Loading...
HomeMy WebLinkAboutBLD2005-00569 0 BUILDING PERMIT • Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00569 Received Date 08/31/2005 SITE ADDRESS: 50 WHEELER LN Issue Date 10/19/2005 PORT LUDLOW, 98365 APPLICANT: MARK E JOHNSON PHONE: THOMAS JOHNSON 62 GARDEN CLUB RD NORDLAND WA 98358 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: PARCEL NUMBER: 990600317 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: NORDLAND CONSTRUCTION CO INC PHONE: (360)385-1247 62 GARDEN CLUB RD NORDLAND WA 98358 Contractor's License: NORDLCN953NT Expires: 8/30/2007 PROJECT DESCRIPTION: NSFR W/ATT. GARAGE W/120 GAL A/G PROPANE TANK & FIREPLACE INSERT CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: (.7Lt It- y-(t'Y UFFER: ` ,; Footing: {NBC i t s-e t,1'', It Foundation: 5MS--45k (l EV> -to sEE MOLD.0ow1aSJO0l.4!.f) /1 4,OS/ Stormwater FINAL Approval: Underground Plumbing: QK //� 05fr Underground Insulation: Dk //// B/S, Shear Wall : - ivy y.�ye �i, ( /A�L., Sheathing: Framing: f//F DM /0/os, Plumbing: O#< l/i ce Propane Tank/ Lines: /kr k �Sif,‘, Insulation: Ii i is d1C /lit sS ,144, Sheetrock: / r ei 4- c p i?1h( Septic Sytem Final Approval (If not on se/04, r): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: 1k - 41^- C/o 3/2.z/06," HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE SPECIAL CONDITIONS FOR C E A BLD05-00569 1.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 5.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 6.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 7.) The building height is not to exceed 35 feet. 8.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 9.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 10.) Minimum setback from Wheeler Lane right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 11.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 12.) Per MPR Code Section 3.107, Accessory Dwelling Units (ADU's) shall not be allowed within the MPR-SF zone. I:\F_BLD_Permit_Buildng.rpt 10/29/19 gUILDING PERMIT APPLICAAN MLA05-531 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00569 Received Date: 8/31/2005 SITE ADDRESS: ..:`,v,t , ` u\1 PORT LUDLOW, 98365 OWNER: MARK E JOHNSON PHONE: THOMAS JOHNSON 62 GARDEN CLUB RD NORDLAND WA 98358 PORT LUDLOW NO. 2 SUBDIVISION: Block: Lot: PARCEL NUMBER: 990600317 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: NORDLAND CONSTRUCTION CO INC PHONE: (360)385-1247 62 GARDEN CLUB RD NORDLAND WA 98358 Contractor's License NORDLCC994JQ Expires 4/16/2002 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI NSFR W/ATT. GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW VALUATION 200,000.00 MAIN: 1,777 CODE EDITION: 2003 ADD'L: HEAT TYPE: HTP OCCUPANCY: R-3 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: 557 #OF STORIES: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 400 SETBACK: DECK: 200 BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: PUBLIC -- BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: 3 i I oc ( R Type Amount Paid By: Date: Receipt: Approved/Date Potable Water Application $53.00 SLE 08/30/05 76607 APPIlfaff State Building Code $4.50 SLE 08/30/05 76607 Plan Check $1,009.94 SLE 08/30/05 76607 c CT Permit $1,553.75 SLE 08/30/05 76607 �`'�—r ��� Total: $2,621.19 '#/t4� . ';l ► it e [rai:, „p Planning ent 11A S f) A 411 7 o JEFFERSON COUNTY ,I i I!)al ,'-, ,.3 DEPARTMENT OF COMMUNITY DEVELOPMENT !;-• 4, I,'' .