HomeMy WebLinkAboutBLD2005-00473 BUILDING PERMIT APPLICAAN ML v
Reviewiew T Ty 437
ype: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD05-00473 Received Date: 7/20/2005
SITE ADDRESS: 304 SMITH RD
NORDLAND, 98358
OWNER: ROBERT G BOWEN PHONE:
MELANIE J BARRY
PO BOX 43623
BIRMINGHAM AL 352430623
SUBDIVISION: Block: Lot: T 9+
PARCEL NUMBER: 921051009 Section: 5 Township: 29 N Range: 01 E
CONTRACTOR: TBD PHONE: 205-807-2541
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOr DETACHED GARGE
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 90,000.00 ADD'L: 498 HEAT TYPE: HTP
CODE EDITION: 2003 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: # OF STORIES:
OCCUPANCY:
OTHER: 6
CONST TYPE: 5N GARAGE: 894 SHORELINE:
CONST TYPE: DECK: 140 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: OTHER
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: 0 Prop: 1
Total: Total:
Routing Date: P
Type Amount Paid By: Date: Receipt: /� PPRME
Permit $923.75 SLE 07/19/05 73486 /�
Plan Check $600.44 SLE 07/19/05 73486 AUG 2 9 2005
State Building Code $4.50 SLE 07/19/05 73486
Total: $1,528.69 Jefferson County Planning
&Building Department
ja"*"4"-. 044d;wr"----'
Foe_Elmo A
• BUILDING al
PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD05-00473 Received Date 07/20/2005
SITE ADDRESS: 304 SMITH RD Issue Date 08/29/2005
NORDLAND, 98358
APPLICANT: ROBERT G BOWEN PHONE:
MELANIE J BARRY
PO BOX 43623
BIRMINGHAM AL 352430623
SUBDIVISION: Block: Lot: T 9+
PARCEL NUMBER: 921051009 Section: 5 Township: 29 N Range: 01 E
CONTRACTOR: TBD PHONE: 205-807-2541
PROJECT DESCRIPTION: DETACHED GARGE
CALL IN FOR THE REQUIRED INSPEXONS THAT APPLY TO YOUR PROJECT.
SETBACKS: OK j/, d/OS
UFFER: OK 9/5/oSli
Footing: OK 05,
Foundation: AV,S $
Stormwate FINAL Approval: 8. i/6
Underground Plumbing: r5K izck e,4
Underground Insulation:
Shear Wall : (9.1tr-4-_,e) 1 Z-'1-0c-
Sheathing: 6-,A-ye Ji „t 2—i-o,5_,
Framing: /.1,?,5'as`—
Plumbing: 611( /s��oS
Propane Tank/ Lines:
Insulation: p/�<;�� 'E L ��1 - • fix, • tt''
Sheetrock:
Septic Sytem Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval: ,
Final/Occupancy Approval: R1,O 6,4'
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
•
SPECIAL CONDITIONS FOR CAQ# BLD05-00473
1.) Eastern edge of structure/greenhouse must be NO MORE THAN 118' from the top of the
bank to allow for placement of approved onsite sewage system.
2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
3.) A Stormwater Plan has been submitted and approved by the Department of Community
Development. Once the subject permit has been issued the applicant shall fully
implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
4.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
5.) The building height is not to exceed 35 feet.
6.) There is a 20 foot setback from the edge of the right-of-way of Smith Road (p5089).
There are 5 foot side setbacks (north &south), of which eaves can enroach within up to 2
feet. the rear setback is 30 feet from the top of the shoreline bluff(west).
I:\F_BLD_Permit_Buildng.rpt 10/29/19
1111
411
6,'INA-NC--C-
OWNER BUILDER STATEMENT
The signer of this statement does certify that they s : : of the Parcel referenced herein,that'")are not loaned ambectas and Slat
the responsibility the proposed proNct. E..
they will be V‘ �*
Signature: r -- — -1 I
E GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PRONE:
FAIL 1 °
V. G e c)u)° kv o -1--t3 Q (Zas- )�o 7 ZS Y(jk
( )
-
MAILING ADDRESS::
CONTRACTOR'S LICENSE WADS
NukeErt
NUMBER:
ARCHITECT!ENGINEER: PHONE ( ) FAX:( )
L
MAILING ADDRESS: E
MAI
Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
Project FraWoodE detlng: — ❑ Sewer
o Addition ❑ Steel Proposed: _ S- Bank ❑ Community System
o Alteration/Remodel 0 Concrete Total: ___L___ Height: r$(Individual System
❑ Repair ❑ Masonry !2- SEP Permit* 6 c(-60-2 ER"
❑ Demolition ❑ Other. Bedrooms: Water Supply:
Existing: Setback: ❑ Private well 0 Two Party
Typeof Heat: Proposed: c O ❑ Public
4kC Total: Name of System:
14-vve 3 AL vin.a.4t-ai.
