Loading...
HomeMy WebLinkAboutBLD2005-00570 • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00570 Received Date 08/31/2005 SITE ADDRESS: 850 TALA SHORE DR Issue Date 01/31/2006 PORT LUDLOW, 98365 APPLICANT: GARY F GREENE PHONE: BETTY R GREENE 2442 NW MARKET ST# 166 SEATTLE WA 981074137 SUBDIVISION: Block: Lot: T 6+ PARCEL NUMBER: 821151005 Section: 15 Township: 28 N Range: 01 E CONTRACTOR: PROJECT DESCRIPTION: FOOT BRIDGE CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: Footing: Foundation: Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : Sheathing: Framing: Plumbing: Propane Tank/ Lines: Insulation: Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: (//,4t PC:// HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • SPECIAL CONDITIONS FOR CASE # BLD05-00570 1.) A vegetative buffer of 50-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 2.) A Geotechnical Report dated November 18, 2002 prepared by Northwestern Territories, Inc. was submitted in conjunction with this application. The report addressed the stability of the geologic hazard area. A setback of 50-feet shall be measured perpendicularly from the top bank to any structure. 3.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 4.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 5.) All construction activities shall not encroach upon the stream & landslide hazard area buffers. This includes the storage or preparation of materials. 6.) The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator. 7.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 8.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 9.) The identified Fish and Wildlife Habitat Area (Type 5 Stream), shall maintain a vegetative buffer setback of 10 feet from OWHM to the proposed detached garage and single family residence with a 5 foot building setback adjoining and a 40 foot setback from the driveway to the OHWM.. 10.) A permanent physical separation along the boundary of the stream buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator. 11.) Stream buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall be in place prior to and during construction activities. The signs shall contain the following statement: "Buffer - Do Not Remove or Alter Existing Vegetation." 12.) The applicant shall fully adhere to all conditions and requirements of the eagle habitat management plan signed by WDFW on January 6, 2006 and signed by applicant on January 10, 2006. • • 13.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 14.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 15.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 16.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 17.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 18.) An engineered Drainage, Erosion, and Sediment Control Plan dated August 2005 has been prepared by Northwestern Territories, Inc. and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 19.) A Hydraulic Project Approval (HPA), Control No. 102795-1 was approved on September 1, 2005. Project work may commence on September 6, 2005 and shall be completed by November 15, 2006. Proponent/contractor shall adhere to all conditions of said HPA. 20.) In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval. 21.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. • • 22.