HomeMy WebLinkAboutBLD2005-00402 • •
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD05-00402 Received Date 06/15/2005
SITE ADDRESS: 92 MEGS WAY Issue Date 07/12/2005
PORT HADLOCK, 98339
APPLICANT: DAVID A ANDERSON PHONE:
MARGARET M ANDERSON
PO BOX 234
PORT HADLOCK WA 983390234
SUBDIVISION: ANDERSON COURT LONG PLAT Block: Lot: 5
PARCEL NUMBER: 931300005 Section: 2 Township: 29 N Range: 01 W
CONTRACTOR: SEVEN BRIDGES PROPERTIES LLC PHONE: (360) 379-4947
PO BOX 1953
PORT TOWNSEND WA 98368
(360) 379-1750
Contractor's License: SEVENBP983JD Expires: 6/24/2006
PROJECT DESCRIPTION: NEW SFR w/Att Garage
CALL IN FOR THE QUIR D INSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS: 7-0/1 r)
UFFER:
Footing:9-?)L0/
Foundation. k<
Stormwa r FINAL Approval:
Underground Plumbing:
Underground nsulation:
Shear Wall : y—(ci—p4,
Sheathing:
Framing: Die ly,5frfr
Plumbing: Zip( i//s/es
Propane Tank/ Lines:
Insulation: ,.$ AL OK Q//s (•J'At�' ,9-49 -
Sheetrock: a��,cr,� b./A'!"
Septic Sytem Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval:
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY -SEE REVERSE
SPECIAL CONDITIONS FOR CA"A BLD05-00402
1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
3.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
5.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
6.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
7.) The building height is not to exceed 35 feet.
8.) Minimum setback from Meg's Way right-of-way shall be 20 feet. Minimum side and rear
yard setbacks shall be 5 feet.
9.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
10.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
11.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
I:\F_BLD_Permit_Buildng.rpt 10/29/19
•
UILDING PERMIT APPLICATION MLA05-00374
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD05-00402 Received Date: 6/15/2005
SITE ADDRESS: MEGS WAY
PORT HADLOCK, 98339
OWNER: DAVID A ANDERSON PHONE:
MARGARET M ANDERSON
PO BOX 234
PORT HADLOCK WA 983390234 ANDERSON COURT LONG PLAT
SUBDIVISION: Block: Lot: 5
PARCEL NUMBER: 931300005 Section: 2 Township: 29 N Range: 01 W
CONTRACTOR: SEVEN BRIDGES PROPERTIES LLC PHONE: (360) 379-4947
PO BOX 1953
PORT TOWNSEND WA 98368
Contractor's License SEVENBP983JD Expires 06/24/2006
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NEW SFR w/Att Garage
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,432
VALUATION 145,000.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 2003 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3
OCCUPANCY: UNHEATED: # OF STORIES:
OTHER:
CONST TYPE: 5N GARAGE: 624 SHORELINE:
CONST TYPE: DECK: 129 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: PUD
BEDROOMS: BATHROOMS:
Exist: 0 Exist: 0
Prop: 3 Prop: 2
Total: 3 Total: 2
Routing Date: UC/ /K(Osa25, •
Type Amount Paid By: Date: Receipt: Approved/Date
Permit . $1,245.75 RAC 06/15/05 73375 PPR \ 0�
Plan Check $809.74 RAC 06/15/05 73375 �/
State Building Code $4.50 RAC 06/15/05 73375 JUL 1 2 2005
Potable Water Application $53.00 RAC 06/15/05 73375 .Jefferson County
Total: $2,112.99 Punning
epartment
FOE 0 S A
,�w °/4 coo- JEFFERSOOtOUNTY II
544 '140
1. DEPARTMENT OF COMMUNITY DEVELOPMENT
`4 621 Sheridan Street• Port Townsend •Washington 98368
.4.... O�
'�s 5 360/379-4450 • 360/379-445 LIA-
www.cojefferson.wa.us/comri4He
Master Permit Application I MLA: 05- 3 Ill
1
Project Description(include separate sheets as necessary): S F i
Tax N mberl q',J •�(1 F t� � P PertY ; 42/4,,zii ..,2 V 'l
Size: /ef zf I (acr square fee)
Site Address and/or Directions to Property: ' ) i .
Property Owner(s)of Record: �. * f`
Telephone: -3 ?q - [ 1 —
� "� t Fax: email:
l-1
Mailing Address: 414 141 6 3 PT.. Tt_ ` ,k_k--1 Lii Ai c sii6 ,-
Applicant/Agent(if different from owner):
Telephone: . 7 4i- `f 7 c/7 Fax: 3 7 R` / 7 i C., email:
Mailing Address: %. cyt/ / .3 Pl.; /eec,-o.. ylel ur44 —93
Whd of Permit?(Check each box that applies)
wilding ❑ Variance(Minor,Major or Reasonable Economic Use)
0 De olition Permit ❑ Conditional Use[C(a),C(d),or C]**
WS"Ingle Family 0 Discretionary"D"or Unnamed Use Classification
t ' arage Attached/Detached 0 Special Use(Essential Public Facilities)**
0 Manufactured Home ❑ Boundary Line Adjustment
❑ Modular O Short Plat**
❑ Commercial* ❑ Binding Site Plan''*
0 Change of Use ❑ Long Plat**
❑Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRDyAmendments**
0 Propane ❑ Plat Vacation/Alteration**
❑Allowed"Yes"Use Consistency Analysis 0 Shoreline Master Program Exemption/Permit Revisions'"*
❑ Stormwater Management ❑ Shoreline Management Substantial Development**
0 Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance
❑Temporary Use Cl Comprehensive Plan/UDC/Land Use District Map Amendment
❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment
0 Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre—Application Conference **Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate J
all:; as my agent in matters relating to this application for permit(s).
41m4111,41.°
OWNER SIGNATURE - 4 .
_ " 9 -
Date: '— 0 C
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide arx- s.s and right of entry to - on County and its employees,representatives or agents for the sole purpose of application
review and an required la Onspecti.•4. • «- . and . ,. is property shall be requested and shall occur only during regular business
hours.
Signature: �L �a� �j
1 Date: �� L
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violat ,the ES ividual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are i comp' de" • e - . o. , .evelopment code.The Applicant acknowledges that he,she or it holds individual
and non-/ransferable pons' . f dtjering1.nd P ith the ESA. The Applicant has read this discia' er and rand, nd dates it below.
Signatu ' r
Date:(:,--- `T• 7
G:\Permi ter\FORMS\DRD FORMS\Master Permit Application 7-8-04-doe
• OWNER BUILDER STATEMENT 0
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be Rssuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: y(� FAX:
MAILING Br.A �s C�13r olif ,tit Lc_ (*- ' ) 3' c. t_? 7 060 ) 3 - / J 4 i 4 t `I J 3 p. 7. EMAIL:
CONTRACTOR'S LICENSE j ki !� WAINS
NUMBER: q s V `�7? g3 .5,D NUMBER
ARCHITECT/ENGINEER: V' PHONE ( ) FAx:( )
MAILING ADDRESS: EMAIL
Prr ject Type: FrapivType: Bathrooms: Shoreline: Type of Sewage Disposal:
e New Wood Existing: ❑ Sewer
❑ Addition 0 Steel Proposed: __L,__— Bank ❑ Community System
❑ Alteration/Remodel 0 Concrete Total: :,Z Height: WIndividual System
❑ Repair 0 Masonry SEP Permit#
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: Setback: ❑ Private well ❑ Two Party
Type Proposed:
T of1eat: Fc fed A ,2Total: Nam of ��
Name of System: ,' i)
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
❑ Underground Tank ❑ Above ground Tank Size of Propane Tank:
❑ Heat Stove ❑ Cook Stove ❑ Woodstove ❑ Fireplace Insert ❑ Hot Water Tank ❑ Pellet Stove ❑ Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Fiie.Offfice-User"Orily •i - k"` afi
Current Proposed u � " 4;. „ ., -w 7-a,-,. F.'i
Main Floor Cj{o Cortsrsterrali 'f "F L 1 ��• ▪ >(�}� QpM� `t ix ,
I, 1. Wes.. .` .en t er...
2 Floor Vo.sc fee: b a
}
3`�Floor ,. � � � t
1dditional Section:
Mezzanine: Plan Checkfep
2.
Heated Basement " • 'YF�''
.0 • !. 1 _
Unheated Basement PotW e,/..ee u z x `, .,, ,.
Other Unheated °" "' L • �
Garage/Carport /�1 1r: /�J/y/ (97S r `. . 4` .4. t 1.4c }) . 7"X° ' ` . ' ',
,11
.` • b t
Decks s-g yam.,'..
Other i: 1�um " - "ter;" + ::_ '.�. 1 'sti 5
ESTIMATED COST(REQUIRED) '{ } h� ?;$ '
4 NY jab'�.a� a
•Fair market value ofal!labor and materials fou ' finish "
/q ST 6 ,. ,.. . v, ,t ,
,,
c,.. ..sir
G:\perrnitcenter\FoRRm P 7-8-04.doc
. --
...._—..._
(t) _,....4&11014.
gli14
§
•e:. '
ANN=
41•111
CD
co-r" .44 .
, —
—
1 .--.-
--D
clo r/1 Loti:
a L,
(7) c7)
_________
._._... _
...
.,,
(y.IV (
.,,
-0 -A
1 v I
.,.,..
al11.. .... ...... ,...... .,... v....%. , t......- i
.,., <.`t
kr)
.‘ ..____.-/ '..... .... '%
',....,,
P—'
.\\\''' '
\ \\N ..Zr)1 Tyr-1?/
r 1
.. . 1 !
...)
ii\,) - / t r
b _
\ ‘,
P° • LL1\
\ \
„
..„..
\ ,,
,
. \c‘, \..
\S.)
/6) • .. a
J2)
, ::•,,. ?Y" j '\.\ ,..
CL) < \ \
9\'.
- o
.. , ,
\C z‘ '-' -N1-
-
,„,_- - ,,, ,
0
0
=
.c., ---
\
•).
v)
. ......................._______. .. ................._,... ..
C>-
\,\T
P- rN
0-'
.cl ....1" ...._i 1/4,
, -- ---r- t,-) \P
0
, i \-,.2
Qi 4 1\D47-
z-- ry ,..........,:_.
›
,u- 1
, i