� , 1 621 Sheridan Street• Port Townsend • Washington 98368 (� , AUG 3 0 2005 , I') 360/379 4450 • 360/379 4451 Fax l t 1.1 q p www.co.jefferson.wa.us/commdevelopment SDI:-till L__, J E F E I'. . . f r l''1 (,f 4f CrC r a „ - Master Permit Application -At----- �j.�` Project Description(i lude separate sheets as necessary): Tax Parce r- , r r, '> Property /_�`�;' A Number: 1 O L�L1 S / 7 Size: 1 Z-i 10 /•, -7 (acres/square feet) Site Address and/or Directions to Property: W4kre..ezee_l.AAJE Property Owner(s)of Record: 72.//-."4 c" , !14A,& YA(':: I'k/ - --�,s e SEr.(l Telephone: 3t; - "774-/Z7f Fax: • 37q S%i,7--- email: YmV i;L—'//c--4/ £ Mailing Address:f 2,-(s fQVG1N 4.4.4 a (20 f M o46 O, A. L�'$3 Cj$ Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: Wh t kind of Permit?(Check each box that applies) wilding ❑ Variance(Minor,Major or Reasonable Economic Use) ❑ gemolition Permit ❑ Conditional Use[C(a),C(d),or C]V§in ** gle Family ❑ Discretionary"D"or Unnamed Use Classification Garage Attached/Detached ❑ Special Use(Essential Public Facilities)** ❑ Manufactured Home ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat** ❑ Commercial* 0 Binding Site Plan** ❑ Change of Use - ❑ Long Plat** ❑ Address I Road Approach 0 Planned Rural Residential Development(PRRD)/Amendments** ❑ Propane 0 Plat Vacation/Alteration** U Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance ❑ Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment U Wireless Telecommunication* U Jefferson County Shoreline Master Program Amendment U Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: I hereby designate /oI14 c .rt DESIGNATION OF AGENT �,f tTf,tA1s(r R1 to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE ��L.,-, igri ti-- Date: g..-3 o - a .S. By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. --;g; Signature: /t�W7n�G+�J./90-61.442.----- Date: 6�->U -G5 The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: ,{,r,,,A.1/ C ,---- Date: '' c., ,CAS C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc OWNER BUILDER STATEMENT ' I I ! AUG �}n ` d rS'ai1d The signer of this statement does hereby certify that they the 0 of the parcel referenced herein,that th are f t license con racto that !. they will be assuming the responsibility of the General Contr r the proposed project. ^ "I Signature: l , ? • S 0 - t3 ,r;;""-'._.''),,,n tiw ;i. GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER' PHONE: FAX: 101404,10tetaTzloccca A to WC._ (366) 174-k.q so ( it �I MAILING ADDRESS: (0Z (�.' _V6d \ 4A,(� „ ter) EMAIL: — — CONTRACTOR'S LICENSE � ,J� V NO VAINS NUMBER: NeDept--4-N Q NT NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: V New ( Wood Existing: VSewer ❑ Addition 0 Steel Proposed: Bank 0 Community System ❑ Alteration/Remodel ❑ Concrete Total: 2- Height: ❑ Individual System ❑ Repair 0 Masonry "'— SEP Permit# ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: n Setback: 1 Private well 0 Two Party Type of Heat: Proposed: 7ublic /;,r}l Fop / i2/o/l Total: i --------- Name of Sy tem:tOt-Yitiole. If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:• Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: I Underground Tank e ground Tank _Size of Propane Tank: 1Z0 CC<J�(.. 