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 23.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 24.) The building height is not to exceed 35 feet. 25.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 26.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 27.) Minimum setback from Tala Shore Drive right-of-way shall be 20-feet. Minimum side yard setbacks shall be 5 feet. Minimum setback from the top of the shoreline bluff shall be 50 feet. Minimum setback from OWHM to residence and detached garage shall be 10 feet with an additional 5 foot building setback adjoining and a 40 foot setback from the driveway to OWHM. 28.) The building setback from the bluff to the house should be at least 50- feet in order to provide an adequate setback for the proposed home for at least the economic life of the sturcture. 29.) Bare soils are subject to erosion, thus ground cover should be encouraged and maitained. Native vegetation that requires little or no irrigation would be most benefical. Also, the existing established trees and brush on the bluff provide stabilization to the bluff and should be left in a relatively natural state. Selective thinning and pruning can be utilized to improve the view. 30.) Heavy irrigation or other activities that would contribute large quantities of water to the soil should be avoided. One cause of landslides is the presence of excessive groundwater in the soil near the bluff. 31.) Runoff from roofs and other hard surfaces such as driveways and patios should be controlled and routed to the beach via tightline or into the stream through a time release system. These options are preferred rather than infiltration, which may cause destabilization of the bluff. Surface water dischage or sedimentation to adjacent properties should not be significantly higher than pre-development conditions. 32.) Septic drainfields should not be constructed between the house and the bluff. 33.) All drainage control devices should be maintained in good working order and inspected at least once a year. 34.) Silt fences or other acceptable sediment control devices may need to be utilized in order to prevent sedimentation to adjacent properties during construction. 35.) TO ENSURE THAT THE PROVISIONS OF THE EROSION AND SEDIMENT CONTROL PLAN ARE FOLLOWED DURING CONSTRUCTION, THE COMPLETE TEXT OF SAID PLAN SHALL BE INCLUDED IN THE CONSTRUCTION PLANS FOR THE PROJECT AND KEPT ON SITE AND MADE AVAILABLE TO THE CONTRACTOR AND APPROPRIATE SUBCONTRACTORS. • 36.) THE FOLLOWING BMP'S SHALL BE IMPLEMENTED IN ADDITION TO ANY THA T MAY LATER BE NECESSARY DUE TO CHANING AND UNFORESEEN SITE CONDITIONS: A. INSTALL STRAW BALE CHECK DAMS AND SILT FENCING PER THE EROSION CONTROL MAP AT THE BEGINNING OF SAID DRAINAGE PLAN. REMOVE THE DAMS, SILT FENCING, AND ANY ENTRAPPED SILTS AFTER THE EXPOSED SOILS ON THESITE ARE COVERED WITH VEGETATION AND/OR GRAVELS. B. CONSTRUCT STORMWATER CONVEYANCE FACILITIES PER THE PLANS AT THE END OF SAID DRAINAGE PLAN. C. OTHER APPROPRIATE BMP'S SUCH AS LIMITATIONS ON ACCESS ROUTES, MINIMIZATION OF SOIL DISTURBING ACTIVITIES, ETC. AS DESCRIBED IN SAID DRAINAGE PLAN SHALL BE IMPLEMENTED IF NECESSARY TO ACCOMPLISH THE OBJECTIVES OF SAID DRAINAGE PLAN. IT IS EXPECTED THAT MINOR ADJUSTMENTS, ESPECIALLY THE INSTALLATION OF ADDITIONAL BMP'S WHERE AN UNEXPECTED NEED ARISES, MAY