August 7, 2005
Project No. GF05024 ( *--
•
Dr. Peter& Deborah Ciani
111
831 Thorndyke Road AUG -- 9 2005
Port Ludlow, WA 98365-9291
7 � i
Subject: Geological/Geotechnical Assessment
Proposed New Ciani Residence
'j 1 ,6 Maxview Drive
Port Ludlow, Jefferson County, Washington
Dear Dr. and Mrs. Ciani:
This report presents the rei' s of our geological/geotechnical evaluation of your proposed new
home site to be located at T'36 Maxview Drive, near Port Ludlow, Jefferson County, Washington.
It is our understanding that you plan on constructingtwo
a new, story, approximate 1,800 square
foot single family residence on the northern portion of the property.
The purpose of our site evaluation was to document existing shallow soil and ground water
conditions in the proposed building location and to provide geotechnical design
recommendations for construction of the proposed improvements. A previous study was
performed f 'ou by our office, titled Geological/Geotechnical Report, Proposed New Ciani
Residence, Maxview Drive, Port Ludlow, Jefferson County, Washington, dated March 30,
2005. The purpose of the previous report was to address landslide and seismic hazard issues
associated with the steep slope located to the west of your proposed building site. The results of
the previous investigation resulted in a recommendation that the new house be located a
minimum of 100 feet from the toe of the steep slope and that no further mitigation was required
for these identified hazards.
EXISTING SITE CONDITONS
The subject site is a near trapezoidal shaped property encompassing approximately 3'/2 acres.
The parcel contains both a level bench area (eastern portion) and a steep slope area (western
portion). The steep slope area was evaluated in our previous report listed above. Therefore, this
report will only focus on the bench area where the house will be constructed.
Gary A. Flowers,PLLC.
19532 12th Avenue NE Shoreline,Washington 98155-1106
206-417-7640
1
Ciani Residence Geological/Geotechnical Report
156 Maxview Drive, Port Ludlow,Jefferson County, Washington
The building site is comprised of two relatively level benches separated by an approximate 4 foot
high step. Each bench is on the order of 70 feet wide. The proposed residence will span over the
step area and will thus require a structural fill pad for the eastern portion of the house. The
subject site has only field grass for vegetation.
Subsurface Soil and Ground Water Conditions
In order to characterize the shallow subsurface soil and ground water conditions on the property
three exploration pits were excavated on the site on July 20, 2005. The results of these
explorations indicated that suitable foundation bearing soils for the new residence are located at
shallow depth. Logs of each of the exploration pits are as follows:
EP-1 (near southeastern corner of house)
0-6" Sod/Topsoil
6"-4' Dense to very dense,moist to very moist with depth, brownish gray, silty, very fine sand
BOH @ 4" No caving No ground water
EP-2 (near northeastern corner of house)
0-6" Sod/Topsoil
6"-4' Dense to very dense,moist to very moist with depth, brownish gray, silty, very fine sand
BOH @ 4" No caving No ground water(slight free water on soil at 3 3'�
1r
EP-3 (near west central edge of house)
AUG -� 9 2005 I
0-3" Sod/Topsoil
3"-4' Dense, moist, brownish gray, medium sand with some silt
BOH
@ 4" No caving No ground water(slight free water on soil at 3')
In addition to the three exploration pits, an approximate 18 inch deep trench had previously been
excavated along the lower bench area (east side of proposed house location) for purposes of
placing an interceptor trench. An evaluation of the soils exposed within this trench indicated that
they were the same dense to very dense silty, very fine sand soils encountered in EP-1 and EP-2.
The encountered soils appear to be an advance outwash or transitional bed equivalent type soil.
These sediments were deposited by meltwater emanating from the front of an advancing glacial
ice sheet, or in a fluvial environment between advancing ice sheets, and were subsequently
overrun and consolidated by the weight of the ice sheet.
Gary A.Flowers,PLLC.
19532 12th Avenue NE Shoreline,Washington 98155-1106
206-417-7640
2
Ciani Residence Geological/Geotechnical Report
156 Maxview Drive, Port Ludlow,Jefferson County, Washington
Hydrology
No indication of standing or flowing water was present at the proposed house location at the time
of our field work. A small stream was previously observed to the north of the house location.