1 Heat Stove 1 Cook Stove Woodstove i Fireplace Insert-)l Hot Water Tank I Pellet Stove 1 Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines, buildings and septic system components, including the reserve area. Square Footage For Office Use Only Current Proposed Amount Main Floor - Consistency Review: )1'1`7 t�t272 5t 41.00 2"u Floor Base fee: (55 .ZS 3fd Floor _ Additional Section: .......-**-- Mezzanine: Plan Check fee: (ooq .gq. Heated Basement State Surcharge fee: (f,SG Unheated Basement Sr'� 7g$- Pot Water Review fee: p- 1 -00 Other Unheated JJ 911/R Approach fee: ( o4-7• O0 Garage/Carport VO 0 C1142Ct TOTAL: $Y285t . tQ Decks 1 )c) Tit 1 L, Receipt Number: R40 Other 1 _ , •I � Cash/Check Number: w�� ESTIMATED COST(REQUIRED) V Date: .Fair market v aterials foundation to finish �) ft6s---1 ZfiL r 0 eC! Initials: -------? 1 C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc if SON o _ _, ti` � c JEFFERSON COUNTY ,-,, r , DEPARTMENT OF COMMUNITY DEVELOPMENT i r:'.., 621 Sheridan Street • Port Townsend • Washington 98368L-, 3 0 g1.1ING�O 360/379-4450 • 360/379-4451 Fax http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMP ,F l r-- _--- - -- MLA# D c3 ( PROJECT/APPLICANT NAME: //iUn/t5 \.i <1 1-CN/ C eiki Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview Lej (7 ii//1 c..6=/� IAA.11' / PU/u- LI-4 L ,;A) 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. 4-0 i /-7 ail/e.---1 e- t'4 i= bevy;r k---cilz A 'S'1 kjc-t..r'_ r/l,-rvr! r-4,- tr, E. /t~vvt s -- h/(74_ .c(T c;eti A- i.- L PAO 1IJ '?74 HAP c.,>' ZirT .71-/f gisLA YA-P- (AJlr;L.- -reef/-✓1<-l- FP. t•,'( -viz:- W/ / /ice T1/k //U.:cf p Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. ' /e- LQ-7 f (-F JNA ' SG-6P/1CJC",- •7�),z4 v, i1/d,ee4 <.) 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. LCc% ✓S" Ririe-'-rqj w 'rr/ ('C'/S/iR_ f}dvo 6•• /42(.e--eei / rie eef FF/ziv'S AtUO ; iVf-✓v'�, lie C-e-1At/Git) ,412c/I t/.0 '772eer 4. Describe the existing soils. Indicate soil type on the site map. ni4i-!I' /—C mot it-( rr, " 7 met)n(t J& m 0 vi� G /4'etel cc,/ 7: -i-i l 7"o h 2 JJ Stf' S0/L 5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. Vt; r6 / Jk/ v&j LL57 44A ce 7v Y 4-rw /--or 7 / 't k ram, L,/ir7 in)S ram, Srr e-7 ,£7 R rL S',,-VAI 16.i/ iidilk ail? I )), 6. Describe any excess levels of noise generated by the( proposed use or activity: ^—� -.v A ,4 �V EJ) / /cCr L G�/�l s'.r lzv -r I�rJ "(r h�Yll e_ �4L It l�lG //v✓/s`� AP-K 5-Aiv'S / £'A/fit!-l/1d1f , e7I: ( STORMWATER PLAN OCT 1 9 2005 tLW stormwater site plan template.doc-rev.10/12/2003 Stow 1 1 a•ater , Required JEFFERS° O TY DEPT.OF CO,IA��( 1 DFIV LOPMENT SIGNATURE:/ �111►1¢[ v 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. V Sr",-)US-!-77vi AR iS 61J eIJ7l e 1,vl'/fU6- /-oT & 7-er JA c,1 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads,and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). Hip ✓�S 7J„ 5u(47- �2e j - !