BE NECESSARY DURING THE CONSTRUCTION PHASE OF THE PROJECT. REFER TO SECTION V.B. "Stabilization and Sediment Trapping" OF SAID DRAINAGE PLAN FOR ADDITIONAL BMP'S THAT MAY BE INCORPORATED AS PART OF THE DRAINAGE PLAN. 37.) CLEARING, GRUBBING, GRADING AND SIMILAR OPERATIONS SHALL NOT BEGIN UNTIL THE APPROPRIATE LIMITS ARE STAKED IN THE FIELD. THIS INCLUDES DELINEATING CLEARING LIMITS; PROPERTY LINES, EASEMENT LINES, STREAM BUFFERS, AND SIMILAR BOUNDARIES. ONCE THESE STAKES ARE SET, CARE SHALL BE TAKEN THAT THE STAKES ARE NOT DISTURBED. 38.) NO FLOWS OR DEPOSITS FROM EXPOSED OR DISTURBED SOILS ARE TO LEAVE THE PROJECT SITE. AS SOON AS UNEXPECTED THREATS TO ADJACENT PROPERTIES BECOMES APPARENT, SUFFICIENT MEASURES SHALL BE TAKEN TO EITHER ELIMINATE THE SOURCE OF THE THREAT OR TO PROVIDE AN ADEQUATE LEVEL OF DEFENCE AGAINST THE THREAT. 39.) NO SOILS SHALL BE EXPOSED, OR GRADING OPERATIONS PERFORMED, UNTIL ALL OF THE REQUIRED BMP'S IN THE DRAINAGE PATH BELOW THE AREA TO BE EXPOSED HAVE BEEN COMPLETED. CLEARING, GRUBBING, AND GRADING OPERATIONS NECESSARY FOR THE CONSTRUCTION OF THE BMP'S ARE EXPECTED FROM THIS REQUIREMENT. 40.) IT IS CRITICAL THAT THE SLOPES OF DITCHES, BERMS, PONDS, AND SIMILAR STRUCTURAL ITEMS BE STABILIZED. THESE SLOPES WILL NOT ONLY SHED AS MUCH SILT AS ANY OTHER EXPOSED SLOPE, BUT THEIR EROSION COULD CAUSE THE FAILURE OF THE STRUCTURAL BMP. 41.) AFTER CUT OR FILL SLOPES ARE COVERED, THEY SHOULD BE MONITORED TO ENSURE THAT THE COVERING IS FUNCTIONING AS INTENDED AND THAT RILLS ARE NOT FORMING UNDER OR THROUGH THE COVERING, • 42.) UNDERGROUND UTILITY CONSTRUCTION SHALL PRO CEED SUBJECT TO THE FOLLOWING CRITERIA: A. A MAJOR SOURCE OF POTENTIALLY CONTAMINATED FLOWS IS FROM PUMPING OR OTHERWISE DEWATERING TRENCHES. FOR THIS REASON, FLOWS DISCHARGED FROM PUMPING OR OTHER METHOD OF TRENCH DEWATER SHALL BE CLOSELY MONITORED AND, EXCEPT WHERE THERE IS NO VISIBLE TURBIDITY, TREATED AS DESCRIBED IN THE DRAINAGE PLAN UNDER SECTION TITLED "DEWATERING CONSTRUCTION SITES". B. WHERE FEASIBLE, NO MORE THAN 500 FEET OF TRENCH SHALL BE OPENED AT ONE TIME. C. WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS, STOCKPILES OF EXCAVATED SOILS SHALL BE PLACED ON THE UPHILL SIDE OF THE TENCH. ANY SUCH STOCKPILES SHALL BE PROTECTED FROM EROSION AS PROVIDED IN SAID DRAINAGE PLAN. D. TRENCHES SHALL BE BACKFILLED AND REVEGETATED AS SOON AS REASONABLY POSSIBLE FOLLOWING PLACEMENT OF UTILITIES. WHEREVER TRENCHES RUN MORE OR LESS STRAIGHT UP AND DOWN A SLOPE, EITHER THE BACKFILL SHALL BE MOUNDED OVER THE TRENCH OR WATERBARS OR SIMILAR BMP'S SHALL BE UTILIZED AS NECESSARY TO PREVENT THE BACKFILLED TRENCH FROM BECOMING A WATER COURSE. SIMPLY COVERING THE EXPOSED SOIL MAY NOT PREVENT THE TRENCH FROM CONVEYING WATERS. E. WHERE THE UPSTREAM END OF A PIPE IS SUBJECT TO INUNDATION, IT SHALL BE TMEPORARILY CAPPED OR PLUGGED AT THE END OF EACH DAY'S WORK TO PREVENT SOIL FROM BEING WASHING INTO THE PIPE. F. THE UNDERGROUND UTILITY LOCATE SERVICE, 1-800-424-5555, SHALL BE CALLED A MINIMUM OF 48 HOURS (2 WORKING DAYS) PRIOR TO BEGINNING ANY EXCAVATION AND ARRAGEMENTS MADE TO HAVE ALL BURIED UTILITIES MARKED. 43.) TO PREVENT SOIL BEING TRACKED ONTO PAVED ROADS, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY IF THERE IS EVIDENCE OF ANY SIGNIFICANT ACCUMULATION OF SOIL. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. WASHING OF THE STREET SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. WHEREVER CONSTURCITON, DELIVERY, AND SIMILAR VEHICLES ENTER PAVED ROADS FROM THIS PROJECT, THE FOLLOWING PROVISIONS SHALL BE FOLLOWIED TO MINIMIZE THE TRANSPORT OF SOIL ONTO THE PAVED ROAD. A. DURING PERIODS OF DRY WEATHER ( WEHRE: THE SOIL IS TOO DRY TO ADHERE TO THE TIRES OF CONSTRUCTION VEHICLES) CONSTRUCTION EHICLES MAY ACCESS PAVED STREETS DIRECTLY FROM THE PROJECT SITE WITH MINITORING AND OCCASIONAL SWEPING OF THE PAVED STREET A SNECESSARY TO PREVENT ACCUMULATIONS OF SOIL. B. DURING PERIODS OF WET WEATHER (WHERE SOIL READILY ADHERES TO THE TIRES OF VEHICLES) THE VEHICLES MAY ACCESS GRAVELED ROADS DIRECTLY FROM THE PRJECT SITE AS NECESSARY, SUT SHALL NOT ACCESS PAVED ROADS WITHOUT FIRST HAVING BEEN ROUTED OVER AREAS WHERE EXISTING GRASS OR OTHER VEGETSTION REMAINS OR ROUTED DOWN A MINIMUM OF 150 FEET OF GRAVELLED ROAD. ACCESS ROUTES OVER GRASS OR OTHER VEGETATION SHALL BE CHANGED OCCASIONALLY TO ENSURE THAT WHEEL RUTS ARE NOT ALLOWED TO DEVELOP AND THAT THE VEGETATION IS NOT UNDULY WORN DOWN. OWNER BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the respLbiillitt of the General Contractor for the proposed project. Signature: 4' / `J t r4 Date: W g U/0 C- GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX: ( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: X New X Wood Existing: Sewer ❑ Addition X Steel Proposed: Bank Community System ❑ Alteration/Remodel X Concrete Total: ;l Height:/ Individual System ❑ Repair 1 Masonry € i) SEP Permit# ❑ Demolition I Other: Bedrooms: Water Supply: Existing: Setback: 1 Private well 1 Two Party Type of Heat: Proposed: 1 Public Vi Total:;, L, Name of System: If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants, employees, etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: i Underground Tank i Above ground Tank Size of Propane Tank: i Heat Stove i Cook Stove i Woodstove I Fireplace Insert i Hot Water Tank i Pellet Stove I Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines, buildings and septic system components, including the reserve area. Square Footage For Office Use Only Current Proposed Amount Main Floor Consistency Review: 2""Floor — Base fee: 2.51. .25. 3fd Floor 7 . Addition I Section: Mezzanine: Ron,CIS ck fee: 1 \ (63 .31 � Heated Basement 'f AU0 3 1 2005 St I e St charge fee: `� I Unheated Basement _Ed Wat Review fee: .1FFF;HSON COUNT` Other Unheated DEPT.OF COMMUNITY-DEVt_td111l ` proach fee: Garage/Carport TOTAL: $ 44q Decks r./ Receipt Number: ,�O i Other Cash/Check Number: , C," ESTIMATED COST(REQUIRED) Date: �> .Fair market value of all labor and materials foundation to finish 'a/US 0 /5,0 00 Initials: C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc •' •SON • ;��' '� �_-.....1'��`�� Y ,��4' cb� JEFFERSON COUNTY r ,��, DEPARTMENT OF COMMUNITY DEVELOPMENT�` '4 621 Sheridan Street • Port Townsend • Washington 98368 AUGA 1 1{'�; „) 360/379 4450 •• 360/379 4451 Fax .q�,iliN��p www.co.Jefferson.wa.us/commdevelopment � SON COUNTYDCL) Master Permit Application MLA: �S _' •7U0"1S-2 6 Project De cription(include separate sheets as necessary): cons• - c+ Fooi Br5 d( .10 L0foec-� prince-7 cy res,dore cud Gc rc„t e A• iOL/ Tax Parcel Property Number: g a i l 5 I C v5 c ps.d 5 tiI5 I OO 6 