The water emanates from the steep slope area and flows offsite to the north. There was no
evidence of erosion anywhere on the parcel.
A water table was not encountered in any of our exploration pits. A small amount of interstitial
water was observed in the soils at a depth of about 3 feet below existing ground surface in
exploration pits EP-2 and EP-3. This would indicate that some amount of ground water is
located at relatively shallow depths and that the ground water table is likely to be shallower
during the winter months.
Seismic Hazards
Generally, there are four types of potential geologic hazards associated with large seismic events:
1) surficial ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground
motion.
To the best of our knowledge at this time there are no fault zones located in the general area of
the subject site so the risk of surficial ground rupture is considered to be low. Seismic hazards
associated with the steep slope to the west of the proposed house location were addressed in our
previous report. Based on the setback from the toe of the steep slope no further mitigation was
recommended. Due to the dense to very dense nature of the underlying sediments the risk of
liquefaction on the site is low. Based on the encountered stratigraphy, it is our opinion that any
earthquake damage to the proposed structure, when founded on suitable foundation bearing strata
in accordance with the recommendations provided in this report would be caused by the intensity
and acceleration associated with the event and not any of the above-discussed impacts. Design of
the project should be consistent with 2003 International Building Code (IBC) guidelines. In
accordance with the 2003 IBC, the following values should be used:
-1 r
Site Class D (Table 1615.1.1) l r I
Ss = 125% (Figure 1516[1]) _ r �~
Si =44% (Figure 1516[2]) , 1 14 AUG - 95
CONCLUSIONS AND RECOMMENDATIONS
On the basis of our geologic research and field explorations, the encountered soils will provide
suitable support for a two story, single family residence. Due to the difference in elevation
between the east and west sides of the proposed building location, an approximate 3 to 4 foot
thick fill pad will be required to provide a level building pad.
Gary A. Flowers, PLLC.
19532 12th Avenue NE Shoreline,Washington 98155-1106 206-417-7640
3
Ciani Residence eological/Geotechnical R part#I
156 Maxview Drive, Port Ludlow,Jefferson County, Washington AUG - 2005
J%
Site Grading
The site should be cleared of all vegetation and topsoil. These materials should be removed from
the site or stored for future landscape use. Any non-organic soils that are to be reused on the site
as structural backfill must be kept covered at all times and protected from the weather.
A grading plan was not available at the time this study was completed. However, based on
discussions with the owner we understand that 3 to 4 feet of structural fill will be placed to
provide a level building pad for the new residence. We further understand that most of the
structural fill will be imported and will consist of silty, gravelly sand, a sample of which was
observed on the site at the time of our field study. The observed sample was very dry and will
likely require moisture conditioning at the time of placement in order to obtain suitable
compaction.
Structural fill is defined as non-organic soil, placed in maximum 8-inch loose lifts with each lift
being compacted to a dense, non-yielding condition prior to installation of the succeeding lift.
Prior to installation of the structural fill pad, any disturbed, natural soils must first be
recompacted to a dense, nonyielding condition. If the subgrade soils are wet and cannot be
recompacted to a dense, nonyielding condition it may be necessary to place a layer of 4 to 6 inch
quarry spalls prior to placement of structural fill. Should this occur, the quarry spalls should be
placed in an 8 to 12 inch thick layer and properly consolidated with a compactor. The top of all
compacted fill should extend horizontally outward a minimum distance of 3 feet beyond the
location of perimeter footings or pavement edges before sloping down at a maximum angle of
2H:1 V.
The planned structural fill pad will be placed over the top of the interceptor drain that was being
constructed at the time of our site visit. As discussed at that time, the drain should be comprised
of heavy duty, rigid, PVC pipe instead of the planned flexible ADS pipe. The drain should also
be covered with a nonwoven geotextile filter fabric such as Mirafi 160N or equivalent.
Foundation Recommendations
A typical spread footing foundation will be suitable for the planned residential construction.
