HomeMy WebLinkAboutBLD2005-00433 1
PILDING PERMIT APPLICATII MLLA05 003398
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD05-00433 Received Date: 6/27/2005
SITE ADDRESS: 84 WELLS RIDGE CT
PORT LUDLOW, 98365
OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: 360-437-2101
70 BREAKER LN
PORT LUDLOW WA 983659766
PORT LUDLOW NO 7
SUBDIVISION: Block: Lot: 5
PARCEL NUMBER: 990100005 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License PORTLAL994L8 Expires 5/2/2006
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NSFR W/ ATT GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,767
VALUATION 161,595.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 2003 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: #OF STORIES: 1
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 494 SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW 1
BEDROOMS: BATHROOMS:
Exist: 0 Exist: 0
Prop: 2 Prop: 3
Total: 2 Total: 3
Routing Date:
Type Amount Paid Bv: Date: Receipt: Approved/Date
PPROVED
Total:
JUL 2 0 2005
ferson County Planning
op?
. Buil ' artment
tit
• •
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD05-00433 Received Date 06/27/2005
SITE ADDRESS: 84 WELLS RIDGE CT Issue Date 07/20/2005
PORT LUDLOW, 98365
APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: 360-437-2101
70 BREAKER LN
PORT LUDLOW WA 983659766
SUBDIVISION: PORT LUDLOW NO 7 Block: Lot: 5
PARCEL NUMBER: 990100005 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
360-437-2522
Contractor's License: PORTLAL994L8 Expires: 5/2/2006
PROJECT DESCRIPTION: NSFR W/ATT GARAGE
CALL IN FOR THE REQUIRED INSPECTI. S THAT APPLY TO YOUR PROJECT.
SETBACKS: a 8/ /o5 / -
UFFER: Die 8/2DS)'
Footing: De sh OS�
Foundation:Dk glib - /,use,,.,L /td izmvhus okcc P1/A3 VAAS
Stormwater FINAL Approval: O1( /2055
Underground Plumbing:
Underground Insulation:
Shear Wall : DX i//ir/c.;f
Sheathing:
Framing: DR W/eoad1.4/Oi S /Wes
Plumbing: d/e /2//lacr
Propane Tank/Lines: %iIT J-/#S 6k /0/o5 IV
Insulation: LJ)1LI.S OK f2/6e/off
Sheetrock: <
Septic Sytem Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: 1:0K -Par-- L'/D 3�/7/0L t�
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL RE* I-ED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY -SEE REVERSE
SPECIAL CONDITIONS FOR CA, # BLD05-00433 •
1.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
2.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC)Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
3.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
4.) All construction activities shall not encroach upon the landslide hazard area buffer. This
includes the storage or preparation of materials.
5.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
6.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
7.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
8.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
Water conservation measures:
1. Roof and other intercepted precipitation shall be routed to on-site detention ponds
and/or other approved means and allowed to be released to the soil slowly.
2. Water collected from Storm water and roof catchments may be used for watering
lawns and gardens. Unless catchment water has been treated to meet drinking water
standards, there shall be no cross connections allowed between the potable supply and
impounded water.
3. Water withdrawn from wells on each property shall not be used for watering of lawns
and/or gardens.
4. Ground water withdrawn from each property shall be restricted to a rate of three (3)
gallons per minute.
5. Installation of water conserving fixtures such as low flow toilets, faucets and shower
restrictors and other water saving plumbing fixtures.
6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation).
Please NOTE that the above listed measures are not intended to be exhaustive, but rather
is intended to be illustrative of the types of water conservation measures.
9.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
1. Installation of a flow meter.
2. On-going well monitoring for chloride concentration.
3. Submittal of monitoring data to County.
10.) MANDATORY MEASURES F COASTAL SIPZ: •
1. For proof of potable water on a building permit application, applicant must utilize
DOH-approved public water system if available.
2. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water or an individual well may be used as proof of potable water subject to the
following requirement:
a. Chloride concentration of a laboratory-certified well water sample submitted with
building permit application.
3. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water.
11.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
12.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
13.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
14.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
15.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
16.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
17.) The building height is not to exceed 35 feet.
18.) Minimum setback from Wells Ridge Court right-of-way shall be 20 feet. Minimum side
and rear yard setbacks shall be 5 feet. If ESA's are present, then the more stricter
setbacks shall apply.
19.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
20.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
21.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
22.) Per MPR Code Section 3.107, Accessory Dwelling Units (ADU's) shall not be allowed
within the MPR-SF zone.