Size: (acres/square feet) Site Address and/or Directions to Property: 'SO Tc4IcA, Shure Drive Pot+ 1-tJ diow (NA Property Owner(s)of Record: (1Ct J"7 G re ej e Telephone: -lot; -7�j Y- a-79 y ` Fax: email: Fc c QJ1 e (G I)h)trl\i.'l P* Mailing Address: .2ytf. . ti(AI Mur ilk'l- Sf1E( , Sec,14iE I,vA (18p1 Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) Building Variance(Minor,Major or Reasonable Economic Use) u Demolition Permit r -- - CoriditTonal IJ�se[C(a),C(d),or CI** Li Single Family ( `,p Discretionary"D"or Unnamed Use Classification ❑ Garage Attached/Detached ------ --LC-Special Use( ssential Public Facilities)** u Manufactured Home i u Boundary Lin Adjustment I Modular I, Ll ❑ Short Plat** I Commercial* AUG 3 1 21( indin8 Site an** Change of Use , u Long plat** Address i Road Approac ❑ Planneld Rura Residential Development(PRRD)/Amendments** Propane ,JEFFEHSON cot9N!t Vacation/ Iteration** I Allowed"Yes"Use Consistency Analysis a er Pro gam ** Stormwater Management DEPT. OF COIv1MUNITY DEAIP JPhP Pinta gam Exemption/Permit Revisions agement Substantial Development** I Site Plan Approval Advance Determination(SPAAD)* I Shoreline Management Variance Temporary Use , Comprehensive Plan/UDC/Land Use District Map Amendment I Wireless Telecommunication* I Jefferson County Shoreline Master Program Amendment Forest Practices Act/Release of Six-Year Moratorium *May require a Pre-Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. r Signature: f s 7 / �Ir-JZQ/1'.de-_ Date: /3o/oG The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-tran e ble responAktfor ering to and complying with the ESA. The Applicant has read this disci imer,and ns and dates it below. Signature: i � G�• 1/t Date: C:\Documents and Settings\mocha\Desktop\Master Permit Application 7-8-04.doc •UILDING PERMIT APPLICAAN MRLA05 0eview 0pe526 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00570 Received Date: 8/31/2005 SITE ADDRESS: 850 TALA SHORE DR PORT LUDLOW, 98365 OWNER: GARY F GREENE PHONE: BETTY R GREENE 2442 NW MARKET ST# 166 SEATTLE WA 981074137 SUBDIVISION: Block: Lot: PARCEL NUMBER: 821151005 Section: 15 Township: 28 N Range: 01 E CONTRACTOR: PHONE: PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI FOOT BRIDGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 15,000.00 ADD'L: HEAT TYPE: UH CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: # OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: BEDROOMS: BATHROOMS: Exist: Exist: Prop: Prop: Total: Total: Routing Date: Type Amount Paid By: Date: Receipt: •p I y=t Permit $251.25 SLE 08/31/05 76608 JAN31 Plan Check $163.31 SLE 08/31/05 76608 2006 State Building Code $4.50 SLE 08/31/05 76608 Jefferson County Plannwu Total: $419.06 & Build3--neN inggDeepartmen O1- d 1• • • 44.) REMOVAL OF TEMPORARY BMP'S TEMPORARY EROSION CONTROL FACILITIES SHALL BE PROMPTLY REMOVED ONCE THEIR PRESENCE IS NO LONGER REQUIRED (WITHIN 60 DAYS). DURING THEIR REMOVAL, ANY ENTRAPPED SEDIMENT SHALL BE DISPOSED OF IN SUITABLE LOCATIONS ON THE PRJECT SITE WHERE THEY WILL NOT BE SUBJECT OT EROSION. DISTURBED AREAS LEFT AFTER THE REMOVAL OF SEDIMENTS SHALL BE PROMPTLY STABILIZED. AS AN ALTERNATE TO THE REMOVAL OF ENTRAPPED SEDIMENTS, THEY MAY BE STABILIZED IN PLACE BY THE APPLCIATION OF SUITABLE BMP'S SUCH AS SODDING, MULCHING, SEEDING, ETC. IN NO CASE SHALL SEDIMENTS BE LEFT IN A CHANNEL OR WHERE THEY WOULD BE WASHED INTO RECEIVING WATERS BY THE NEXT STORM. 