�✓tff`-F r✓t�('� L��U C:� 7'� wec- �4 iC: dA L( R 0 rA.57 it 'I AUG 3 0 Li; l Permanent Stormwater Control Plan CC This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate sto_rrmildtefEY trot l3MPs' _J and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual)or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. 7,,S-i- nr ✓eL orb s/t kJ/l a. f�l/1IG/ �/(17'eefe sT(sJZ1 l i4/4-rez uiASg- W/Lt, i i n L.-1 T,x,r ,+ r,,,r;v6- t'it,t/ -lu 6/4 7.az 7v s'T,e -r crc/R S'w/lGr z,rV Me' NA y Re 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"large"projects or projects that involve the potential for dispersion of contaminants.] C--4 kiries' zed! ri e r 11. Describe the performance goals and standards applicable to the project. ,fr-t e-7- 7' (Ulf'(_ e-(.:<' t?,s-e t.I/ 7,;/1 k kl- , 4/,v46L1- b(P tR<?' STozM tv13-rr 12. Describe the flow control system. b�./4/Of i fiR -i CT 1PM`'( 05 1-1/ Le 6911 6/k1. ]3 ti<>4T?) / stormwater site plan template.doc—rev.10/12/2003 6 13. Describe the water quality system. t'liLgLfC (ti/4-7/ _L= ,, r ,.;` �t.,�,, .,, SEA Ge,e 14. Describe the conveyance system analysis and design. 4-)10.14- J'vt`j 1--Ii t '{_ /Z/?/`" I?-Jlift/ .y co 3&I t--{4 P. Cl=. �f� ? i- u �'i�f'�l '':0;t% J ("it/ 15. Describe the source of fill material, physical characteristics of fill material, and deposition of excess material. Lv/i/H ; ' 7/E a.,� J.`{ -r- /1-i E c r�.r"no f ,.k' a r-? ��,. t--'� >r ;.1<.I ` }� U.<< 1 <S /`-i fi-? J.,ril1•r (�r' i-/;;.';f 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. t_zip 3 0 2005 NTY vi • 18. Describe methods for restoration of the site. _ 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included, list the Manuals here. A 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. • , afl. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements, describe those conditions or restrictions here. 1/ • `/ s �f If (`) ;1 !J _ '/,/_ 't,.j.,.1, 1 —1 f • 't , i 3 stormwater site plan template.doc—rev.10/12/2003 7 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual (beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. f<��! �.. . � .501477/ 1-6-, -?= o `' / /fie / r t 14 T'.J r ./ A 6' 4E1 2. Establish Construction Access. Z-r i.';/3< r{'� (J, Zl!j f',.f{ l /�oJ m 1�-_06./<. ()vet< 0/2, 11i1-71K: 1-ael-A Ai C/Z G T r STG P/Lr 0/-7 v/1 /(`•:'fir C��. ` �:Fr�'rr�t'L' of A /V:."C.- 3. Control Flow Rates. f y`(SA r11 ?-11-viv - GaA/ 7-p ec c r ic'/V /itc/; _ { , 4. Install Sediment Controls. AUG 3 0 -QQ5 5. Stabilize Soils. ,. {sGCllIG11{`T/_t'./ , XL, /\U:t rt,1 c„:u/L-.S I e�'�1\1 1 fUir- 6. Protect Slopes. /�. -,F-if r. 1. ��:/C.`/'JI R�/ (:'f'C' tl j,i:/.�� L G flr\It- 7. Protect Drain Inlets. " .. i slomiwater site plan template.doc-rev.10/12/2003 8 12 Required Elements-Construction SWPPP(continued) 8. Stabilize Channels and Outlets. if Yif3A C.c./ As I 4_.S 9. Control Pollutants. S•ji 171( Pr'-(rIk.SC t('' AR avc Fo 5PG/0f eiv-r fix KeC"PrAkr• A 1-1:- ( 71\1 '771(.:(P. (.1.0177J 1A-)eK ( 714 6:fi c'a•I(i) 2/.7 Po.a.Crt/IWTS / (ze , 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). . ,• , , CI-jog( f'(-) L.