Jf Mile is a Commercial Proles you must answer the fofowina:
Number of Parking Spaces: Currant: Proposed: _ Number of 8126 Parking Spaces:
Number of occupants(Includes owners,tenants,employees,etc) Cunrnt ed
IBC Occupancy: IBC Type of construction: _— WIN you have Food Service? Yes I No
If this is a Propane Tank andlor Aoollance Installation momtlt.mark all Items below that such:
❑ Underground Tank Above ground Tank Size of Propane Tank: l 5 O elk L.
❑ Heat Stove ❑ Cook Stove ❑ Woodstove ❑ Fireplace Insert X Hot Water Tank ❑ Pellet Stove ❑ Other
is this aooliance belna Installed In a Manufactured I Mobile Horns? Yes t)
When applying for a permit to Install a propane tank you must also submit a site plan showing ail of tine buildings,ail property
lines, tank location and sire,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve wee. .�,� ,1n a . , r. ti j-
SQuare Footage M °( �r"r� n. a , t u ,, , .
Current Proposed 1,. .x • • t , . ., �Y1`,,,,.rt .+w',t i , SS
Main Floor t ,e; `*�t ` �,i " y
T y ?
eu Floor Li Cr 3� j "` : . ,,. 4.. isf �,, „
3m Floor ,� �` '+ - , r4 x y,.-1,111+ ':`,
_ , . rtc�
Mezzanine: T r 1a" •:sr iti i 4) L ;
Heated Basement `4 •. i!- "'7�' ,• yr " •"'{
Unheated Basement W � {,�. 4Er..korT;ia� / rp..ri f,k'" k x + l
r'te4Other Untreated :WaT ' `r4,�rs .. yyle -c_s;
wEq I . may: s , j r�, {1,,
Decks E 4' !CT 4,,~ __a i E ,', � l.'.r:
Other /t•/�_ }�� , aiiiiiiiar4 i. ,nj' (yt''''''4?� lvr 4i.,,Y'E `Y 1r7 '.
W lie" I� .Vf/ '�!E ) a "�T v"�h J'-i.,4 y r .r;;.:.'.t, tors. r
ESTIMATED COST(REQUIRED) QI� , a }s. ' °
•
.Fair market value of all labor and ma finish
`+ ,� •"'c
IiMfiiilAl: f.: ,:• 1a�t t ;r r tfr
G:\PennitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc •
ro a oil Aam 8.
yaj at5c WO
all 7410'e IaWa3
PLAN
S.7
47
nj
Who
t MAV 7- 7 5' 77 1�,,Z4t
GAR 071�1%ufk *ozl
pye
Set f&Cvfi,,y- I F�- LL
40ira 5,�Fc T10tv
dembl? y
PER
4J✓oRrff
APPROVED' APPROVED 0
PR' JEFFE;N
s ORMWATER P T 4 7
LAN SITE PLAN
N MTY
AUG 9 W UG T7.
APPROVED
2 9 �005 PERMIT # BID
JEFFERSON COUXN
PEPT OF COMMUNITY OOVELRP�ENT, DEPT. 0 . PCO C664TY 05-0 L
SIGN MMUNrrY D,EVELOPMW
SIGNATURE:
4 7 Kk
- - - - - - - - — COUNTY DC Lu
OM4�i
-- ------ ---
6
rL
EA, P
47
2, Z-
SON T-A I Air. v- pr N 777
-F-
0
0
(v
301UM—
New
NE'-j
Z
TAN
<
FT
<
m Z -3 Ja
Lu
-Lap
..-- -5E
All
14J
ll� lc:rl vNrih /I U .1
[A .
Y
p4e. OJT- 4�
DOWN 00
M1 6T10H ArA ta
Avel-
41
A
r,t4r— agAv cc
Ica o ro, ru
TANk.
I
0
L 0
...... 55T Cr-M&QCE
7-
t
Lu
W
0bF?TH
2 Lu
SHEeT
0-F