Loading...
HomeMy WebLinkAboutCONSENT PHUGA change order 11 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: October 20, 2025 Subject: Change Order No. 11, Phase 2 - Water Reclamation Plant for the Port Hadlock UGA, Project No. 405-2114-0, Commerce Project No. 22-96515-026 Statement of Issue: Change Order No. 11 with Interwest Construction of Burlington, Washington. Analysis/Strategic Goals/Pro's Et Con's: This change order modifies the original plan in the following ways: 1) added metal wainscot in the shop space; 2) added top course for finishing around the admin and chem buildings; 3) reconfigured the foul air lines at the dewatering bins; 4) added an additional propane regulator to feed the generators; 5) placement of landscape rocks at various locations; 6) added a stainless steel lab sink and countertop; 7) added HVAC controls for the lab heating unit; 8) modified the davit crane floor socket at the yard pump station; and 9) added conduits at various location per OCR 09. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 11 is $57,819.85 (includes 9.2% Washington State Sales Tax). The contract amount will increase from $10,524,218.43 to $10,582,038.28. The project is funded at 100% by the Department of Commerce. Recommendation: Public Works recommends that the Board authorize Change Order No. 11 with Interwest Construction, and return two originals to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewed By: aest7kt20 JoshPeters, County Administrator Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 11 Dale: 10/8/2025 CHANGE ORDER Order No. Ordered by County Engineer under terms of EArticle 9 and 11 of the General and Supplemental Conditions Contract No. Change proposed by Contractor To: Interwest Construction �- 4575 Fey Rd End rse�y: �- V\. Li.C5.') (C11 ,Tv�L, Port Angeles,WA 98363 ont r Firm Name f /�i c Ib11312 5� S gn lure Date Use- PUC5 \C Title Consent given by Surety:(when required) Project Title Phase 2-Water Reclamation Facility for the By: PH Sewer Attorneyin fact Dote You are ordered to perform the following described work upon receipt of an approved copy of this change order: The changes for this change order were 1)added metal wainscot for the shop; 2)added top course for finishing around the admin and chem buildings; 3)reconfiguration of the foul air lines at the dewatering bins;4)additional propane regulator to feed the generators;5)landscape rocks,various locations;6)additional stainless steel lab sink and countertop;7) additional HVAC controls for lab space;8)modifications to the davit crane floor socket at the yard pump station;9) additional conduits,various location(OCR 09). All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(Incl.9,1%WSST) AMOUNT(Incl.9.1%WSST) THIS ORDER(incl.9.2%WSST) AFTER CHANGE(Incl.9.1%WSST) $ 10,020,835.00 $ 10,524,218.43 $57,819.85 $ 10,582,038.28 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add) TIME 502 606 0 606 APPROVAL RECOMMENDED APPROy C RECOMMENDED / ----) Projectp3v_ii,.. e._(..\_hry Dote County Engineer Date APPROVAL RECOMMENDED APPROVED ❑ Cl Engineering Services Manager Date Chair,Jefferson County Commissioners Date JEFFERSON COUNTY I Contract No. 1405-2114-0 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS _ Change Date: 10/8/2025 CHANGE ORDER ESTIMATE Order No. 11 ESTIMATED ESTIMATED UNIT UNIT QUANTITY AMOUNT MEASURE PRICE CHANGE CHANGE COP No. DESCRIPTION 34.1 Added conduit in scope of OCR 09 LS $27,269.86 1 $27,269.86 39 Davit crane floor socket LS $1,878.50 1 $1,878.50 40 Added HVAC controls LS $2,276.67 1 $2,276.67 41.1 Stainless Steel Lab Sink and Countertop LS $3,698.96 1 $3,698.96 42 Landscape Rocks LS $2,329.51 1 $2,329.51 Additional regulator to feed propane 43 generators LS $5,830.61 1 $5,830.61 47 Reconfigure foul air at dewatering bins LS $3,155.60 1 $3,155.60 Added CSTC around sidewalks and buildings- 52 clean-up LS $3,234.26 1 $3,234.26 53 Metal wainscoat for the shop LS $3,274.61 1 $3,274.61 I CO 11 Subtotal $52,948.58 1. ESTIMATED NET CHANGE SUBTOTAL: $52,948.58 9.2%Sales Tax $4,871.27 ESTIMATED NET CHANGE TOTAL: $57,819.85