Most of the foundation will be supported by a structural fill pad as described above in the Site
Grading section. For the portion of the foundation that will be supported on the dense to very
dense natural soils, the exposed soils should be scarified to a minimum depth of 12 inches and
then recompacted to a dense, nonyielding condition. This will provide for more uniform
settlement of the foundations between the different types of bearing soils. Provided the structural
fill pad is correctly constructed and approved, and the natural soils are scarified and recompacted
as described, an allowable soil bearing value of 2000 psf may be used in the design of these
footings, including both dead and live loads. An increase of one-third may be used for short-term
wind or seismic loading. Perimeter footings for the proposed structures should be buried a
Gary A. Flowers,PLLC.
19532 1211i Avenue NE Shoreline,Washington 98155-1106
206-417-7640
4
Ciani Residence Geological/Geotechnical Report
156 Maxview Drive, Port Ludlow,Jefferson County, Washington
minimum of 18 inches into the surrounding soil for frost protection. Settlement of footings
placed as detailed herein should be less than 1 inch total and %2 inch differential. However,
foundations placed on disturbed or improperly compacted soil may result in increased settlement.
All foundation excavations should be inspected by a representative of this firm, prior to concrete
placement, to verify that the design bearing capacity of the soils has been attained and that
construction conforms to the recommendations contained in this report.
Lateral loads can be resisted by friction between the foundation and the supporting soils, and/or
by passive earth pressure acting on the buried portions of the foundations. The foundations must
be backfilled with structural fill compacted to a dense, nonyielding condition to achieve the
passive resistance provided below. The structural fill must extend horizontally outward from the
embedded portion of the foundation a distance equal to at least three times the embedment depth
over which the passive resistance is applied. We recommend the following design parameters:
• Passive equivalent fluid =250 pcf
• Coefficient of friction= 0.35
The above values are allowable and include a factor of safety of at least 2.0.
Retaining Walls
At this time we are unaware of any retaining walls planned for the project. If walls under 8 feet
high are planned they should be designed for an equivalent fluid pressure of 35 pcf if free to
rotate and 55 pcf if fixed, with level backfill. Passive resistance would be 250 pcf. Any
retaining walls taller than 3 feet must be lined with a minimum of 12 inches of washed rock to
within 1 foot of finish grade or an approved drainage mat such a MiraDrain or IncaDrain. The
washed rock or drainage mat must tie into the footing drain.
Floor Support Recommendations
For slab-on-grade floors we recommend that the upper twelve (12) inches of natural soil beneath
the slab be recompacted to a firm, unyielding condition. Any yielding areas should be
overexcavated and filled with approved structural fill.
A capillary break layer consisting of 4 inches of washed pea gravel and a heavy duty (minimum
10 mil), polyethylene plastic vapor barrier should be provided under any floor slabs where
moisture intrusion is a concern. If the vapor barrier becomes compromised in any way during
construction it should be replaced or an additional layer added. Penetrations through the vapor
barrier should be wrapped and taped. ( _ _,F5)
j`+ ; ii
AUG 9 2005 I
Gary A. Flowers,PLLC.
19532 l2'h Avenue NE Shoreline,Washington 98155-1 106 206-417-7640
5
Ciani Residence Geological/Geotechnical Report
156 Maxview Drive, Port Ludlow,Jefferson County, Washington
Site Drainage
All storm water runoff from impervious surfaces should be collected and piped into an approved
storm water drainage system. We understand that storm water will be placed into the small
existing drainage the flows off the site to the north. There is also a drainage ditch along the west
side of Maxview Drive that could be used. Infiltration of storm water does not appear to be a
suitable option for this site due to the very dense, fine grained nature of the underlying soils.
All perimeter footing walls should be provided with a drain at the footing level. Drains should
consist of rigid, perforated, PVC pipe surrounded by washed drain rock (maximum 5/8 inch) or
pea gravel. Either the pipe or the drain rock should be wrapped with a nonwoven geotextile filter
fabric. The level of the perforations in the pipe should be set approximately 2 inches below the
bottom of the footing and the drains should be constructed with sufficient gradient to allow
gravity discharge away from the buildings. Roof and surface runoff should not discharge into the
footing drain system, but should be handled by a separate, rigid, tightline drain that discharges
into an approved storm water conveyance system. In planning, exterior grades adjacent to walls
should be sloped downward away from the structure to achieve surface drainage.