I:\F_BLD_Perm it_Bu ild ng.rpt 10/29/19
, . _,.. 0
APPROVED
>;teN
"y SITE P LA44
.�C ,�, I t "A-z'� 1.,t4- --- 0 JUL 1 9 21 5
ir, ....,. ..
�/G / e ` 1 iv ,E
'A IlkiiIMNIAZIMN 1/44.11///47.Mk
NATUR .4/9) \ D. .01 Y�I �iOW10: %�+1
(;:t,4 IL)3 la-C'') li l'Otal I. IP g,y,-,,u- r .
•
A ;1 -
)\ 4, - -.
Stormwa
±4�1 �1 11111111z°
Require ���I %�..•i
Ili I)___ iijrallf
I
P4''F,* ' 1G7 ).
0 ! -
// l R
.14.j.
,\4 ---• /2 ..,(J ..z.• ‘iiit-7
Cf -
ii
9 , ` A: _ R- L
o t. -
v \ ®n'll'_95" GO lq.9-A,
i' ` PfrIMIT # BLD\ I I `3a '07 II ' 1u ,
\ , 0 5 - 0 4 3 tD..IP.n � : .l_ '
JEFFERSON r;l. r' ;ij
COUNTY DCD t li I,
1,1:It/I - -- Ll "�1DI..i_ 1 JUN 2 7 2005 I /
I
Lt21. 4:'L 5 ) .1/62. -71 IL.4.1DLOvki 00 , 1
-i --I. PY-7: 14..1,,, /7r.-- FLA.iii ' pKtvid.. Ntiep %(
'
1 if)
J U N 2 7 2005 ►'_
JEFFERSON COUNTY STORMWATER MANAGEMENT ^ -- _.,
SMALL PARCEL EROSION ANT SEDIMENT CONTROL PLAN •
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: Port Ludlow Assoc Associates Telephone: 437-2101
Address: 70 Breaker Lane, Port Ludlow, WA 98365
Assessor's Parcel Number: 9 9 0/CO OOS
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description: New Single Family Residence W/ attached garage,
Site Location: gy /ifie l/-S , C/ A ,"_74- / d/o4, 7if)9 9 ee5
Person Responsible for BMP Installation and Maintenance: Jeff Evange r
Address: Same as above
I Telephone:S2Ille as above
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads.Please check the measures you plan to implement and show their approximate location on
the site plan.You may also propose measures other than those listed. Attach additional sheets,if
more space is required.
[] Stabilize construction access route. Limit construction vehicles to one route,if feasible.
Provide a stabilized construction access by applying quarry spalls,ballast,or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[1 Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas,landslide or erosion hazard area,etc.).
APPROVED
•
STORMWATER PLAN
SPESC Instructions—Short Form
Revised July 17,2002 J U L 19 2005
3
JEFFER O OU Y
Require DEPT.OF I DE .0 . ENT
SIGNATU
s
EROSION AND SEDIMENT CONTROL WORKSHEET
[] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1
and September 30. Stabilization means that disturbed areas will have well-established
plant cover or be landscaped to minimize erosion.
[X Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads,driveways,and parking areas after clearing and subgrade
preparation.
[f Protect adjacent properties and water bodies from sediment deposition:
[] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies.(See attached illustrations from Stormwater Management Manual.)
[] Install a filter fence down'slope from areas of land disturbing activity to filter runoff
before it Ieaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
01 Regularly inspect and maintain all BMPs especially after storms events.
[] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy soils. So I believe the above.
measures will be sufficient.
1� tI, 11
SPESC Instructions—Short FormJ0i
Revised July 17,2002
4
fi I
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized(seeded,landscaped,apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural
type vegetation and lawn to property line
3. Describe how runoff from impervious surfaces will be controlled(disperse to vegetated areas tc•.
infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.)..
i
All impervious surfaces will he run to roof drains and
catch basins as designed into the plat requirements.
„
SPESC Instructions—Short Form r
} Revised July 17,2002 5 E J U N 2 7 2005 ! _I
f
r y
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices.Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and. silt
fence will be installed, Silt fence will be left in
Place until we are ready to landscape and all roof drains/
• catch basins are in, Landscaping will be installed as
early as possible on the exterior of the building when
all exterior concrete work is completeiC! 4
The Best Mana nt Practices proposed above will be implemented to control erosion, sediment, and
stormwa ' notify the Jefferson County for inspections as required.