45.) CONTROL OF POLLUTANTS OTHER THAN SEDIMENT NO TOXIC OR NOXIOUS SUBSTANCES SHALL BE USED, STORED OR DISPOSED OF ON OR OFF THE PROJECT SITE IN CONJUNCTION WITH THE PROJECT EXCEPT IN FULL COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS AND THE RECOMMENDATIONS OF THE SUPPLIER OF THE SUBSTANCE. THE PROJECT LABEL OR INSTRUCTIONS FOR USE AD THE MATERIAL SAFETY DATA SHEETS (MSDS) FOR SUCH PRODECTS SHALL BE KEPT ON THE SITE UNTIL THE PRODUCT HAS BEEN USED UP OR REMOVED FROM THE SITE AND PROPERTLY DISPOSED OF. WHILE NOT COMMONLY THOUGHT OF AS A HAZARDOUS MATERIAL, COMMON FERTILIZER CAN BE VERY DAMAGING IF ALLOWE:D TO ENTER RECEIVING WATERS. FERTILIZERS SHALL ONLY BE USED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE SUPPLIER AND ANY CONCENTRATIONS SUCH AS DRIBBLES OR LEAKS SHALL BE CLEANED UP. IN THE EVENT OF A SPILL OR OTHER UNUSUAL EVENT INVOLVING TOXIC OR HAZARDOUS MATERIALS, WORK IN THE VICINITY SHALL BE IMMEDIATELY STOPPED AND THE FOLLOWING AGENCIES NOTIFIED: WASHINGTON STATE DEPARTMENT OF ECOLOGY, (206) 459-6000 DURING NORMAL BUSINESS HOURS OR (206) 753-2353 AFTER HOURS. 46.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN LETTER FROM NORTHWESTERN TERITORIES, INC. STATING THAT THE STORMWATER FACILITY HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE "DRAINAGE, EROSION, AND SEDIMENT CONTROL PLAN DATED AUGUST 2005. 47.) Proponent shall comply with the planting requirements of the Habitat Management Plan prepared by Amy Lietman of Marine Sueveys &Assessments. A written letter from Ms. Lietman is required prior to final buidling occupancy to verify compliance of the Habitat Management Plan. 48.) Residential developers and individual builders shall be required to preserve shoreline vegetation and reduce the associated risk of erosion daring construction and any future activity which may impact the stability of the shoreline. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 "' 850 TALA SHORES DR. BLD05-570 GREENE Approvals Req'd Prior to Final Inspection SEP RAP ZON SIPZ • DPW C,{L OHO- - T NUMBER SPECIES O14METER 1 HEMLOCK 10-INCH ON TOP OF 48-INCH CEDAR STUMP 2 WHITE FlR 26-INCH 3 HEMLOCK 72-INCH 4 WHITE FIR 8-INCH 5 WHITE FIR 36-INCH 6 HEMLOCK 34-INCH 7 HEMLOCK 24-INCH 8 HEMLOCK 10-INCH 9 HEMLOCK 24-INCH 10 CEDAR 48-INCH 11 HEMLOCK 16-INCH 12 HEMLOCK 14-INCH 13 HEMLOCK 14-INCH 14 ALDER 30-INCH 15 HEMLOCK 10-INCH 16 A44PLE 24-INCH 17 ALDER 26-INCH 18 MAPLE 30-INCH 19 HEMLOCK 36-INCH 20 HEMLOCK 12-INCH 21 HEMLOCK 24-INCH 22 HEMLOCK 10-INCH 23 CEDAR 24-INCH 24 WHITE nR 18-INCH 25 FIR 14-INCH 26 CEDAR 8-INCH 27 CEDAR 9-INCH 28 WHITE FIR 20-INCH 29 WHITE FIR 20-INCH 30 WHITE FlR 18-INCH 31 WHITE FIR 18-INCH 32 WHITE F7R 16-INCH 33 FIR 36-INCH 34 CEDAR 26-INCH 35 RR 22-INCH 36 HEMLOCK 22-INCH 37 FIR 22-INCH 38 CEDAR 37-INCH SEE A7.6 RAISE GRADE, TYP. ------------- IIIL T.O. BRIDGE HOUSE ..ire REVISED Sff L, Hubam • . 1 ..- _ 6FJMTERS �►, • RESIDENCE 8 5 0 TALA SHORE DR PORT LUDLOW , WA 98365 3 SITE SECTION: PROPOSED SCALE: 1/16' = 1'-0" # SID 05-057 arsigSDW tom DCD FINNE ARCHITECTS am 2 1 7 PINE STREET 12TH FLOOR PENTHOUSE SEATTLE, WA 98101-1520 klixi, TELEPHONE 206 / 467 - 2880 FACSIMILE 206 / 467 - 2882 SITE SECTION: PROPOSED E M A I L �s@FINNE.com II, I- SCALE: 1/16" = 1'-O" ' SEE RELATED DOCUMENTS: i 1. DRAINAGE, EROSION AND SEDIMENT CONTROL PLAN r 2. SEPTIC DESIGN i i NOTE: FOR ALL SEPTIC SYSTEM PIPING, TANK AND AC¢ - ! BY --C _ / WOgO % i CREATIVE DESIGN SOLUTIONS. INSTALLATION DETAILS �_ SEE SEPTIC DESIGN DRAWINGS ------ �- 7` r-� --- SD A i 6t f / 7.03 ! 