Loading...
HomeMy WebLinkAboutBLD2005-00490 Geotechnical Report ciLl G J J :,256 N L 20 Stre• TECH et, Suite [6 th gellcvue, W A 98\),s.j.).„/SJ(kfAii 005 CONSULTANTS, INC, '425) 747-5618 FAX 747- t:; . II1I a _IN! 03035 To: John and Nancy Rowe norm Mat R.McGinnis,P.E. Co,: Date: May 4, 2007 Address: 480 Ade!ma Beach Road FAX: Port Townsend, Washington 98366 Phone: (360)385-3818 r Post-Construction Geotechnical Observation Tram and Accessory Dwelling Unit 5523 SR 20 Jefferson County, Washington This memo follows our visit on May 2, 2007 ;o observe conditions around the completed acr:e!3s, dwelling unit (ADU) and the tram for beach access. Construction of the main residence has r.c: begun yet. At the time of our arrival the detached ADt.; and the cable supported tram 4, :se- complete. Based on our observations of the completed work ,t appears to have been conducted ;;e::,_:.a accordance with the recommendations which we made in our December 10, 2004 letter_ '':-:�;;';c,:..r.: construction work has not significantly disturbed the steep slope and conditions on the °>:,,�< essentially unchanged since our last visit in December of 2004. The completed cons .c :r: :_ not appear to have adversely affected slope stability. Please contact us if you have any questions regarding this memo or if we can be of further assistance. RECEIVED Respectfully submitted, GEOTFCH CONSULTANTS, INC. MAY - ,.. , 9 20�7 � � JEFFERSON COUN1Y QC Va.- e: • ,54 0644 '''''':r.,-2.:2r-; 7/...-) Vlarc ';: McGinnis, P.E. "'rincioa: • f'3r 2 'd L80LSBE08E dTI :EO LO Sf.: