sensitive areas. • 4. Erosion Problem Areas. Description of potential erosion problems on site In the context of the characteristics of the on-site goes(e.g.,inedibility,settieabillty,permeability,depth,texture,soil structure)., JA- . • 5. . Construction Phasing. a. Construction sequence Ty ...1 •]t 1 a_ C a�lh..sG�GxL _S•V. _ - b. Construction phasing(If proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). • I. Provide a or000sed construcoon schedule. • II. Wet Season Construction Activities. a. Proposed wet season construction activities. b. Proposed wet son con*uctIon activities for environmentally sensitive areas, Pr— 7. Financial!Dwnership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. • b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. • e. Engineering Calculations. Provide Des! Calculations on a separate sheet for the following,if applicable. a. Sediment Ponds/Traps. . b. Diversions. - c. Waterways. "I.'1/4 . - d. Runofw/Stormwater Detention Calculations � Q- -- _ . corm,::xc:..sget aEase.•«z.—rev tnnznmw 1 i, A{ - 6 211\�J ll IQ � y JUIY 1 1 Jun-06-05 0T:56am From-Meridian Group of Companies 2066210750 I-016 p.008/016 F-006 , • • • Stormwater Site Plan Changes Stormwater Site Plan,the proposed revisions shall be If the designer wishes to make changes or revisions to the originally approved submitted to DCD prior to construction. The submittal shall include substitute that pages explsl that Include suppoall ll th proposedreaso fhangeor the s, revised drawings showing any structural changes.and any other supporting Final Corrected Plan Submittal If the project included construction-of conveyance systems,treatment facilities.flow control facilities.or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ras-bu11ts')when the project ais completed. These should be engineering drawings (stamped by a licensed clue engineer)that accurately represent the project constructed. • APPLICANT SIGNATURE • . By signing the Construction SWPPP worksheet, I as the appiicant/owner attest that the Information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of ail owners of the affe S TATIVE SIGNATURE (�kn + • THIS SPACE MAY SE USED FOR ADDITIONAL NOTES;IF NEEDED: • • • • • • • • • • • • • • m rr anhvatar olio MO temple4.dec—n+.1011212DOJ J U N — 6 2V 35 i 12