( k.74'Tc 11. Maintain Best Management Practices(BMPs). ,A4/1/417/1/A( /91/4 Ksxv / 12. Manage the Project. Iv) 1 IA 2(( ."' --/71R01'(-All-tCr c.eyv (,Ar f Et-C. _7-,QT74 Gi_Ct) 2. Adjacent Areas. a. Description of the adjacent areas th4t may ibe_affected by site -disturbance :e.g., streams, lakes, wetlands, residential areas, roads). 14°1' "- 1;11 nfize,s-rco l4T 7 7-/-/ _ EY:-r 7(. t1cr I (C7 e I 1' /r() b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). /V r c:ro p k„)( et\II /v1(,kr: —7/-0,,,/ (st- 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. /7-/;!-).!!: cvr: c. Rif EA4 f? -•g stormwater site plan template.doc—rev.10/12/2003 9 b. Description of special requirements for tworking in or near environmentally sensitive areas. l7-- S/%-,r t/f.- A'.'i (j Il.�� t c 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g., erodibility, settleability,permeability,depth, texture, soil structure). . Pre:f'.- </ L'IC._. //i; r•r.'.�i�/`i�f�l-/�...�/ .��\ / 'V(11I -'in �.(_y.,r/I�`f�'... t/'-�' y Ir, ..."../ t�'') {:.F...f `...C1-I I^" L ✓'/-�. 4��)�/;���V f_\ /`1 + L 7 t- / 7. 51^ 0 1 ,c/,6 s-. t"J!c /'"i< Ai! U7 /4 1 /y f � 1 J' r�9,�I/s i f l-1 l'l?07c(-7` / //, S r-,T.) p,- 5. Construction Phasing. 4. a. Construction sequence 77'6FA-1 I-c-7" tf ft'1 i!' 'j,7 JZA/1i'.j//Cr " /Zvp, //1/t1- /,1(/i�v/ �.. S '/r f, H J.r f2- -1;_-f ,f, f -1?-APE. 15--4 a t .4• b. Construction phasing(if proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). Provide a proposed construction schedule. II. Wet Season Construction Activities. a. Proposed wet season construction activities. / { p6k/LlAu'NJ?" .5r Ui J( rt)/1 1:i• ITV Pi-f-lC ,, b. Proposed wet season construction activities for environmentally sensitive areas. 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. `rf b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts y r " 8. Engineering Calculations. Provide Design Calculations on a S@p?ratP,Stieat fnr the following, if applicable. a. Sediment Ponds/Traps. J',(/1_..�i b. Diversions. `� : c. Waterways. f"1 , ;I d. Runoff/Stormwater Detention Calculations i.;'; Ur,' , f 200Cj ( stormwater site plan template.doc—rev.10/12/2003 10 Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes, and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities, flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. (LANDOWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: stormwater site plan template.doe—rev 10/12/2003 12 , , -_M Johnson FAX N0. :3603796950 Oct. 17 2005 07:41AN P2 �t. �-- fRA/AJ4Gr f / --cr._—/,l� 14,s-e4 .T 4.. -10ttA� .�'r�N�.a -z-- 1°L z fA21-A 3, f 1-lrr /7 wyice/.e'2 9/�y�aS .4D A k4s's , co Wl/ /-t a £.41/ \'', x. A -. o SAT. °A 81" 05 .ne 5 'FgRS S$. tit.(i() 3$5-1Z47 MIXED as ear -REVISED s 'L as 0056e/ : dated , .Og -�.—,— Has been APPROVED .0 /lm" byJ F HRS•0 C .UN fi r.of •• _ ifibit - siGNA . .• all Ait. d ..� �" I!�' .W -10 Stormwater „&:, t� ,_ Q ,, Required o; a t I f OCT 17 2005 ; �, oc a "_-_ : 1 ypl _ . - Lh ?0--p ,Qt \ 1; ild r te c L, 6- �ii...„ I� $e --air �''' ,./...„ E,,L.., Fmrri,V(T , 96 a Ir " 1 ., y 1 p -, jft - M- 0 ) 8 R fc, , 57b M r-i w a/SrEkSAL . _ . _. roA RoaF '" IUD SThieN bis i�6 Q fiki �,- ?N-4Ti :Na 015_ri ..• - • -