1 S89`31 34 x �0.59. �- t \ \ PROPERTY LINE 0e 7 35 .5� ! 4 i „ _ �, 22 �~� 'f �.. --z �_:�,.� NOTE: \/ / — PROPOSED HOUSE DEMENSIONS ARE TO -� �`? " s P D NEW TREES, TYP. CORNER OF CONCRETE 37 DIG �� 9'9 ;_Q... a I , Y t i 35 J6 XI �� �� �� T.� WALL i i j I `" AO . i h 34 i / \ + \ BENCH MARK / `. .` '• E 490'-4" 19 f I I 4_ 1 ' I' Lot `[ SEE NOTE 3 - WATE WEIR LINES TO E / SEPTIC TANK AND SEWAGE PUMP 12"X12" CATCH BASIN WITH 8 _ _ _ ---- \' (I . h, ! CROS AM 0 90' /' X WP % PER SEPTIC DESIGN DOCUMENTS 1'F HDPE OR CUP PIPE UNDER \ - ------}^' I (SEE ON SHEET 5 g / ' O �'YVEtL— ! I (VERIFY�OCATION IN F{ELD) !� DRIVEWAY TO , ! SEWN \ y LI OF S DESIGN DWG'S) /\,�y -J F ! _ - - - - - - - - - - - TIGHTLINE PER, ER10N AND 1 ;yj f`\ If` 16 •v - SEDIMENT COJiTROI PLAN \ 5 y 4 1M I 0.\ r V \j Ld•p ' i ,4 IiT�FIV i 1 1 1� 4" T3E�ORATED PIPE UNDER E4�87'-6" / 7 ) 4' PERF T WALL, TIGHTIJNE TO DRAIN LINE \ / '� A7.5 � / � �'; 7 FOUNDATI � , ^M_ !! / UNDER DRIVEWAY R \ r:• , TS�O� 3 V � ��VEL D IVEWAY ACID F O (,� H ftOW\' 1 DRAIN , AgKING REA _ a 1 , APPROXIMATE LOCATION OF \ Q,- �EE^487''- SEPTIC FIELD \ \ J � ����� � -- T• 1'�L" — � 10'. , NOTE: 10 �:0 k� ;' Hood Canal SEE SEPTIC DESIGN DOCUMENTS \ // FOR FINAL LAYOUT \ \ 4 \' 7 y - _ /l : ��� A9� i 4 i APPROXIMATE FIE32 EDGE OF ROAD I! !! / SEPTIC FI LD / // 3 1 DARK LINES INDICATE NEW/REVISED / 7 / TOPOGRAPHY. TYP. MRIFY ; /// ?2 HOUS ;i �IGHT LINE STORM WATER TO DASHED LINES INDICATE EXISTING _ ' g ION FIELD K j_ _ _ ` _ k , k3� r s • p % �l . / BEACH PER DRAINAGE, EROSION i \ TOPOGRAPHY TO BE CHANGED, TYP. I 2 Cam. ° ; AND SEDIMENT CONTROL PLAN Lot -CH 0(2A1 TI r 0 SHE FLOM[s' TIE ATER SEPTIC TANK AND PUMP CHAgE-RSA - \ ATER SY E It •� - INS TO STORM / �7-------�- ( y_ t y Y/% YSTEM PER DRAINAGE, ;' i � �. i 30 ! ! i - DESI DOCUMENTS YERI�LOCATION ) - f/ ,�� � / � #L �486'-0 ,F, _ �� AND SEDIMENT jai--������ 1 9 , l% Lc CREATE SLOPE AWAY FROM G E SLAB fY - j D� ; ' \1� I 2 _ \ �% �� OU PLAN! WP1 \•� /� / PROPANE TAON CONCRETE P D (VERI LOCATION IN FIELD) A ��$ i \ ��- /� �� �� �4`0• ' ' // GARAGE �Lv � �' SETBAfX= 155'-5 \ \ ! ;z � �; / L---------------- SETBACK= 209'-8" _ '11 148 / :/ OF 27 �O ! PEDESTAL j / 1 2g BATALITE DISH (VERIFY LOCATION) 100' S! \ \ ( i "\ \ ( Y — PROPOSED NEW TREES, TYP. fTBgCK / y,i 0 i'- ) CO C Ali , / j 5p S�egcK N89'34" \ 36 .24 \ `V , I-D TY LINE nN _ y 0 10, 20' 30' 40' \ ,, j CARPORT -PVC I 1 BLDG IDE CK - � FRAME AND SHED 7t / S I ( I FTORMG D EE12-1 CH CUP —(- PLASTIC TARP / // 0 5' I 4tFOOT X 4-FOOT - = 79.97 -- ERXCEEDYHEI�GHAE TO I EL CTRIC TRANSFORMER ADJACEMY GRADt: - / 12"X12" CATCH BASIN WITH 8" HDPE OR ( GRAVEL DRIVEWAY I HAS 4L WHERE ROCKE IS- - - _ - ( CMP PIPE AROUND GARAGE SLAB_TO STORM - - - - - - f T �—50" ABOVE GRADE, TYP Q , / Lot 1 \\ SEWER SYSTEM TIGHTLINE PER, EROSION ANIT t ____ _____-_________!' ( "x x x" INDICATES GU DRAIL 3 SEDIMENT CONTROL PLAN J STONE ROCKERY RETAINING TO BE INSTALLED, WALL, TYP. SEE DETAIL 4/A1.1 NOT TIED 2�-0- T.O. ROCKERY TO FOLLOW (II \ ADJA CE FOR FIAT BACKSLOPE, SURFACE SHOULD BE IMPERVIOUS & SLOPED TO DRAIN MIN 16) T ROCKERY NOTES: O 2 -FREE-DRAINING BACKFILL (MAX 5%< FINES) 1. ROCKERIES 4' AND OVER IN HEIGHT REQUIRE A BUILDING PERMIT. MIN 8" WIDE LAYER OF 2"-4' QUARRY b SPALLS ADJACENT TO ROCKERY 2. FOR ROCKERIES BETWEEN 4' AND 6' HIGH, THE INSTALLER OR CONTRACTOR SWILL PROVIDE SEE NOTES 1-3 - �\ `STABLE A LETTER TO THE BUILDING INSPECTOR PRIOR TO FINAL INSPECTION CERTIFYING THAT THE HAVE BEEN PREPARED WITH THESE STANDARDS. FOR PERMIT & CUT FACE IN NATIVE SUBGRADE AND DRAINAGE IN ACCORDANCE CERTIFICATION REQUIREMENTS. - II ICI =! MATERIAL (SEE NOTE 7). 3. ROCKERIES 6' AND OVER IN HEIGHT REQUIRE ENGINEERING SUPERVISION BY SPECIAL INSPECTOR (UBC 3066), WHICH AT MINIMUM SHALL CONSIST Of INSPECTION AND WRITTEN 1" (OR LESS) DIAMETER WASHED GRAVEL MIN 6" COVER OVER PIPE; MIN 2" CERTIFICATION OF SUBGRADE, PLACEMENT OF BASE COURSE AND DRAINAGE, AND FINISHED ROCKERY. II`II=II=II=!I GRAVEL UNDER PIPE, „, "'" E5 1-11=11=11=11- MIN 4' DAM. PERF. PIPE; MIN 1% 4. ROCK SHALL BE SOUND AND HAVE MINIMUM DENSITY OF 160 POUNDS PER CUBIC FOOT. CONTINUOUS SLOPE TO OUTLET; PIPE 5. THE LONG DIMENSION OF ALL ROCKS SWVl BE PLACED PERPENDICULAR TO THE WALL. MIN 12-�� &/OR CUT FACE LINED WITH FILTER FABRIC (MIRAFI OR EQUIVALENT). EACH ROCK SHOULD BEAR ON TWO ROCKS IN THE TIER BELOW. FIRM, UNDISTURBED SOIL PLACEMENT OF ADJACENT STRUCTURES 1. IMPROVED WALKING SURFACES ABOVE AND ADJACENT TO ROCKERIES OVER 30' IN HEIGHT SHALL BE PROTECTED BY A GUARDRAIL CONFORMING TO UBC 1711. NO ROADWAYS OR PARKING LOTS IN THIS AREA ^ _ 2. ROCKERIES ARE EROSION -CONTROL STRUCTURES, NOT RETAINING WALLS. NATIVE MATERIAL - - - MUST BE STABLE AND FREE -STAND IN CUT FACE. 3. ANY DEVIATION IN DESIGN OR IN PLACEMENT OF ADJACENT STRUCTURES MUST BE SUBMITTED .fill III-f(- WITH THE SEAL OF A CIVIL ENGINEER CURRENTLY LICENSED IN THE STATE OF WASHINGTON. rL NO FOOTINGS OF STRUCTURES (INCLUDING OTHER ROCKERIES) !'- MAY BEAR IN STIPPLED AREA 4 TYPICAL ROCKERY DETAIL SCALE: NTS RAISE GRADE, TYP. ROCKERY RETAINING WALL, TYP. GARAGE SLAB T.O. SLAB +486'-00" II �Inl I I I swaLE CREEK TELEPHONE TELEPHON ❑ / _ _ — _ — _ 4.6-FOOT X 4.6-FOOT / POWER VAULT NO. 634058-155363 ORDINARY HIGH WATER NARK Lot 4 ,/ 10'-0- STREAM BUFFER (EACH SIDE, / MEASURED HORIZONTALLY FROM WATER LINE TO CROSS SEWER LINE 0 90' ADDITIONAL STREAM 7� N T /EDORDINARY HIGH WATER MARK) PER � (SEE SHEET 1 OF SEPTIC DESIGN DWG'S) BUFFER AREA /' % - - - �� SEPTIC SPAAD APPROVAL j' -- ADDITIONAL 5'-00 7 DRAIN LINE PER � � \ /-"�-��- BUILDING SETBACK NOTE: DRAINAGE, EROSION AND ---- --__ ____ _ ' FROM BUFFER USE i SEDIMENT CONTROL PLAN `�- \��- CULVERT OUTLET LOCATIO IN FlEI j�00' SFT GRAVa DRIVEWA4' FL EL NOT TIED CARPORT HOUSE 10. 77.07 CHH_ ADJACENT HOUSES' SETBACKS �1 09.20.07 CHH SETBACK / HOUSE LOCATION NUMBER DATE BY DESCRIPTION OF REVISIONS CONSTRUCTION SET 4112 REGISTERED ARCHITECT NIL' C. 'I NNE STATE OF WASHINGTON SITE PLAN NT LOUSE X = TREES TO BE REMOVED —S = SEWER LINE ---------------`--------�'------- ! VI- =WATERLINE I N JOB GREENE ,I SITE PLAN DATE JUNE 15, 2007 -SCALE: 1/16" = 1'-O" SCALE 1/16" = 1'-0" NT LOUSE X = TREES TO BE REMOVED —S = SEWER LINE ---------------`--------�'------- ! VI- =WATERLINE I N JOB GREENE ,I SITE PLAN DATE JUNE 15, 2007 -SCALE: 1/16" = 1'-O" SCALE 1/16" = 1'-0"