r/
Signature o Owner/Agent . Date
SPESC Instructions—Short Form U U!'r 2 %F
Revised July 17,2002
6
, cod JEFFERSON•UNTY • igt 7- S
-4, , tat PARTMENT OF Shera Street Pam{ NI EVELOPMENT 4# geza 32 x
1- To nstjnc vuastiingthn,983 ..�
360/379-4450 • 360/379-445 Fax.-- ft t' �Saywa�id—X�
1i9 � O www.co.jefferson.wa.us/comr6development I
T become sivc.i fD/ait
x JUN 2 7 2005I ) O ✓• if
Master Permit Application , MLA: 0rD -_ ,,.�0'
Project Description(include separate sheets as necessary): /
Weal 5t le y !_esideo e. le a tee- —r
,..a4e-
Tax tiff
P e/
Number: 99D/D D 005 Size: 113, 8'7/ -
7 (sees/square feet)
Site Address and/or Directions to Property: Sy /I ,�e//'S 4' e CZ� iOrt za014�, 40d-- 9y365
Property Owner(s)of Record: L O . LIC.
Telephone: (,34 0) Y3 7-.2/O -Fax: o �y.3�- 2S 2 2 email:
Mailing Address: 70 � a r A �ep ,g.,1 "ori kid/old, io8 9834S
Applicant/Agent(if different from owner): /4/lq
Telephone: Fax:
email:
Mailing Address:
What kind of Permit? (Check each box that applies)
t 'Building 0 Variance(Minor,Major or Reasonable Economic Use)
❑ Demolition Permit ❑ Conditional Use[C(a), C(d),or C]**
IiSingle Famil ❑ Discretionary"D"or Unnamed Use Classification
'Garage Attache. Detached ❑ Special Use(Essential Public Facilities)**
❑Manufactured Home 0 Boundary Line Adjustment
•
❑ Modular 0 Short Plat**
❑Commercial* ❑Binding Site Plan**
❑Change of Use ❑ Long Plat**
0 Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRDYAmendments**
MPropane ❑ Plat Vacation/Alteration**
❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions**
❑ Stormwater Management 0 Shoreline Management Substantial Development**
❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance
❑Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment
❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre-Application Conference **Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or Ws knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and
expenses which may in any way ,cc rue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to pro ' and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any it t r i s .Access and rig of entry to this property shall be requested and shall occur ly durin regular business
hours. -
Signature: / I Date:
The action or actions Applicant will undertake as a result of the Issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
`Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been Issued will •t vi•ate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you ar= .., p ance with the Jefferson County development code.The Applicant acknowledges that h ,she or it holds individual
and non-transferab•/ ibi f. i;i e ipg a plying with the ESA. The Applicant has read this disda' of nd sig and cats it below.
Signature: it f i — Date:
2
G:\PemutCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc
0b/22/2005 11:31 3603794451 JEFF CO DCD PAGE 03
OB/21/2005 17:08 FAX 3604372522 • PORT LUDLOW, ASSOC1itTEs - rumtr ur;Iirnrc Laiuuo
Ir-' r --a r I •--
OWNER BUILDER STATEMENT it
'l I i i t ' * '
The signer of this statement does hereby Certify that they are the Owners of the parcel referenced � ;tt,8t they ate tad that
' yerAldbe Theirespvt 1WthelSerletaiOontectorfarihepregessdprUJed'• . , ,
Signature: Date: JUN 2 7 2ki`?5 '. i
GENERAL CONTRACTOR OR MANUFACmED HOME INSTMi.ER: PHONE; ; PAX
het ieeilow , SiCiat4C IGC (3ko ) `Y3? 121D/ (,;`o) y37-2522.
.. MAILINGAoonEss: 7O Qie,/i,tlsut bit,1__�
CottrrnAgr R•s Lies 4d3 WAINS -
NUMBER: r 9F9 NUMBER
ARcHrrJcr/ENGINr'.ER: Cy • 25 X PHONG ( ) , FAX ( )
MAJUI44/ApDfEss:` 32 OX, E/ev R -io jar e .� )..1 75 `
Type: . ,fariateType: • • ,-Bathrooms: • , •. ' „ - Shoreline: , .Type of Sewage Disposal:
Y'New ta'Wood Exdating: � t" 'Sewer . ,
O Addition 1 a 'Steel - Proposed: .4 Bank G Community System
t] Mteratian/Remodel 0 Concrete Total .3 - Height: 0 Individual System
❑ Repair 0 Masonry SEP Remit#
❑ Demolition 0 Other, Bedrooms: Water Supply:
Existing: -ef Setback: 0 Private well 0 Two Parry
Tyyppo�of Heat: Proposed: 2 epubue
, ec• r-if., Total: _._ Name of System: OW 5 Z
lfihie hi a C*mrrwrtlai Project you must anSwer the following;
Number of Petidng Spaces: Current: Proposed:____ Number of ALA Panto Spaces:
Number of occupants(Includes owners,tenants.employees,etc) Currant Proposed -
IBC Occupancy: IBC Typo of construdtbn: Will you have Food Service? Yes / No
ifvisIs s Pretuns Tank ndlor�lnnlianrp Installation permit.mark all item below thatannly:
0Undergrot,nd Tank t'Above ground Tank Size of Propane Tank: /iv gf a..