Care should be taken to avoid any grading or construction of any berms or other structures that
may cause storm water to flow under any pavements. Water introduced under the pavement
section could result in an unstable subgrade and future pavement failures.
Erosion Protection
The natural, on-site soils and proposed fill soils contain fines and are considered to be subject to
erosion from both sheet flow and channelized flow. Due to the gentle grades on the site the
erosion hazard can be handled with standard construction practices. An approved erosion control
plan should be provided and implemented. The plan should include, at a minimum,placement of
silt fences along the lower reaches of the property. The silt fences should be placed as per local
municipal specifications and properly maintained. Soil stockpiles should be covered with plastic
during periods of inclement weather. Areas stripped of vegetation during construction should be
replanted, or otherwise protected, as soon as possible. Typically the construction entrance should
be rocked to minimize off-site soil transport. However, since there is a long gravel road out to
the first pavement this should not be necessary unless required by local regulations.
SUMMARY
Based on our site reconnaissance and subsurface explorations the site appears to be suitable for
the proposed development provided the recommendations presented herein are properly
implemented.
SIP
w
!,
r
Gary A. Flowers,PLLC. '
19532 12` Avenue NE Shoreline,Washington 98155-1106
-_,206-41L2.60
6 -.I,
Ciani Residence Geological/Geotechnical Report
156 Maxview Drive, Port Ludlow,Jefferson County, Washington
We recommend that we be retained to review those portions of the plans and specifications that
pertain to grading or foundation installations to determine that they are consistent with the
recommendations of this report. Construction monitoring and consultation services should also
be provided to verify that subsurface conditions are as expected. Should conditions be revealed
during construction that differs from the anticipated subsurface profile, we will evaluate those
conditions and provide alternative recommendations where appropriate.
Field construction monitoring and observation services should be considered an extension of this
initial geotechnical evaluation and are essential to the determination of compliance with the
project drawings and specifications. Such activities would include site clearing and grading,
subsurface drainage, fill placement and compaction and bearing soils verification.
Our findings and recommendations provided in this report were prepared in accordance with
generally accepted principles of engineering geology and geotechnical engineering as practiced in
the Puget Sound area at the time this report was submitted. We make no other warranty, either
expressed or implied.
Sincerely,
*ILT Pkt
FW
o - ssti! n , 040 Ca
ort/Y P-41*-\''''i
r,l � +1 .. I:T ,,,Meilly. z iii ,
7""' % 06 16271� , ':
o‘-. ♦ , _
ioNAL 4
gios -. ,_
== Ge l EXPIRES '1—-yc�—o C l
I GerY A- Flowers y
Gary A. Flowers, P.G.,P.E.G. Robert M. Pride, P.E.
Engineering Geologist Geotechnical Engineer
AUG - 9 2005 ,_':./
Gary A. Flowers,PLLC.
19532 12th Avenue NE Shoreline,Washington 98155-I 106
206-417-7640
7
. .
�
�
—n�
\
| /
' |
/ \
V �
|
Lo
cc,
/
AUG — 4 ����
. � '~. ~ — —
\ | \
/ >
--�^-------- -- / r
`
�
|
|
..
�
I
D 1`
it
E
j (
1 f 1
; - AUG - 9 2005
s off, O, c
S 3Jr' )/Y/
'
w
' .
�
�
�
�
u.
"
�
�
�
\�
~^
~-
�^
'
�
�
/
/
\�
~J =
| AVU - 9 /005
--__-_- /
^ 'r 09
J �// /m/
r,.3 ci1
3----- 'T._ ::)-------- 0._
•..D
'. ....9
ri
, 0
fL
/-,
,-,
J
,---
. '- --- - ),•__
f ......... cv -4
..f, 5 e,
.....1 I.j c...,
.....)
1.--
v
c-c
. , •••u
-...c
,..."
‘,
.------ -/-----.."--------------'.----'''''''''''''' ,
1 AUG — 9 ?006 :,) jli
t -
-—
b c
... ,
..< "D, -.-• OcC"`
—/
s 0
. .