,
o Heat Stove o Cook Stove 0 Woodatove ❑ Fireplace Insert 0 Hot Water Tank CI pellet Stove o Other -Is this troollanGe bolna Installed(n a'Manufactured I Mobllejiome? Yes / Na
When applying for a penult to Install a propane tank you must also submit a site plan showing all of the buddings,all properly
lines,(ink location and else,dlatancas from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
.�.• . k!:y h:C :ln;•I.�� k'1 19rf '" S,"� i{rv� .� "�h ll•Ij Jvp•;�.�•- .'„ti' —�7• ; `�
Bquaro Paotaao , . 1{ ?��°i� lii��rr` :. l y .+ 1 /,i4;S .,irl: '} �,
Current Proposal „t t2 ..ti . t:`,(A.3, Lc1 rt,.''
Main 1=Toor E.'N„'rF�i•Z,,r,-I,:r9-"vl' r, .xt. ;';J... 4:: ,',�:
r
t=a � �wt 310- qS
—•— f 1":a. `. �, 0, hi` fry., : ;fig''
.:Y Cy.,•' '..);;? Cox
!tM1 14:1' `•e7:.MIA` • �1 .�.,:',s •..,.::; ..:. .,..r11.
31°Floor '�' :...,� r. R, r t
rr
.;:Yt°r"1'('f�`{I F*.Cf r a 'i r', �1 r r 't41,h i t+'%•'}:,
Mezzanine: . 1� 1 tt 1 1a� ''�1 8-1/ {F a i. , ;,,•:.r
,d 4 }�a�C���i
Pleated Basement : i ii: ."jr a`Ml,i 4•p�`..pyi,p�. ! • .. ' 1Zr'i�••••••'..
_1�^ Basement rJ Aq.i'.� 7( s �yLy��11.. ,;' :,: ;:,.,: .
Unheated •Jt) t./el ll". .t.i,� %,, ,4 0't,.'a^a{ 1 (- 4 r\ p 1}:'N•7 t•• Ir.♦ •n..
,�- r' '1 fu�yln".'-�'i+ E'ui n.� i'�ftt. 44M Q' GPI
'+:• ,':'i...,..,l......'-.;I'''•'•.3'`'dr.
r Other Unheated •t3 I 1 :'�{%°` li Cl fi.tl .trpr. . •,.....,,:.-'::r:::.:Z•r. . r�.
.�- I e r I I�l+�,jt 11 .r• M IJs ��.1y :,.'t:•'M's•:,.r::..,i,r•::..,::.�°•�<<f-/'
t•44 !;'.s'4lf`�•Td'!=:lF i`.1?I�I�ric' •�1'1.'i' I k� ';�: e.e:;' �:1:i : i..t'•`:�4.,
nit
, yvy li 6;4- "j4." :j..‘:ce,7,}ij.',..14.Z...0 4.N.t.'.1..f al is.° 1
Decks !td;rW„' ..1Xh}>f� ."� ;4. g+r' �3' :ia ?;c.2.,• ,,, ,,,,.,;'ra•,1 : ,,
k:4 • 1 •� ti' t.. y ,.'K,,,?..,r J:• 14Hi.•i•.•.Other {r
Vl I t l{ Nb�i. rV 5 gg r --11
'' .�� t p±�t'+�l�lS• r r�+� isp�I,kt,� u k' ��� L � r ,• �,• '. t �
j� , •4i i� ♦ji'1R� 1 ` r t •
ESTIMATED COST(REQUIRED) >r4 i` (• .' `" l-1 � :�: ; `, ;,..e f,-rr,4.42...,.-''
Weir mad*value of elf labor and moteltsls uW• •). ,1 1,- q''• ,�', ., V" M'(,, .d't: tti:'I 1`.
W!1 1 i <,1'.N 'y � [,' N�, ::a,,I•-•.-•..:^•. .44.4
tl f r 1'• tt 1
L///� q�.�•�. 4- t 1 4 r
/1VV �O� • V✓ Y r- ,fir 4 I.f../'._�I, } } r 1 (ii- )G:\ tFORMA\DRDFORM \MasterPraApplc.don7- -04.ck •